E-CFR

US Electronic Code of Federal Regulations Reading Aid

Title 46—Shipping–Volume 4

Last updated on December 2nd, 2023 at 07:13 pm

Contents hide

Title 46—Shipping–Volume 4


Part


chapter i—Coast Guard, Department of Homeland Security (Continued)

90

CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED)

SUBCHAPTER I—CARGO AND MISCELLANEOUS VESSELS

PART 90—GENERAL PROVISIONS


Authority:46 U.S.C. 2103, 3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277, sec. 1–105; Department of Homeland Security Delegation No. 0170.1(II)(92)(a), (92)(b).



Source:CGFR 65–50, 30 FR 16970, Dec. 30, 1965, unless otherwise noted.

Subpart 90.01—Authority and Purpose

§ 90.01-1 Purpose of regulations.

The purpose of the regulations in this subchapter is to set forth uniform minimum requirements for cargo and miscellaneous vessels, as listed in Column 5 of table 90.05–1(a). The regulations in this subchapter (parts 90, 91, 92, 93, 95, 96, 97, 98, and 105) have preemptive effect over State or local regulation within the same fields.


[CGD 95–028, 62 FR 51205, Sept. 30, 1997, as amended by USCG–2012–0196, 81 FR 48261, July 22, 2016]


§ 90.01-7 Right of appeal.

Any person directly affected by a decision or action taken under this subchapter, by or on behalf of the Coast Guard, may appeal therefrom in accordance with subpart 1.03 of this chapter.


[CGD 88–033, 54 FR 50380, Dec. 6, 1989]


§ 90.01-15 OMB control numbers assigned pursuant to the Paperwork Reduction Act.

(a) Purpose. This section collects and displays the control numbers assigned to information collection and recordkeeping requirements in this subchapter by the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.). The Coast Guard intends that this section comply with the requirements of 44 U.S.C. 3507(f), which requires that agencies display a current control number assigned by the Director of the OMB for each approved agency information collection requirement.


(b) Display.


46 CFR part or section where identified or described
Current OMB control No.
§ 91.27–131625–0065
§ 91.40–31625–0032
§ 91.40–51625–0032
§ 97.15–71625–0064
§ 97.15–171625–0064

[CGD 88–072, 53 FR 34297, Sept. 6, 1988, as amended by CGD 82–004a, 55 FR 2525, Jan. 25, 1990; CGD 89–037, 57 FR 41822, Sept. 11, 1992; USCG–2004–18884, 69 FR 58347, Sept. 30, 2004]


Subpart 90.05—Application

§ 90.05-1 Vessels subject to requirements of this subchapter.

(a) This subchapter is applicable to all U.S.-flag vessels indicated in Column 4 of Table 2.01–7(A) and to all such foreign-flag vessels which carry 12 or fewer passengers from any port in the United States to the extent prescribed by law, except as follows:


(1) Any vessel of a foreign nation signatory to the International Convention for Safety of Life at Sea, 1974, and which has on board a current, valid safety equipment certificate.


(2) Any vessel operating exclusively on inland waters which are not navigable waters of the United States.


(3) Any vessel while laid up and dismantled and out of commission.


(4) With the exception of vessels of the U.S. Maritime Administration, any vessel with title vested in the United States and which is used for public purposes.


(b) Notwithstanding the exception previously noted in paragraph (a)(1) of this section, foreign vessels of novel design or construction or whose operation involves potential unusual risks shall be subject to inspection to the extent necessary to safeguard life and property in United States ports, as further provided by § 2.01–13 of subchapter A (Procedures Applicable to the Public) of this chapter.


(c) Notwithstanding the exception noted in paragraph (a)(1) of this section, each foreign vessel shall report marine casualties occurring while the vessel is in the navigable waters of the United States as required by subpart 97.07.


[CGFR 65–50, 30 FR 16970, Dec. 30, 1965]


Editorial Note:For Federal Register citations affecting § 90.05–1, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.

§ 90.05-5 Specific application noted in text.

(a) At the beginning of the various parts, subparts, and sections, a more specific application is generally given for the particular portion of the text involved. This application sets forth the types, sizes, or services or vessels to which the text pertains, and in many cases limits the application of the text to vessels contracted for before or after a specific date. As used in this subchapter, the term “vessels contracted for” includes not only the contracting for the construction of a vessel, but also the contracting for a material alteration to a vessel, the contracting for the conversion of a vessel to a cargo or miscellaneous vessel, and the changing of service or route of a vessel if such change increases or modifies the general requirements for the vessel or increases the hazards to which it might be subjected.


§ 90.05-7 Ocean or unlimited coastwise vessels on inland and Great Lakes routes.

(a) Vessels inspected and certificated for ocean or unlimited coastwise routes shall be considered suitable for navigation insofar as the provisions of this subchapter are concerned on any inland routes, including the Great Lakes.


§ 90.05-10 Application to vessels on an international voyage.

(a) Except for yachts and fishing vessels and as provided in paragraphs (b), (c), and (d) of this section, the regulations in this subchapter that apply to a vessel on an “international voyage” apply to a vessel that—


(1) Is mechanically propelled and of at least 500 gross tons; and


(2) Is engaged on a voyage—


(i) From a country to which the International Convention for Safety of Life at Sea, 1974, (SOLAS 74) applies, to a port outside that country or the reverse;


(ii) From any territory, including the Commonwealth of Puerto Rico, all possessions of the United States and all lands held by the United States under a protectorate or mandate, whose international relations are the responsibility of a contracting SOLAS 74 government, or which is administered by the United Nations, to a port outside the territory or the reverse; or


(iii) Between the contiguous states of the United States and the states of Hawaii or Alaska or between the states of Hawaii and Alaska.


(b) The regulations that apply to a vessel on an “international voyage” in this subchapter do not apply to ships engaged on a voyage solely on the Great Lakes and the St. Lawrence River as far east as a straight line drawn from Cap de Rosiers to West Point, Anticosti Island, the 63d Meridian;


(c) The Commandant or his authorized representative may exempt any vessel on an international voyage from the requirements of this subchapter if the vessel—


(1) Makes a single international voyage in exceptional circumstances; and


(2) Meets safety requirements prescribed for the voyage by the Commandant.


(d) The Commandant or his authorized representative may exempt any vessel from the construction requirements of this subchapter if the vessel does not proceed more than 20 nautical miles from the nearest land in the course of its voyage.


[CGD 72–131R, 38 FR 29320, Oct. 24, 1973, as amended by CGD 90–008, 55 FR 30661, July 26, 1990; CGD 84–069, 61 FR 25288, May 20, 1996]


§ 90.05-20 Applicability to offshore supply vessels.

(a) Existing offshore supply vessels as defined by § 90.10–40(b), if they are of 100 GRT (100 GT ITC if GRT is not assigned) as defined in § 125.160 of this chapter or more, are subject to inspection under this subchapter. New offshore supply vessels as defined by § 90.10–40(c), are subject to inspection under subchapter L of this chapter.


(b) Each offshore supply vessel permitted grandfathering under paragraph (a) of this section must have completed construction and have a Certificate of Inspection by—


(1) March 16, 1998, if the vessel is of less than 500 GRT (6,000 GT ITC if GRT is not assigned) as defined in § 125.160 of this chapter; or


(2) August 18, 2016, if the vessel is of at least 6,000 GT ITC (500 GRT if GT ITC is not assigned) as defined in § 125.160 of this chapter.


[CGD 82–004 and CGD 86–074, 62 FR 49321, Sept. 19, 1997, as amended by USCG–2012–0208, 79 FR 48925, Aug. 18, 2014]


§ 90.05-25 Seagoing barge.

(a) Each seagoing barge, as defined in 46 CFR 90.10–36, is subject to inspection and certification; except that a seagoing barge is exempt from those requirements if it is unmanned for the purposes of operating or navigating the barge, and carries neither a hazardous material as cargo nor a flammable or combustible liquid, including oil, in bulk quantities of 250 barrels or more.


(b) In applying the laws and regulations to manned seagoing barges, one criterion for invocation of safety standards is the description of seagoing barges by relative size in gross tons. When it is determined by the Commandant that the gross register tonnage for a particular manned seagoing barge, which is attained by exemptions, reductions, or other devices in the basic gross tonnage formulation, will circumvent or be incompatible with the application of specific safety requirements in the regulations in this subchapter for a manned seagoing barge of such physical size, the Commandant shall prescribe the regulations to be made applicable to such seagoing barge. When the Commandant determines that the gross register tonnage is not a valid criterion for the invocation of safety requirements based on relative size, the parties involved will be informed of the determination and of the regulations applicable to such manner seagoing barges, and before being permitted to operate such seagoing barges, compliance therewith shall be required. Endorsements or notations on the seagoing barge’s certificate of inspection may be made as appropriate.


[CGFR 65–50, 30 FR 16970, Dec. 30, 1965, as amended by USCG–2011–0363, 78 FR 53328, Aug. 29, 2013]


§ 90.05-35 Flammable and combustible liquid cargo in bulk.


Note:

Requirements for double hull construction for vessels carrying oil, as defined in 33 CFR 157.03, in bulk as cargo are found in 33 CFR 157.10d.


Vessels inspected and certificated under this subchapter may carry limited quantities of flammable and combustible liquid cargo in bulk in the grades indicated, provided the Certificate of Inspection is endorsed to permit such carriage:


(a) Cargo vessels:


(1) Grades D and E in an integral tank; and


(2) Grades D and E and certain specifically named Grade C in a portable tank, including a marine portable tank (MPT), in accordance with subpart 98.30 or 98.33 of this subchapter.


(b) Miscellaneous Vessels, such as cable, salvage, pile-driving, and oil-drilling-rig vessels:


(1) Grades B, C, D, and E in a fixed independent or integral tank authorized by the commandant;


(2) Grades D and E and certain specifically named Grade C in a portable tank, including an MPT, in accordance with subpart 98.30 or 98.33 of this subchapter.


[CGD 84–043, 55 FR 37410, Sept. 11, 1990, as amended by CGD 90–051, 57 FR 362146, Aug. 12, 1992]


Subpart 90.10—Definition of Terms Used in This Subchapter

§ 90.10-1 Anniversary date.

The term anniversary date means the day and the month of each year, which corresponds to the date of expiration of the Certificate of Inspection.


[USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 90.10-2 Approved.

This term means approved by the Commandant unless otherwise stated.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965. Redesignated by USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 90.10-3 Barge.

This term means any nonself-propelled vessel.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965. Redesignated by USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 90.10-5 Carrying freight for hire.

The carriage of any goods, wares, or merchandise or any other freight for a valuable consideration whether directly or indirectly flowing to the owner, charterer, operator, agent, or any other person interested in the vessel.


§ 90.10-7 Commandant.

This term means the Commandant of the Coast Guard.


§ 90.10-9 Coast Guard District Commander.

This term means an officer of the Coast Guard designated as such by the Commandant to command all Coast Guard activities within the officer’s district, which include the inspection, enforcement, and administration of Subtitle II of Title 46, U.S. Code, Title 46 and Title 33 U.S. Code, and regulations issued under these statutes.


[CGD 95–028, 62 FR 51205, Sept. 30, 1997]


§ 90.10-11 Coastwise.

Under this designation shall be included all vessels normally navigating the waters of any ocean or the Gulf of Mexico 20 nautical miles or less offshore.


§ 90.10-12 Gas free.

This term means free from dangerous concentrations of flammable or toxic gases.


§ 90.10-13 Great Lakes.

Under this designation shall be included all vessels navigating the Great Lakes.


§ 90.10-14 Headquarters.

This term means the Commandant (CG–00), Attn: Commandant, U.S. Coast Guard Stop 7000, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7000.


[CGFR 67–90, 33 FR 1015, Jan. 26, 1968, as amended by CGD 88–070, 53 FR 34534, Sept. 7, 1988; USCG–2013–0671, 78 FR 60150, Sept. 30, 2013]


§ 90.10-15 Industrial personnel.

This term means every person carried on board an industrial vessel for the sole purpose of carrying out the industrial business or functions of the industrial vessel. Examples of industrial personnel include tradesmen, such as mechanics, plumbers, electricians, and welders; laborers, such as wreckers and construction workers; and other persons, such as supervisors, engineers, technicians, drilling personnel, and divers.


[CGFR 67–90, 33 FR 1015, Jan. 26, 1968]


§ 90.10-16 Industrial vessel.

This term means every vessel which by reason of its special outfit, purpose, design, or function engages in certain industrial ventures. Included in this classification are such vessels as drill rigs, missile range ships, dredges, cable layers, derrick barges, pipe lay barges, construction and wrecking barges. Excluded from this classification are vessels carrying freight for hire or engaged in oceanography, limnology, or the fishing industry.


[CGFR 67–90, 33 FR 1015, Jan. 26, 1968]


§ 90.10-19 Lakes, bays, and sounds.

Under this designation shall be included all vessels navigating the waters of any of the lakes, bays, or sounds other than the waters of the Great Lakes.


§ 90.10-20 Liftboat.

Liftboat means an offshore supply vessel with moveable legs capable of raising its hull above the surface of the sea.


[CGD 82–004a, 55 FR 2525, Jan. 25, 1990, as amended by USCG–2014–0688, 79 FR 58282, Sept. 29, 2014]


§ 90.10-21 Marine inspector or inspector.

These terms mean any person from the civilian or military branch of the Coast Guard assigned under the superintendence and direction of an Officer in Charge, Marine Inspection, or any other person as may be designated for the performance of duties with respect to inspection, enforcement, and administration of Subtitle II of Title 46, U.S. Code, Title 46 and Title 33 U.S. Code, and regulations issued under these statutes.


[CGD 95–028, 62 FR 51205, Sept. 30, 1997]


§ 90.10-23 Motorboat.

This term means any vessel indicated in Column 5 of table 90.05–1(a) 65 feet in length or less which is propelled by machinery (including steam). The length shall be measured from end to end over the deck excluding sheer. This term includes a boat temporarily or permanently equipped with a detachable motor. For the purpose of this subchapter, motorboats are included under the term “vessel” unless specifically noted otherwise. The various classes of motorboats are as follows:



Class A—Any motorboat less than 16 feet in length.

Class 1—Any motorboat 16 feet or over and less than 26 feet in length.

Class 2—Any motorboat 26 feet or over and less than 40 feet in length.

Class 3—Any motorboat 40 feet or over and not more than 65 feet in length.

[CGFR 65–50, 30 FR 16970, Dec. 30, 1965, as amended by CGD 95–028, 62 FR 51205, Sept. 30, 1997]


§ 90.10-25 Ocean.

Under this designation shall be included all vessels navigating the waters of any ocean or the Gulf of Mexico more than 20 nautical miles offshore.


§ 90.10-27 Officer in Charge, Marine Inspection (OCMI).

This term means any person from the civilian or military branch of the Coast Guard designated as such by the Commandant and who, under the superintendence and direction of the Coast Guard District Commander, is in charge of an inspection zone for the performance of duties with respect to the inspections, enforcement, and administration of Subtitle II of Title 46, U.S. Code, Title 46 and Title 33 U.S. Code, and regulations issued under these statutes.


[CGD 95–028, 62 FR 51205, Sept. 30, 1997]


§ 90.10-29 Passenger.

(a) The term passenger means—


(1) On an international voyage, every person other than—


(i) The master and the members of the crew or other persons employed or engaged in any capacity on board a vessel on the business of that vessel; and


(ii) A child under 1 year of age.


(2) On other than an international voyage, an individual carried on the vessel, except—


(i) The owner or an individual representative of the owner or, in the case of a vessel under charter, an individual charterer or individual representative of the charterer;


(ii) The master; or


(iii) A member of the crew engaged in the business of the vessel who has not contributed consideration for carriage and who is paid for onboard services.


(b) The term passenger for hire means a passenger for whom consideration is contributed as a condition of carriage on the vessel, whether directly or indirectly flowing to the owner, charterer, operator, agent, or any other person having an interest in the vessel.


[CGD 84–069, 61 FR 25288, May 20, 1996]


§ 90.10-30 Pilot boarding equipment and point of access.

(a) Pilot Boarding Equipment means a pilot ladder, accommodation ladder, pilot hoist, or combination of them as required by this subchapter.


(b) Point of Access means the place on deck of a vessel where a person steps onto or off of pilot boarding equipment.


[CGD 79–032, 49 FR 25455, June 21, 1984]


§ 90.10-33 Rivers.

Under this designation shall be included all vessels whose navigation is restricted to rivers and/or canals exclusively, and to such other waters as may be so designated by the Coast Guard District Commander.


§ 90.10-35 Recognized classification society.

The term recognized classification society means the American Bureau of Shipping or other classification society recognized by the Commandant.


§ 90.10-36 Seagoing barge.

A seagoing barge is a nonself-propelled vessel of at least 100 gross tons making voyages beyond the Boundary Line (as defined in 46 CFR part 7). The phrase nonself-propelled vessel means a vessel without sufficient means for self-propulsion and is required to be towed.


[CGFR 65–50, 30 FR 16970, Dec. 30, 1965, as amended by CGD 95–028, 62 FR 51206, Sept. 30, 1997]


§ 90.10-37 Vessel.

Where the word vessel is used in this subchapter, it shall be considered to include all vessels indicated in Column 5 of Table 90.05–1(a), except as otherwise noted in this subpart.


§ 90.10-38 Specially suitable for vehicles.

A space which is specially suitable for vehicles is one designed for the carriage of automobiles or other self-propelled vehicles with batteries connected and fuel tanks containing gasoline on vessels on ocean or unlimited coastwise voyages. Requirements for the design and protection of spaces “specially suitable for vehicles” appear in subparts 92.15, 95.05, 95.15, 96.05, 97.36, 97.37, and 97.80 of this subchapter. In addition, preparation of automobiles prior to carriage, with the exception of disconnecting battery cables, must be in accordance with the applicable provisions of 49 CFR 176.905.


[CGFR 66–33, 31 FR 15284, Dec. 5, 1966, as amended by CGD 86–033, 53 FR 36025, Sept. 16, 1988]


§ 90.10-40 Offshore supply vessels.

(a) An offshore supply vessel is a vessel that is propelled by machinery other than steam, that is of 15 gross tons or more, and that regularly carries goods, supplies or equipment in support of exploration, exploitation, or production of offshore mineral or energy resources.


(b) An existing offshore supply vessel is one that is—


(1) Of at least 15 GRT but less than 500 GRT (6,000 GT ITC if GRT is not assigned) as defined in § 125.160 of this chapter, contracted for, or the keel of which was laid, before March 15, 1996; or


(2) Of at least 6,000 GT ITC (500 GRT if GT ITC is not assigned) as defined in § 125.160 of this chapter, contracted for, or the keel of which was laid, before August 18, 2014.


(c) A new offshore supply vessel is one—


(1) That is of at least 15 GRT but less than 500 GRT (6,000 GT ITC if GRT is not assigned) as defined in § 125.160 of this chapter, and was contracted for, or the keel of which was laid, on or after March 15, 1996;


(2) That is of at least 6,000 GT ITC (500 GRT if GT ITC is not assigned) as defined in § 125.160 of this chapter, and was contracted for, or the keel of which was laid, on or after August 18, 2014; or


(3) That underwent a major conversion initiated on or after March 15, 1996.


[CGD 82–004 and CGD 86–074, 62 FR 49321, Sept. 19, 1997, as amended by USCG–2012–0208, 79 FR 48925, Aug. 18, 2014]


§ 90.10-42 Tankerman.

The following ratings are established in part 13 of this chapter. The terms for the ratings identify persons holding valid merchant mariners’ documents for service in the ratings issued under that part:


(a) Tankerman-PIC.


(b) Tankerman-PIC (Barge).


(c) Restricted Tankerman-PIC.


(d) Restricted Tankerman-PIC (Barge)


(e) Tankerman-Assistant.


(f) Tankerman-Engineer.


[CGD 79–116, 60 FR 17157, Apr. 4, 1995]


Subpart 90.15—Equivalents

§ 90.15-1 Conditions under which equivalents may be used.

(a) Where in this subchapter it is provided that a particular fitting, material, appliance, apparatus, or equipment, or type thereof, shall be fitted or carried in a vessel, or that any particular provision shall be made or arrangement shall be adopted, the Commandant may accept in substitution therefor any other fitting, material, apparatus, or equipment, or type thereof, or any other arrangement: Provided, That he shall have been satisfied by suitable trials that the fitting, material, appliance, apparatus, or equipment, or type thereof, or the provision or arrangement is at least as effective as that specified in this subchapter.


(b) In any case where it is shown to the satisfaction of the Commandant that the use of any particular equipment, apparatus, or arrangement not specifically required by law is unreasonable or impracticable, the Commandant may permit the use of alternate equipment, apparatus, or arrangement to such an extent and upon such conditions as will insure, to his satisfaction, a degree of safety consistent with the minimum standards set forth in this subchapter.


Subpart 90.20—General Marine Engineering Requirements

§ 90.20-1 Marine engineering details.

(a) All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter.


Subpart 90.25—General Electrical Engineering Requirements

§ 90.25-1 Electrical engineering details.

(a) All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter.


Subpart 90.27—Lifesaving Appliances and Arrangements

§ 90.27-1 Lifesaving appliances and arrangements.

All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25288, May 20, 1996]


Subpart 90.35—American Bureau of Shipping’s Standards

§ 90.35-1 Standards to be used.

(a) Where in this subchapter an item, or method of construction, or testing is required to meet the standards established by the American Bureau of Shipping, the current standards in effect at the time of construction of the vessel, or otherwise as applicable, shall be used. The current standards of other recognized classification societies may also be accepted upon approval by the Commandant.


§ 90.35-5 Where obtainable.

The standards established by the American Bureau of Shipping are usually published annually and may be purchased from the American Bureau of Shipping, ABS Plaza, 16855 Northchase Drive, Houston, TX 77060. These standards may also be examined at Coast Guard Headquarters. Contact Commandant (CG–5PS), Attn: Director of Commercial Regulations, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509. The standards are also available at the Office of any Coast Guard District Commander or Officer in Charge, Marine Inspection.


[USCG–2012–0832, 77 FR 59779, Oct. 1, 2012; USCG–2013–0671, 78 FR 60150, Sept. 30, 2013]


PART 91—INSPECTION AND CERTIFICATION


Authority:46 U.S.C. 3205, 3306, 3307, 70034; 46 U.S.C. Chapter 701; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; DHS Delegation 00170.1, Revision No. 01.2.


Source:CGFR 65–50, 30 FR 16974, Dec. 30, 1965, unless otherwise noted.


Editorial Note:Nomenclature changes to part 91 appear by USCG–2012–0832, 77 FR 59779, Oct. 1, 2012.

Subpart 91.01—General Provisions; Certificate of Inspection

§ 91.01-1 Preemptive effect.

The regulations in this part have preemptive effect over State or local regulations in the same field.


[USCG–2006–24797, 77 FR 33877, June 7, 2012]


§ 91.01-2 When required.

(a) Except as noted in this subpart or subpart 91.05, no vessel subject to inspection and certification shall be operated without a valid certificate of inspection.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965. Redesignated by USCG–2006–24797, 77 FR 33877, June 7, 2012]


§ 91.01-5 Posting.

(a) On vessels of over 25 gross tons, the original certificate of inspection shall, in general, be framed under glass and posted in a conspicuous place where it will be most likely to be observed. On vessels not over 25 gross tons, and on other vessels such as barges, where the framing of the certificate under glass would be impracticable, the original certificate of inspection shall be kept on board to be shown on demand.


§ 91.01-10 Period of validity for a Certificate of Inspection.

(a) Certificates of inspection will be issued for a period of 5 years. Application may be made by the master, owner, or agent for inspection and issuance of a new certificate of inspection at any time during the period of validity of the current certificate.


(b) Certificates of inspection may be revoked or suspended by the Coast Guard where such process is authorized by law. This may occur if the vessel does not meet the requirements of law or regulations in this chapter or if there is a failure to maintain the safety requirements requisite to the issuance of a certificate of inspection.


(c) The master or owner of a seagoing barge for which inspection and certification is required by 46 CFR 90.05–25(a), or the master or owner’s agent, may apply for a certificate of inspection that is valid for a specific period less than 5 years, or for a specific voyage. The certificate will describe the conditions under which it is issued, and will be endorsed as applying to an unmanned seagoing barge. Paragraph (c) of this section applies if the seagoing barge–


(1) Makes a voyage beyond the Boundary Line for the sole purpose of changing employment; or


(2) Makes a voyage beyond the Boundary Line only infrequently and after doing so returns to its port of departure.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18901, Dec. 18, 1968; CGD 95–012, 60 FR 48051, Sept. 18, 1995; USCG–1999–4976, 65 FR 6501, Feb. 9, 2000; USCG–2011–0363, 78 FR 53328, Aug. 29, 2013]


§ 91.01-15 Temporary certificate.

(a) If necessary to prevent delay of the vessel, a temporary certificate of inspection, Form CG–854, shall be issued pending the issuance and delivery of the regular certificate of inspection. Such temporary certificate shall be carried in the same manner as the regular certificate and shall in all ways be considered the same as the regular certificate of inspection which it represents.


§ 91.01-20 Expired certificate.

(a) Nothing in this subpart shall prevent a vessel upon a regularly established line from a port in the United States to a port of a foreign country not contiguous to the United States whose certificate of inspection expires at sea or while said vessel is in a foreign port or a port of Hawaii from lawfully completing her voyage without the valid certificate of inspection or temporary certificate required by this subpart: Provided, That the certificate of inspection did not expire within 15 days after the vessel left the last port of the United States, and that the voyage shall be completed within 30 days after the expiration of the certificate of inspection.


§ 91.01-25 Emergency carriage of more than 16 persons in addition to the crew on vessels not engaged in international voyages.

(a) When a District Commander finds that an emergency situation exists, he authorizes the local Officer in Charge, Marine Inspection, to issue amendments to vessels’ certificates of inspection authorizing the carriage of more than 16 persons in addition to the crew.


(b) Upon receipt of an application from a vessel’s owner or operator, the Local Officer in Charge, Marine Inspection, amends the vessel’s certificate of inspection after—


(1) Additional lifesaving and firefighting equipment found necessary by the OCMI has been provided;


(2) A stability evaluation has been performed; and


(3) Any other conditions considered necessary by the OCMI have been satisfied.


[CGD 76–004, 41 FR 32744, Aug. 5, 1976]


Subpart 91.05—Permit To Proceed to Another Port for Repair

§ 91.05-1 When issued.

(a) The Officer in Charge, Marine Inspection, may issue a permit to proceed to another port for repair, Form CG–948 to a vessel, if in his judgment it can be done with safety, even if the certificate of inspection of the vessel has expired or is about to expire.


§ 91.05-5 To whom issued.

(a) Such permit will only be issued upon the written application of the master, owner, or agent of the vessel.


§ 91.05-10 Conditions of permit.

(a) The permit will state upon its face the conditions under which it is issued and whether or not the vessel is permitted to carry freight or passengers.


§ 91.05-15 Posting.

(a) The permit shall be carried in a manner similar to that described in § 91.01–5 for a certificate of inspection.


Subpart 91.15—Inspection of Vessels

§ 91.15-1 Standards in inspection of hulls, boilers, and machinery.

In the inspection of hulls, boilers, and machinery of vessels, the standards established by the American Bureau of Shipping, see part 90, subpart 90.35 of this chapter, respecting material and inspection of hulls, boilers, and machinery, and the certificate of classification referring thereto, except where otherwise provided for by the rules and regulations in this subchapter, subchapter E (Load Lines), subchapter F (Marine Engineering), subchapter J (Electrical Engineering), and subchapter W (Lifesaving Appliances and Arrangements) of this chapter, shall be accepted as standard by the inspectors.


[CGD 84–069, 61 FR 25289, May 20, 1996]


§ 91.15-5 Alternate compliance.

(a) In place of compliance with other applicable provisions of this subchapter, the owner or operator of a vessel subject to plan review and inspection under this subchapter for initial issuance or renewal of a Certificate of Inspection may comply with the Alternate Compliance Program provisions of part 8 of this chapter.


(b) For the purposes of this section, a list of authorized classification societies, including information for ordering copies of approved classification society rules and supplements, is available at Coast Guard Headquarters. Contact Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509; telephone 202–372–1372 or fax 202–372–1925. Approved classification society rules and supplements are incorporated by reference into 46 CFR 8.110(b).


[CGD 95–010, 62 FR 67536, Dec. 24, 1997, as amended by USCG–1999–5004, 64 FR 30439, June 8, 1999; USCG–2004–18884, 69 FR 58347, Sept. 30, 2004; USCG–2006–25697, 71 FR 55746, Sept. 25, 2006; USCG–2009–0702, 74 FR 49231, Sept. 25, 2009; USCG–2013–0671, 78 FR 60150, Sept. 30, 2013]


Subpart 91.20—Initial Inspection

§ 91.20-1 Prerequisite of certificate of inspection.

(a) The initial inspection is a prerequisite of the issuance of the original certificate of inspection.


§ 91.20-5 When made.

(a) The original inspection will only be made upon the written application of the owner or builder of the vessel to the Officer in Charge, Marine Inspection, on Form CG–3752, Application for Inspection of U.S. Vessel, at or nearest the port where the vessel is located.


§ 91.20-10 Plans.

(a) Before application for inspection is made, and before construction is started, the owner or builder shall have plans approved by the Commandant indicating the proposed arrangement and construction of the vessel. The procedure for submitting plans and the list of plans to be supplied is set forth in subpart 91.55.


§ 91.20-15 Scope of inspection.

(a) The initial inspection, which may consist of a series of inspections during the construction of a vessel, shall include a complete inspection of the structure, including the outside of the vessel’s bottom, the machinery, unfired pressure vessels, equipment and the inside and outside of the boilers. The inspection shall be such as to insure that the arrangements, material, and scantlings of the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment fully comply with the applicable regulations for such vessel and are in accordance with approved plans, and determine that the vessel is in possession of a valid certificate issued by the Federal Communications Commission, if any. The inspection shall be such as to ensure that the workmanship of all parts of the vessel and its equipment is in all respects satisfactory and that the vessel is provided with lights, means of making sound signals, and distress signals as required by applicable statutes and regulations.


(b) When equipment is installed which is not required by applicable regulations in this subchapter, that equipment shall be inspected and tested as required for such equipment by applicable regulations in subchapter H (Passenger Vessels) of this chapter. For example, fire-detecting systems shall be inspected and tested as required by subpart 71.20 of subchapter H (Passenger Vessels) of this chapter.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGFR 68–32, 33 FR 5718, Apr. 12, 1968; CGFR 68–82, 33 FR 18901, Dec. 18, 1968; CGD 71–161R, 37 FR 28262, Dec. 21, 1972; CGD 82–036, 48 FR 654, Jan. 6, 1983; CGD 79–032, 49 FR 25455, June 21, 1984; CGD 95–012, 60 FR 48051, Sept. 18, 1995]


§ 91.20-20 Specific tests and inspections.

The applicable tests and inspections as set forth in subpart 91.25 of this part shall be made at this time. In addition, the following specific tests and inspections shall be made by the inspector.


(a) For inspection procedures of lifesaving appliances and arrangements, see subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


(b) For installation of carbon dioxide fire extinguishing system piping, see 46 CFR 95.15–15. For clean agent fire extinguishing piping, see 46 CFR 95.16–15.


(c) For inspection procedures of marine engineering equipment and systems, see subchapter F (Marine Engineering) of this chapter.


(d) For inspection procedures of Electrical Engineering equipment and systems, see subchapter J (Electrical Engineering) of this chapter.


(e) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98 of this subchapter.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 84–069, 61 FR 25289, May 20, 1996; USCG–2006–24797, 77 FR 33877, June 7, 2012]


Subpart 91.25—Inspection for Certification

§ 91.25-1 Prerequisite of reissuance of certificate of inspection.

(a) An inspection for certification is a prerequisite of the reissuance of a certificate of inspection.


§ 91.25-5 Application for a Certificate of Inspection.

You must submit a written application for an inspection for certification to the cognizant Officer in Charge, Marine Inspection. To renew a Certificate of Inspection, you must submit an application at least 30 days before the expiration of the tank vessel’s current certificate. You must use Form CG–3752, Application for Inspection of U.S. Vessel, and submit it to the Officer in Charge, Marine Inspection at, or nearest to, the port where the vessel is located. When renewing a Certificate of Inspection, you must schedule an inspection for certification within the 3 months before the expiration date of the current Certificate of Inspection.


[USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.25-7 Incorporation by reference.

(a) Certain material is incorporated by reference into this subchapter with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG–ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593–7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(b) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617–770–3000, http://www.nfpa.org.


(1) NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009, IBR approved for § 91.25–20(a).


(2) [Reserved]


[USCG–2012–0196, 81 FR 48261, July 22, 2016]


§ 91.25-10 Scope of inspection.

The inspection for certification shall include an inspection of the structure, boilers, and other pressure vessels, machinery, and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment, is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations for such vessel and determine that the vessel is in possession of a valid certificate issued by the Federal Communications Commission, if required. The lights, means of making sound signals, and distress signals carried by the vessel shall also be subject to the above mentioned inspection for the purpose of ensuring that they comply with the requirements of the applicable statutes and regulations.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGFR 68–32, 33 FR 5718, Apr. 12, 1968; CGFR 68–82, 33 FR 18901, Dec. 18, 1968; CGD 71–161R, 37 FR 28262, Dec. 21, 1972; CGD 82–036, 48 FR 655, Jan. 6, 1983; CGD 79–032, 49 FR 25455, June 21, 1984; CGD 95–012, 60 FR 48051, Sept. 18, 1995]


§ 91.25-15 Lifesaving equipment.

For inspection procedures of Lifesaving appliances and arrangements, see subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25289, May 20, 1996]


§ 91.25-20 Fire extinguishing equipment.

(a) At each inspection for certification, periodic inspection and at other times necessary, the inspector will determine that all fire-extinguishing equipment is in suitable condition and may require any tests necessary to determine the condition of the equipment. The inspector will determine if the tests and inspections required by § 97.15–60 of this subchapter have been conducted. At each inspection for certification and periodic inspection, the inspector will check fire-extinguishing equipment with the following tests and inspections:


(1) Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10 (incorporated by reference, see § 91.25–7) as amended here:


(i) Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements of NFPA 10 for annual maintenance and recharging of extinguishers.


(ii) Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew.


(iii) Non-rechargeable or non-refillable extinguishers must be inspected and maintained in accordance with NFPA 10; however, the annual maintenance need not be conducted by a certified person and can be conducted by the owner, operator, person-in-charge, or a designated member of the crew.


(iv) The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records have not been properly maintained, a qualified servicing facility must perform the required inspections, maintenance procedures, and hydrostatic pressure tests. A tag issued by a qualified servicing organization, and attached to each extinguisher, may be accepted as evidence that the necessary maintenance procedures have been conducted.


Table 91.25–20(a)(1)

Type unit
Test
Soda acidDischarge. Clean hose and inside of extinguisher thoroughly. Recharge.
FoamDischarge. Clean hose and inside of extinguisher thoroughly. Recharge.
Pump tank (water or antifreeze)Discharge. Clean hose and inside of extinguisher thoroughly. Recharge with clean water or antifreeze.
Cartridge operated (water, antifreeze or loaded stream)Examine pressure cartridge and replace if end is punctured or if cartridge is otherwise determined to have leaked or to be in unsuitable condition. Remove liquid. Clean hose and inside of extinguisher thoroughly. Recharge with clean water, solution, or antifreeze. Insert charged cartridge.
Carbon DioxideWeigh cylinders. Recharge if weight loss exceeds 10 percent of weight of charge. Inspect hose and nozzle to be sure they are clear.
1
Dry chemical (cartridge-operated type)Examine pressure cartridge and replace if end is punctured or if cartridge is otherwise determined to have leaked or to be in unsuitable condition. Inspect hose and nozzle to see they are clear. Insert charged cartridge. Be sure dry chemical is free-flowing (not caked) and chamber contains full charge.
Dry chemical (stored pressure type)See that pressure gage is in operating range. If not, or if seal is broken, weigh or otherwise determine that full charge of dry chemical is in extinguisher. Recharge if pressure is low or if dry chemical is needed.
Vaporizing liquid
2 (pump type)
Pump a few strokes into clean pail and replace liquid. Keep water out of extinguisher or liquid. Keep extinguisher completely full of liquid.
Vaporizing liquid
2 (stored pressure type)
See that pressure gage is in operating range. Weigh or check liquid level to determine that full charge of liquid is in extinguisher. Recharge if pressure is low or if liquid is needed.


1 Cylinders must be tested and marked, and all flexible connections and discharge hoses of semi-portable carbon dioxide and halon extinguishers must be tested or renewed, as required by §§ 147.60 and 147.65 of this chapter.


2 Vaporizing-liquid type fire extinguishers containing carbon tetrachloride or chlorobromomethane or other toxic vaporizing liquids shall be removed from all vessels. (See § 95.50–5(e) of this subchapter.)


(2) Fixed fire-extinguishing systems must be checked as noted in Table 91.25–20(a)(2). In addition, all parts of the fixed fire-extinguishing systems, must be examined for excessive corrosion and general conditions.


Table 91.25–20(a)(2)

Type system
Test
FoamSystems utilizing a soda solution must have that solution replaced. In all cases, ascertain that powder is not caked
Carbon dioxideWeigh cylinders. Recharge cylinder if weight loss exceeds 10 percent of the weight of the charge. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Inspect hoses for damage or decay. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible connections on fixed carbon dioxide systems must be tested or renewed, as required by 46 CFR 147.60 and 147.65
Halon 1301 and halocarbonRecharge or replace if weight loss exceeds 5 percent of the weight of the charge or if cylinder has a pressure gauge, recharge cylinder if pressure loss exceeds 10 percent, adjusted for temperature. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Inspect hoses for damage or decay. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible connections to Halon 1301 and halocarbon cylinders must be tested or renewed, as required by 46 CFR 147.60 and 147.65 or 147.67.
NOTE: Halon 1301 system approvals have expired, but existing systems may be retained if they are in good and serviceable condition to the satisfaction of the Coast Guard inspector.
Inert gasRecharge or replace cylinder if cylinder pressure loss exceeds 5 percent of the specified gauge pressure, adjusted for temperature. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible connections on fixed inert extinguishers must be tested or renewed, as required by 46 CFR 147.60 and 147.66.
Water mistMaintain system in accordance with the maintenance instructions in the system manufacturer’s design, installation, operation, and maintenance manual.

(3) On all fire-extinguishing systems, all piping controls, valves, and alarms must be checked to ascertain that the system is in operating condition. In this respect steam smothering lines must be checked with at least a 50 p.s.i. air pressure with the ends capped or by blowing steam through the lines at the designed pressure.


(4) The fire main system must be operated and the pressure checked at the most remote and highest outlets. All firehose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGFR 68–32, 33 FR 5718, Apr. 18, 1968; CGD 78–154, 44 FR 13491, Mar. 12, 1979; CGD 84–044, 53 FR 7748, Mar. 10, 1988; USCG–1999–4976, 65 FR 6501, Feb. 9, 2000; 65 FR 11904, Mar. 7, 2000; USCG–2006–24797, 77 FR 33877, June 7, 2012; USCG–2012–0196, 81 FR 48262, July 22, 2016]


§ 91.25-25 Hull equipment.

(a) At each inspection for certification and periodic inspection, the inspectors shall conduct the following tests and inspections of hull equipment:


(1) All watertight doors shall be operated locally by manual power and also by hydraulic or electric power if so fitted. Where remote control is fitted, the doors shall also be operated by the remote control apparatus.


(2) The remote controls of all valves shall be operated.


(3) The owner, operator or master shall provide the Officer in Charge, Marine Inspection with all current valid certificates and registers of cargo gear issued by an organization recognized by the Commandant under § 31.10–16.


(b) Every acceptable cargo gear certificate and/or register shall be properly executed by a person authorized to do so and shall:


(1) Certify as to the tests and examinations conducted;


(2) Show the dates on which the tests and examinations were conducted; and


(3) Indicate that the cargo gear described in the certificate or register complies with the standards of the organization or association authorized to issue the certificate or register.


(c) Competent persons for the purposes of this section are defined as—


(1) Surveyors of a classification society recognized by the Commandant under 46 U.S.C. 3316.


(2) Surveyors of a cargo gear organization recognized by the Commandant under § 31.10–16.


(3) Responsible officials or employees of the testing laboratories, companies, or organizations who conduct tests of pieces of loose cargo gear, wire rope, or the annealing of gear as may be required by the standards of the organization or association authorized to issue the certificate or register.


(d) The registers issued in connection with cargo gear certification must have all required entries fully completed as of the dates indicated, shall be kept current, and shall include the following:


(1) A register of the cargo handling machinery and the gear accessory thereto carried on the vessel named therein;


(2) Certification of the testing and examination of winches, derricks, and their accessory gear;


(3) Certification of the testing and examination of cranes, hoists, and their accessory gear;


(4) Certification of the testing and examination of chains, rings, hooks, shackles, swivels, and blocks;


(5) Certification of the testing and examination of wire rope;


(6) Certification of the heat-treatment of chains, rings, hooks, shackles, and swivels which require such treatment; and,


(7) Certification of the annual thorough examinations of gear not required to be periodically heat-treated.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.25-30 Electrical engineering equipment.

For inspection procedures of electrical engineering equipment and systems see subchapter J (Electrical Engineering) of this chapter.


§ 91.25-35 Marine engineering equipment.

(a) For inspection procedures of marine engineering equipment and systems, see subchapter F (Marine Engineering) of this chapter.


§ 91.25-37 Tanks containing dangerous cargoes.

(a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98 of this subchapter.


§ 91.25-38 Pollution prevention.

At each inspection for certification and periodic inspection, the inspector shall examine the vessel to determine that it meets the vessel design and equipment requirements for pollution prevention in 33 CFR part 155, subpart B.


[CGD 71–161R, 37 FR 28262, Dec. 21, 1972, as amended by USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.25-40 Sanitary inspection.

(a) At each inspection for certification and periodic inspection, the quarters, toilets, and washing spaces, galleys, serving pantries, lockers, etc., shall be examined by the inspector to be assured that they are in a sanitary condition.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.25-45 Fire hazards.

(a) At each inspection for certification and periodic inspection, the inspector shall examine the tank tops and bilges in the machinery spaces to see that there is no accumulation of oil which might create a fire hazard.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.25-50 Inspector not limited.

(a) Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the safety and seaworthiness of the vessel.


(b) [Reserved]


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by USCG–2021–0348, 87 FR 3224, Jan. 21, 2022]


Subpart 91.27—Annual and Periodic Inspections

§ 91.27-1 Annual and periodic inspections.

(a) Annual inspection. Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date, except as required in paragraph (b) of this section.


(1) You must contact the cognizant Officer in Charge, Marine Inspection to schedule an inspection at a time and place which he or she approves. No written application is required.


(2) The scope of the annual inspection is the same as the inspection for certification as specified in § 91.25–10 but in less detail unless the cognizant marine inspector finds deficiencies or determines that a major change has occurred since the last inspection. If deficiencies are found or a major change to the vessel has occurred, the marine inspector will conduct an inspection more detailed in scope to ensure that the vessel is in satisfactory condition and fit for the service for which it is intended. If your vessel passes the annual inspection, the marine inspector will endorse your current Certificate of Inspection.


(3) If the annual inspection reveals deficiencies in your vessel’s maintenance, you must make any or all repairs or improvements within the time period specified by the Officer in Charge, Marine Inspection.


(4) Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel’s seaworthiness.


(b) Periodic inspection. Your vessel must undergo a periodic inspection within 3 months before or after the second or third anniversary of the date of your vessel’s Certificate of Inspection. This periodic inspection will take the place of an annual inspection.


(1) You must contact the cognizant Officer in Charge, Marine Inspection to schedule an inspection at a time and place which he or she approves. No written application is required.


(2) The scope of the periodic inspection is the same as that for the inspection for certification, as specified in § 91.25–10. The Officer in Charge, Marine Inspection will insure that the vessel is in satisfactory condition and fit for the service for which it is intended. If your vessel passes the periodic inspection, the marine inspector will endorse your current Certificate of Inspection.


(3) If the periodic inspection reveals deficiencies in your vessel’s maintenance, you must make any or all repairs or improvements within the time period specified by the Officer in Charge, Marine Inspection.


(4) Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel’s seaworthiness.


[USCG–1999–4976, 65 FR 6501, Feb. 9, 2000]


§ 91.27-5 Certificate of Inspection: Conditions of validity.

To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in § 91.27–1 (a) and (b) and your Certificate of Inspection must be endorsed.


[USCG–1999–4976, 65 FR 6502, Feb. 9, 2000]


§ 91.27-13 Alternative annual inspection for offshore supply vessels less than 400 gross tons in foreign ports.

(a) The owner or operator of an offshore supply vessel of less than 400 gross tons, except liftboats as defined in § 90.10–20 of this chapter, may request authorization to conduct an alternative annual inspection in place of the annual inspection described in § 91.27–1(a) of this chapter. You must submit your request to the Officer in Charge, Marine Inspection responsible for conducting inspections in the country in which the vessel is operating and will be examined. To qualify for the alternative annual inspection, you must meet the following requirements:


(1) The request for authorization must be in writing and received by the cognizant Officer in Charge, Marine Inspection before the end of the twelfth month of each COI anniversary year.


(2) The vessel is expected to be continuously employed outside of the United States during the 3 months before and after each anniversary date of the issuance of the COI.


(b) In determining whether to grant authorization for the alternative annual inspection, the Officer in Charge, Marine Inspection will consider the following:


(1) Information contained in previous inspection and drydock examination reports, including the Officer in Charge, Marine Inspection’s recommendation for participation in the alternative midperiod examination program, and the alternative annual inspection program.


(2) The nature, number, and severity of any marine casualties or accidents, as defined in § 4.03–1 of this chapter, which the vessel has experienced in the last 3 years.


(3) The nature, number, and severity of any outstanding inspection requirements for the vessel.


(4) The owner or operator’s history of compliance and cooperation in the alternative midperiod examination program and the alternative annual inspection program, which includes—


(i) The prompt correction of deficiencies;


(ii) The reliability of previously submitted alternative examination and annual inspection reports; and


(iii) The reliability of representations that the vessel under consideration will be, and other vessels previously examined under this section were, employed outside of the United States for the 3 month period before and after each anniversary date.


(c) If authorization is granted, the Officer in Charge, Marine Inspection must provide the applicant written authorization to proceed with the alternative annual inspection, including special instructions when appropriate.


(d) The following conditions must be met for the alternative annual inspection to be accepted by the Coast Guard in lieu of conducting an annual inspection in accordance with § 91.27–1(a) of this subpart.


(1) The alternative annual inspection must be conducted within 3 months before and after each anniversary date.


(2) The alternative annual inspection must be of the scope detailed in § 91.27–1(a) of this subpart and must be conducted by the vessel’s master, operator, or a designated representative of the owner or operator.


(3) Upon completion of the alternative annual inspection, the person or persons conducting the inspection must prepare a comprehensive report describing the conditions found. This inspection report must contain sufficient detail to allow an evaluation to be made by the Officer in Charge, Marine Inspection to whom the report is submitted that the vessel is fit for the service and route specified on the Certificate of Inspection. The report must include reports and receipts documenting the servicing of lifesaving and fire protection equipment, and any photographs or sketches necessary to clarify unusual circumstances. Each person preparing the report must sign it and certify that the information contained therein is complete and accurate.


(4) Unless the vessel’s master participated in the alternative annual inspection and the preparation of the inspection report, the master must review the report for completeness and accuracy. The master must sign the report to indicate review and forward it to the vessel’s owner or operator who requested authorization to conduct the inspection.


(5) The owner or operator of an offshore supply vessel inspected under this subpart must review and submit the report required by paragraph (d)(3) of this section to the Officer in Charge, Marine Inspection who authorized the owner or operator to conduct the alternative annual inspection. The inspection report must be received by the cognizant Officer in Charge, Marine Inspection before the first day of the fifth month following the anniversary date. The forwarding letter or endorsement must be certified and contain the following information—


(i) That the person or persons who conducted the inspection acted on behalf of the vessel’s owner or operator;


(ii) That the inspection report was reviewed by the owner or operator;


(iii) That the discrepancies noted during the inspection have been corrected or will be corrected within a stated time frame; and


(iv) That the owner or operator has sufficient personal knowledge of conditions aboard the vessel at the time of the inspection or has made necessary inquiries to justify forming a belief that the inspection report is true and correct.


(e) The form of certification required under this subpart is as follows:



I certify that the above is true and complete to the best of my knowledge and belief.


(f) Deficiencies and hazards discovered during an alternative annual inspection conducted pursuant to this section must be corrected or eliminated, if practical, before the inspection report is submitted to the Officer in Charge, Marine Inspection in accordance with paragraph (d)(5) of this section. Deficiencies and hazards that are not corrected or eliminated by the time the inspection report is submitted must be listed in the report as “outstanding.” Upon receipt of an inspection report indicating outstanding deficiencies or hazards, the Officer in Charge, Marine Inspection will inform the owner or operator of the vessel in writing of the time period in which to correct or eliminate the deficiencies or hazards and the method for establishing that the corrections have been accomplished. Where a deficiency or hazard remains uncorrected or uneliminated after the expiration of the time specified for correction or elimination, the Officer in Charge, Marine Inspection will initiate appropriate enforcement measures.


(g) Upon receipt of the report required by paragraph (d)(3) of this section, the Officer in Charge, Marine Inspection must evaluate it and make the following determination:


(1) Whether the alternative annual inspection is accepted in lieu of the annual inspection required by § 91.27–1(a) of this subpart.


(2) Whether the vessel is in satisfactory condition.


(3) Whether the vessel continues to be reasonably fit for its intended service and route. The Officer in Charge, Marine Inspection may request any additional information needed to make the determinations required by this section. The Officer in Charge, Marine Inspection will inform the owner or operator in writing of the determinations required by this section.


(h) If the Officer in Charge, Marine Inspection determines, in accordance with paragraph (g) of this section, that the alternative annual inspection is not accepted in lieu of the annual inspection required by § 91.27–1(a) of this subpart, the vessel must be reinspected by the cognizant Officer in Charge, Marine Inspection as soon as practical.


(i) If the Officer in Charge, Marine Inspection determines, in accordance with paragraph (g) of this section, that the alternative annual inspection is accepted in lieu of the annual inspection required by § 91.27–1(a) of this subpart, the master must complete the applicable COI endorsement.


[USCG–1999–4976, 65 FR 6502, Feb. 9, 2000; 65 FR 11904, Mar. 7, 2000]


§ 91.27-15 Inspectors not limited.

(a) Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the seaworthiness of the vessel.


(b) [Reserved]


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by USCG–2021–0348, 87 FR 3224, Jan. 21, 2022]


Subpart 91.30—Inspection After Accident

§ 91.30-1 General or partial survey.

(a) A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.


Subpart 91.35—Sanitary Inspections

§ 91.35-1 When made.

(a) An inspection of quarters, toilet and washing spaces, serving pantries, galleys, etc., shall be made at least once in every month. If the route of the vessel is such that it is away from a United States port for more than one month, an inspection shall be conducted at least once every trip.


Subpart 91.40—Drydocking

§ 91.40-1 Definitions relating to hull examinations.

As used in this part—


(a) Drydock examination means hauling out a vessel or placing a vessel in a drydock or slipway for an examination of all accessible parts of the vessel’s underwater body and all through-hull fittings.


(b) Internal structural examination means an examination of the vessel while afloat or in drydock and consists of a complete examination of the vessel’s main strength members, including the major internal framing, the hull plating, voids, and ballast tanks, but not including cargo or fuel oil tanks.


(c) Cargo tank internal examination means an examination of the vessel while afloat or in drydock and consists of an examination of the internals of all cargo tanks; except, if the vessel is certificated to carry cargoes regulated under part 38 or subchapter O of this chapter, the cargo tank internal examination must be accomplished as specified in parts 38 and 151 of this chapter respectively.


(d) Underwater survey means the examination, while the vessel is afloat, of all accessible parts of the vessel’s underwater body and all through-hull fittings.


[CGD 84–024, 52 FR 39653, Oct. 23, 1987, as amended by CGD 84–024, 53 FR 32231, Aug. 24, 1988; CGD 95–028, 62 FR 51206, Sept. 30, 1997]


§ 91.40-3 Drydock examination, internal structural examination, cargo tank internal examination, and underwater survey intervals.

(a) Except as provided in paragraphs (b) through (g) of this section, each vessel must undergo drydock, internal structural, and cargo tank internal examinations as follows:


(1) Except under paragraph (a)(2) of this section, vessels that operate in salt water must be examined in accordance with the intervals set forth in Table 91.40–3(a) of this section. Where Table 91.40–3(a) indicates a 2.5 year examination interval, it means a vessel must undergo two examinations within any five year period. No more than three years may elapse between any two examinations.


Table 91.40–3(a)—Salt Water Service Vessels Examination Intervals in Years


Single hull ship and barge
Double hull barge with internal framing
1
Double hull barge with external framing
2
Single hull barge with independent tanks
3
Wood hull ship and barge
Unmanned deck cargo barge
4
Unmanned double hull freight barge
5
Drydock2.55.05.05.02.55.05.0
Internal structural2.52.52.52.52.52.52.5
Cargo tank internal
6 2.5

6 5.0

6 10.0

6 10.0

6 2.5

6 5.0

Note:


1 Applicable to double hull tank barges (double sides, ends, and bottoms) when the structural framing is on the internal tank surface.


2 Applicable to double hull tank barges (double sides, ends, and bottoms) when the structural framing is on the external tank surface accessible for examination from voids, double bottoms, and other similar spaces.


3 Applicable to single hull tank barges with independent cargo tanks which have a cargo containment envelope that is not a contiguous part of the hull structure and which has adequate clearance between the tanks and between the tanks and the vessel’s hull to provide access for examination of all tank surfaces and the hull structure.


4 Applicable to unmanned/non-permissively manned deck cargo barge which carries cargo only above the weather deck and which provides complete access for examination of the inside of the hull structure.


5 Applicable to unmanned/non-permissively manned double hull freight barges (double sides, ends, and bottoms) the arrangement of which provides access for a complete internal structural examination as defined in § 91.40–1(b) without the necessity of entering cargo tanks or holds.


6 Or as specified in Part 151.


(2) Vessels that operate in fresh water at least six months in every 12 month period since the last drydock examination must be examined in accordance with the intervals set forth in Table 91.40–3(b) of this section. Where Table 91.40–3(b) indicates a 2.5 year examination interval, it means a vessel must undergo two examinations within any five year period. No more than three years may elapse between any two examinations.


Table 91.40–3(b)—Fresh Water Service Vessels Examination Intervals in Years


Single hull ship and barge
Double hull barge with

internal

framing
1
Double hull barge with

external

framing
2
Single hull barge with independent tanks
3
Wood hull ship and barge
Unmanned deck cargo barge
4
Unmanned double hull freight barge
5
Drydock5.010.010.010.02.510.010.0
Internal structural5.05.05.05.02.55.05.0
Cargo tank internal
6 5.0

6 5.0

6 10.0

6 10.0

6 2.5

6 5.0

Note:


1 Applicable to double hull tank barges (double sides, ends, and bottoms) when the structural framing is on the internal tank surface.


2 Applicable to double hull tank barges (double sides, ends, and bottoms) when the structural framing is on the external tank surface accessible for examination from voids, double bottoms, and other similar spaces.


3 Applicable to single hull tank barges with independent cargo tanks which have a cargo containment envelope that is not a contiguous part of the hull structure and which has adequate clearance between the tanks and between the tanks and the vessel’s hull to provide access for examination of all tank surfaces and the hull structure.


4 Applicable to unmanned/non-permissively manned deck cargo barge which carries cargo only above the weather deck and which provides complete access for examination of the inside of the hull structure.


5 Applicable to unmanned/non-permissively manned double hull freight barges (double sides, ends, and bottoms) the arrangement of which provides access for a complete internal structural examination as defined in § 91.40–1(b) without the necessity of entering cargo tanks or holds.


6 Or as specified in Part 151.


(b) During each inspection or reinspection for certification, all wing voids, rakes, cofferdams, and other void spaces on barges must be opened and checked from on-deck for the presence of water or cargo indicating hull damage or cargo tank leakage. If water or cargo is not present, these spaces need not be gas freed, ventilated, cleaned, or otherwise prepared for personnel entry. If water or cargo is present, an internal structural examination may be required.


(c) If, during an internal structural, cargo tank internal examination, or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be drydocked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs.


(d) Vessels less than 15 years of age (except wooden hull vessels) that are in salt water service with a 2.5 year drydock interval (as indicated in Table 91.40–3(a) of this section) or that are in fresh water service with a five year drydock interval (as indicated in Table 91.40–3(b) of this section) may be considered for an underwater survey instead of alternate drydock examinations, provided the vessel is fitted with an effective hull protection system. Vessel owners or operators must apply to the Officer in Charge, Marine Inspection, for approval of underwater surveys instead of alternate drydock examinations for each vessel. The application must include the following information:


(1) The procedure to be followed in carrying out the underwater survey.


(2) The location where the underwater survey will be accomplished.


(3) The method to be used to accurately determine the diver location relative to the hull.


(4) The means that will be provided for examining through-hull fittings.


(5) The means that will be provided for taking shaft bearing clearances.


(6) The condition of the vessel, including the anticipated draft of the vessel at the time of the survey.


(7) A description of the hull protection system.


(e) Vessels otherwise qualifying under paragraph (d) of this section, that are 15 years of age or older, may be considered for continued participation in or entry into the underwater survey program on a case-by-case basis if—


(1) Before the vessel’s next scheduled drydocking, the owner or operator submits a request for participation or continued participation to Commandant (CG–CVC);


(2) During the vessel’s next drydocking after the request is submitted, no appreciable hull deterioration is indicated as a result of a complete set of hull gaugings; and


(3) The results of the hull gauging and the results of the Coast Guard drydock examination together with the recommendation of the Officer in Charge, Marine Inspection, are submitted to Commandant (CG–CVC) for final approval.


(f) Each vessel which has not met with the applicable examination schedules in paragraphs (a) through (e) of this section because it is on a voyage, must undergo the required examinations upon completion of the voyage.


(g) The Commandant (CG–CVC) may authorize extensions to the examination intervals specified in paragraph (a) of this section.


[CGD 84–024, 52 FR 39653, Oct. 23, 1987, as amended by CGD 84–024, 53 FR 32231, Aug. 24, 1988; CGD 84–024, 53 FR 34872, Sept. 8, 1988; CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50729, Sept. 27, 1996; CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–2009–0702, 74 FR 49231, Sept. 25, 2009]


§ 91.40-5 Notice and plans required.

(a) The master, owner, operator, or agent of the vessel shall notify the Officer in Charge, Marine Inspection, whenever the vessel is to be drydocked regardless of the reason for drydocking.


(b) Each vessel, except barges, that holds a Load Line Certificate must have on board a plan showing the vessel’s scantlings. This plan must be made available to the Coast Guard marine inspector whenever the vessel undergoes a drydock examination, internal structural examination, cargo tank internal examination, or underwater survey or whenever repairs are made to the vessel’s hull.


(c) Each barge that holds a Load Line Certificate must have a plan showing the barge’s scantlings. The plan need not be maintained on board the barge but must be made available to the Coast Guard marine inspector whenever the barge undergoes a drydock examination, internal structural examination, or cargo tank internal examination, or underwater survey or whenever repairs are made to the barge’s hull.


[CGD 84–024, 52 FR 39654, Oct. 23, 1987]


Subpart 91.43—Integral Fuel Oil Tank Examinations

§ 91.43-1 When required.

(a) Each fuel oil tank with at least one side integral to the vessel’s hull and located within the hull (“integral fuel oil tank”) is subject to inspection as provided in this section. The owner or operator of the vessel shall have the tanks cleaned out and gas freed as necessary to permit internal examination of the tank or tanks designated by the marine inspector. The owner or operator shall arrange for an examination of the fuel tanks of each vessel during an internal structural examination at intervals not to exceed five years.


(b) Integral non-double-bottom fuel oil tanks need not be cleaned out and internally examined if the marine inspector is able to determine by external examination that the general condition of the tanks is satisfactory.


(c) Double-bottom fuel oil tanks on vessels less than 10 years of age need not be cleaned out and internally examined if the marine inspector is able to determine by external examination that the general condition of the tanks is satisfactory.


(d) All double-bottom fuel oil tanks on vessels 10 years of age or older but less than 15 years of age need not be cleaned out and internally examined if the marine inspector is able to determine by internal examination of at least one forward double-bottom fuel oil tank, and by external examination of all other double-bottom fuel oil tanks on the vessel, that the general condition of the tanks is satisfactory.


(e) All double-bottom fuel oil tanks on vessels 15 years of age or older but less than 25 years of age need not be cleaned out and internally examined if the marine inspector is able to determine by internal examination of at least one forward, one amidships, and one aft double-bottom fuel oil tank, and by external examination of all other double-bottom fuel oil tanks on the vessel, that the general condition of the tanks is satisfactory.


(f) All double-bottom fuel oil tanks on vessels 25 years of age or older need not be cleaned out and internally examined if the marine inspector is able to determine by internal examination of at least one double-bottom fuel oil tank in way of each cargo hold/tank, and by external examination of all other double-bottom fuel oil tanks, that the general condition of the tanks is satisfactory.


[CGD 84–024, 52 FR 39654, Oct. 23, 1987, as amended by CGD 84–024, 53 FR 32232, Aug. 24, 1988]


Subpart 91.45—Repairs and Alterations

§ 91.45-1 Notice required.

(a) No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection.


(b) Drawings of alterations shall be approved before work is started unless deemed unnecessary by the Officer in Charge, Marine Inspection.


(c) Drawings will not be required for repairs in kind.


§ 91.45-5 Inspection required.

(a) An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken.


Subpart 91.50—Special Operating Requirements

§ 91.50-1 Inspection and testing required when making alterations, repairs, or other such operations involving riveting, welding, burning or like fire-producing actions.

(a) The provisions of “Standard for The Control of Gas Hazards on Vessels to be Repaired,” NFPA No. 306, published by National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02669, shall be used as a guide in conducting the inspections and issuance of certificates required by this section.


(b) Until an inspection has been made to determine that such operation can be undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding, burning, or like fire-producing actions shall be made:


(1) Within or on the boundaries of cargo tanks which have been used to carry combustible liquids or chemicals in bulk; or,


(2) Within spaces adjacent to cargo tanks which have been used to carry Grade D combustible liquid cargo, except where the distance between such cargo tanks and the work to be performed is not less than twenty-five (25) feet; or,


(3) Within or on the boundaries of fuel tanks; or,


(4) To pipelines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks; or,


(5) On miscellaneous vessels such as cable, salvage, pile driving, and oil drilling rig vessels that have been specially authorized to carry Grade B or Grade C flammable liquid cargo in bulk by the Commandant, within or on the boundaries of such cargo tanks or within spaces adjacent to such cargo tanks.


(c) Such inspections shall be made and evidenced as follows:


(1) In ports or places in the United States or its territories and possessions the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not reasonably available, the Officer in Charge, Marine Inspection, upon the recommendation of the vessel owner and his contractor or their representative, shall select a person who, in the case of an individual vessel, shall be authorized to make such inspection. If the inspection indicates that such operations can be undertaken with safety, a certificate setting forth the fact in writing and qualified as may be required, shall be issued by the certified marine chemist or the authorized person before the work is started. Such qualifications shall include any requirements as may be deemed necessary to maintain, insofar as can reasonably be done, the safe conditions in the spaces certified throughout the operation and shall include such additional tests and certifications as considered required. Such qualifications and requirements shall include precautions necessary to eliminate or minimize hazards that may be present from protective coatings or residues from cargoes.


(2) When not in such a port or place, and a marine chemist or such person authorized by the Officer in Charge, Marine Inspection, is not reasonably available, the inspection shall be made by the senior officer present and a proper entry shall be made in the vessel’s logbook.


(d) It shall be the responsibility of the senior officer present to secure copies of certificates issued by the certified marine chemist or such person authorized by the Officer in Charge, Marine Inspection. It shall be the responsibility of the senior officer present, insofar as the persons under his control are concerned, to maintain a safe condition on the vessel by full observance of all qualifications and requirements listed by the marine chemist in the certificate.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 95–072, 60 FR 50464, Sept. 29, 1995]


Subpart 91.55—Plan Approval

§ 91.55-1 General.

(a) The following list of required plans is general in character, but includes all plans which normally show construction and safety features coming under the cognizance of the Coast Guard. In the case of a particular vessel, all of the plans enumerated may not be applicable, and it is intended that only those plans and specifications be submitted as will clearly show the vessel’s arrangement, construction and required equipment.


(b) In the following list of required plans, the items which must be approved by the American Bureau of Shipping for vessels classed by that organization are indicated by an asterisk. When prints bearing record of such approval by the American Bureau of Shipping are forwarded to the Coast Guard they will in general be accepted as satisfactory except insofar as the law or the Coast Guard regulations contain requirements which are not covered by the American Bureau of Shipping.


(c) Plans and specifications for cargo gear shall be approved by either a recognized classification society or the International Cargo Gear Bureau, Inc., whose home office is located at 321 West 44th Street, New York, NY 10036, on the Internet at http://www.icgb.com.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–2008–0906, 73 FR 56510, Sept. 29, 2008]


§ 91.55-5 Plans and specifications required for new construction.

(a) General. (1) Specifications.


(2) General Arrangement Plan of decks, holds, inner bottoms, etc., and including inboard and outboard profile.


(b) Hull structure.
1
(1) *Inner Bottom Plating and Framing.




1 The asterisk (*) indicates items which may require approval by the American Bureau of Shipping for vessels classed by that society.


(2) *Midship Section.


(3) *Shell Plating and Framing.


(4) *Stem, Stern Frame, and Rudder.


(5) *Structural Deck Plans for Strength Decks.


(6) *Pillars and Girders.


(7) *Watertight and Oiltight Bulkheads.


(8) *Foundations for Main Machinery and Boilers.


(9) *Arrangement of Ports, Doors, and Airports in Shell Plating.


(10) *Hatch Coamings and Covers in Weather and Watertight Decks.


(11) *Details of Hinged Subdivision Watertight Doors and Operating Gear.


(12) *Scuppers and Drains Penetrating Shell Plating.


(13) *Arrangement of the cargo gear including a stress diagram. The principal details of the gear and the safe working load for each component part shall be shown.


(c) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter.


(d) Fire control. (1) General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system.


(2) Ventilation diagram including dampers and other fire control features.


(3) Details of alarm systems.


(4) Details of extinguishing systems, including fire mains, carbon dioxide, clean agent, foam, and sprinkling systems.


(e) Marine engineering. For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this chapter.


(f) Electrical engineering. For plans required for electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter.


(g) Lifesaving equipment. (1) These plans are to show the location and arrangement of embarkation decks, all overboard discharges and projections in way of launching lifeboats, weights of lifeboats fully equipped and loaded, working loads of davits and winches, types and sizes of falls, the manufacturer’s name and identification for all equipment, and all other relevant and necessary information.


(i) Arrangement of lifeboats.


(ii) Arrangement of davits.


(iii) Location and stowage of liferafts and buoyant apparatus.


(h) Crew’s accommodations. (1) Arrangement plans showing accommodations, ventilation, escapes, hospital, and sanitary facilities for all crewmembers.


(i) Navigation bridge visibility. For vessels of 100 meters (328 feet) or more in length contracted for on or after September 7, 1990, a plan must be included which shows how visibility from the navigation bridge will meet the standards contained in § 92.03–1 of this subchapter.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 79–023, 48 FR 51008, Nov. 4, 1983; CGD 85–099, 55 FR 32248, Aug. 8, 1990; CGD 85–099, 55 FR 40260, Oct. 2, 1990; CGD 88–032, 56 FR 35825, July 29, 1991; 56 FR 46354, Sept. 11, 1991; USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 91.55-10 Plans required for alterations of existing vessels.

(a) In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by § 91.45–1. The general scope of the plans shall be as noted in § 91.55–5.


§ 91.55-15 Procedure for submittal of plans.

(a) As the relative location of shipyards, design offices, and Coast Guard offices vary throughout the country, no specific routing will be required in the submittal of plans. In general, one of the following procedures would apply, but in a particular case, if a more expeditious procedure can be used, there will be no objection to its adoption.


(1) The plans may be submitted to the Officer in Charge, Marine Inspection, in the district in which the vessel is to be built. This procedure will be most expeditious in the case of those offices where personnel and facilities are available for examination and approval of the plans locally.


(2) The plans may be submitted directly to the Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509. In this case, the plans will be returned directly to the submitter, with a copy of the action being forwarded to the interested Officer in Charge, Marine Inspection.


(3) The plans may be submitted by visitors directly to Commanding Officer, U.S. Coast Guard Marine Safety Center, 1900 Half Street, SW., Suite 1000, Room 525, Washington, DC 20024, or transmitted by mail to: Commanding Officer, U.S. Coast Guard Marine Safety Center, 2100 2nd St., SW., Stop 7102, Washington, DC 20593–7102, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC. In this case, the plans will be returned directly to the submitter, with a copy of the action being forwarded to the interested Officer in Charge, Marine Inspection.


(4) In the case of classed vessels, upon specific request by the submitter, the American Bureau of Shipping will arrange to forward the necessary plans to the Coast Guard indicating its action thereon. In this case, the plans will be returned as noted in paragraph (a)(2) of this section.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 78–128, 47 FR 21204, May 17, 1982; CGD 82–063b, 48 FR 4781, Feb. 3, 1983; CGD 88–070, 53 FR 34534, Sept. 7, 1988; CGD 89–025, 54 FR 19571, May 8, 1989; CGD 96–041, 61 FR 50729, Sept. 27, 1996; USCG–2007–29018, 72 FR 53966, Sept. 21, 2007; USCG–2009–0702, 74 FR 49231, Sept. 25, 2009; USCG–2013–0671, 78 FR 60150, Sept. 30, 2013]


§ 91.55-20 Number of plans required.

(a) Three copies of each plan are normally required so that one can be returned to the submitter. If the submitter desires additional approved plans, a suitable number should be submitted to permit the required distribution.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGFR 69–116, 35 FR 6861, Apr. 30, 1970]


Subpart 91.60—Certificates Under International Convention for Safety of Life at Sea, 1974

§ 91.60-1 Application.

The provisions of this subpart shall apply to all cargo vessels on an international voyage. (See § 91.05–10 of this chapter.)


[CGD 95–012, 60 FR 48051, Sept. 18, 1995, as amended by USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 91.60-5 Cargo Ship Safety Construction Certificate.

(a) All vessels on an international voyage are required to have a Cargo Ship Safety Construction Certificate. This certificate shall be issued by the U.S. Coast Guard or the American Bureau of Shipping to certain vessels on behalf of the United States of America as provided in Regulation 12, chapter I, of the International Convention for Safety of Life at Sea, 1974.


(b) All such vessels shall meet the applicable requirements of this chapter for vessels on an international voyage.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 90–008, 55 FR 30661, July 26, 1990]


§ 91.60-10 Cargo Ship Safety Equipment Certificate.

(a) All vessels on an international voyage are required to have a Cargo Ship Safety Equipment Certificate.


(b) All such vessels shall meet the applicable requirements of this chapter for vessels on an international voyage.


§ 91.60-15 Cargo Ship Safety Radio Certificate.

Every vessel equipped with a radio installation on an international voyage must have a Cargo Ship Safety Radio Certificate. Each radio installation must meet the requirements of the Federal Communication Commission and the International Convention for Safety of Life at Sea.


[USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 91.60-25 Exemption Certificate.

(a) A vessel may be exempted by the Commandant from complying with certain requirements of the Convention under his administration upon request made in writing to him and transmitted via the Officer in Charge, Marine Inspection.


(b) When an exemption is granted to a vessel by the Commandant under and in accordance with the Convention, an Exemption Certificate describing such exemption shall be issued through the appropriate Officer in Charge, Marine Inspection, in addition to other required certificates.


§ 91.60-30 Safety Management Certificate.

All vessels to which 33 CFR part 96 applies on an international voyage must have a valid Safety Management Certificate and a copy of their company’s valid Document of Compliance certificate on board.


[CGD 95–073, 62 FR 67514, Dec. 24, 1997]


§ 91.60-35 Availability of Certificates.

The Convention certificates must be on board the vessel and readily available for examination at all times.


[USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 91.60-40 Duration of Convention certificates.

(a) The following certificates are valid for a period of not more than 60 months.


(1) A Cargo Ship Safety Construction Certificate.


(2) A Cargo Ship Safety Equipment Certificate.


(3) A Safety Management Certificate.


(4) A Cargo Ship Safety Radio Certificate.


(b) An Exemption certificate must not be valid for longer than the period of the certificate to which it refers.


(c) A Convention certificate may be withdrawn, revoked, or suspended at any time when it is determined that the vessel is no longer in compliance with applicable requirements. (See § 2.01–70 of this chapter for procedures governing appeals.)


[USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 91.60-45 American Bureau of Shipping.

(a) The American Bureau of Shipping, with its home office at ABS Plaza, 16855 Northchase Drive, Houston, TX 77060, is hereby designated as an organization duly authorized to issue the “Cargo Ship Safety Construction Certificate” to certain cargo ships on behalf of the United States of America as provided in Regulation 12, chapter I, of the International Convention for Safety of Life at Sea, 1974, and Executive Order 12234 and the certificate shall be subject to the requirements in this subpart. The American Bureau of Shipping is authorized to place the official seal of the United States of America on the certificate. This designation and delegation to the American Bureau of Shipping shall be in effect until terminated by proper authority and notice of cancellation is published in the Federal Register.


(b) At the option of the owner or agent of a vessel on an international voyage and on direct application to the American Bureau of Shipping, the Bureau may issue to such vessel a Cargo Ship Safety Construction Certificate, having a period of validity of not more than 60 months after ascertaining that the vessel:


(1) Has met the applicable requirements of the Convention; and,


(2) Is currently classed by the Bureau and classification requirements have been dealt with to the satisfaction of the Bureau.


(c) When the Bureau determines that a vessel to which it has issued a Cargo Ship Safety Construction Certificate no longer complies with the Bureau’s applicable requirements for classification, the Bureau shall immediately furnish to the Coast Guard all relevant information, which will be used by the Coast Guard to determine whether or not to withdraw, revoke or suspend the Cargo Ship Safety Construction Certificate.


[CGFR 65–50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 90–008, 55 FR 30661, July 26, 1990; CGD 96–041, 61 FR 50729, Sept. 27, 1996; USCG–2000–7790, 65 FR 58461, Sept. 29, 2000]


PART 92—CONSTRUCTION AND ARRANGEMENT


Authority:46 U.S.C. 3306; E.0. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 0170.1.


Source:CGFR 65–50, 30 FR 16983, Dec. 30, 1965, unless otherwise noted.

Subpart 92.01—Hull Structure

§ 92.01-1 Application.

(a) The provisions of this subpart, with the exception of § 92.01–90, shall apply to all vessels contracted for on or after November 19, 1952. Vessels contracted for prior to November 19, 1952, shall meet the requirements of § 92.01–90.


§ 92.01-2 Incorporation by reference.

(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. The material is also available for inspection at Coast Guard Headquarters. Contact Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509. The material is also from the source listed in paragraph (b) of this section.


(b) International Maritime Organization (IMO), Publications Section, 4 Albert Embankment, London. SE1 7SR, United Kingdom, telephone + 44 (0)20 7735 7611, http://www.imo.org.


(1) International Convention for the Safety of Life at Sea (SOLAS), as amended, Consolidated Edition, 2009, including Erratum, IBR approved for § 92.07–1(c).


(2) [Reserved]


[USCG–2009–0702, 74 FR 49232, Sept. 25, 2009, as amended by USCG–2012–0832, 77 FR 59779, Oct. 1, 2012; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013; USCG–2012–0196, 81 FR 48262, July 22, 2016]


§ 92.01-5 Vessels subject to load line.

(a) For vessels assigned a load line, see subchapter E (Load Lines) of this chapter, for special requirements as to strength, closure of openings, etc.


§ 92.01-10 Structural standards.

(a) In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. However, in special cases, a detailed analysis of the entire structure or some integral part may be made by the Coast Guard to determine the structural requirements.


§ 92.01-15 Special consideration.

(a) Special consideration will be given to the structural requirements for small vessels or vessels of an unusual design not contemplated by the rules of the American Bureau of Shipping.


§ 92.01-90 Vessels contracted for prior to November 19, 1952.

(a) Existing structure previously approved will be considered satisfactory so long as it is maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction.


Subpart 92.03—Navigation Bridge Visibility

§ 92.03-1 Navigation bridge visibility.

Each cargo and miscellaneous vessel which is 100 meters (328 feet) or more in length and contracted for on or after September 7, 1990, must meet the following requirements:


(a) The field of vision from the navigation bridge, whether the vessel is in a laden or unladen condition, must be such that:


(1) From the conning position, the view of the sea surface is not obscured forward of the bow by more than the lesser of two ship lengths or 500 meters (1,640 feet) from dead ahead to 10 degrees on either side of the vessel. Within this arc of visibility any blind sector caused by cargo, cargo gear, or other permanent obstruction must not exceed 5 degrees.


(2) From the conning position, the horizontal field of vision extends over an arc from at least 22.5 degrees abaft the beam on one side of the vessel, through dead ahead, to at least 22.5 degrees abaft the beam on the other side of the vessel. Blind sectors forward of the beam caused by cargo, cargo gear, or other permanent obstruction must not exceed 10 degrees each, nor total more than 20 degrees, including any blind sector within the arc of visibility described in paragraph (a)(1) of this section.


(3) From each bridge wing, the field of vision extends over an arc from at least 45 degrees on the opposite bow, through dead ahead, to at least dead astern.


(4) From the main steering position, the field of vision extends over and arc from dead ahead to at least 60 degrees on either side of the vessel.


(5) From each bridge wing, the respective side of the vessel is visible forward and aft.


(b) Windows fitted on the navigation bridge must be arranged so that:


(1) Framing between windows is kept to a minimum and is not installed immediately in front of any work station.


(2) Front windows are inclined from the vertical plane, top out, at an angle of not less than 10 degrees and not more than 25 degrees.


(3) The height of the lower edge of the front windows is limited to prevent any obstruction of the forward view previously described in this section.


(4) The height of the upper edge of the front windows allows a forward view of the horizon at the conning position, for a person with a height of eye of 1.8 meters (71 inches), when the vessel is at a forward pitch angle of 20 degrees.


(c) Polarized or tinted windows must not be fitted.


[CGD 85–099, 55 FR 32248, Aug. 8, 1990, as amended by USCG–2014–0688, 79 FR 58282, Sept. 29, 2014]


Subpart 92.05—General Fire Protection

§ 92.05-1 Fire hazards to be minimized.

(a) The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable.


§ 92.05-5 Woodwork insulated from heated surfaces.

(a) Internal combustion engine exhausts, boiler and galley uptakes, and similar sources of ignition shall be kept clear of and suitably insulated from any woodwork or other combustible matter.


§ 92.05-10 Lamp room construction.

(a) Lamp, paint, and oil lockers and similar compartments shall be constructed of steel or shall be wholly lined with metal.


§ 92.05-15 Segregation of spaces containing the emergency source of electric power.

(a) The provisions of this section shall apply to all vessels contracted for on or after October 1, 1958.


(b) When a compartment containing the emergency source of electric power, or vital components thereof, adjoins a space containing either the ship’s service generators or machinery necessary for the operation of the ship’s service generators, all common bulkheads and/or decks shall be protected by approved “structural insulation” or other approved material. This protection shall be such as to be capable of preventing an excessive temperature rise in the space containing the emergency source of electric power, or vital components thereof, for a period of at least one hour in the event of fire in the adjoining space. Bulkheads or decks meeting Class A–60 requirements, as defined by § 72.05–10 of Subchapter H (Passenger Vessels) of this chapter, will be considered as meeting the requirements of this paragraph.


Subpart 92.07—Structural Fire Protection

§ 92.07-1 Application.

(a) The provisions of this subpart, with the exception of § 92.07–90, apply to all vessels of 4,000 gross tons or more contracted for on or after January 1, 1962. Such vessels contracted for prior to January 1, 1962, must meet the requirements of § 92.07–90(a).


(b) The provisions of this subpart, with the exception of § 92.07–90, apply to all industrial vessels of 300 gross tons or more but less than 4,000 gross tons, contracted for on or after July 1, 1968, which carry in excess of 12 industrial personnel. Such vessels contracted for prior to July 1, 1968, must meet the requirements of § 92.07–90(b).


(c) Vessels meeting the structural fire protection requirements of SOLAS, Chapter II–2, Regulations 5, 6, 8, 9, and 11 (incorporated by reference, see § 92.01–2), may be considered equivalent to the provisions of this subpart.


[CGFR 67–90, 33 FR 1015, Jan. 26, 1968, as amended by CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–2003–16630, 73 FR 65192, Oct. 31, 2008; USCG–2012–0196, 81 FR 48262, July 22, 2016]


§ 92.07-5 Definitions.

(a) Standard fire test. A “standard fire test” is one which develops in the test furnace a series of time temperature relationships as follows:



5 minutes—1,000 °F.

10 minutes—1,300 °F.

30 minutes—1,550 °F.

60 minutes—1,700 °F.

(b) “A” Class divisions. Bulkheads or decks of the “A” Class shall be composed of steel or equivalent metal construction, suitably stiffened and made intact with the main structure of the vessel; such as shell, structural bulkheads, and decks. They shall be so constructed, that if subjected to the standard fire test, they would be capable of preventing the passage of flame and smoke for one hour.


(c) “B” Class bulkheads. Bulkheads of the “B” Class shall be constructed with approved incombustible materials and made intact from deck to deck and to shell or other boundaries. They shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of flame for one half hour.


(d) “C” Class divisions. Bulkheads or decks of the “C” Class shall be constructed of approved incombustible materials, but need meet no requirements relative to the passage of flame.


(e) Steel or other equivalent metal. Where the term “steel or other equivalent metal” is used in this subpart, it is intended to require a material which, by itself or due to insulation provided, has structural and integrity qualities equivalent to steel at the end of the applicable fire exposure.


(f) Approved material. Where in this subpart approved materials are required, they refer to materials approved under the applicable subparts of Subchapter Q (Specifications) of this chapter, as follows:


Deck Coverings164.006
Structural Insulations164.007
Bulkhead Panels164.008
Incombustible Materials164.009
Interior Finishes164.012

(g) Stairtower. A stairtower is a stairway which penetrates more than a single deck within the same enclosure.


[CGFR 65–50, 30 FR 16983, Dec. 30, 1965, as amended by CGFR 67–90, 33 FR 1015, Jan. 26, 1968; CGD 75–032, 41 FR 17910, Apr. 29, 1976]


§ 92.07-10 Construction.

(a) The hull, superstructure, structural bulkheads, decks, and deckhouses shall be constructed of steel. Alternately, the Commandant may permit the use of other suitable material in special cases, having in mind the risk of fire.


(b) Bulkheads of galleys, paint and lamp lockers, and emergency generator rooms shall be of “A” Class construction.


(c) The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction.


(d) Within the accommodation and service areas the following conditions shall apply:


(1) Corridor bulkheads in accommodation spaces shall be of the “A” or “B” Class intact from deck to deck. Stateroom doors in such bulkheads may have a louver in the lower half.


(2) Stairtowers, elevator, dumbwaiter, and other trunks shall be of “A” Class construction.


(3) Bulkheads not already specified to be of “A” or “B” Class construction may be of “A”, “B”, or “C” Class construction.


(4) The integrity of any deck in way of a stairway opening, other than a stairtower, shall be maintained by means of “A” or “B” class bulkheads and doors at one level. The integrity of a stairtower shall be maintained by “A” Class doors at every level. The doors shall be of self-closing type. Holdback hooks, or other means of permanently holding the door open will not be permitted. However, magnetic holdbacks operated from the bridge or from other suitable remote control positions are acceptable.


(5) Interior stairs, including stringers and treads, shall be of steel.


(6) Except for washrooms and toilet spaces, deck coverings within accommodation spaces shall be of an approved type. However, overlays for leveling or finishing purposes which do not meet the requirements for an approved deck covering may be used in thicknesses not exceeding
3/8 of an inch.


(7) Ceilings, linings, and insulation, including pipe and duct laggings, shall be of approved incombustible materials.


(8) Any sheathing, furring or holding pieces incidental to the securing of any bulkhead, ceiling, lining, or insulation shall be of approved incombustible materials.


(9) Bulkheads, linings, and ceilings may have a combustible veneer within a room not to exceed
2/28 of an inch in thickness. However, combustible veneers, trim, decorations, etc., shall not be used in corridors or hidden spaces. This is not intended to preclude the use of an approved interior finish or a reasonable number of coat of paint.


(e) Wood hatch covers may be used between cargo spaces or between stores spaces. Hatch covers in other locations shall be of steel or equivalent metal construction. Tonnage openings shall be closed by means of steel plates.


(f) Nitrocellulose or other highly flammable or noxious fume-producing paints or lacquers shall not be used.


(g) The provisions of paragraph (d) (1) through (9) of this section apply to control spaces on vessels whose initial Application for Inspection is submitted to an Officer in Charge, Marine Inspection on or after June 15, 1987.


[CGFR 65–50, 30 FR 16983, Dec. 30, 1965, as amended by CGFR 67–90, 33 FR 1015, Jan. 26, 1968; CGD 84–073, 52 FR 18364, May 15, 1987; 52 FR 22751, June 15, 1987]


§ 92.07-90 Vessels contracted for prior to July 1, 1968.

(a) For all vessels of 4,000 gross tons and over contracted for prior to January 1, 1962, existing structure arrangements and materials previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction. Major alterations and conversions shall be in compliance with the provisions of this subpart to the satisfaction of the Officer in Charge, Marine Inspection.


(b) For industrial vessels of 300 gross tons and over but less than 4,000 gross tons, contracted for prior to July 1, 1968, which carry in excess of 12 industrial personnel, existing structure arrangements and materials previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction. Major alterations and conversions shall be in compliance with this subpart to the satisfaction of the Officer in Charge, Marine Inspection.


[CGFR 67–90, 33 FR 1016, Jan. 26, 1968]


Subpart 92.10—Means of Escape

§ 92.10-1 Application.

(a) The provisions of this subpart, with the exception of § 92.10–90, shall apply to all vessels contracted for on or after November 19, 1952. Vessels contracted for prior to November 19, 1952, shall meet the requirements of § 92.10–90.


§ 92.10-5 Two means required.

(a) There shall be at least two means of escape from all general areas accessible to the passengers, if carried, or where the crew may be quartered or normally employed. At least one of these two means of escape shall be independent of watertight doors.


§ 92.10-10 Location.

(a) The two means of escape shall be as remote as practicable so as to minimize the possibility of one incident blocking both escapes.


§ 92.10-15 Vertical ladders not accepted.

(a) Vertical ladders and deck scuttles shall not in general be considered satisfactory as one of the required means of escape. However, where it is demonstrated that the installation of a stairway would be impracticable, a vertical ladder may be used as the second means of escape.


§ 92.10-20 No means for locking doors.

(a) No means shall be provided for locking doors giving access to either of the two required means of escape, except that crash doors or locking devices, capable of being easily forced in an emergency, may be employed provided a permanent and conspicuous notice to this effect is attached to both sides of the door. This paragraph shall not apply to outside doors to deckhouses where such doors are locked by key only and such key is under the control of one of the vessel’s officers.


§ 92.10-25 Stairway size.

(a) Stairways shall be of sufficient width having in mind the number of persons having access to such stairs for escape purposes.


(b) Vessels contracted for on or after January 1, 1959, shall meet the requirements of this paragraph. Special consideration for relief may be given in the case of small vessels if it is shown to be unreasonable or impracticable to meet the requirements.


(1) All interior stairways, other than those within the machinery spaces or cargo holds, shall have a minimum width of 28 inches. The angle of inclination with the horizontal of such stairways shall not exceed 50 degrees.


§ 92.10-30 Dead end corridors.

(a) Dead end corridors, or the equivalent, more than 40 feet in length shall not be permitted.


§ 92.10-35 Public spaces.

(a) In all cases, public spaces having a deck area of over 300 square feet shall have at least two exits. Where practicable, these exits shall give egress to different corridors, rooms, or spaces to minimize the possibility of one incident blocking both exits.


§ 92.10-40 Access to lifeboats.

(a) The stairways, corridors, and doors shall be so arranged as to permit a ready and direct access to the various lifeboat embarkation areas.


§ 92.10-45 Weather deck communications.

(a) Vertical communication shall be provided between the various weather decks by means of permanent inclined ladders.


§ 92.10-90 Vessels contracted for prior to November 19, 1952.

(a) Existing arrangements previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original design: Provided, That in no case will a greater departure from the standards of §§ 92.10–5 through 92.10–45 be permitted than presently exists. Nothing in this paragraph shall be construed as exempting any vessel from having 2 means of escape from all main compartments which are accessible to the passengers, if carried, or where the crew are normally quartered or employed.


Subpart 92.15—Ventilation

§ 92.15-1 Application.

The provisions of this subpart, with the exception of § 92.15–90, shall apply to all vessels contracted for on or after November 19, 1952. Vessels contracted for prior to November 19, 1952, shall meet the requirements of § 92.15–90.


§ 92.15-5 Vessels using fuel having a flashpoint of 110 degrees or lower.

(a) Where liquid fuel having a flashpoint of 110 degrees F. or lower is used for main or auxiliary machinery or for starting purposes, the spaces containing such machinery or fuel tanks shall have ventilation as required by this section.


(1) At least 2 ventilators fitted with cowls or their equivalent for the purpose of properly and effectively ventilating the bilges of every engine and fuel-tank compartment in order to remove any flammable or explosive gases.


(2) Vessels constructed so that the greater portions of the bilges under the engine and fuel tanks are open or exposed to the natural atmosphere at all times are not required to be fitted with ventilators.


§ 92.15-10 Ventilation for closed spaces.

(a) Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators.


(b) Means shall be provided for stopping all fans in ventilation systems serving machinery and cargo spaces and for closing all doorways, ventilators and annular spaces around funnels and other openings to such spaces, from outside these spaces, in case of fire.


(c) On unmanned cargo barges not fitted with a fixed bilge system, vents and ventilators may be omitted from void spaces.


(d) The ventilation of spaces that are “specially suitable for vehicles” shall be in accordance with §§ 97.80–1, 111.105–39 and 111.105–40 of this chapter, as applicable.


(1) Areas below the weather deck shall be provided with continuous pressure-positive ventilation at each level on which vehicles are transported.


(2) The quantity of ventilating air shall be not less than 1 cubic foot per minute per square foot of deck area.


(3) The ventilation system shall be such as to prevent air stratification as well as to prevent the accumulation of air pockets.


(4) An alarm system shall be provided which will indicate the loss of required ventilation. The alarm location shall be in a normally manned space acceptable to the Commandant.


(e) For requirements regarding controls of electrically powered ventilation systems, see subchapter J (Electrical Engineering) of this chapter.


[CGFR 65–50, 30 FR 16983, Dec. 30, 1965, as amended by CGFR 66–33, 31 FR 15284, Dec. 5, 1966; USCG–2003–16630, 73 FR 65193, Oct. 31, 2008]


§ 92.15-15 Ventilation for crew quarters and, where provided, passenger spaces.

(a) All living spaces shall be adequately ventilated in a manner suitable to the purpose of the space.


(b) On vessels of 100 gross tons and over, except for such spaces as are so located that under all ordinary conditions of weather, windows, ports, skylights, etc., and doors to passageways can be kept open, all crew spaces shall be ventilated by a mechanical system, unless it can be shown that a natural system will provide adequate ventilation. However, vessels which trade regularly in the tropics shall, in general, be fitted with a mechanical ventilation system.


§ 92.15-90 Vessels contracted for prior to November 19, 1952.

(a) Existing arrangements previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original design provided that in no case will a greater departure from the standards of §§ 92.15–5 through 92.15–15 be permitted than presently exists.


Subpart 92.20—Accommodations for Officers and Crew


Source:CGD 95–027, 61 FR 26005, May 23, 1996, unless otherwise noted.

§ 92.20-1 Application.

(a) The provisions of this subpart apply to all vessels of 100 gross tons and over contracted for on or after November 19, 1952. Vessels of 100 gross tons and over contracted for prior to November 19, 1952 must meet the requirements of § 92.20–90.


(b) Vessels of less than 100 gross tons must meet the applicable requirements of this subpart insofar as is reasonable and practicable.


§ 92.20-5 Intent.

It is the intent of this subpart that the accommodations provided for officers and crew on all vessels must be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged, and insulated from undue noise, heat, and odors.


§ 92.20-10 Location of crew spaces.

(a) Crew quarters must not be located farther forward in the vessel than a vertical plane located at 5 percent of the vessel’s length abaft the forward side of the stem at the designed summer load water line. However, for vessels in other than ocean or coastwise service, this distance need not exceed 8.5 meters (28 feet). For the purposes of this paragraph, the vessel’s length must be as defined in § 43.15-1 of subchapter E (Load Lines) of this chapter. Unless approved by the Commandant, no section of the deck head of the crew spaces may be below the deepest load line.


(b) There must be no direct communication, except through solid, close fitted doors, or hatches between crew spaces and chain lockers, or machinery spaces.


§ 92.20-15 Construction.

All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition.


§ 92.20-20 Sleeping accommodations.

(a) Where practicable, each licensed officer must be provided with a separate stateroom.


(b) Sleeping accommodations for the crew must be divided into rooms, no one of which shall berth more than 4 persons.


(c) Each room must be of such size that there is at least 2.78 square meters (30 square feet) of deck area and a volume of at least 5.8 cubic meters (210 cubic feet) for each person accommodated. The clear head room must be not less than 190 centimeters (75 inches). In measuring sleeping accommodations, any furnishings contained therein for the use of the occupants are not to be deducted from the total volume or from the deck area.


(d) Each person shall have a separate berth and not more than one berth may be placed above another. The berth must be composed of materials not likely to corrode. The overall size of a berth must not be less than 68 centimeters (27 inches) wide by 190 centimeters (75 inches) long, except by special permission of the Commandant. Where 2 tiers of berths are fitted, the bottom of the lower berth must not be less than 30 centimeters (12 inches) above the deck. The berths must not be obstructed by pipes, ventilating ducts, or other installations.


(e) A locker must be provided for each person accommodated in a room.


§ 92.20-25 Washrooms and toilet rooms.

(a) There must be provided at least 1 toilet, 1 washbasin, and 1 shower or bathtub for each 8 members or portion thereof in the crew who do not occupy rooms to which private or semi-private facilities are attached.


(b) The toilet rooms and washrooms must be located convenient to the sleeping quarters of the crew to which they are allotted but must not open directly into such quarters except when they are provided as private or semi-private facilities.


(c) All washbasins, showers, and bathtubs shall be equipped with adequate plumbing, including hot and cold running water. All toilets must be installed with adequate plumbing for flushing.


(d) At least 1 washbasin must be fitted in each toilet room, except where private or semi-private facilities are provided and washbasins are installed in the sleeping rooms.


(e) Where more than 1 toilet is located in a space or compartment, each toilet must be separated by partitions.


§ 92.20-30 Messrooms.

(a) Messrooms must be located as near to the galley as is practicable except where the messroom is equipped with a steam table.


(b) Each messroom must seat the number of persons expected to eat in the messroom at one time.


§ 92.20-35 Hospital space.

(a) Each vessel which in the ordinary course of its trade makes voyages of more than 3 days duration between ports and which carries a crew of 12 or more, must be provided with a hospital space. This space must be situated with due regard to the comfort of the sick so that they may receive proper attention in all weathers.


(b) The hospital must be suitably separated from other spaces and must be used for the care of the sick and for no other purpose.


(c) The hospital must be fitted with berths in the ratio of 1 berth to every 12 members of the crew or portion thereof who are not berthed in single occupancy rooms, but the number of berths need not exceed 6.


(d) The hospital must have a toilet, washbasin, and bathtub or shower conveniently situated. Other necessary suitable equipment such as a clothes locker, a table, and a seat shall be provided.


(e) On vessels in which the crew is berthed in single occupancy rooms, a hospital space will not be required, provided that one room is designated and fitted for use as a treatment or isolation room. This room must meet the following standards:


(1) The room must be available for immediate medical use; and


(2) A washbasin with hot and cold running water must be installed either in or immediately adjacent to the space and other required sanitary facilities must be conveniently located.


§ 92.20-40 Other spaces.

Each vessel must have—


(a) Sufficient facilities where the crew may wash and dry their own clothes, including at least 1 sink supplied with hot and cold fresh water;


(b) Recreation spaces; and


(c) A space or spaces of adequate size on an open deck to which the crew has access when off duty.


[CGD 95–027, 61 FR 26005, May 23, 1996; 61 FR 32900, June 25, 1996]


§ 92.20-45 Lighting.

Each berth must have a light.


§ 92.20-50 Heating and cooling.

(a) All manned spaces must be adequately heated and cooled in a manner suitable to the purpose of the space.


(b) The heating and cooling system for accommodations must be capable of maintaining a temperature of 21 °C (70 °F) under normal operating conditions without curtailing ventilation.


(c) Radiators and other heating apparatus must be so placed and shielded, where necessary, to avoid risk of fire, danger, or discomfort to the occupants. Pipes leading to radiators or heating apparatus must be insulated where those pipes create a hazard to persons occupying the space.


§ 92.20-55 Insect screens.

Provisions must be made to protect the crew quarters against the admission of insects.


§ 92.20-90 Vessels contracted for prior to November 19, 1952.

(a) Vessels of less than 100 gross tons, contracted for prior to November 19, 1952, must meet the general intent of § 92.20–5 and in addition must meet the following requirements:


(1) Existing structure, arrangements, materials, and facilities, previously accepted or approved will be considered satisfactory so long as they are maintained in a suitable condition to the satisfaction of the Officer in Charge, Marine Inspection.


(2) Minor repairs and alterations may be made to the same standard as the original construction.


(b) Vessels of 100 gross tons and over, contracted for prior to March 4, 1915, must meet the following requirements:


(1) Existing structure, arrangements, materials, and facilities, previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(2) Minor repairs and alterations may be made to the same standard as the original construction, provided that in no case will a greater departure from the standards of §§ 92.20–5 through 92.20–55 be permitted than presently exists.


(c) Vessels of 100 gross tons and over, contracted for on or after March 4, 1915, but prior to January 1, 1941, must meet the following requirements:


(1) Existing structure, arrangements, materials, and facilities, previously approved will be considered satisfactory so long as they are maintained in a suitable condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction.


(2) Each vessel, which in the ordinary course of its trade makes a voyage of more than 3 days duration between ports and which carries a crew of 12 or more persons, must be provided with a suitable hospital space for the exclusive use of the sick or injured.


(3) The crew spaces must be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged, and insulated from undue noise, heat, and odors.


(d) Vessels of 100 gross tons and over, contracted for on or after January 1, 1941, but prior to November 19, 1952, must meet the following requirements:


(1) Existing structure, arrangements, materials, and facilities, previously approved will be considered satisfactory so long as they are maintained in a suitable condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction.


(2) Washbasins, showers, and bathtubs if substituted for showers, must be equipped with adequate plumbing including hot and cold running water.


(3) Each crewmember must have a separate berth, and berths may not be placed more than 2 high.


(4) Each vessel, which in the ordinary course of its trade makes a voyage of more than 3 days duration between ports and which carries a crew of 12 or more persons, must be provided with a suitable hospital space for the exclusive use of the sick or injured. Berths shall be provided in the ratio of 1 berth for each 12 members of the crew or fraction thereof, but the number of berths need not exceed 6.


(5) The crew spaces must be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged, and insulated from undue noise, heat, and odors.


Subpart 92.25—Rails and Guards

§ 92.25-1 Application.

(a) The provisions of this subpart, with the exception of § 92.25–90, shall apply to all vessels contracted for on or after July 1, 1969. Vessels contracted for prior to July 1, 1969, shall meet the requirements of § 92.25–90.


[CGFR 65–50, 30 FR 16983, Dec. 30, 1965, as amended by CGFR 69–72, 34 FR 17484, Oct. 29, 1969; CGD 80–120, 47 FR 5723, Feb. 8, 1982]


§ 92.25-5 Where rails required.

(a) All vessels shall have efficient guard rails or bulwarks on decks and bridges. The height of rails or bulwarks shall be at least 39
1/2 inches from the deck except that where this height would interfere with the normal operation of the vessel, a lesser height may be approved by the Commandant. At exposed peripheries of the freeboard and superstructure decks, the rails shall be in at least three courses, including the top. The opening below the lowest course shall not be more than 9 inches. The courses shall not be more than 15 inches apart. In the case of ships with rounded gunwales the guard rail supports shall be placed on the flat of the deck. On other decks and bridges the rails shall be in at least two courses, including the top, approximately evenly spaced. If it can be shown to the satisfaction of the Officer in Charge, Marine Inspection, that the installation of rails of such height will be unreasonable and impracticable, having regard to the business of the vessel, rails of a lesser height or in some cases grab rails may be accepted and inboard rails may be eliminated if the deck is not generally accessible.


(b) Where it can be shown to the satisfaction of the Commandant that a vessel is engaged exclusively in voyages of a sheltered nature, the provisions of paragraph (a) of this section may be relaxed.


[CGFR 69–72, 34 FR 17484, Oct. 29, 1969, as amended by CGD 80–120, 47 FR 5723, Feb. 8, 1982]


§ 92.25-10 Storm rails.

(a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board might have normal access. Storm rails shall be installed on both sides of passageways which are 6 feet or more in width.


§ 92.25-15 Guards in dangerous places.

(a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc.


§ 92.25-90 Vessels contracted for prior to July 1, 1969.

(a) Vessels contracted for prior to July 1, 1969, assigned a deeper load line under part 42 of subchapter E (Load Lines) of this chapter shall have efficient guard rails or bulwarks as required by § 92.25–5. Otherwise, existing structure, arrangements, materials, and facilities previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original construction. However, in no case will greater departure from the standards of §§ 92.25–5 through 92.25–15 be permitted than presently exists.


[CGFR 69–72, 34 FR 17484, Oct. 29, 1969, as amended by CGD 80–120, 47 FR 5723, Feb. 8, 1982]


PART 93—STABILITY


Authority:46 U.S.C. 3306, 5115; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

Subpart 93.01—Application

§ 93.01-1 General.

Each vessel must meet the applicable requirements in subchapter S of this chapter.


[CGD 79–023, 48 FR 51008, Nov. 4, 1983]


PART 95—FIRE PROTECTION EQUIPMENT


Authority:46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 0170.1.


Source:CGFR 65–50, 30 FR 17001, Dec. 30, 1965, unless otherwise noted.

Subpart 95.01—Application

§ 95.01-1 General.

(a) The provisions of this part apply to all vessels except as specifically noted in this part.


(b) Equipment installed prior to August 22, 2016 as required by this paragraph (b) may remain in service so long as it is maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by USCG–2006–24797, 77 FR 33878, June 7, 2012; USCG–2012–0196, 81 FR 48262, July 22, 2016]


§ 95.01-2 Incorporation by reference.

(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Also, it is available for inspection at Coast Guard Headquarters. Contact Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509”; telephone 202–372–1405. The material is also available from the sources listed in paragraphs (b) and (c) of this section.


(b) ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428–2959, 877–909–2786, http://www.astm.org.


(1) ASTM F1121–87 (Reapproved 2010), Standard Specification for International Shore Connections for Marine Fire Applications, (approved March 1, 2010), incorporation by reference approved for § 95.10–10.


(2) [Reserved]


(c) International Maritime Organization (IMO) Publishing, 4 Albert Embankment, London SE1 7SR, United Kingdom, +44 (0)20 7735 7611, http://www.imo.org.


(1) FSS Code, International Code for Fire Safety Systems, Second Edition, 2007 Edition (Resolution MSC.98(73)), IBR approved for § 95.05–3(a) and (b).


(2) [Reserved]


(d) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617–770–3000, http://www.nfpa.org.


(1) NFPA 13, Standard for the Installation of Sprinkler Systems, 2010 Edition, effective August 26, 2009, IBR approved for § 95.30–1.


(2) [Reserved]


(e) UL (formerly Underwriters Laboratories), 12 Laboratory Drive, P.O. Box 13995, Research Triangle Park, NC 27709, 919–549–1400, http://www.ul.com.


(1) UL 19, Standard for Safety for Lined Fire Hose and Hose Assemblies, Twelfth Edition, approved November 30, 2001, IBR approved for § 95.10–10(n).


(2) [Reserved]


[USCG–2009–0702, 74 FR 49232, Sept. 25, 2009, as amended by USCG–2012–0832, 77 FR 59780, Oct. 1, 2012; USCG–2012–0866, 78 FR 13251, Feb. 27, 2013; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013; USCG–2012–0196, 81 FR 48262, July 22, 2016]


§ 95.01-5 Equipment installed but not required.

(a) Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part.


(b) Use of non-approved fire detection systems may be acceptable as excess equipment provided that—


(1) Components are listed and labeled by an independent, nationally recognized testing laboratory as set forth in 29 CFR 1910.7, and are designed, installed, tested, and maintained in accordance with an appropriate industry standard and the manufacturer’s specific guidance;


(2) Installation conforms to the requirements of 46 CFR chapter I, subchapter J (Electrical Engineering), especially the hazardous location electrical installation regulations in 46 CFR 111.105; and


(3) Coast Guard plan review is completed for wiring plans.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by USCG–2012–0196, 81 FR 48262, July 22, 2016]


Subpart 95.05—Fire Detection and Extinguishing Equipment

§ 95.05-1 Fire detection, manual alarm, and supervised patrol systems.

(a) Fire detection, manual alarm, and supervised patrol systems are not required except in special cases; but if installed, the systems must meet the applicable requirements of 46 CFR, part 76 of subchapter H (Passenger Vessels) of this chapter.


(b) In each compartment containing explosives, and in adjacent cargo compartments, there must be provided a smoke detection system. When used, sample extraction smoke detection systems must meet the requirements in § 95.05–3.


(c) Enclosed spaces that are “specially suitable for vehicles” must be fitted with a fire detection and alarm system.


[USCG–2012–0196, 81 FR 48263, July 22, 2016]


§ 95.05-3 Sample extraction smoke detection systems.

(a) For vessels contracted for on or after January 18, 2017, a sample extraction smoke detection system must be installed in accordance with chapter 10 of the FSS Code (incorporated by reference, see § 95.01–2).


(b) Periodically, the FSS Code defers to “the Administration.” For U.S. flag vessels, “the Administration” is the United States Coast Guard. The following requirements are provided for the provisions of Chapter 10 that defer to the Administration:


(1) For sequential scanning systems under FSS Code, chapter 10, paragraph 2.1.2, a satisfactory overall response time will be achieved by limiting the maximum allowable interval to 2 minutes.


(2) Under the FSS Code, chapter 10, paragraph 2.2.2, fans of sufficient capacity to provide a satisfactory overall response time will signal an alarm within 3 minutes upon introduction of smoke at the most remote accumulator on a vehicle deck and within 5 minutes upon introduction of smoke at the most remote accumulator in container and general cargo holds.


(3) Means provided to isolate smoke accumulators from liquid or refrigerated cargoes must be to the satisfaction of the Commanding Officer of the U.S. Coast Guard Marine Safety Center.


(4) Notwithstanding anything to the contrary in FSS Code chapter 10, periodic testing of sample extraction smoke detection systems must be conducted as part of the annual inspection and include inspection of all piping, valves, controls and alarms, and by introduction of smoke into the accumulators.


[USCG–2012–0196, 81 FR 48263, July 22, 2016]


§ 95.05-5 Fire main system.

(a) Fire pumps, hydrants, hose, and nozzles shall be installed on the following vessels:


(1) On all self-propelled vessels.


(2) On all barges with sleeping accommodations for more than 12 persons.


(b) The arrangements and details of the fire main system shall be as set forth in subpart 95.10.


§ 95.05-10 Fixed fire extinguishing systems.

(a) Approved fire extinguishing systems may be used or required in locations delineated in this section on the following vessels. Previously approved installations may be retained as long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(1) On all self-propelled vessels other than yachts and fishing vessels.


(2) On all barges with sleeping accommodations for more than 12 persons.


(b) A fixed carbon dioxide or other approved system must be installed in all cargo compartments and tanks for combustible cargo, except for vessels engaged exclusively in the carriage of coal or grain in bulk. For cargo compartments and tanks fitted with a fixed carbon dioxide or other approved system a deck foam system is not required, instead of the carbon dioxide system or other approved system, the following systems may be used or required in special cases:


(1) A fixed foam system may be used in cargo tanks.


(2) A water sprinkling system may be required, and the details of such system will be subject to special approval, in cases where a cargo is normally accessible and is considered to be a part of the working or living quarters.


(3) Spaces “specially suitable for vehicles” must be fitted with an approved carbon dioxide system. Alternately, the Commandant may permit the installation of an approved water sprinkler system or other suitable system.


(c) On vessels other than motorboats, a fixed carbon dioxide or other approved system must be installed in all lamp and paint lockers, oil rooms, and similar spaces.


(d) On vessels of 1,000 gross tons and over, contracted for on or after November 19, 1952, or where conversion from coal to oil is contracted for on or after November 19, 1952, a fixed carbon dioxide, foam, or water spray system shall be installed in all spaces containing oil fired boilers, either main or auxiliary, or their fuel oil units, valves, or manifolds in the line between the settling tanks and the boilers.


(e) Fire extinguishing systems shall be provided for internal combustion installations in accordance with the following:


(1) If a fixed fire-extinguishing system is installed to protect an internal combustion propelling machinery installation, the system shall be of the carbon dioxide type.


(2) On vessels of 1,000 gross tons and over on an international voyage, the construction or conversion of which is contracted for on or after May 26, 1965, a fixed carbon dioxide system shall be installed in all spaces containing internal combustion or gas turbine main propulsion machinery, auxiliaries with an aggregate power of 1,000 b. hp. or greater, or their fuel oil units, including purifiers, valves, and manifolds.


(3) On vessels, the construction, conversion or automation of which is contracted for on or after July 1, 1968, the systems shall be in accordance with the following:


(i) A fixed carbon dioxide system shall be installed in any space containing machinery using fuel having a flashpoint of less than 110 °F.


(ii) On vessels of 1,000 gross tons and greater, a fixed carbon dioxide or clean agent system as described in 46 CFR subpart 95.16 must be installed in any space that contains internal combustion or gas turbine main propulsion machinery, or auxiliary machinery with an aggregate power of 1,000 b.h.p. or greater, or the fuel oil units of such machinery, including purifiers, valves, and manifolds.


(f) On vessels contracted for on or after November 19, 1952, where an enclosed ventilating system is installed for electric propulsion motors or generators, a fixed carbon dioxide extinguishing system must be installed in such a system.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGFR 66–33, 31 FR 15285, Dec. 6, 1966; CGFR 67–90, 33 FR 1016, Jan. 26, 1968; CGD 95–027, 61 FR 26006, May 23, 1996; USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 95.05-15 Hand portable fire extinguishers and semiportable fire extinguishing systems.

(a) Approved hand portable fire extinguishers and semiportable fire extinguishing systems shall be installed on all vessels, other than unmanned barges and fishing vessels, as set forth in subpart 95.50.


Subpart 95.10—Fire Main System, Details

§ 95.10-1 Application.

(a) The provisions of this subpart, with the exception of § 95.10–90, shall apply to all fire main installations contracted for on or after May 26, 1965. Installations contracted for prior to May 26, 1965, shall meet the requirements of § 95.10–90.


§ 95.10-5 Fire pumps.

(a) Vessels must be equipped with independently driven fire pumps in accordance with Table 95.10–5(a).


Table 95.10–5(a)—Fire Pump System Requirements

Gross tons
Minimum

number of

pumps
Hose and

hydrant

size, inches
Nozzle orifice size, inches
Length of hose, feet
Over
Not over
100
1 1

1 1
1/2

1
1/2

1 50
1001,00011
1/2

5/8
50
1,0001,50021
1/2

5/8
50
1,5002
2 2
1/2

2
7/8

2 50


1 On vessels of 65 feet (19.8 meters) in length or less,
3/4-inch hose of a good commercial grade together with a commercial garden hose nozzle may be used. The pump may be hand operated and the length of hose must be sufficient to assure coverage of all parts of the vessel.


2 A 1
1/2 inch hose that is 75 feet (22.86 meters) in length with a
5/8-inch nozzle may be used where specified by § 95.10–10(b) of this subpart for interior locations and 50 feet (15.24 meters) of 1
1/2 inch hose may be used in exterior locations on vessels in other than ocean or coastwise service. For vessels on ocean or coastwise service, two 1
1/2 inch outlets, each provided with one 1
1/2 inch hose supplied through a wye connection may be substituted.


(b) On vessels of 1,000 gross tons or more on an international voyage, each required fire pump, while delivering water thru the fire main system at a pressure corresponding to that required by paragraph (c) of this section, must have a minimum capacity of at least two-thirds of that required for an independent bilge pump. However, in no case may the capacity of each fire pump be less than that otherwise required by this section.


(c) Each pump must be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 p.s.i. Where 1
1/2-inch hose is permitted in lieu of 2
1/2-inch hose by footnote 2 of Table 95.10–5(a), the pump capacity must be determined on the same basis as if 2
1/2-inch hose had been permitted. Where
3/4-inch hose is permitted by Table 95.10–5(a), the Pitot tube pressure need be only 35 p.s.i.


(d) Fire pumps must be fitted on the discharge side with relief valves set to relieve at 25 p.s.i. in excess of the pressure necessary to maintain the requirements of paragraph (c) of this section or 125 p.s.i., whichever is greater. Relief valves may be omitted if the pumps, operating under shut-off conditions, are not capable of developing a pressure exceeding this amount.


(e) Fire pumps must be fitted with a pressure gage on the discharge side of the pumps.


(f) Fire pumps may be used for other purposes provided at least one of the required pumps is kept available for use on the fire system at all times. In no case shall a pump having connection to an oil line be used as a fire pump. Branch lines connected to the fire main for purposes other than fire and deck wash shall be so arranged that adequate water can be made continuously available for firefighting purposes.


(g) The total area of the pipes leading from a pump must not be less than the discharge area of the pump.


(h) On vessels with oil fired boilers, either main or auxiliary, or with internal combustion propulsion machinery, where two fire pumps are required, they shall be located in separate spaces, and the arrangement of pumps, sea connections, and sources of power shall be such as to insure that a fire in any one space will not put all of the fire pumps out of operation. However, when it is shown to the satisfaction of the Commandant that it is unreasonable or impracticable to meet this requirement due to the size or arrangement of the vessel, or for other reasons, the installation of a total flooding fixed fire extinguishing or clean agent system may be accepted as an alternate method of extinguishing any fire that could affect the powering and operation of at least one of the required fire pumps.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGFR 66–33, 31 FR 15285, Dec. 6, 1966; CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–2006–24797, 77 FR 33878, June 7, 2012; USCG–2012–0196, 81 FR 48263, July 22, 2016]


§ 95.10-10 Fire hydrants and hose.

(a) The size of fire hydrants, hose, and nozzles and the length of hose required must be as noted in Table 95.10–5(a).


(b) Instead of the 2
1/2-in hose and hydrants specified in Table 95.10–5(a) of this subpart, on vessels of more than 1,500 gross tons:


(1) The hydrants in interior locations may have wye connections for 1
1/2-in hoses. In these cases, the hose must be 75 ft in length, and only one hose is required at each fire station; however, if all such stations can be satisfactorily served with 50-ft lengths, a 50-ft hose may be used; and


(2) The hydrants for exterior locations may substitute two 1
1/2 in outlets, each with a 1
1/2-in hose, supplied through a wye connection.


(c) On vessels of 500 gross tons or more there must be at least one shore connection to the fire main available to each side of the vessel in an accessible location. Suitable cut-out valves and check valves must be provided. Suitable adapters also must be provided for furnishing the vessel’s shore connections with couplings mating those on the shore fire lines. Vessels of 500 gross tons or more on an international voyage, must be provided with at least one international shore connection complying with ASTM F 1121 (incorporated by reference, see § 95.01–2). Facilities must be available enabling an international connection to be used on either side of the vessel.


(d) Fire hydrants must be of sufficient number and so located that any part of the vessel, other than main machinery spaces, accessible to persons on board while the vessel is being navigated and all cargo holds may be reached with at least 2 streams of water from separate outlets, at least one of which must be from a single length of hose. In main machinery spaces, all portions of such spaces must be capable of being reached by at least 2 streams of water, each of which must be from a single length of hose from separate outlets; however, this requirement need not apply to shaft alleys containing no assigned space for the stowage of combustibles. Fire hydrants must be numbered as required by § 97.37–15 of this subchapter.


(e) All parts of the fire main located on exposed decks must either be protected against freezing or be fitted with cut-out valves and drain valves so that the entire exposed parts of such piping may be shut off and drained in freezing weather. Except when closed to prevent freezing, such valves must be sealed open.


(f) The outlet at the fire hydrant must be limited to any position from the horizontal to the vertical pointing downward, so that the hose will lead horizontally or downward to minimize the possibility of kinking.


(g) Each fire hydrant must have at least one length of firehose, a spanner wrench, and a hose rack or other device for stowing the hose.


(h) Firehose must be connected to the outlets at all times. However, on open decks where no protection is afforded to the hose in heavy weather, or where the hose may be liable to damage from the handling of cargo, the hose may be temporarily removed from the hydrant and stowed in an accessible nearby location.


(i) Each firehose on each hydrant must have a combination solid stream and water spray firehose nozzle approved under subpart 162.027 of this chapter. Firehose nozzles previously approved under subpart 162.027 of this chapter may be retained so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(j) In each propulsion machinery space containing an oil fired boiler, internal combustion machinery, or oil fuel unit on a vessel on an international voyage or of 1000 gross tons or more, each firehose having a combination nozzle previously approved under subpart 162.027 of this chapter must have a low-velocity water spray applicator that is also previously approved under subpart 162.027 of this chapter. The length of the applicator must be less than 1.8 meters (6 feet).


(k) Fixed brackets, hooks, or other means for stowing an applicator must be next to each fire hydrant that has an applicator under paragraph (j) of this section.


(l) Firehose must not be used for any other purpose than fire extinguishing, drills, and testing.


(m) Fire hydrants, nozzles, and other fittings must have threads to accommodate the hose connections noted in paragraph (l) of this section.


(n) Firehose and couplings must be as follows:


(1) Fire station hydrant connections must be brass, bronze, or other equivalent metal. Couplings must either:


(i) Use National Standard firehose coupling threads for the 1
1/2 inch (38 millimeter) and 2
1/2 inch (64 millimeter) hose sizes, i.e., 9 threads per inch for 1
1/2 inch hose, and 7
1/2 threads per inch for 2
1/2 inch hose; or


(ii) Be a uniform design for each hose diameter throughout the vessel.


(2) Where 19 millimeters (
3/4 inch) hose is permitted by table 95.10–5(a), the hose and couplings must be of good commercial grade.


(3) Each section of firehose must be lined commercial firehose that conforms to Underwriters’ Laboratories, Inc. Standard 19 or Federal Specification ZZ-H-451E. Hose that bears the label of Underwriters’ Laboratories, Inc. as lined firehose is accepted as conforming to this requirement.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGD 74–60, 41 FR 43151, Sept. 30, 1976; CGD 76–086, 44 FR 2392, Jan. 11, 1979; CGD 88–032, 56 FR 35826, July 29, 1991; CGD 95–012, 60 FR 48051, Sept. 18, 1995; CGD 95–027, 61 FR 26007, May 23, 1996; CGD 95–028, 62 FR 51206, Sept. 30, 1997; USCG–2000–7790, 65 FR 58461, Sept. 29, 2000; USCG–2012–0196, 81 FR 48263, July 12, 2016]


§ 95.10-15 Piping.

(a) All piping, valves, and fittings shall meet the applicable requirements of subchapter F (Marine Engineering) of this chapter.


(b) All distribution cut-off valves shall be marked as required by § 97.37–10 of this subchapter.


(c) For vessels on an international voyage, the diameter of the fire main shall be sufficient for the effective distribution of the maximum required discharge from two fire pumps operating simultaneously. This requirement is in addition to § 95.10–5(c). The discharge of this quantity of water through hoses and nozzles at a sufficient number of adjacent hydrants shall be at a minimum Pitot tube pressure of approximately 50 pounds per square inch.


§ 95.10-90 Installations contracted for prior to May 26, 1965.

Installations contracted for prior to May 26, 1965, shall meet the following requirements:


(a) Except as specifically modified by this paragraph, the requirements of §§ 95.10–5 through 95.10–15 shall be complied with insofar as the number and general type of equipment is concerned. Existing equipment, except firehose nozzles and low-velocity water spray applicators, previously approved, but not meeting the applicable requirements of §§ 95.10–5 through 95.10–15 may be continued in service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs, alterations, and replacements may be permitted to the same standards as the original installations. However, all new installations or major replacements shall meet the applicable requirements in this subpart.


(b) All vessels contracted for prior to November 19, 1952, other than motorboats, shall be fitted with fire pumps, hoses, and nozzles in accordance with Table 95.10–90(a)(2).


Table 95.10–90(a)(2)

Gross tons
Minimum number of pumps
Minimum hose and hydrant size, inches
Nozzle orifice size, inches
Length of hose feet
Over
Not over
1001
1 1
1/2

1
5/16

1 50
1001,0001
2 1
1/2

2
5/8

2 50
1,0002
2 1
1/2

2
5/8

2 50


1 On vessels of 65 feet in length or less,
3/4-inch hose of good commercial grade together with a commercial garden hose nozzle may be used. The pump may be hand operated and the length of hose shall be sufficient to assure coverage of all parts of the vessel.


2 May use 50 feet of 2
1/2-inch hose with
7/8-inch nozzles for exterior stations. 75 feet of 1
1/2-inch hose with
5/8-inch nozzles may be used for interior station in which case such interior stations shall have siamese connections.


(c) Vessels contracted for prior to July 1, 1935, need not meet the requirements of § 95.10–5(h), and vessels contracted for on or after July 1, 1935, but prior to November 19, 1952, may have a carbon dioxide “bilge” in lieu of “total flooding” system. However, in vessels of both categories where a conversion from coal to oil is contracted for on or after November 19, 1952, the provisions of § 95.10–5(h) shall apply.


(d) The general requirements of § 95.10–5(c) through (g), § 95.10–10(d) through (i), and § 95.10–15 shall be complied with insofar as is reasonable and practicable.


(e) Firehose nozzles and low-velocity spray applicators must meet the requirements of 95.10–10(i), 95.10–10(j), and 95.10–10(k).


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGD 76–086, 44 FR 2392, Jan. 11, 1979; CGD 95–027, 61 FR 26007, May 23, 1996]


Subpart 95.13—Steam Smothering Systems

§ 95.13-1 Application.

Steam smothering systems are not permitted on vessels contracted for on or after January 1, 1962. Previously approved installations may be retained as long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


[CGD 95–027, 61 FR 26007, May 23, 1996]


Subpart 95.15—Carbon Dioxide Extinguishing Systems, Details

§ 95.15-1 Application.

(a) Where a carbon dioxide extinguishing system is installed, the provisions of this subpart, with the exception of § 95.15–90, shall apply to all installations contracted for on or after November 19, 1952. Installations contracted for prior to November 19, 1952, shall meet the requirements of § 95.15–90.


(b) The requirements of this subpart are based on a “high pressure system,” i.e., one in which the carbon dioxide is stored in liquid form at atmospheric temperature. Details for “low pressure systems,” i. e., those in which the carbon dioxide is stored in liquid form at a continuously controlled low temperature, may be specifically approved by the Commandant where it is demonstrated that a comparable degree of safety and fire extinguishing ability is achieved.


§ 95.15-5 Quantity, pipe sizes, and discharge rates.

(a) General. The amount of carbon dioxide required for each space shall be as determined by paragraphs (b) through (d) of this section.


(b) Total available supply. A separate supply of carbon dioxide need not be provided for each space protected. The total available supply shall be at least sufficient for the space requiring the greatest amount.


(c) Cargo spaces. (1) The number of pounds of carbon dioxide required for each space shall be equal to the gross volume of the space in cubic feet divided by 30.


(2) Although separate piping shall be led to each cargo hold and ‘tween deck, for the purpose of determining the amount of carbon dioxide required, a cargo compartment will be considered as the space between watertight or firescreen bulkheads and from the tank top or lowest deck to the deck head of the uppermost space on which cargo may be carried. If a trunk extends beyond such deck, the trunk volume shall be included. Tonnage openings shall be considered as sealed for this purpose.


(3) Branch lines to the various cargo holds and ‘tween decks shall not be less than
3/4-inch standard pipe size.


(4) No specific discharge rate need be applied to such systems.


(d) Machinery spaces, paint lockers, tanks, and similar spaces. (1) Except as provided in paragraph (d)(3) of this section, the number of pounds of carbon dioxide required for each space shall be equal to the gross volume of the space divided by the appropriate factor noted in Table 95.15–5(d)(1). If fuel can drain from the compartment being protected to an adjacent compartment, or if the compartments are not entirely separate, the requirements for both compartments shall be used to determine the amount of carbon dioxide to be provided. The carbon dioxide shall be arranged to discharge into both such compartments simultaneously.


Table 95.15–5(d)(1)

Gross volume of compartment, cubic feet
Factor
Over—
Not over—
500 15
5001,60016
1,6004,50018
4,50050,00020
50,000 22

(2) For the purpose of the requirements of this paragraph, the volume of the machinery space shall be taken as exclusive of the normal machinery casing unless the boiler, internal combustion machinery, or fuel oil installation extend into such space, in which case the volume shall be taken to the top of the casing or the next material reduction in casing area, whichever is lower. For installations contracted for on or after October 1, 1959, “normal machinery casing” and “material reduction in casing area” shall be defined as follows:


(i) By “normal machinery casing” shall be meant a casing the area of which is not more than 40 percent of the maximum area of the machinery space.


(ii) By “material reduction in casing area” shall be meant a reduction to at least 40 percent of the casing area.


(3) For vessels on an international voyage contracted for on or after May 26, 1965, the amount of carbon dioxide required for a space containing propulsion boilers or internal combustion propulsion machinery shall be as given by paragraphs (d) (1) and (2) of this section or by dividing the entire volume, including the casing, by a factor of 25, whichever is the larger.


(4) Branch lines to the various spaces shall be as noted in Table 95.15–5(d)(4).


Table 95.15–5(d)(4)

Maximum quantity of carbon dioxide required, pounds
Minimum pipe size, inches
Maximum quantity of carbon dioxide required, pounds
Minimum pipe size, inches
100
1/2
2,5002
1/2
225
3/4
4,4503
3001 7,1003
1/2
6001
1/4
10,4504
1,0001
1/2
15,0004
1/2
2,4502

(5) Distribution piping within the space shall be proportioned from the supply line to give proper distribution to the outlets without throttling.


(6) The number, type, and location of discharge outlets shall be such as to give a uniform distribution throughout the space.


(7) The total area of all discharge outlets shall not exceed 85 percent nor be less than 35 percent of the nominal cylinder outlet area or the area of the supply pipe, whichever is smaller. The nominal cylinder outlet area in square inches shall be determined by multiplying the factor 0.0022 by the number of pounds of carbon dioxide required, except that in no case shall this outlet area be less than 0.110 square inches.


(8) The discharge of at least 85 percent of the required amount of carbon dioxide shall be complete within 2 minutes.


(e) Spaces specially suitable for vehicles. (1) The number of pounds of carbon dioxide required must be equal to the gross volume of the largest space which is capable of being sealed divided by 22. In no case, however, may the quantity be less than that required by paragraph (c)(2) of this section.


(2) The discharge of two thirds of the required quantity of carbon dioxide must be completed within 10 minutes. Any faster discharge rate is also acceptable.


(3) Except as noted in paragraphs (e) (1) and (2) of this section, the requirements of paragraph (d) of this section shall apply.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGFR 66–33, 31 FR 15285, Dec. 6, 1966; CGD 95–028, 62 FR 51207, Sept. 30, 1997; USCG–1999–6216, 64 FR 53226, Oct. 1, 1999; USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 95.15-10 Controls.

(a) Except as noted in § 95.15–20(b) all controls and valves for the operation of the system shall be outside the space protected, and shall not be located in any space that might be cut off or made inaccessible in the event of fire in any of the spaces protected.


(b) If the same cylinders are used to protect more than one hazard, a manifold with normally closed stop valves shall be used to direct the carbon dioxide into the proper space. If cylinders are used to protect only one hazard, a normally closed stop valve shall be installed between the cylinders and the hazard except for systems of the type indicated in § 95.15–5(d) which contain not more than 300 pounds of carbon dioxide.


(c) Distribution piping to the various cargo spaces shall be controlled from not more than two stations. One of the stations controlling the system for the main machinery space shall be located as convenient as practicable to one of the main escapes from the space. All control stations and the individual valves and controls shall be marked as required by §§ 97.37–10 and 97.37–13 of this subchapter.


(d) Systems of the type indicated in § 95.15–5(d) shall be actuated by one control operating the valve to the space and a separate control releasing at least the required amount of carbon dioxide. These two controls shall be located in a box or other enclosure clearly identified for the particular space. Those systems installed without a stop valve shall be operated by one control releasing at least the required amount of carbon dioxide.


(e) Where provisions are made for the simultaneous release of a given amount of carbon dioxide by operation of a remote control, provisions shall also be made for manual control at the cylinders. Where gas pressure from pilot cylinders is used as a means for releasing the remaining cylinders, not less than two pilot cylinders shall be used for systems consisting of more than two cylinders. Each of the pilot cylinders shall be capable of manual control at the cylinder, but the remaining cylinders need not be capable of individual manual control.


(f) Systems of the type indicated in § 95.15–5(d), other than systems for tanks, which are of more than 300 pounds of carbon dioxide, shall be fitted with an approved delayed discharge so arranged that the alarm will be sounded for at least 20 seconds before the carbon dioxide is released into the space. Such systems of not more than 300 pounds of carbon dioxide shall also have a similar delayed discharge, except for those systems for tanks and for spaces which have a suitable horizontal escape. This paragraph shall be applicable only to systems installed on or after July 1, 1957.


(g) All distribution valves and controls shall be of an approved type. All controls shall be suitably protected.


(h) Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Each control valve to branch lines must be marked to indicate the related space served.


(i) If the space or enclosure containing the carbon dioxide supply or controls is to be locked, a key to the space or enclosure shall be in a break-glass-type box conspicuously located adjacent to the opening.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGD 74–100B, 40 FR 6209, Feb. 10, 1975; USCG–1999–6216, 64 FR 53226, Oct. 1, 1999]


§ 95.15-15 Piping.

(a) The piping, valves, and fittings shall have a bursting pressure of not less than 6,000 pounds per square inch.


(b) All piping, in nominal sizes not over
3/4 inch shall be at least Schedule 40 (standard weight) and in nominal sizes over
3/4 inch, shall be at least Schedule 80 (extra heavy).


(c) All piping, valves, and fittings of ferrous materials shall be protected inside and outside against corrosion unless specifically approved otherwise by the Commandant.


(d) A pressure relief valve or equivalent set to relieve between 2,400 and 2,800 pounds per square inch shall be installed in the distributing manifold or such other location as to protect the piping in the event that all branch line shut-off valves are closed.


(e) All dead-end lines shall extend at least 2 inches beyond the last orifice and shall be closed with cap or plug.


(f) All piping, valves, and fittings shall be securely supported, and where necessary, protected against injury.


(g) Drains and dirt traps shall be fitted where necessary to prevent the accumulation of dirt or moisture. Drains and dirt traps shall be located in accessible locations where possible.


(h) Piping shall be used for no other purpose except that it may be incorporated with the fire-detecting system.


(i) Piping passing through living quarters shall not be fitted with drains or other openings within such spaces.


(j) Installation test requirements are:


(1) Upon completion of the piping installation, and before the cylinders are connected, a pressure test shall be applied as set forth in this paragraph. Only carbon dioxide or other inert gas shall be used for this test.


(2) The piping from the cylinders to the stop valves in the manifold shall be subjected to a pressure of 1,000 pounds per square inch. With no additional gas being introduced to the system, it shall be demonstrated that the leakage of the system is such as not to permit a pressure drop of more than 150 pounds per square inch per minute for a 2-minute period.


(3) The individual branch lines to the various spaces protected shall be subjected to a test similar to that described in the preceding paragraph with the exception that the pressure used shall be 600 pounds per square inch in lieu of 1,000 pounds per square inch. For the purpose of this test, the distribution piping shall be capped within the space protected at the first joint ahead of the nozzles.


(4) In lieu of the tests prescribed in paragraphs (j) (1) through (3) of this section, small independent systems protecting spaces such as emergency generator rooms, lamp lockers, etc., may be tested by blowing out the piping with air at a pressure of at least 100 pounds per square inch.


§ 95.15-20 Carbon dioxide storage.

(a) Except as provided in paragraph (b) of this section, the cylinders shall be located outside the spaces protected, and shall not be located in any space that might be cut off or made inaccessible in the event of a fire in any of the spaces protected.


(b) Systems of the type indicated in § 95.15–5(d), consisting of not more than 300 pounds of carbon dioxide, may have the cylinders located within the space protected. If the cylinder stowage is within the space protected, the system shall be arranged in an approved manner to be automatically operated by a heat actuator within the space in addition to the regular remote and local controls.


(c) The space containing the cylinders shall be properly ventilated and designed to preclude an anticipated ambient temperature in excess of 130 degrees F.


(d) Cylinders shall be securely fastened and supported, and where necessary, protected against injury.


(e) Cylinders shall be so mounted as to be readily accessible and capable of easy removal for recharging and inspection. Provisions shall be available for weighing the cylinders.


(f) Where subject to moisture, cylinders shall be so installed as to provide a space of at least 2 inches between the flooring and the bottom of the cylinders.


(g) Cylinders shall be mounted in an upright position or inclined not more than 30 degrees from the vertical. However, cylinders which are fitted with flexible or bent siphon tubes may be inclined not more than 80 degrees from the vertical.


(h) Where check valves are not fitted on each independent cylinder discharge, plugs or caps shall be provided for closing outlets when cylinders are removed for inspection or refilling.


(i) All cylinders used for storing carbon dioxide must be fabricated, tested, and marked in accordance with §§ 147.60 and 147.65 of this chapter.


[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by CGD 84–044, 53 FR 7749, Mar. 10, 1988; USCG–1999–6216, 64 FR 53226, Oct. 1, 1999]


§ 95.15-25 Discharge outlets.

(a) Discharge outlets shall be of an approved type.


§ 95.15-30 Alarms.

(a) A protected space must be fitted with an approved audible alarm if:


(1) The space is normally accessible to persons onboard while the vessel is being navigated; and


(2) Is not a paint locker or similar small space.


(b) The alarm must:


(1) Sound automatically and audibly for at least 20 seconds before carbon dioxide is discharged into the space;


(2) Be conspicuously and centrally located and be marked as required by 46 CFR 97.37–9; and


(3) Use stored gas power provided by the extinguishing agent, gas from pilot cylinders, or gas from cylinders specifically provided to power the alarms.


(c) For systems installed on or after July 1, 1957, alarms are mandatory only for systems required to be fitted with a delayed discharge.


[USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 95.15-35 Enclosure openings.

(a) Where mechanical ventilation is provided for spaces other than cargo and similar spaces which are protected by a carbon dioxide extinguishing system, provisions shall be made so that the ventilation system is automatically shut down with the operation of the system to that space.


(b) Where natural ventilation is provided for spaces protected by a carbon dioxide extinguishing system, provisions shall be made for easily and effectively closing off the ventilation.


(c) Means shall be provided for closing all other openings to the space protected from outside such space. In this respect, relatively tight doors, shutters, or dampers shall be provided for openings in the lower portion of the space. The construction shall be such that openings in the upper portion of the space can be closed off either by permanently installed means or by the use of canvas or other material which is normally carried by the vessel.


§ 95.15-40 Pressure relief.

(a) Where necessary, relatively tight compartments such as refrigeration spaces, paint lockers, etc., shall be provided with suitable means for relieving excessive pressure accumulating within the compartment when the carbon dioxide is injected.


§ 95.15-50 Lockout valves.

(a) A lockout valve must be provided on any carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or altered after July 9, 2013. “Altered” means modified or refurbished beyond the maintenance required by the manufacturer’s design, installation, operation and maintenance manual.


(b) The lockout valve must be a manually operated valve located in the discharge manifold prior to the stop valve or selector valves. When in the closed position, the lockout valve must provide complete isolation of the system from the protected space or spaces, making it impossible for carbon dioxide to discharge in the event of equipment failure during maintenance.


(c) The lockout valve design or locking mechanism must make it obvious whether the valve is open or closed.


(d) A valve is considered a lockout valve if it has a hasp or other means of attachment to which, or through which, a lock can be affixed, or it has a locking mechanism built into it.


(e) The master or person-in-charge must ensure that the valve is locked open at all times, except while maintenance is being performed on the extinguishing system, when the valve must be locked in the closed position.


(f) Lockout valves added to existing systems must be approved by the Commandant as part of the installed system.


[USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 95.15-60 Odorizing units.

Each carbon dioxide extinguishing system installed or altered after July 9, 2013, must have an approved odorizing unit to produce the scent of wintergreen, the detection of which will serve as an indication that carbon dioxide gas is present in a protected area and any other area into which the carbon dioxide may migrate. “Altered” means modified or refurbished beyond the maintenance required by the manufacturer’s design, installation, operation and maintenance manual.


[USCG–2006–24797, 77 FR 33878, June 7, 2012]


§ 95.15-90 Installations contracted for prior to November 19, 1952.

(a) Installations contracted for prior to November 19, 1952, shall meet the following requirements:


(1) Existing arrangements, materials, and facilities previously approved shall be considered satisfactory so long as they meet the minimum requirements of this paragraph and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation.


(2) The details of the systems shall be in general agreement with §§ 95.15–5 through 95.15–40 insofar as is reasonable and practicable, with the exception of § 95.15–5(d)(1), (2) and (4) covering spaces other than cargo spaces, which systems may be installed in accordance with paragraphs (a) (3) through (6) of this section.


(3) In boilerrooms, the bilges shall be protected by a system discharging principally below the floor plates. Perforated pipe may be used in lieu of discharge nozzles for such systems. The number of pounds of carbon dioxide shall be equal to the gross volume of the boilerroom taken to the top of the boilers divided by 36. In the event of an elevated boiler room which drains to the machinery space, the system shall be installed in the engineroom bilge and the gross volume shall be taken to the flat on which the boilers are installed.


(4) In machinery spaces where main propulsion internal combustion machinery is installed, the number of pounds of carbon dioxide required shall be equal to the gross volume of the space taken to the under side of the deck forming the hatch opening divided by 22.


(5) In miscellaneous spaces other than cargo or main machinery spaces the number of pounds of carbon dioxide required shall be equal to the gross volume of the space divided by 22.


(6) Branch lines to the various spaces other than cargo and similar spaces shall be as noted in Table 95.15–90(a)(6). This table is based on cylinders having discharge outlets and siphon tubes of
3/8 inch diameter.


Table 95.15–90(a)(6)

Number of cylinders
Nominal pipe size, inches
Over
Not over
2
1/2—standard.
24
3/4—standard.
46 1—extra heavy.
612 1
1/4—extra heavy.
1216 1
1/2—extra heavy.
1627 2—extra heavy.
2739 2
1/2—extra heavy.
3960 3—extra heavy.
6080 3
1/2—extra heavy.
80104 4—extra heavy.
104165 5—extra heavy.

[CGFR 65–50, 30 FR 17001, Dec. 30, 1965, as amended by USCG–1999–6216, 64 FR 53226, Oct. 1, 1999]


Subpart 95.16—Fixed Clean Agent Gas Extinguishing Systems, Details


Source:USCG–2006–24797, 77 FR 33879, June 7, 2012, unless otherwise noted.

§ 95.16-1 Application.

(a) “Clean agent” means a halocarbon or inert gas used as a fire extinguishing agent.


(b) A clean agent extinguishing system must comply with this part. Systems contracted for prior to July 9, 2012, may, as an alternative, comply with 46 CFR 95.16–90.


(c) Each clean agent system must:


(1) Be of a total flooding type to protect against Class B and Class C hazards as defined in 46 CFR 95.50–5;


(2) Address and minimize any hazard to personnel created by the effects of extinguishing agent decomposition products and combustion products, especially the effects of decomposition product hydrogen fluoride (HF), if applicable;


(3) Be accompanied by an approved manufacturer’s design, installation, operation, and maintenance manual;


(4) Be used only to protect enclosed spaces;


(5) Not employ electric power for system actuation or controls; and


(6) Not use any source of power for alarms in protected spaces, other than the extinguishing agent, gas from pilot cylinders, or gas from cylinders specifically provided to power the alarms.


§ 95.16-5 Controls.

(a) At least one releasing station must be installed near the main entrance/exit to the protected space.


(b) System controls must be of an approved type and be suitably protected from damage and located outside the protected space.


(c) Systems must have releasing stations consisting of one control to operate the stop valve to the protected space and a second control to release at least the required amount of agent. These two controls must be located in a box or other enclosure clearly identified for the particular space.


(d) Systems protecting a single space not exceeding 6,000 cubic feet in gross volume may be installed without a stop valve if a suitable horizontal means of escape from the space exists.


(e) Controls may not be located in any space that could be cut off from the operator in the event of fire in the protected space.


(f) Where the extinguishing agent can be released by remote control, the system must have a manual local control at the cylinders.


(g) Systems with remotely operated releasing controls must have mechanical override features.


(h) Automatic discharge arrangements may be used for spaces having a gross volume less than 6,000 cubic feet. However, automatic discharge is required for spaces having a gross volume less than 6,000 cubic feet where the agent is stored in the protected space, as allowed by 46 CFR 95.16–20.


(i) A system designed to use gas pressure from one or more agent storage cylinders and provide pilot pressure to actuate the release of extinguishing agent from other storage cylinders that contain three or more total storage cylinders must be equipped with at least two designated pilot cylinders, each of which is capable of manual control at the pilot cylinder.


§ 95.16-10 Piping, fittings, valves, nozzles.

(a) Piping, fittings, and valves must be:


(1) In accordance with the manufacturer’s approved design, installation, operation, and maintenance manual;


(2) Securely supported and when necessary protected against damage;


(3) Protected inside and out against corrosion; and


(4) Equipped with:


(i) Dead end lines (dirt traps) that extend at least 2 inches beyond the last nozzle of each distribution line and that are closed with a cap or plug; and


(ii) Drains and dirt traps, fitted where necessary to prevent dirt or moisture accumulation and located in accessible locations where possible.


(b) Piping requirements. Piping must be:


(1) Used exclusively for extinguishing system purposes;


(2) Protected by a pressure relief valve in sections where gas pressure can be trapped between closed valves; and


(3) Welded if it passes through living quarters.


(c) Piping prohibitions. Piping must not:


(1) Use rolled groove or cut groove ends; or


(2) Be fitted with drains or other openings if it passes through living quarters.


(d) Valve requirements. Valves for system operation must be:


(1) Outside the protected space, and


(2) Marked, if serving a branch line, to indicate the space the branch line serves.


(e) Valve prohibitions. Valves may not be located in any space that could be cut off from the operator in the event of fire in the protected space.


§ 95.16-15 Extinguishing agent: Quantity.

A separate supply need not be provided for each space protected, but the total available supply must be at least sufficient for the space requiring the greatest amount.


§ 95.16-20 Extinguishing agent: Cylinder storage.

(a) Unless installed as required in paragraph (b) of this section, the agent must be stored outside of the protected space. Common bulkheads and decks located between the cylinder storage room and the protected spaces must meet the insulation criteria for Class A–60, as defined in 46 CFR 72.05–10.


(b) The cylinders may be stored inside the protected space, if:


(1) The space does not exceed 6,000 cubic feet gross volume; and


(2) The system can be automatically operated by a pneumatic heat actuator as well as a remote manual control.


(c) The cylinder storage space must be properly ventilated and designed to preclude an anticipated ambient temperature in excess of 130 °Fahrenheit.


(d) The cylinders must be securely fastened and supported as directed in the manufacturer’s approved design, installation, operation, and maintenance manual, and where necessary protected against damage.


(e) The cylinders must be mounted so they are readily accessible and capable of easy removal for recharging and inspection and for weighing in the case of halocarbon system cylinders.


(f) The cylinders must be installed to provide a space of at least 2 inches between the deck and the bottom of the cylinders. A tray or other bottom support located 2 inches above the deck is an acceptable arrangement.


(g) The cylinders must be mounted upright, unless otherwise specified in the instruction manual.


(h) All cylinder storage room doors must open outward.


§ 95.16-25 Manifold and cylinder arrangements.

(a) A check valve must be provided between each cylinder and manifold or distribution piping. The valve must be permanently marked to indicate the direction of flow.


(b) If the same cylinder is used to protect more than one space, normally, closed stop valves must be provided to direct the agent into each protected space.


(c) Each cylinder must be fabricated, tested, and marked in accordance with 46 CFR 147.60(b) and 49 CFR part 180.


(d) The cylinders in a common manifold must be:


(1) Of the same size;


(2) Filled with the same amount of agent; and


(3) Pressurized to the same working pressure.


§ 95.16-30 Enclosure openings.

(a) If mechanical ventilation is provided for in a protected space, the ventilation system must automatically shut down prior to discharge of the system to that space.


(b) If natural ventilation is provided for in a space protected by a clean agent extinguishing system, the ventilation must be capable of being easily and effectively closed off.


(c) All other openings to a protected space must be capable of being closed. Doors, shutters, or dampers must be installed for openings in the lower portion of the space. Openings in the upper portion of the space must be capable of being closed off either by permanently installed means or by the use of canvas or other material normally carried on the vessel.


§ 95.16-35 Pressure relief.

Tight compartments, like refrigeration spaces and paint lockers, must have a way to relieve the accumulation of excessive pressure within the compartment when the extinguishing agent is injected.


§ 95.16-40 Locked spaces.

If a space or enclosure containing extinguishing agent supply or controls is lockable, a key to the space or enclosure must be in a break glass type box conspicuously located adjacent to the opening.


§ 95.16-45 Pre-discharge alarms and time delay devices.

(a) Each system protecting a space with greater than 6,000 cubic feet gross volume or a space less than 6,000 cubic feet gross volume without a suitable horizontal escape route must have a pneumatic pre-discharge alarm and time delay.


(1) The time delay period must:


(i) Last at least 20 seconds;


(ii) Be approved by the Officer in Charge, Marine Inspection during system installation; and


(iii) Provide enough time for one person to walk from the farthest area of the protected space to the primary exit.


(2) The time delay device must be pneumatically operated and have an accuracy of −0/+20 percent of the rated time delay period throughout the operating temperature range and range of delay settings.


(b) The pre-discharge alarm must:


(1) Sound for the duration of the time delay;


(2) Be conspicuously and centrally located in the protected space and marked as required by 46 CFR 97.37–9;


(3) Depend on the extinguishing agent, gas from a pilot cylinder, or a nitrogen cylinder specifically provided to power the alarm for its source of power; and


(4) Be audible over running machinery.


§ 95.16-50 Instructions.

(a) Simple, complete operating instructions must be conspicuously located at or near any release station and in the extinguishing agent cylinder storage room.


(b) On a system in which extinguishing agent cylinders are stored outside the protected space, operating instructions must also:


(1) Include a schematic diagram of the system; and


(2) Describe alternate methods of discharging the extinguishing agent into protected spaces should the manual releases or stop valve controls fail to operate.


§ 95.16-60 System piping installation testing.

(a) Halocarbon systems. A pressure test using the extinguishing agent, air or inert gas, must be conducted on halocarbon system discharge piping on completion of piping installation and before extinguishing agent cylinders are connected.


(1) Except as otherwise specified in this section:


(i) Piping from the cylinders to the stop valves or selector valves must be subjected to a pressure of 1
1/2 times the cylinder charging pressure at 70 °Fahrenheit; and


(ii) The leakage during a 2-minute period must not exceed a pressure drop of 10 percent of the test pressure.


(2) Individual branch lines to a protected space must be tested as described in paragraph (a)(1) of this section, except that:


(i) The pressure must be 150 pounds per square inch; and


(ii) Distribution piping must be capped within the protected space at the first joint upstream of the nozzles.


(3) Pneumatic actuation piping must be tested as described in paragraph (a)(1) of this section.


(b) Inert gas systems. A pressure test using air or inert gas must be conducted on each inert gas system’s piping on completion of piping installation and before extinguishing agent cylinders are connected.


(1) Except as otherwise specified in this section:


(i) Piping from the cylinders to the stop valves or selector valves must be subjected to a pressure of 1,000 pounds per square inch (psi) at 70 °Fahrenheit; and


(ii) The leakage during a 2-minute period must not exceed a pressure drop of 100 psi.


(2) Individual branch lines to a protected space must be tested as described in paragraph (b)(1) of this section, except that:


(i) The pressure must be 600 psi; and


(ii) Distribution piping must be capped within the protected space at the first joint upstream of the nozzles.


(3) Pneumatic actuation piping must be tested as described in paragraph (b)(1) of this section.


(c) Small independent systems. In lieu of test requirements in paragraphs (a) or (b) of this section, a small independent halocarbon or inert gas system, like those found in emergency generator rooms and paint lockers, may be tested by blowing out the piping with air pressure of at least 100 psi, if:


(1) There are no valves in the system discharge piping; and


(2) There is not more than one change in direction between the agent container and the discharge nozzle.


§ 95.16-90 Installations contracted for prior to July 9, 2012.

Installations contracted for prior to July 9, 2012, must meet the requirements of this subpart unless previously approved existing arrangements, materials, and facilities are:


(a) Maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection; and


(b) Subjected to no more than minor repairs or alterations implemented to the same standards as the original installation.


Subpart 95.17—Foam Extinguishing Systems, Details

§ 95.17-1 Application.

(a) Where a foam extinguishing system is installed, the provisions of this subpart, with the exception of § 95.17–90, shall apply to all installations contracted for on or after November 19, 1952. Installations contracted for prior to November 19, 1952, shall meet the requirements of § 95.17–90.


§ 95.17-5 Quantity of foam required.

(a) Area protected. (1) For machinery and similar spaces, the system shall be so designed and arranged as to spread a blanket of foam over the entire tank top or bilge of the space protected. The arrangement of piping shall be such as to give a uniform distribution over the entire area protected.


(2) Where an installation is made to protect an oil fired boiler installation on a flat which is open to or can drain to the lower engineroom or other space, both the flat and the lower space shall be protected simultaneously. The flat shall be fitted with suitable coamings on all openings other than deck drains to properly restrain the oil and foam at that level. Other installations of a similar nature will be considered in a like manner.


(3) Where a system is installed to protect a tank, it shall be so designed and arranged as to spread a blanket of foam over the entire liquid surface of the tank within the range of usual trim. The arrangement of piping shall be such as to give a uniform distribution over the entire area protected.


(b) Rate of application. (1) For spaces other than tanks, the rate of discharge to foam outlets protecting the hazard shall be at least as set forth in this paragraph.


(i) For chemical foam systems with stored “A” and “B” solutions, a total of at least 1.6 gallons per minute of the two solutions shall be discharged for each 10 square feet of area protected.


(ii) For other types of foam systems, the water rate to the dry powder generators or air foam production equipment shall be at least 1.6 gallons per minute for each 10 square feet of area protected.


(2) For tanks, the rate of discharge to foam outlets protecting the hazard shall be as set forth in paragraph (b)(1) of this section, except that the value of 1 gallon per minute shall be substituted in both cases for the value of 1.6 gallons per minute.


(c) Supply of foam producing material. (1) There shall be provided a quantity of foam producing material sufficient to operate the equipment at the discharge rate specified in paragraph (b) of this section for a period of at least 3 minutes for spaces other than tanks, and for at least 5 minutes for tanks.


(d) Separate supply of foam agent. A separate supply of foam agent need not be provided for each space protected. The total available supply shall be at least sufficient for the space requiring the greatest amount.


(e) Water supply for required pumps. Where pumps are required, the water supply shall be from outside the space protected and shall in no way be dependent upon power from the space protected.


§ 95.17-10 Controls.

(a) The foam agent, its container, and all controls and valves for the operation of the system shall be of an approved type.


(b) The foam agent container and all controls and valves for the operation of the system shall be outside the space protected and shall not be located in such space as might be cut off or made inaccessible in the event of fire in any of the spaces protected. The control space shall be as convenient as practicable to one of the main escapes from the spaces protected, and shall be marked as required by § 97.37–13 of this subchapter. Where pumps are required, it shall not be necessary that they be started from the control space.


(c) Complete, but simple instructions for the operation of the system shall be located in a conspicuous place at or near the controls.


(d) The valves to the various spaces served shall be marked as required by § 97.37–10 of this subchapter.


§ 95.17-15 Piping.

(a) All piping, valves, and fittings shall meet the applicable requirements of Subchapter F (Marine Engineering) of this chapter.


(b) All piping, valves, and fittings of ferrous materials shall be protected inside and outside against corrosion unless specifically approved otherwise by the Commandant.


(c) All piping, valves, and fittings shall be securely supported, and where necessary, protected against injury.


(d) Drains and dirt traps shall be fitted where necessary to prevent the accumulation of dirt or moisture.


(e) Piping shall be used for no other purpose.


§ 95.17-20 Discharge outlets.

(a) Discharge outlets shall be of an approved type.


§ 95.17-25 Additional protection required.

(a) In order that any residual fires above the floor plates may be extinguished when a foam system is installed for the protection of spaces other than tanks, at least 2 fire hydrants, in addition to those required for the machinery space by Subpart 95.10, shall be installed outside of the machinery space entrance. Such hydrants shall be fitted with sufficient hose so that any part of the machinery space may be reached with at least 2 streams of water, and each hose shall be equipped with an approved combination nozzle, applicator, and self-cleaning strainer as described in § 95.10–10(i)(3).


§ 95.17-90 Installations contracted for prior to November 19, 1952.

(a) Installations contracted for prior to November 19, 1952, shall meet the following requirements:


(1) Existing arrangements, materials, and facilities previously approved shall be considered satisfactory so long as they meet the minimum requirements of this paragraph and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation.


(2) The details of the systems shall be in general agreement with §§ 95.17–5 through 95.17–20, with the exception of § 95.17–5(a)(2), insofar as is reasonable and practicable. A 6-inch blanket of foam in 5 minutes for tanks and 3 minutes for other spaces will be considered as meeting the requirements of § 95.17–5.


Subpart 95.30—Automatic Sprinkler Systems, Details

§ 95.30-1 Application.

Automatic sprinkler systems must comply with Chapter 25 of NFPA 13 (incorporated by reference, see § 95.01–2).


[USCG–2012–0196, 81 FR 48263, July 22, 2016]


Subpart 95.50—Hand Portable Fire Extinguishers and Semiportable Fire Extinguishing Systems, Arrangements and Details

§ 95.50-1 Application.

(a) The provisions of this subpart, with the exception of §§ 95.50–80 and 95.50–90, as applicable, apply to all vessels, other than unmanned barges and fishing vessels, contracted for on or after November 19, 1952.


(b) Vessels contracted for prior to August 22, 2016 and on or after November 19, 1952, must meet the requirements of § 95.50–80.


(c) Vessels contracted for prior to November 19, 1952, must meet the requirements of § 95.50–90.


[USCG–2012–0196, 81 FR 48264, July 22, 2016]


§ 95.50-5 [Reserved]

§ 95.50-10 Location.

(a) Approved portable fire extinguishers and semi-portable fire extinguishing systems must be installed in accordance with Table 95.50–10(a) of this section. The location of the equipment must be to the satisfaction of the Officer in Charge, Marine Inspection. Nothing in this paragraph should be construed as limiting the Officer in Charge, Marine Inspection, from requiring such additional equipment as he or she deems necessary for the proper protection of the vessel.


(b) Table 95.50–10(a) indicates the minimum required number and type of extinguisher for each space listed. Extinguishers with larger numerical ratings or multiple letter designations may be used if the extinguishers meet the requirements of the table.


Table 95.50–10(a)—Portable Fire Extinguisher and Semi-Portable Fire Extinguishing Systems

Space
Minimum required rating
Quantity and location
Safety Areas
1
Wheelhouse or fire control roomNone required.
Stairway and elevator enclosuresNone required.
Communicating corridors.2–A1 in each main corridor not more than 150 ft apart. (May be located in stairways.)
Lifeboat embarkation and lowering stationsNone.
Radio room20–B:C
2
2 required in the vicinity of the exit.
2
Accommodations
1
Staterooms, toilet spaces, public spaces, offices, lockers, isolated storerooms, pantries, open decks, etcNone required.
Service Spaces
1
Galleys40–B:C1 for each 2,500 sq ft or fraction thereof suitable for hazards involved.
Paint and lamp rooms40–B1 outside space in the vicinity of the exit.
Accessible baggage, mail, specie rooms, and storerooms2–A1 for each 2,500 sq ft or fraction thereof located in the vicinity of the exits, either inside or outside the spaces.
Carpenter shop and similar spaces2–A1 outside the space in the vicinity of the exit.
Machinery Spaces
Coal-fired boilers: Bunker and boiler spaceNone required.
Oil-fired boilers: Spaces containing oil-fired boilers, either main or auxiliary, or their fuel-oil units40–B

160–B
2 required.
3

1 required.
4
Internal combustion or gas turbine propelling machinery spaces40–B1 for each 1,000 brake horsepower; not less than 2 but not more than 6.
5
120–B1 required.
6 7
Electric propulsive motors or generators of an open type40–B:C1 for each propulsion motor or generator unit.
Enclosed ventilating systems for motors and generators of electric propelling machineryNone required.
Auxiliary Spaces
Internal combustion or gas turbine40–B1 outside the space in the vicinity of the exit.
7
Electric emergency motors or generators40–B:C1 outside the space in the vicinity of the exit.
8
SteamNone required.
Trunks to machinery spacesNone required.
Fuel tanksNone required.
Cargo Spaces
Inaccessible during voyage, including trunks and cargo tanksNone required.
Accessible during voyageNone required.
Spare Units
2–A10 percent of the total number required rounded up.
40–B:C10 percent of the total number required rounded up.
20–B:C1


1 For motorboats, the total number of portable fire extinguishers required for safety areas, accommodation spaces, and service spaces must be one 20–B for motorboats of less than 50 GT and two 20–B ratings for motorboats of 50 GT or more.


2 For vessels on an international voyage, substitute one 20–C in the vicinity of the exit.


3 Vessels of less than 1,000 gross tons require one.


4 Vessels of less than 1,000 gross tons may substitute one 160–B.


5 Only one is required for motorboats.


6 If an oil-burning donkey boiler fitted in space, the 160–B previously required for the protection of the boiler may be substituted. Not required where a fixed carbon dioxide system is installed.


7 Not required on vessels of less than 300 gross tons if the fuel has a flashpoint higher than 110 °F.


8 Not required on vessels of less than 300 gross tons.


(c) Semi-portable fire extinguishing systems must be located in the open so as to be readily seen.


(d) If portable fire extinguishers are not located in the open or behind glass so that they may be readily seen, they may be placed in enclosures together with the firehose, provided such enclosures are marked as required by § 97.37–15 of this subchapter.


(e) Portable fire extinguishers and their stations must be numbered in accordance with § 97.37–23 of this subchapter.


(f) Portable or semi-portable extinguishers, which are required on their nameplates to be protected from freezing, must not be located where freezing temperatures may be expected.


[USCG–2012–0196, 81 FR 48264, July 22, 2016]


§ 95.50-20 Semi-portable fire extinguishers.

(a) The frame or support of each semi-portable fire extinguisher required by Table 95.50–10(a) must be welded or otherwise permanently attached to a bulkhead or deck.


(b) If an approved semi-portable fire extinguisher has wheels and is not required by Table 95.50–10(a), it must be securely stowed when not in use to prevent it from rolling out of control under heavy sea conditions.


(c) Semi-portable extinguishers must be fitted with suitable hoses and nozzles, or other practicable means, so that all areas of the space can be protected.


[CGD 77–039, 44 FR 34133, June 14, 1979, as amended by USCG–2012–0196, 81 FR 48265, July 22, 2016]


§ 95.50-80 Location and number of fire extinguishers required for vessels constructed prior to August 22, 2016.

(a) Vessels contracted for prior to August 22, 2016 must meet the following requirements:


(1) Previously installed extinguishers with extinguishing capacities smaller than what is required in table 95.50–10(a) of this subpart need not be replaced and may be continued in service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(2) All new equipment and installations must meet the applicable requirements in this subpart for new vessels.


(b) [Reserved]


[USCG–2012–0196, 81 FR 48265, July 22, 2016]


§ 95.50-90 Vessels contracted for prior to November 19, 1952.

(a) Vessels contracted for prior to November 19, 1952, shall meet the following requirements:


(1) The provisions of §§ 95.50–5 through 95.50–15 shall be met with the exception that existing installations in safety areas and service spaces may be maintained if in the opinion of the Officer in Charge, Marine Inspection, they are in general agreement with the degree of safety prescribed by Table 95.50–10(a). In such cases, minor modifications may be made to the same standard as the original installation: Provided, That in no case will a greater departure from the standards of Table 95.50–10(a) be permitted than presently exists.


Subpart 95.60—Fire Axes

§ 95.60-1 Application.

(a) The provisions of this subpart shall apply to all vessels other than motorboats.


§ 95.60-5 Number required.

(a) All vessels except barges shall carry at least the minimum number of fire axes as set forth in Table 95.60–5(a). Nothing in this paragraph shall be construed as limiting the Officer in Charge, Marine Inspection, from requiring such additional fire axes as he deems necessary for the proper protection of the vessel.


Table 95.60–5(a)

Gross tons
Number of axes
Over
Not over
501
502002
2005004
5001,0006
1,000 8

(b) Manned barges shall carry at least two fire axes.


§ 95.60-10 Location.

(a) Fire axes shall be distributed throughout the spaces available to persons on board so as to be most readily available in the event of emergency.


(b) If fire axes are not located in the open, or behind glass, so that they may be readily seen, they may be placed in enclosures together with the fire hose, provided such enclosures are marked as required by § 97.37–15 of this subchapter.


PART 96—VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT


Authority:46 U.S.C. 3306; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation No. 00170.1, Revision No. 01.3.



Source:CGFR 65–50, 30 FR 17008, Dec. 30, 1965, unless otherwise noted.

Subpart 96.01—Application

§ 96.01-1 General.

(a) The provisions of this part shall apply to all vessels except as specifically noted in this part.


§ 96.01-3 Incorporation by reference.

(a) Certain materials are incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a). To enforce any edition other than the one listed in paragraph (b) of this section, notice of the change must be published in the Federal Register and the material made available to the public. All approved material is on file at the Office of the Federal Register, Washington, DC 20408, and at the Coast Guard Headquarters. Contact Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509. The material is also available from the address indicated in paragraph (b).


(b) The material approved for incorporation by reference in this part, and the sections affected is:



American Society for Testing and Materials (ASTM)

100 Barr Harbor Drive, West Conshohocken, PA 19428–2959.

ASTM F 1014–92, Standard Specification for Flashlights on Vessels—96.35–5


Note:

All other documents referenced in this part are still in effect.


[CGD 82–042, 53 FR 17705, May 18, 1988, as amended by CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50729, Sept. 27, 1996; CGD 97–057, 62 FR 51046, Sept. 30, 1997; USCG–1999–5151, 64 FR 67181, Dec. 1, 1999; USCG–2009–0702, 74 FR 49232, Sept. 25, 2009; USCG–2012–0832. 77 FR 59780, Oct. 1, 2012; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013]


Subpart 96.03—Marine Engineering Systems

§ 96.03-1 Installation and details.

(a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter. Systems of this type include the following:



Steering Systems.

Bilge and Ballast Systems.

Tank Vent and Sounding Systems.

Overboard Discharges and Shell Connections.

Pipe and Pressure Systems.

Liquefied Petroleum Gas For Cooking and Heating.

Subpart 96.05—Electrical Engineering and Interior Communications Systems

§ 96.05-1 Installation and details.

(a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this type include the following:



Ship’s service generating systems.

Ship’s service power distribution systems.

Ship’s lighting systems.

Electric propulsion and propulsion control systems.

Emergency lighting and power systems.

Electric lifeboat winch systems.

Electric steering gear and steering control systems.

Fire detecting and alarm systems.

Sound powered telephone and voice tube systems.

Engine order telegraph systems.

Rudder angle indicator systems.

Refrigerated spaces alarm systems.

Navigation lights systems.

Daylight signaling lights.

Miscellaneous machinery alarms and controls.

General alarm systems.

(b) Electrical equipment installed in spaces “specially suitable for vehicles” shall be in accordance with subchapter J (Electrical Engineering) of this chapter.


[CGFR 66–33, 31 FR 15285, Dec. 6, 1966, as amended by CGFR 68–32, 33 FR 5719, Apr. 12, 1968, CGD 74–125A, 47 FR 15232, Apr. 8, 1982]


Subpart 96.06—Lifesaving Appliances and Arrangements

§ 96.06-1 Installation.

The installation of all lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25289, May 20, 1996]


Subpart 96.07—Anchors, Chains, and Hawsers

§ 96.07-1 Application.

(a) The provisions of this subpart, with the exception of § 96.07–90, shall apply to all vessels contracted for on or after November 19, 1952. Vessels contracted for prior to November 19, 1952, shall meet the requirements of § 96.07–90.


§ 96.07-5 Ocean, coastwise, or Great Lakes service.

(a) Vessels in ocean, coastwise, or Great Lakes service, except unmanned barges, must be fitted with anchors. chains, and hawsers in general agreement with the Standards established by the American Bureau of Shipping, see 46 CFR part 90, subpart 90.35.


(b) In addition to the provisions of paragraph (a) of this section, the following requirements and alternatives also apply:


(1) The American Bureau of Shipping rules relating to anchor equipment are mandatory, not a guide.


(2) Vessels under 200 feet (61 meters) in length and with an American Bureau of Shipping equipment number of less than 150 may be equipped with either—


(i) One anchor of the tabular weight and one-half the tabulated length of anchor chain listed in the applicable standard, or


(ii) Two anchors of one-half the tabular weight with the total length of anchor chain listed in the applicable standard provided both anchors are in a position that allows for ready use at all times and the windlass is capable of heaving in either anchor.


(c) Tugs, under 200 feet (61 meters) in length, shall have at least one anchor of one-half the tabular weight listed in the applicable standards.


(d) Standards of other recognized classification societies may be used, in lieu of those established by the American Bureau of Shipping, upon approval by the Commandant.


[CGFR 68–32, 33 FR 5720, Apr. 12, 1968, as amended by CGD 87–013, 53 FR 20624, June 6, 1988; USCG–2022–0323, 88 FR 10030, Feb. 16, 2023]


§ 96.07-10 Lakes, bays, and sounds, or river service.

(a) Vessels in lakes, bays, and sounds, or river service shall be fitted with such ground tackle and hawsers as deemed necessary by the Officer in Charge, Marine Inspection, depending upon the size of the vessel and the waters on which it operates.


§ 96.07-90 Vessels contracted for prior to November 19, 1952.

(a) Vessels contracted for prior to November 19, 1952, shall meet the following requirements:


(1) Installations previously accepted or approved shall be considered satisfactory for the same service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. If the service of the vessel is changed, the suitability of the equipment will be established by the Officer in Charge, Marine Inspection.


Subpart 96.17—Magnetic Compass and Gyrocompass

§ 96.17-1 When required.

(a) All mechanically propelled vessels in ocean or coastwise service must be fitted with a magnetic compass.


(b) All mechanically propelled vessels of 1,600 gross tons and over in ocean or coastwise service must be fitted with a gyrocompass in addition to the magnetic compass.


(c) Each vessel must have an illuminated repeater for the gyrocompass required under paragraph (b) that is at the main steering stand unless the gyrocompass is illuminated and is at the main steering stand.


[CGD 75–074, 42 FR 5963, Jan. 31, 1977]


Subpart 96.25—Radar

§ 96.25-1 When required.

All mechanically propelled vessels of 1,600 gross tons and over in ocean or coastwise service must be fitted with a marine radar system for surface navigation. Facilities for plotting radar readings must be provided on the bridge.


[CGD 75–074, 42 FR 5964, Jan. 31, 1977]


Subpart 96.27—Sounding Equipment

§ 96.27-1 When required.

All mechanically propelled vessels of 500 gross tons and over in ocean or coastwise service and all mechanically propelled vessels of 500 gross tons and over in Great Lakes service and certificated for service on the River St. Lawrence eastward of the lower exit of the St. Lambert Lock at Montreal, Canada, must be fitted with an efficient electronic sounding apparatus.


[CGD 95–027, 61 FR 26007, May 23, 1996]


Subpart 96.30—Protection From Refrigerants


Source:CGD 86–036, 57 FR 48325, Oct. 23, 1992, unless otherwise noted.

§ 96.30-1 Application.

(a) This subpart, except § 96.30–90, applies to each vessel that is contracted for on or after November 23, 1992, and is equipped with any refrigeration unit using—


(1) Ammonia to refrigerate any space with a volume of more than 20 cubic feet; or


(2) Fluorocarbons to refrigerate any space with a volume of more than 1000 cubic feet.


(b) Each vessel that is contracted for before November 23, 1992, must satisfy § 96.30–90 if it is equipped with any refrigeration unit using—


(1) Ammonia to refrigerate any space with a volume of more than 20 cubic feet; or


(2) Fluorocarbons to refrigerate any space with a volume of more than 1000 cubic feet.


§ 96.30-5 General.

(a) Each self-contained breathing apparatus must be of the pressure-demand, open-circuit type, approved by the Mine Safety and Health Administration (MSHA) and by the National Institute for Occupational Safety and Health (NIOSH), and have at a minimum a 30-minute air supply, a full facepiece, and a spare charge.


(b) All equipment shall be maintained in an operative condition, and it shall be the responsibility of the master and chief engineer to ascertain that a sufficient number of the crew are familiar with the operation of the equipment.


[CGD 86–036, 57 FR 48325, Oct. 23, 1992; 57 FR 56406, Nov. 27, 1992]


§ 96.30-15 Self-contained breathing apparatus.

(a) Each vessel must have a self-contained breathing apparatus for use as protection against gas leaking from a refrigeration unit.


(b) The self-contained breathing apparatus required by paragraph (a) of this section may be one of those required by § 96.35–10.


§ 96.30-90 Vessels contracted for before November 23, 1992.

Vessels contracted for before November 23, 1992, must meet the following requirements:


(a) Each vessels must satisfy §§ 96.30–5 through 96.30–15 concerning the number of items and method of stowage of equipment.


(b) Items of equipment previously approved, but not meeting the applicable specifications set forth in § 96.30–5, may continue in service as long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection; but each item in an installation or a replacement must meet all applicable specifications.


(c) After November 23, 1994, each respirator must either satisfy § 96.30–5(a) or be a self-contained compressed-air breathing apparatus previously approved by MSHA and NIOSH under part 160, subpart 160.011, of this chapter.


Subpart 96.35—Fireman’s Outfit

§ 96.35-1 Application.

This subpart, except § 96.35–90, applies to each vessel that is on an international voyage and is contracted for on or after November 23, 1992. Each vessel that is on an international voyage and is contracted for before November 23, 1992, must satisfy § 96.35–90.


[CGD 86–036, 57 FR 48325, Oct. 23, 1992]


§ 96.35-5 General.

(a) All flame safety lamps shall be of an approved type, constructed in accordance with subpart 160.016 of subchapter Q (Specifications) of this chapter.


(b) Each self-contained breathing apparatus must be of the pressure-demand, open-circuit type, approved by the Mine Safety and Health Administration (MSHA) and by the National Institute for Occupational Safety and Health (NIOSH), and have at a minimum a 30-minute air supply and full facepiece.


(c) Flashlights shall be Type II or Type III, constructed and marked in accordance with ASTM F 1014 (incorporated by reference, see § 96.01–3).


(d) All lifelines shall be of steel or bronze wire rope. Steel wire rope shall be either inherently corrosion-resistant, or made so by galvanizing or tinning. Each end shall be fitted with a hook with keeper having throat opening which can be readily slipped over a
5/8-inch bolt. The total length of the lifeline shall be dependent upon the size and arrangement of the vessel, and more than one line may be hooked together to achieve the necessary length. No individual length of lifeline may be less than 50 feet in length. The assembled lifeline shall have a minimum breaking strength of 1,500 pounds.


(e) All equipment shall be maintained in an operative condition, and it shall be the responsibility of the master and chief engineer to ascertain that a sufficient number of the crew are familiar with the operation of the equipment.


(f) Boots and gloves shall be of rubber or other electrically nonconducting material.


(g) The helmet shall provide effective protection against impact.


(h) Protective clothing shall be of material that will protect the skin from the heat of fire and burns from scalding steam. The outer surface shall be water resistant.


[CGFR 65–50, 30 FR 17008, Dec. 30, 1965, as amended by CGFR 69–72, 34 FR 17485, Oct. 29, 1969; CGD 82–042, 53 FR 17705, May 18, 1988; CGD 86–036, 57 FR 48325, Oct. 23, 1992; USCG–1999–5151, 64 FR 67181, Dec. 1, 1999]


§ 96.35-10 Fireman’s outfit.

(a) Each fireman’s outfit must consist of one self-contained breathing apparatus, one lifeline with a belt or a suitable harness, one flashlight, one flame safety lamp, one rigid helmet, boots and gloves, protective clothing, and one fire ax. In lieu of the flame safety lamp, vessels may carry an oxygen depletion meter which is listed by a Coast Guard recognized independent laboratory as intrinsically safe.


(b) Every vessel shall carry at least two firemen’s outfits.


[CGFR 69–72, 34 FR 17485, Oct. 29, 1969, as amended by CGD 86–036, 57 FR 48325, Oct. 23, 1992; CGD 95–028, 62 FR 51207, Sept. 30, 1997]


§ 96.35-15 Stowage.

The fireman’s outfits must be stored in widely separated, accessible locations.


[CGD 75–074, 42 FR 5964, Jan. 31, 1977]


§ 96.35-20 Spare charges.

(a) A complete recharge shall be carried for each self-contained breathing apparatus, and a complete set of spare batteries shall be carried for each flashlight. The spares shall be stowed in the same location as the equipment it is to reactivate.


§ 96.35-90 Vessels contracted for before November 23, 1992.

Vessels contracted for before November 23, 1992, must meet the following requirements:


(a) Each vessel must satisfy §§ 96.35–5 through 96.35–20 concerning the number of items and method of stowage of equipment.


(b) Items of equipment previously approved, but not meeting the applicable specifications set forth in § 96.35–5, may continue in service as long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection; but each item in an installation or a replacement must meet all applicable specifications.


(c) After November 23, 1994, each respirator must either satisfy § 96.35–5(b) or be a self-contained compressed-air breathing apparatus previously approved by MSHA and NIOSH under part 160, subpart 160.011, of this chapter.


[CGD 86–036, 57 FR 48326, Oct. 23, 1992]


Subpart 96.40—Pilot Boarding Equipment

§ 96.40-1 Pilot boarding equipment.

(a) This section applies to each vessel that normally embarks or disembarks a pilot from a pilot boat or other vessel.


(b) Each vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel has only one set of equipment, the equipment must be capable of being easily transferred to and rigged for use on either side of the vessel.


(c) Pilot boarding equipment must be capable of resting firmly against the vessel’s side and be secured so that it is clear from overboard discharges.


(d) Each vessel must have lighting positioned to provide adequate illumination for the pilot boarding equipment and each point of access.


(e) Each vessel must have a point of access that has—


(1) A gateway in the rails or bulwark with adequate handholds; or


(2) Two handhold stanchions and a bulwark ladder that is securely attached to the bulwark rail and deck.


(f) The pilot boarding equipment required by paragraph (b) of this section must include at least one pilot ladder approved under subpart 163.003 of this chapter. Each pilot ladder must be of a single length and capable of extending from the point of access to the water’s edge during each condition of loading and trim, with an adverse list of 15°.


(g) Whenever the distance from the water’s edge to the point of access is more than 30 feet, access from a pilot ladder to the vessel must be by way of an accommodation ladder or equally safe and convenient means.


(h) Pilot hoists, if used, must be approved under subpart 163.002 of this chapter.


[CGD 79–032, 49 FR 25455, June 21, 1984]


PART 97—OPERATIONS


Authority:33 U.S.C. 1321(j); 46 U.S.C. 2103, 3306, 5111, 6101; 49 U.S.C. 5103, 5106; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 12777, 56 FR 54757; 3 CFR, 1991 Comp., p. 351; Department of Homeland Security Delegation No. 0170.1.


Source:CGFR 65–50, 30 FR 17011, Dec. 30, 1965, unless otherwise noted.

Subpart 97.01—Application

§ 97.01-1 General; preemptive effect.

(a) The provisions of this part shall apply to all vessels except as specifically noted in this part.


(b) The regulations in this part have preemptive effect over State or local regulations in the same field.


[CGFR 65–50, 30 FR 17011, Dec. 30, 1965, as amended by USCG–2006–24797, 77 FR 33881, June 7, 2012]


§ 97.01-2 Incorporation by reference.

(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in paragraph (b) of this section, the Coast Guard must publish notice of change in the Federal Register; and the material must be available to the public. All approved material is available for inspection at Coast Guard Headquarters. Contact Commandant (CG–ENG–4), Attn: Lifesaving and Fire Safety Division, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509 or contact the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. All material is available from the sources indicated in paragraph (b) of this section.


(b) The material approved for incorporation by reference in this part and the sections affected are as follows:



American Society for Testing and Materials (ASTM)

100 Barr Harbor Drive, West Conshohocken, PA 19428–2959

ASTM D 93–97, Standard Test Methods for Flash Point by Pensky-Martens Closed Cup Tester—97.15–55

ASTM Adjunct F 1626, Symbols for Use in Accordance with Regulation II–2/20 of the 1974 SOLAS Convention as amended PCN: 12–616260–01 (1996)—97.36–1

International Maritime Organization (IMO)

Publications Section, 4 Albert Embankment, London, SE1 7SR United Kingdom

Resolution A.654(16), Graphical Symbols for Fire Control Plans—97.36–1

[CGD 95–028, 62 FR 51207, Sept. 30, 1997, as amended by USCG–1998–4442, 63 FR 52191, Sept. 30, 1998; USCG–1999–5151, 64 FR 67181, Dec. 1, 1999; USCG–2009–0702, 74 FR 49232, Sept. 25, 2009; USCG–2012–0832, 77 FR 59780, Oct. 1, 2012; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013; USCG–2014–0688, 79 FR 58282, Sept. 29, 2014]


Subpart 97.05—Notice to Mariners and Aids to Navigation

§ 97.05-1 Duty of officers.

(a) Licensed deck officers are required to acquaint themselves with the latest information published by the Coast Guard and the National Geospatial-Intelligence Agency regarding aids to navigation. Neglect to do so is evidence of neglect of duty. It is desirable that vessels other than motorboats shall have available in the pilothouse for convenient reference at all times a file of the applicable Notice to Mariners.


(b) Local Notices to Mariners, published by each U.S. Coast Guard District, contain announcements and information on changes in aids to navigation and other marine information affecting the safety of navigation on oceans and coastwise and the Great Lakes. These notices may be obtained free of charge from the U.S. Coast Guard Navigation Center Web site found at http://www.navcen.uscg.gov/?pageName = lnmMain.


(c) Weekly Notices to Mariners (Worldwide coverage) are prepared jointly by the National Geospatial-Intelligence Agency, National Ocean Service, and the U.S. Coast Guard. They include changes in aids to navigation and other important navigation safety information in assembled form for U.S. waters. Foreign marine information is also included in these notices. These notices are available without charge from the National Geospatial-Intelligence Agency Web site found at http://msi.nga.mil/NGAPortal/MSI.portal.


[USCG–2014–0688, 79 FR 58282, Sept. 29, 2014]


§ 97.05-5 Charts and nautical publications.

As appropriate for the intended voyage, all vessels except barges, vessels operating exclusively on rivers, and motorboats other than those certificated for ocean or coastwise route, must carry adequate and up-to-date—


(a) Charts;


(b) Sailing directions;


(c) Coast pilots;


(d) Light lists;


(e) Notices to mariners;


(f) Tide tables;


(g) Current tables; and


(h) All other nautical publications necessary.
1




1 For United States vessels in or on the navigable waters of the United States, see 33 CFR 164.33.


[CGD 75–074, 42 FR 5964, Jan. 31, 1977]


Subpart 97.07—Notice and Reporting of Casualty and Voyage Records

§ 97.07-1 Notice and reporting of casualty and voyage records.

The requirements for providing notice and reporting of marine casualties and for retaining voyage records are contained in subpart 4.05 of this chapter.


[CGD 84–099, 52 FR 47536, Dec. 14, 1987, as amended by USCG–1998–4442, 63 FR 52191, Sept. 30, 1998]


Subpart 97.10—Persons Allowed in Pilothouse and on Navigation Bridge

§ 97.10-1 Application.

(a) The provisions of this subpart shall apply to all vessels carrying passengers.


§ 97.10-5 Persons excluded.

Masters and pilots shall exclude from the pilothouse and navigation bridge while underway, all persons not connected with the navigation of the vessel. However, licensed officers of vessels, persons regularly engaged in training, regulating, evaluating, or learning the profession of pilot, officials of the United States Coast Guard, United States Navy, National Geospatial-Intelligence Agency, National Ocean Service, United States Army Corps of Engineers, Maritime Administration, and National Transportation Safety Board may be allowed in the pilothouse or upon the navigation bridge upon the responsibility of the master or pilot.


[CGD 91–023, 59 FR 16779, Apr. 8, 1994, as amended by USCG–2001–10224, 66 FR 48620, Sept. 21, 2001; USCG–2014–0688, 79 FR 58283, Sept. 29, 2014]


Subpart 97.11—Stability Letter

§ 97.11-1 Posting.

If a stability letter is issued under § 170.120 of this chapter, it must be posted under glass or other suitable transparent material in the pilothouse of the vessel.


[CGD 79–023, 48 FR 51008, Nov. 4, 1983]


Subpart 97.12—Bulk Solid Cargoes


Source:75 FR 64591, October 19, 2010, unless otherwise noted.

§ 97.12-1 Definition of a bulk solid cargo.

(a) A bulk solid cargo—


(1) Consists of particles, granules, or larger pieces of material generally uniform in composition;


(2) Is not grain; and


(3) Is loaded directly into a vessel’s cargo space with no intermediate form of containment.


(b) Additional requirements for bulk solid materials needing special handling are contained in Part 148 of this chapter.


§ 97.12-3 Guidance for the master.

(a) The owner or operator of a vessel must provide the master with safe loading and stowage information for each bulk solid cargo that vessel will carry.


(b) The shipper of a bulk solid cargo, as defined in § 148.3 of this chapter, must provide the master of a vessel with information regarding the nature of the cargo in advance of loading operations. Additional requirements in § 148.60 of this chapter may also apply.


§ 97.12-5 Bulk solid cargoes that may liquefy.

If the information provided in § 97.12–3(a) or (b) indicates that the bulk solid cargo to be carried is prone to liquefy during carriage, due to small particle sizes and moisture content, then the requirements contained in § 148.450 of this chapter apply.


§ 97.12-10 Cargo securing manuals.

Each U.S.-flagged vessel that must comply with Chapter VI/5.6 or Chapter VII/5 of the International Convention for the Safety of Life at Sea, 1974 as amended must have on board a cargo securing manual that meets the requirements of 33 CFR part 97.


[USCG–2000–7080, 81 FR 28018, May 9, 2016]


Subpart 97.13—Station Bills

§ 97.13-1 Muster lists, emergency signals, and manning.

The requirements for muster lists, emergency signals, and manning must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25289, May 20, 1996]


Subpart 97.15—Tests, Drills, and Inspections

§ 97.15-1 Application.

(a) Except as specifically noted, the provisions of this subpart shall apply to all vessels other than motorboats, and to all motorboats on an international voyage. Motorboats not on an international voyage shall meet the general intent of this subpart insofar as is reasonable and practicable with the exception that the logging of information is not required.


§ 97.15-3 Steering gear, whistle, and means of communication.

(a) On all vessels making a voyage of more than 48 hours’ duration, the entire steering gear, the whistle, and the means of communication between the bridge or pilothouse and the engineroom shall be examined and tested by an officer of the vessel within a period of not more than 12 hours prior to departure. On all other vessels similar examinations and tests shall be made at least once in every week.


(b) The date of the test and the condition of the equipment shall be noted in the official logbook.


§ 97.15-5 Drafts and load line markings.

(a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and aft, in the official logbook when leaving port.


(b) On vessels subject to the requirements of subchapter E (Load Lines) of this chapter at the time of departure from port on an ocean, coastwise, or Great Lakes voyage, the master shall insert in the official logbook a statement of the position of the load line mark, port and starboard, in relation to the surface of the water in which the vessel is then floating.


(1) When an allowance for draft is made for density of the water in which the vessel is floating, this density is to be noted in the official logbook.


§ 97.15-7 Verification of vessel compliance with applicable stability requirements.

(a) Except as provided in paragraph (d) of this section, after loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master or person in charge shall determine that the vessel complies with all applicable stability requirements in the vessel’s trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. The vessel may not depart until it is in compliance with these requirements.


(b) When determining compliance with applicable stability requirements the vessel’s draft, trim, and stability must be determined as necessary.


(c) If a log book is required by § 97.35, then the master or person in charge must enter an attestation statement verifying that the vessel complies with the applicable stability requirements at the times specified in paragraph (a) and any stability calculations made in support of the determination must be retained on board the vessel for the duration of the voyage.


(d) Stability verification is not required for tank barges whose Certificate of Inspection carries draft restrictions for purposes other than stability.


[CGD 89–037, 57 FR 41822, Sept. 11, 1992]


§ 97.15-10 Sanitation.

(a) It shall be the duty of the master and chief engineer to see that the vessel, and, in particular, the quarters are in a clean and sanitary condition. The chief engineer shall be responsible only for the sanitary condition of the engineering department.


§ 97.15-15 Examination of boilers and machinery.

It shall be the duty of the chief engineer when assuming charge of the boilers and machinery of a vessel to examine them thoroughly. If any parts thereof are in bad condition, the fact shall immediately be reported to the master, owner or agent, and the Officer in Charge, Marine Inspection.


[CGD 95–028, 62 FR 51207, Sept. 30, 1997]


§ 97.15-17 Loading doors.

(a) The master of a vessel fitted with loading doors shall assure that all loading doors are closed watertight and secured during the entire voyage except that—


(1) If a door cannot be opened or closed while the vessel is at a dock, it may be open while the vessel approaches and draws away from the dock, but only as far as necessary to enable the door to be immediately operated;


(2) If needed to operate the vessel, or embark and disembark passengers when the vessel is at anchor in protected waters, loading doors may be open provided that the master determines that the safety of the vessel is not impaired.


(b) For the purposes of this section, “loading doors” include all weathertight ramps, bow visors, and openings used to load personnel, equipment, cargo, and stores, in the collision bulkhead, the side shell, and the boundaries of enclosed superstructures that are continuous with the shell of the vessel.


(c) The master shall enter into the log book the time and door location of every closing of the loading doors.


(d) The master shall enter into the log book any opening of the doors in accordance with paragraph (a)(2) of this section setting forth the time of the opening of the doors and the circumstances warranting this action.


[CGD 89–037, 57 FR 41823, Sept. 11, 1992]


§ 97.15-20 Hatches and other openings.

(a)(1) With the exception stated in paragraph (a)(2) of this section, it shall be the responsibility of the master to assure himself that all exposed cargo hatches and other openings in the hull of his vessel are closed, made properly watertight by the use of tarpaulins, gaskets or similar devices, and in all respects properly secured for sea before leaving protected waters.


(2) A vessel engaged in a voyage exclusively on Great Lakes waters and having 6 feet or more of freeboard, measured vertically from the water’s edge at the lowest point of sheer to the top of deck at the ship’s side, may, at the master’s discretion, omit tarpaulins on the ship’s hatches from 16 May through 15 September (both dates inclusive). This exemption does not relieve the master of any responsibility for the securing and protection of his hatches during the interval of exemption and, in case of indications of bad weather or other threatening conditions, he shall not leave protected waters until the exposed cargo hatches and other openings in the hull of his vessel are properly covered, secured and protected.


(b) The openings to which this section applies are as follows:


(1) Exposed cargo hatches.


(2) Gangway, cargo and coaling ports fitted below the freeboard deck.


(3) Port lights that are not accessible during navigation including the dead lights for such port lights.


(c) Vessels which, by their design, do not require cargo hatch closing devices and to which § 45.01–20 of subchapter E (Load Lines) of this chapter applies need not comply with the requirements of this section as to exposed cargo hatches.


(d) The master at his discretion may permit hatches or other openings to remain uncovered or open, or to be uncovered or opened for reasonable purposes such as ship’s maintenance while the vessel is being navigated: Provided, That in his opinion existing conditions warrant such action.


(e) In the event the master employs the discretionary provisions of this section after leaving port he shall cause appropriate entries to be made in the official log or equivalent thereof setting forth the time of uncovering, opening, closing or covering of the hatches or other openings to which this section applies and the circumstances warranting the action taken.


(f) The discretionary provisions of this section shall not relieve the master of his responsibility for the safety of his vessel, her crew or cargo.


§ 97.15-30 Emergency lighting and power systems.

(a) Where fitted, it shall be the duty of the master to see that the emergency lighting and power systems are operated and inspected at least once in each week that the vessel is navigated to be assured that the system is in proper operating condition.


(b) Internal combustion engine driven emergency generators shall be operated under load for at least 2 hours, at least once in each month that the vessel is navigated.


(c) Storage batteries for emergency lighting and power systems shall be tested at least once each 6-month period that the vessel is navigated to demonstrate the ability of the storage battery to supply the emergency loads for the period of time specified in Table 112.05–5(a) of this chapter.


(d) The date of the tests and the condition and performance of the apparatus shall be noted in the official log book.


[CGFR 65–50, 30 FR 17014, Dec. 30, 1965, as amended by CGFR 70–143, 35 FR 19906, Dec. 30, 1970; 36 FR 5606, Mar. 25, 1971]


§ 97.15-35 Emergency training, musters, and drills.

Onboard training, musters, and drills must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25289, May 20, 1996]


§ 97.15-55 Requirements for fuel oil.

(a) It shall be the duty of the chief engineer to cause an entry in the log to be made of each supply of fuel oil received on board, stating the quantity received, the name of the vendor, the name of the oil producer, and the flashpoint (Pensky-Martens Closed Cup Method, ASTM D 93 (incorporated by reference, see § 97.01–2)) for which it is certified by the producer.


(b) It shall be the further duty of the chief engineer to cause to be drawn and sealed and suitably labeled at the time the supply is received on board, a half-pint sample of each lot of fuel oil. These samples shall be preserved until the particular supply of oil is exhausted.


[CGFR 65–50, 30 FR 17011, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18901, Dec. 18, 1968; USCG–2000–7790, 65 FR 58461, Sept. 29, 2000]


§ 97.15-60 Firefighting equipment, general.

(a) It shall be the duty of the owner, master, or person in charge to see that the vessel’s firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated.


(b) It shall be the duty of the owner, master, or person in charge to require and have performed at least once in every twelve months the tests and inspections of all hand portable fire extinguishers, semiportable fire extinguishing systems, and fixed fire extinguishing systems on board, as described in Tables 91.25–20(a)(1) and 91.25–20(a)(2) in § 91.25–20 of this subchapter. The owner, master, or person in charge shall keep records of such tests and inspections showing the dates when performed, the number and/or other identification of each unit tested and inspected, and the name(s) of the person(s) and/or company conducting the tests and inspections. Such records shall be made available to the inspector upon request and shall be kept for the period of validity of the vessel’s current certificate of inspection. Where practicable these records should be kept in or with the vessel’s log book. The conduct of these tests and inspections does not relieve the owner, master, or person in charge of his responsibility to maintain this firefighting equipment in proper condition at all times.


§ 97.15-75 Test of inflatable hopper gate seals on Great Lakes bulk dry cargo vessels.

(a) It is the duty of the Master to ensure that the inflatable hopper gate seals installed on vessels required to meet the damage stability requirements of subpart H of part 172 of this chapter are tested after each carriage of cargo.


(b) Where inflatable hopper gate seals are installed, the test must consist of inflating the seals and assuring they hold the design pressure for at least 15 minutes without a drop in pressure.


(c) The date of the test and the condition of the equipment must be noted in the vessel’s official logbook.


[CGD 80–159, 51 FR 33059, Sept. 18, 1986]


Subpart 97.16—Auto Pilot

§ 97.16-1 Use of auto pilot.

Except as provided in 33 CFR 164.15, when the automatic pilot is used in—


(a) Areas of high traffic density;


(b) Conditions of restricted visibility; and


(c) All other hazardous navigational situations, the master shall ensure that—


(1) It is possible to immediately establish manual control of the ship’s steering;


(2) A competent person is ready at all times to take over steering control;


(3) The changeover from automatic to manual steering and vice versa is made by, or under, the supervision of the officer of the watch.


[CGD 75–074, 42 FR 5964, Jan. 31, 1977]


Subpart 97.19—Maneuvering Characteristics

§ 97.19-1 Data required.

For each ocean and coastwise vessel of 1,600 gross tons or over, the following apply:


(a) The following maneuvering information must be prominently displayed in the pilothouse on a fact sheet:


(1) For full and half speed, a turning circle diagram to port and starboard that shows the time and the distance of advance and transfer required to alter the course 90 degrees with maximum rudder angle and constant power settings.


(2) The time and distance to stop the vessel from full and half speed while maintaining approximately the initial heading with minimum application of rudder.


(3) For each vessel with a fixed propeller, a table of shaft revolutions per minute for a representative range of speeds.


(4) For each vessel with a controllable pitch propeller a table of control settings or a representative range of speeds.


(5) For each vessel that is fitted with an auxiliary device to assist in maneuvering, such as a bow thruster, a table of vessel speeds at which the auxiliary device is effective in maneuvering the vessel.


(b) The maneuvering information must be provided in the normal load and normal light condition with normal trim for a particular condition of loading assuming the following—


(1) Calm weather—wind 10 knots or less, calm sea;


(2) No current;


(3) Deep water conditions—water depth twice the vessel’s draft or greater; and


(4) Clean hull.


(c) At the bottom of the fact sheet, the following statement must appear:



Warning

The response of the (name of the vessel) may be different from those listed above if any of the following conditions, upon which the maneuvering information is based, are varied:


(1) Calm weather—wind 10 knots or less, calm sea;


(2) No current;


(3) Water depth twice the vessel’s draft or greater;


(4) Clean hull; and


(5) Intermediate drafts or unusual trim.


(d) The information on the fact sheet must be:


(1) Verified six months after the vessel is placed in service; or


(2) Modified six months after the vessel is placed into service and verified within three months thereafter.


(e) The information that appears on the fact sheet may be obtained from:


(1) Trial trip observations;


(2) Model tests;


(3) Analytical calculations;


(4) Simulations;


(5) Information established from another vessel of similar hull form, power, rudder and propeller; or


(6) Any combination of the above.


The accuracy of the information in the fact sheet required is that attainable by ordinary shipboard navigation equipment.

(f) The requirements for information for fact sheets for specialized craft such as semi-submersibles, hydrofoils, hovercraft and other vessels of unusual design will be specified on a case by case basis.


[CGD 73–78, 40 FR 2689, Jan. 15, 1975]


Subpart 97.20—Whistling

§ 97.20-1 Unnecessary whistling prohibited.

(a) The unnecessary sounding of the vessel’s whistle is prohibited within any harbor limits of the United States.


Subpart 97.25—Searchlights

§ 97.25-1 Improper use prohibited.

(a) No person shall flash or cause to be flashed the rays of a searchlight or other blinding light onto the bridge or into the pilothouse of any vessel under way.


Subpart 97.27—Lookouts

§ 97.27-5 Master’s and officer’s responsibility.

(a) Nothing in this part shall exonerate any master or officer in command from the consequences of any neglect to keep a proper lookout or to maintain a proper fire watch or from any neglect of any precaution which may be required by the ordinary practice of seamen or by the special circumstances of the case. When circumstances require it, additional watches shall be maintained to guard against fire or other danger and to give an alarm in case of accident or disaster.


Subpart 97.30—Reports of Accidents, Repairs, and Unsafe Equipment

§ 97.30-1 Repairs to boilers and pressure vessels.

(a) Before making any repairs to boilers or unfired pressure vessels, the chief engineer shall submit a report covering the nature of the repairs to the Officer in Charge, Marine Inspection, at or nearest to the port where the repairs are to be made.


§ 97.30-5 Accidents to machinery.

(a) In the event of an accident to a boiler, unfired pressure vessel, or machinery tending to render the further use of the item unsafe until repairs are made, or if by ordinary wear such items become unsafe, a report shall be made, by the chief engineer immediately to the Officer in Charge, Marine Inspection, or if at sea immediately upon arrival at port.


§ 97.30-10 Notice required before repair.

(a) No repairs or alterations, except in an emergency, shall be made to any lifesaving or fire detecting or extinguishing equipment without advance notice to the Officer in Charge, Marine Inspection. When emergency repairs or alterations have been made, notice shall be given to the Officer in Charge, Marine Inspection, as soon as practicable.


Subpart 97.33—Communication Between Deckhouses

§ 97.33-1 When required.

On all vessels navigating in other than protected waters, where the distance between deckhouses is more than 46 meters (150 feet) a fixed means facilitating communication between both ends of the vessel, such as a raised fore and aft bridge or side tunnels, must be provided. Previously approved arrangements may be retained so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


[CGD 95–027, 61 FR 26007, May 23, 1996]


Subpart 97.34—Work Vests

§ 97.34-1 Application.

(a) Provisions of this subpart shall apply to all vessels inspected and certificated in accordance with this subchapter.


§ 97.34-5 Approved types of work vests.

(a) Each buoyant work vest carried under the permissive authority of this section must be approved under—


(1) Subpart 160.053 of this chapter; or


(2) Subpart 160.077 of this chapter as a commercial hybrid PFD.


[CGD 78–174A, 51 FR 4350, Feb. 4, 1986]


§ 97.34-10 Use.

(a) Approved buoyant work vests are considered to be items of safety apparel and may be carried aboard vessels to be worn by crew members when working near or over the water under favorable working conditions. They shall be used under the supervision and control of designated ship’s officers. When carried, such vests shall not be accepted in lieu of any portion of the required number of approved life preservers and shall not be substituted for the approved life preservers required to be worn during drills and emergencies.


§ 97.34-15 Shipboard stowage.

(a) The approved buoyant work vests shall be stowed separately from the regular stowage of approved life preservers.


(b) The locations for the stowage of work vests shall be such as not to be easily confused with that for approved life preservers.


§ 97.34-20 Shipboard inspections.

(a) Each work vest shall be subject to examination by a marine inspector to determine its serviceability. If found to be satisfactory, it may be continued in service, but shall not be stamped by a marine inspector with a Coast Guard stamp. If a work vest is found not to be in a serviceable condition, then such work vest shall be removed from the vessel. If a work vest is beyond repair, it shall be destroyed or mutilated in the presence of a marine inspector so as to prevent its continued use as a work vest.


§ 97.34-25 Additional requirements for hybrid work vests.

(a) In addition to the other requirements in this subpart, commercial hybrid PFD’s must be—


(1) Used, stowed, and maintained in accordance with the procedures set out in the manual required for these devices by § 160.077–29 of this chapter and any limitation(s) marked on them; and


(2) Of the same or similar design and have the same method of operation as each other hybrid PFD carried on board.


[CGD 78–174A, 51 FR 4350, Feb. 4, 1986]


Subpart 97.35—Logbook Entries

§ 97.35-1 Application.

(a) Except as specifically noted, the provisions of this subpart shall apply to all vessels other than motorboats and barges. Motorboats on an international or intercoastal voyage may be required to carry a logbook in accordance with § 97.35–10.


§ 97.35-3 Logbooks and records.

(a) The master or person in charge of a vessel that is required by 46 U.S.C. 11301 to have an official logbook shall maintain the logbook on form CG–706. When the voyage is completed, the master or person in charge shall file the logbook with the Officer in Charge, Marine Inspection.


(b) The master or person in charge of a vessel that is not required by 46 U.S.C. 11301 to have an official logbook, shall maintain, on board, an unofficial logbook or record in any form desired for the purposes of making entries therein as required by law or regulations in this subchapter. Such logs or records are not filed with the Officer in Charge, Marine Inspection, but must be kept available for review by a marine inspector for a period of 1 year after the date to which the records refer. Separate records of tests and inspections of fire fighting equipment must be maintained with the vessel’s logs for the period of validity of the vessel’s certificate of inspection.


[CGD 95–027, 61 FR 26007, May 23, 1996]


§ 97.35-5 Actions required to be logged.

The actions and observations noted in this section shall be entered in the official log book. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience.


(a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving appliances and Arrangements) of this chapter.


(b) Steering Gear, Whistle, and Means of Communication. Prior to departure. See § 97.15–3.


(c) Drafts and Load Line Markings. Prior to leaving port, ocean, coastwise, and Great Lakes services only. See § 97.15–5.


(d) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 97.15–7.


(e) Loading doors. Where applicable, every closing and any opening when not docked. See § 97.15–17.


(f) Hatches and other openings. All openings and closings, or leaving port without closing. Except vessels on protected waters. See § 97.15–20.


(g) Emergency Lighting and Power Systems. Weekly and semi-annually. See § 97.15–30.


(h) Fuel oil data: Upon receipt of fuel oil on board. See § 97.15–55.


(i) Cargo gear inspections: At least once a month. See § 91.37–70 of this subchapter.


(j) Inflatable hopper gate seals. Where installed to comply with subpart G of part 172 of this chapter after each carriage of cargo. See § 97.15–75.


[CGFR 65–50, 30 FR 17011, Dec. 30, 1965, as amended by CGD 80–159, 51 FR 33059, Sept. 18, 1986; CGD 89–037, 57 FR 41823, Sept. 11, 1992; CGD 84–069, 61 FR 25289, May 20, 1996]


Subpart 97.36—Display of Plans

§ 97.36-1 When required.

Barges with sleeping accommodations for more than six persons and all self-propelled vessels shall have permanently exhibited for the guidance of the officer in charge of the vessel the following plans:


(a) General arrangement plans showing for each deck the fire control stations, the various sections enclosed by fire-resisting bulkheads, together with particulars of the fire alarms, detecting systems, the sprinkler installation (if any), the fire extinguishing appliances, means of access to different compartments, decks, etc., and the ventilating systems including particulars of the master fan controls, the positions of dampers, the location of the remote means of stopping fans, and identification numbers of the ventilating fans serving each section. If cargo compartments are “specially suitable for vehicles,” they shall be so indicated on the plan. Alternatively, at the discretion of the Commandant, the aforementioned details may be set out in any other medium, such as a booklet or on computer software, provided that the aforementioned details are available to each officer and a copy is retained on board at all times and is accessible during emergencies. For vessels constructed on or after September 30, 1997 or for existing vessels which have their plans redrawn, the symbols used to identify the aforementioned details shall be in accordance with IMO Assembly resolution A.654(16). These identical symbols can also be found in ASTM Adjunct F 1626 (incorporated by reference, see § 97.01–2).


(b) Plans showing clearly for each deck and hold the boundaries of the watertight compartments, the openings therein with the means of closure and position of any controls thereof, and the arrangements for the correction of any list due to flooding.


(c) The aforementioned information shall be kept up-to-date, any alteration being recorded in the applicable medium as soon as practicable.


[CGD 95–028, 62 FR 51207, Sept. 30, 1997, as amended by USCG–2000–7790, 65 FR 58461, Sept. 29, 2000]


Subpart 97.37—Markings for Fire and Emergency Equipment, Etc.

§ 97.37-1 Application.

(a) The provisions of this subpart, with the exception of § 97.37–90, shall apply to all vessels contracted for on or after November 19, 1952. Vessels contracted for prior to November 19, 1952, shall meet the requirements of § 97.37–90.


§ 97.37-3 General.

(a) It is the intent of this subpart to provide such markings as are necessary for the guidance of the person on board in case of an emergency. In any specific case, and particularly on small vessels, where it can be shown to the satisfaction of the Officer in Charge, Marine Inspection, that the prescribed markings are unnecessary for the guidance of the persons on board in case of emergency, such markings may be modified or omitted.


(b) In addition to English, all stateroom notices, directional signs, etc., shall be printed in languages appropriate to the service of the vessel or other action be taken to achieve the same purpose.


(c) Where in this subpart red letters are specified, letters of a contrasting color on a red background will be accepted.


§ 97.37-5 General alarm bell contact maker.

Each general alarm contact maker must be marked in accordance with requirements in subchapter J (Electrical Engineering Regulations) of this chapter.


[CGD 74–125A, 47 FR 15232, Apr. 8, 1982]


§ 97.37-7 General alarm bells.

(a) All general alarm bells shall be identified by red lettering at least
1/2 inch high:



“GENERAL ALARM—WHEN BELL RINGS GO TO YOUR STATION.”


(b) [Reserved]


§ 97.37-9 Carbon dioxide and clean agent alarms.

Each carbon dioxide or clean agent fire extinguishing alarm must be conspicuously marked: “WHEN ALARM SOUNDS VACATE AT ONCE. CARBON DIOXIDE OR CLEAN AGENT BEING RELEASED.”.


[USCG–2006–24797, 77 FR 33881, June 7, 2012]


§ 97.37-10 Fire extinguishing system branch lines.

(a) The branch line valves of all fire extinguishing systems shall be plainly and permanently marked indicating the spaces served.


(b) [Reserved]


§ 97.37-11 Carbon dioxide warning signs.

Each entrance to a space storing carbon dioxide cylinders, a space protected by carbon dioxide systems, or any space into which carbon dioxide might migrate must be conspicuously marked as follows:


(a) Spaces storing carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION.”.


(b) Spaces protected by carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM OPERATES OR WINTERGREEN SCENT IS DETECTED, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING.” The reference to wintergreen scent may be omitted for carbon dioxide systems not required to have odorizing units and not equipped with such units.


(c) Spaces into which carbon dioxide might migrate—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. DISCHARGE INTO NEARBY SPACE CAN COLLECT HERE. WHEN ALARM OPERATES OR WINTERGREEN SCENT IS DETECTED VACATE IMMEDIATELY.” The reference to wintergreen scent may be omitted for carbon dioxide systems not required to have odorizing units and not equipped with such units.


[USCG–2006–24797, 77 FR 33881, June 7, 2012]


§ 97.37-13 Fire extinguishing system controls.

The control cabinets or spaces containing valves or manifolds for the various fire extinguishing systems must be distinctly marked in conspicuous red letters at least 2 inches high: “[STEAM/CARBON DIOXIDE/CLEAN AGENT/FOAM/WATER SPRAY—as appropriate] FIRE APPARATUS.”.


[USCG–2006–24797, 77 FR 33881, June 7, 2012]


§ 97.37-15 Fire hose stations.

(a) Each fire hydrant shall be identified in red letters and figures at least two inches high “FIRE STATION NO. 1,” “2,” “3,” etc. Where the hose is not stowed in the open or behind glass so as to be readily seen, this identification shall be so placed as to be readily seen from a distance.


(b) [Reserved]


§ 97.37-20 Self-contained breathing apparatus.

(a) Lockers or spaces containing self-contained breathing apparatus shall be marked “SELF-CONTAINED BREATHING APPARATUS.”


(b) [Reserved]


§ 97.37-23 Hand portable fire extinguishers.

(a) Each hand portable fire extinguisher shall be marked with a number and the location where stowed shall be marked with a corresponding number at least
1/2 inch high. Where only one type and size of hand portable fire extinguisher is carried, the numbering may be omitted.


(b) [Reserved]


§ 97.37-25 Emergency lights.

(a) All emergency lights shall be marked with a letter “E” at least
1/2 inch high.


(b) [Reserved]


§ 97.37-33 Instructions for changing steering gear.

(a) Instructions in at least
1/2 inch letters and figures shall be posted in the steering engine room, relating in order, the different steps to be taken in changing to the emergency steering gear. Each clutch, gear, wheel, lever, valve, or switch which is used during the changeover shall be numbered or lettered on a metal plate or painted so that the markings can be recognized at a reasonable distance. The instructions shall indicate each clutch or pin to be “in” or “out” and each valve or switch which is to be “opened” or “closed” in shifting to any means of steering for which the vessel is equipped. Instructions shall be included to line up all steering wheels and rudder amidship before changing gears.


(b) [Reserved]


§ 97.37-35 Rudder orders.

(a) At all steering stations, there shall be installed a suitable notice on the wheel or device or in such other position as to be directly in the helmsman’s line of vision, to indicate the direction in which the wheel or device must be turned for “right rudder” and for “left rudder.”


(b) [Reserved]


§ 97.37-42 Markings for lifesaving appliances, instructions to passengers, and stowage locations.

Lifesaving appliances, instructions to passengers, and stowage locations must be marked in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.


[CGD 84–069, 61 FR 25289, May 20, 1996]


§ 97.37-47 Portable magazine chests.

(a) Portable magazine chests shall be marked in letters at least 3 inches high:



“PORTABLE MAGAZINE CHEST—FLAMMABLE—KEEP LIGHTS AND FIRE AWAY.”


(b) [Reserved]


§ 97.37-50 Ventilation alarm failure.

(a) The alarm required by § 92.15–10(d)(4) of this subchapter, which indicates the loss of required ventilation in spaces specially suitable for vehicles, shall be marked with a conspicuous sign in at least
1/4-inch letters “VENTILATION FAILURE IN VEHICULAR SPACE.”


(b) [Reserved]


[CGFR 66–33, 31 FR 15286, Dec. 6, 1966]


§ 97.37-60 Watertight doors.

Quick-acting Class I watertight doors fitted in accordance with the requirements in § 170.255(d) of this chapter must be marked “KEEP THIS DOOR CLOSED”.


[CGD 80–129, 51 FR 33059, Sept. 18, 1986]


§ 97.37-90 Vessels contracted for prior to November 19, 1952.

(a) Vessels contracted for prior to November 19, 1952, shall meet the requirements of this paragraph.


(1) The requirements of §§ 97.37–5 through 97.37–50 shall be met with the exception that existing signs and markings containing the same general intent, but not necessarily identical wording or exact letter type, size, or color, may be retained so long as they are in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(2) [Reserved]


(b) [Reserved]


[CGFR 65–50, 30 FR 17011, Dec. 30, 1965, as amended by CGFR 66–33, 31 FR 15286, Dec. 6, 1966]


Subpart 97.40—Markings on Vessels

§ 97.40-1 Application.

(a) The provisions of this subpart shall apply to all vessels except as specifically noted.


§ 97.40-5 Hull markings.

Vessels shall be marked as required by parts 67 and 69 of this chapter.


[CGD 72–104R, 37 FR 14233, July 18, 1972]


§ 97.40-10 Draft marks and draft indicating systems.

(a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or at any place at the stern of the vessel as may be necessary for easy observation. The bottom of each mark must indicate the draft.


(b) The draft must be taken from the bottom of the keel to the surface of the water at the location of the marks.


(c) In cases where the keel does not extend forward or aft to the location of the draft marks, due to raked stem or cut away skeg, the datum line from which the draft shall be taken shall be obtained by projecting the line of the bottom of keel forward or aft, as the case may be, to the location of the draft marks.


(d) In cases where a vessel may have a skeg or other appendage extending locally below the line of the keel, the draft at the end of the vessel adjacent to such appendage shall be measured to a line tangent to the lowest part of such appendage and parallel to the line of the bottom of the keel.


(e) Draft marks must be separated so that the projections of the marks onto a vertical plane are of uniform height equal to the vertical spacing between consecutive marks.


(f) Draft marks must be painted in contrasting color to the hull.


(g) In cases where draft marks are obscured due to operational constraints or by protrusions, the vessel must be fitted with a reliable draft indicating system from which the bow and stern drafts can be determined.


[CGFR 65–50, 30 FR 17011, Dec. 30, 1965, as amended by CGD 89–037, 57 FR 41823, Sept. 11, 1992]


§ 97.40-15 Load line marks.

(a) Vessels assigned a load line shall have the deck line and the load line marks permanently scribed or embossed as required by subchapter E (Load Lines) of this chapter.


Subpart 97.45—Carrying of Excess Steam

§ 97.45-1 Master and chief engineer responsible.

It shall be the duty of the master and the chief engineer of any vessel to require that a steam pressure is not carried in excess of that allowed by the certificate of inspection, and to require that the safety valves, once set by the inspector, are in no way tampered with or made inoperable.


[CGD 95–028, 62 FR 51207, Sept. 30, 1997]


Subpart 97.47—Routing Instructions

§ 97.47-1 All persons must comply.

All licensed masters, officers, and certificated seamen on U.S. vessels must strictly comply with routing instructions issued by competent naval authority.


[CGD 95–027, 61 FR 26008, May 23, 1996]


Subpart 97.50—Compliance With Provisions of Certificate of Inspection

§ 97.50-1 Master or person in charge responsible.

(a) It shall be the duty of the master or other person in charge of the vessel to see that all of the provisions of the certificate of inspection are strictly adhered to. Nothing in this subpart shall be construed as limiting the master or other person in charge of the vessel, at his own responsibility, from diverting from the route prescribed in the certificate of inspection or taking such other steps as he deems necessary and prudent to assist vessels in distress or for other similar emergencies.


(b) [Reserved]


Subpart 97.53—Exhibition of Merchant Mariner Credential

§ 97.53-1 Officers.

All officers on a vessel must have their licenses or officer endorsements conspicuously displayed.


[USCG–2006–24371, 74 FR 11265, Mar. 16, 2009]


Subpart 97.55—De-Energizing of Cargo Hold Lighting Circuits When Grain or Other Combustible Bulk Cargo Is Carried

§ 97.55-1 Master’s responsibility.

Before loading bulk grain or any bulk solid cargo to which § 148.435 of this chapter applies, the master shall have the lighting circuits to cargo compartments in which the grain or bulk solid cargo is to be loaded de-energized at the distribution panel or panel board. He shall thereafter have periodic inspections made of the panel or panel board as frequently as necessary to ascertain that the affected circuits remain de-energized while this bulk cargo remains within the vessel.


[USCG–2009–0091, 75 FR 64591, Oct. 19, 2010]


§ 97.55-5 Warning notice posted.

(a) As a precaution against any subsequent unintentional re-energizing of the circuits specified above, an appropriate notice shall be posted at the location where the control is effected warning against re-energizing these circuits. Such notice shall remain posted while this bulk cargo remains within the vessel.


Subpart 97.80—Operation of Vehicles in Enclosed Locations

§ 97.80-1 Special operating conditions.

(a) The operation of self-propelled vehicles in enclosed locations shall be permitted only when the other conditions in this section have been met.


(b) Spaces exposed to carbon monoxide or other hazardous vapors from exhausts of power-operated industrial trucks shall have adequate ventilation. The senior deck officer shall see that tests of the carbon monoxide content of the atmosphere are made as frequently as conditions require to insure that dangerous concentrations do not develop. Such tests shall be made in the area in which persons are working, by persons acquainted with the test equipment and procedure. The carbon monoxide concentration in the holds and intermediate decks where persons are working shall be maintained at not more than 50 parts per million (0.005%) as a time-weighted average, and persons shall be removed from the area if the concentration exceeds 75 parts per million (0.0075%). When necessary, portable blowers of adequate size and location shall be utilized.


[CGFR 66–33, 31 FR 15286, Dec. 6, 1966, as amended by CGFR 69–72, 34 FR 17485, Oct. 29, 1969; CGD 95–027, 61 FR 26008, May 23, 1996]


Subpart 97.90—Pilot Boarding Operations

§ 97.90-1 Pilot boarding operation.

(a) The master shall ensure that pilot boarding equipment is maintained as follows:


(1) The equipment must be kept clean and in good working order.


(2) Each damaged step or spreader step on a pilot ladder must be replaced in kind with an approved replacement step or spreader step, prior to further use of the ladder. The replacement step or spreader step must be secured by the method used in the original construction of the ladder, and in accordance with manufacturer instructions.


(b) The master shall ensure compliance with the following during pilot boarding operations:


(1) Only approved pilot boarding equipment may be used.


(2) The pilot boarding equipment must rest firmly against the hull of the vessel and be clear of overboard discharges.


(3) Two man ropes, a safety line and an approved lifebuoy with an approved water light must be at the point of access and be immediately available for use during boarding operations.


(4) Rigging of the equipment and embarkation/debarkation of a pilot must be supervised in person by a deck officer.


(5) Both the equipment over the side and the point of access must be adequately lit during night operations.


(6) If a pilot hoist is used, a pilot ladder must be kept on deck adjacent to the hoist and available for immediate use.


[CGD 79–032, 49 FR 25455, June 21, 1984]


Subpart 97.95—Person in Charge of Transfer of Liquid Cargo in Bulk


Source:CGD 79–116, 60 FR 17157, Apr. 4, 1995, unless otherwise noted.

§ 97.95-1 General.

A qualified person in charge of a transfer of liquid cargo in bulk shall be designated in accordance with subpart C of 33 CFR part 155.


[CGD 79–116, 60 FR 17157, Apr. 4, 1995]


PART 98—SPECIAL CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK


Authority:33 U.S.C. 1903; 46 U.S.C. 3306, 3307, 3703; 49 U.S.C. App. 1804; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 0170.1.


Source:CGFR 65–50, 30 FR 17022, Dec. 30, 1965, unless otherwise noted.


Editorial Note:Nomenclature changes to part 98 appear by USCG–2009–0702, 74 FR 49232, Sept. 25, 2009.

Subpart 98.01—General

§ 98.01-1 Applicability.

(a) The provisions of this part shall apply to all self-propelled cargo vessels which carry in bulk any of the dangerous cargoes specifically noted in this part.


(b) [Reserved]


(c) The regulations for barges carrying any of the bulk chemical cargoes listed in subparts 98.01 through 98.25 are found in subchapter O of this chapter.


(d) [Reserved]


(e) Manned barges carrying any of the cargoes listed in Table 151.05 of this chapter will be considered individually by the Commandant and may be required to meet the applicable requirements of subchapter O of this chapter, as well as the requirements of this subchapter.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 70–10, 35 FR 3711, Feb. 25, 1970; CGD 84–043, 55 FR 37411, Sept. 11, 1990; 59 FR 17011, Apr. 11, 1994]


§ 98.01-3 Incorporation by reference.

(a) Certain standards and specifications are incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a). To enforce any edition other than the ones listed in paragraph (b) of this section, notice of change must be published in the Federal Register and the material made available to the public. All approved material is at the National Archives and Records Administration (NARA), and is available from the sources indicated in paragraph (b) of this section. For information on the availability of this material at NARA, call 202–741–6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(b) The standards and specifications approved for incorporation by reference in this part and the sections affected, are:



American Society for Nondestructive Testing (ASNT)

4153 Arlingate Road, Caller # 28518, Columbus, OH, 43228–0518


ASNT “Recommended Practice No. SNT-TC-1A (1988), Personnel Qualification and Certification in Nondestructive Testing”
98.25–97(c)(2)

American Society of Mechanical Engineers (ASME) International

Three Park Avenue, New York, N.Y. 10016–5990


ASME Boiler and Pressure Vessel Code, section V, Nondestructive Examination (1986)
98.25–97(a)(1)

[CGD 85–061, 54 FR 50965, Dec. 11, 1989, as amended by USCG–1999–6216, 64 FR 53226, Oct. 1, 1999]


Subpart 98.25—Anhydrous Ammonia in Bulk

§ 98.25-1 Applicability.

(a) The regulations in this subpart apply to each self-propelled vessel that has anhydrous ammonia on board as a cargo, cargo residue, or vapor and that is not regulated under part 154 of this chapter.


(b) Any self-propelled vessel to which this subpart applies shall be inspected and certificated under this subchapter and subchapter D of this chapter.


[CGD 74–289, 44 FR 26008, May 3, 1979]


§ 98.25-5 How anhydrous ammonia may be carried.

(a) Anhydrous ammonia shall be carried in unfired pressure vessel type tanks independent of the structure as detailed in this part, except as otherwise provided in paragraph (b) of this section.


(b) When anhydrous ammonia is to be transported at its boiling temperature at or near atmospheric pressure, the Commandant may permit the use of alternate methods of storage if it is shown to his satisfaction that a degree of safety is obtained consistent with the minimum requirements of this subpart.


§ 98.25-10 Design and construction of cargo tanks.

(a) The cargo tanks shall meet the requirements for Class I, I-L, II, or II-L welded pressure vessels and shall be fabricated, inspected, and tested in accordance with the applicable requirements of part 54 of subchapter F (Marine Engineering) of this chapter.


(b) Unlagged cargo tanks subject to atmospheric temperatures shall be designed for a pressure of not less than 250 pounds per square inch gage.


(c) Where unrefrigerated cargo tanks are lagged as required by §§ 98.25–30 and 98.25–60, the tanks shall be designed for a pressure of not less than 215 pounds per square inch gage.


(d) Refrigerated cargo tanks, in which the temperature of the liquid ammonia is maintained below the normal atmospheric temperatures, shall be designed for a pressure of not less than the vapor pressure corresponding to the temperature of the liquid at which the system is to be maintained, plus 25 pounds per square inch gage.


(e) Each tank shall be provided with not less than a 15″ × 18″ diameter manhole, fitted with a cover located above the maximum liquid level and as close as possible to the top of the tank. Where access trunks are fitted to tanks, the diameter of the trunks shall be not less than 30 inches.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18902, Dec. 18, 1968]


§ 98.25-15 Markings.

(a) Cargo tanks shall be marked in accordance with the requirements of § 54.10–20 of subchapter F (Marine Engineering) of this chapter.


(b) In addition to the markings required to be stamped on the tank, the legend, “Anhydrous Ammonia” shall be conspicuously and legibly marked upon the dome or upper portion of the tank in letters at least 4 inches high.


(c) All tank inlet and outlet connections, except safety relief valves, liquid level gaging devices and pressure gages shall be labeled to designate whether they terminate in the vapor or liquid space. Labels of noncorrosive material may be attached to valves.


(d) All tank markings shall be permanently and legibly stamped in a readily visible position. If the tanks are lagged, the markings attached to the tank proper shall be duplicated on a corrosion resistant plate secured to the outside jacket of the lagging.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18902, Dec. 18, 1968]


§ 98.25-20 Installation of cargo tanks.

(a) Independent tanks shall be arranged in the vessel so as to provide a minimum clearance of not less than 24 inches from the vessel’s side and not less than 15 inches from the vessel’s bottom. Where more than one tank is installed in a vessel, the distance between such tanks shall be not less than 15 inches, unless otherwise approved by the Commandant. Alternate provisions may be made for moving such tanks to provide for adequate inspection and maintenance of the vessel’s structure and the tanks.


(b) The design shall show the manner in which the tanks are to be installed, supported, and secured in the vessel and shall be approved prior to installation. Tanks shall be supported in steel saddles and securely anchored in place. If the tanks are required to be stress-relieved no appendages shall be welded to the tanks after they have been stress-relieved unless authorized by the Commandant.


(c) Tanks may be located in dry cargo holds or in liquid cargo tanks or may be installed “on deck” or “under deck” with the tank protruding above deck. On installations where a portion of the tank extends above the weather deck, provision shall be made to maintain the weathertightness of the deck, except that vessels operating on protected inland waters may have tanks located in the holds of hopper type barges without the watertightness of the deck being maintained. All tanks shall be installed with the manhole opening and fittings located above the weather deck.


(d) The anhydrous ammonia tanks may be installed in the bulk liquid cargo tanks provided the liquid surrounding the enclosed anhydrous ammonia tanks complies with the following chemical and physical properties:


(1) Boiling point above 125 °F. at atmospheric pressure.


(2) Inert to ammonia at 100 °F. at atmospheric pressure.


(3) Noncorrosive in the liquid and vapor phase to the ammonia tanks and piping.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 70–10, 35 FR 3711, Feb. 25, 1970]


§ 98.25-30 Lagging.

(a) Lagged tanks shall be covered with an incombustible insulation material of a thickness to provide a thermal conductance of not more than 0.075 B.t.u. per square foot per degree F. differential in temperature per hour. The insulating material shall be of an approved type complying with the requirements of subpart 164.009 of subchapter Q (Specifications) of this chapter, and shall be given a vapor proof coating with fire retardant material acceptable to the Commandant. Tanks exposed to the weather shall have the insulation and vapor proof coating covered with a removable sheet metal jacket of not less than 0.083 inch thickness and flashed around all openings so as to be weather tight. Materials other than sheet metal may be used to cover the insulation and vapor proof coating when specifically authorized by the Commandant.


(b) Where unlagged tanks are installed in insulated holds or insulated ‘tween deck spaces, such tanks shall be considered lagged provided the thermal conductance of the insulation is not less than that required by paragraph (a) of this section.


§ 98.25-35 Refrigerated systems.

(a) Where refrigerated systems are installed to maintain the temperature of the liquid below atmospheric, at least two complete refrigeration plants automatically regulated by pressure variations within the tanks shall be provided, each to be complete with the necessary auxiliaries for proper operation. The capacity of each refrigeration compressor shall be sufficient to maintain the vapor pressure in the tanks during the peak atmospheric temperature conditions below the pressure for which the tanks are designed.


(b) An alternate arrangement may consist of three compressors, any two of which shall be capable of maintaining the vapor pressure in the tanks during peak atmospheric temperature conditions below the pressure for which the tanks are designed, the third compressor acting as a stand-by unit.


(c) Refrigerated tanks shall be insulated in conformance with the requirements of § 98.25–30.


§ 98.25-40 Valves, fittings, and accessories.

(a) All valves, flanges, fittings and accessory equipment shall be of a type suitable for use with anhydrous ammonia and shall be made of steel, or malleable or nodular iron meeting the requirements of § 56.60–1 of subchapter F (Marine Engineering) of this chapter. Valves shall be fitted with noncorrosive material suitable for ammonia service. Valves, flanges, and pipe fittings shall be of the square or round tongue and groove type or raised-face, United States of America Standard 300-pound standard minimum, fitted with suitable soft gasket material. Welded fittings shall be used wherever possible and the number of pipe joints shall be held to a minimum. Screwed joints are not permitted for pipe diameters exceeding 2 inches. Nonferrous materials, such as copper, copper alloys and aluminum alloys, shall not be used in the construction of valves, fittings or accessory equipment. Brazed joints are prohibited.


(b) Each tank shall be provided with the necessary fill and discharge liquid and vapor shut-off valves, safety relief valves, liquid level gaging devices, thermometer well and pressure gage, and shall be provided with suitable access for convenient operation. Connections to tanks installed below the weather deck shall be made to a trunk or dome extending above the weather deck. Connections to the tanks shall be protected against mechanical damage and tampering. Other openings in the tanks, except as specifically permitted by this part, are prohibited.


(c) All connections to the tanks, except safety devices and liquid level gaging devices, shall have manually operated shut-off valves located as close to the tank as possible.


(d) Excess flow valves where required by this section shall close automatically at the rated flow of vapor or liquid as specified by the manufacturer. The piping, including valves, fittings and appurtenances, protected by an excess flow valve, shall have a greater capacity than the rated flow of the excess flow valve.


(e) Liquid level gaging devices which are so constructed that outward flow of tank contents shall not exceed that passed by a No. 54 drill size opening, need not be equipped with excess flow valves.


(f) Pressure gage connections need not be equipped with excess flow valves if the openings are not larger than No. 54 drill size.


(g) Excess flow valves may be designed with a bypass, not to exceed a No. 60 drill size opening, to allow equalization of pressure.


(h) Prior to disconnecting shore lines, the pressure in the liquid and vapor lines shall be relieved through suitable valves installed at the loading header.


(i) Relief valves shall be fitted in liquid lines which may be subject to excessive pressure caused by liquid full condition, and the escape from the relief valves shall be piped to the venting system.


(j) The pressure gage shall be located at the highest practical point. The thermometer well shall terminate in the liquid space and be attached to the shell by welding with the end of the fitting being provided with a gas-tight screwed plug or bolted cover.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18902, Dec. 18, 1968; CGFR 70–10, 35 FR 3712, Feb. 25, 1970]


§ 98.25-45 Liquid level gaging device.

(a) Each tank shall be fitted with a liquid level gaging device of suitable design to indicate the maximum level to which the tank may be filled with liquid at temperatures between 20 °F. and 130 °F.


(b) Liquid level gaging devices shall be of the following types: magnetic, rotary tube, slip tube, fixed tube, automatic float, or other types acceptable to the Commandant.


(c) Gaging devices that require bleeding of the product to the atmosphere, such as rotary tube, fixed tube, and slip tube, shall be so designed that the bleed valve maximum opening is not larger than a No. 54 drill size, unless provided with an excess flow valve.


(d) Gaging devices shall have a design pressure of at least 250 pounds per square inch.


(e) Gage glasses of the columnar type are prohibited.


§ 98.25-50 Filling and discharge pipes.

(a) Filling connections shall be provided with one of the following:


(1) Combination back pressure check valve and excess flow valve;


(2) One double or two single back pressure check valves; or


(3) A positive shut-off valve in conjunction with either an internal back pressure check valve or an internal excess flow valve.


(b) All other liquid and vapor connections to tanks, except filling connections, safety relief valves, and liquid level gaging devices and pressure gages described in § 98.25–40(e) and (f) shall be equipped with automatic excess flow valves; or in lieu thereof, may be fitted with quick closing internal stop valves, which, except during filling and discharge operations, shall remain closed. The control mechanism for such valves shall be provided with a secondary remote control of a type acceptable to the Commandant.


(c) The excess flow, internal stop or back pressure check valves shall be located on the inside of the tank or outside where the piping enters the tank. In the latter case, installation shall be made in such a manner that any undue strain will not cause breakage between the tank and the excess flow or internal stop valve.


(d) Where the filling and discharge are made through a common nozzle at the tank, and the connection is fitted with a quick-closing internal stop valve as permitted in paragraph (b) of this section, the back pressure check valve or excess flow valve is not required, provided, however, a positive shut-off valve is installed in conjunction with the internal stop valve.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 70–10, 35 FR 3712, Feb. 25, 1970]


§ 98.25-55 Cargo piping.

(a) Piping shall be of seamless steel meeting the requirements of § 56.60–1 of subchapter F (Marine Engineering) of this chapter. The piping shall be of not less than Schedule 40 thickness. In case of piping on the discharge side of the liquid pumps or vapor compressors, the design shall be for a pressure of not less than the pump or compressor relief valve setting; or if the piping is not fitted with relief valves, the design pressure shall not be less than the total discharge head of the pump or compressor.


(b) Where necessary, provision shall be made for expansion and contraction of piping by means of seamless steel pipe expansion bends. Special consideration will be given for packless type expansion joints. Slip type expansion joints are prohibited. Piping shall be provided with adequate support to take the weight of the piping off the valves and fittings.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 68–82, 33 FR 18902, Dec. 18, 1968]


§ 98.25-60 Safety relief valves.

(a) Each tank shall be fitted with two or more approved safety relief valves, designed, constructed, and flow-tested for capacity in conformance with subpart 162.018 of subchapter Q (Specifications) of this chapter.


(b) Each safety relief valve shall start to discharge at a pressure not in excess of the design pressure of the tank.


(c) Safety relief valves shall be attached to the tank near the highest point of the vapor space. Shutoff valves shall not be installed between the tanks and the safety relief valves, except manifolds for mounting multiple safety relief valves may be fitted with acceptable interlocking three-way valves so arranged at all times as to permit at any position of the three-way valve, an unrestricted flow of vapors through at least one port. When two safety relief valves are mounted in parallel on both the upper outlets of the three-way valve, the arrangement shall be such as to permit at least one safety relief valve to be operative at all times.


(d) Each safety valve shall be tested in the presence of a marine inspector at the site of installation before or after mounting prior to being placed in service. The tests shall prove that the safety relief valve will start to discharge at a pressure not in excess of the maximum allowable pressure of the tank.


[CGFR 68–82, 33 FR 18902, Dec. 18, 1968]


§ 98.25-65 Filling density.

(a) The filling density, or the percent ratio of the liquefied gas that may be loaded in the tank to the weight of the water the tank will hold at 60 °F., shall not exceed 56 percent for unlagged tanks and 58 percent for lagged or refrigerated tanks.


§ 98.25-70 Venting.

(a) Except as provided in paragraph (b) of this section, each safety valve installed on a cargo tank shall be connected to a branch vent of a venting system which shall be constructed so that the discharge of gas will be directed vertically upward to a point at least 10 feet above the weather deck or the top of any tank or house located above the weather deck.


(b) The capacity of branch vents or vent headers shall depend upon the number of cargo tanks connected to such branch or header as provided in Table 98.25–70(b).


Table 98.25–70(b)—Capacity of Branch Vents or Vent Headers

Number of cargo tanks
Percent of total valve discharge
1 or 2100
390
480
570
6 or more60

(c) In addition to the requirement specified in paragraph (b) of this section, the size of the branch vents or vent headers shall be such that the back pressure in relief valve discharge lines shall not be more than 10 percent of the safety relief valve setting.


(d) Return bends and restrictive pipe fittings are prohibited. Vents and headers shall be so installed as to prevent stresses on safety relief valve mountings.


(e) When vent discharge risers are installed, they shall be so located as to provide protection against physical damage and be fitted with loose raincaps.


(f) No shut-off valve shall be fitted in the venting system between the safety relief valve and the vent outlets. Suitable provision shall be made for draining the venting system if liquid can collect therein.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 70–10, 35 FR 3712, Feb. 25, 1970; 35 FR 6431, Apr. 22, 1970]


§ 98.25-75 Ventilation.

(a) All enclosed spaces containing cargo tanks fitted with bottom outlet connections shall be provided with mechanical ventilation of sufficient capacity to assure a change of air every 3 minutes. Where cargo tanks are fitted with top outlet connections, the enclosed spaces containing such tanks shall be fitted with efficient natural or mechanical ventilation.


(b) Enclosed compartments in which machinery such as cargo pumps or vapor compressors are located shall be adequately ventilated.


§ 98.25-80 Cargo hose.

(a) Cargo hose fabricated of seamless steel pipe with swivel joints, wire braided armored rubber or other hose material acceptable to the Commandant, shall be fitted to the liquid or vapor lines during filling and discharging of the cargo tanks.


(b) Hose subject to tank pressure shall be designed for a bursting pressure of not less than five times the maximum safety relief valve setting of the tank.


(c) Hose subject to discharge pressure of pumps or vapor compressors shall be designed for a bursting pressure of not less than five times the pressure of setting of the pump or compressor relief valve.


(d) Before being placed in service, each new cargo hose, with all necessary fittings attached, shall be hydrostatically tested by the manufacturer to a pressure of not less than twice the maximum pressure to which it may be subjected in service. The hose shall be marked with the maximum pressure guaranteed by the manufacturer.


§ 98.25-85 Electrical bonding.

(a) Each cargo tank shall be electrically grounded to the hull. The cargo vessel shall be electrically connected to the shore piping prior to connecting the cargo hose. This electrical connection shall be maintained until after the cargo hose has been disconnected and any spillage has been removed.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 70–10, 35 FR 3712, Feb. 25, 1970]


§ 98.25-90 Special operating requirements.

(a) Repairs involving welding or burning shall not be undertaken on the cargo tanks or piping while anhydrous ammonia in either the liquid or vapor state is present in the system.


(b) During the time anhydrous ammonia is laden in the tanks the vessel shall be under constant surveillance.


(c) Authorization from the Commandant (CG–OES) shall be obtained to transport lading other than anhydrous ammonia in the cargo tanks.


(d) Sufficient hose stations shall be installed with adequate water supply so that if leakage of anhydrous ammonia occurs the vapors may be removed by use of a stream of water.


(e)(1) At least two units of approved self-contained breathing apparatus, one stowed forward of the cargo tanks and one stowed aft of the cargo tanks, shall be carried on board the vessel at all times.


(2) All approved self-contained breathing apparatus, masks and respiratory protective devices shall be of types suitable for starting and operating at the temperatures encountered, and shall be maintained in good operating condition.


(3) Personnel involved in the filling or discharge operations shall be adequately trained in the use of the equipment.


(4) For all self-propelled cargo vessels, during filling or discharge operations every person on the vessel shall carry on his person or have close at hand at all times a canister mask approved for ammonia; or each person shall carry on his person a respiratory protective device which will protect the wearer against ammonia vapors and provide respiratory protection for emergency escape from a contaminated area which would result from cargo leakage. This respiratory protective equipment shall be of such size and weight that the person wearing it will not be restricted in movement or in the wearing of lifesaving device.


(f) While fast to a dock, a vessel during transfer of bulk cargo shall display a red flag by day or a red light by night, which signal shall be so placed that it will be visible on all sides. When at anchor, a vessel during transfer of bulk cargo shall display a red flag by day, which signal shall be so placed that it will be visible on all sides.


[CGFR 70–10, 35 FR 3712, Feb. 25, 1970, as amended by CGD 82–063b, 48 FR 4781, Feb. 3, 1983; CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2012–0832, 77 FR 59780, Oct. 1, 2012]


§ 98.25-95 Tests and inspections.

(a) Each tank shall be subjected to the tests and inspections described in this section in the presence of a marine inspector, except as otherwise provided in this part.


(1) An internal inspection of the tank is conducted within—


(i) Ten years after the last internal inspection if the tank is a pressure-vessel type cargo tank on an unmanned barge described under § 151.01–25(c) of this chapter and carrying cargo at temperatures of −67 °F (−55 °C) or warmer; or


(ii) Eight years after the last internal inspection if the tank is of a type other than that described in paragraph (a)(1)(i) of this section.


(2) An external examination of unlagged tanks and the visible parts of lagged tanks is made at each inspection for certification and periodic inspection. The owner shall ensure that the amount of insulation deemed necessary by the marine inspector is removed from insulated tanks during each internal inspection to allow spot external examination of the tanks and insulation, or the thickness of the tanks may be gauged by a nondestructive means accepted by the marine inspector without the removal of insulation.


(3) If required by the Officer in Charge, Marine Inspection the owner shall conduct nondestructive testing of each tank in accordance with § 98.25–97.


(4) If the tank is a pressure vessel type cargo tank with an internal inspection interval of 10 years, and is 30 years old or older, determined from the date it was built, the owner shall conduct nondestructive testing of each tank in accordance with § 98.25–97, during each internal inspection.


(b) A hydrostatic test of 1
1/2 times the maximum allowable pressure as determined by the safety relief valve setting shall be made at any time that the inspector considers such hydrostatic test necessary to determine the condition of the tank. If the jacket and lagging are not removed during the hydrostatic tests prescribed in this paragraph, the tank shall hold the hydrostatic test pressure for at least 20 minutes without a pressure drop.


(c) The safety relief valves shall be popped in the presence of a marine inspector by either liquid, gas or vapor pressure at least once every four years to determine the accuracy of adjustment and, if necessary, shall be reset.


[CGFR 65–50, 30 FR 17022, Dec. 30, 1965, as amended by CGFR 67–86, 32 FR 17622, Dec. 9, 1967; CGD 85–061, 54 FR 50965, Dec. 11, 1989; USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 98.25-97 Nondestructive testing.

(a) Before nondestructive testing may be conducted to meet § 98.25–95(a) (3) and (4), the owner shall submit a proposal to the Officer in Charge, Marine Inspection for approval that includes—


(1) The test methods and procedures to be used, all of which must meet section V of the ASME Boiler and Pressure Vessel Code (1986);


(2) Each location on the tank to be tested; and


(3) The test method and procedure to be conducted at each location on the tank.


(b) If the Officer in Charge, Marine Inspection rejects the proposal, the Officer in Charge, Marine Inspection informs the owner of the reasons why the proposal is rejected.


(c) If the Officer in Charge, Marine Inspection accepts the proposal, then the owner shall ensure that—


(1) The proposal is followed; and


(2) Nondestructive testing is performed by personnel meeting ASNT “Recommended Practice No. SNT-TC-1A (1988), Personnel Qualifications and Certification in Nondestructive Testing.”


(d) Within 30 days after completing the nondestructive test, the owner shall submit a written report of the results to the Officer in Charge, Marine Inspection.


[CGD 85–061, 54 FR 50965, Dec. 11, 1989]


Subpart 98.30—Portable Tanks and Intermediate Bulk Containers


Source:CGD 73–172, 39 FR 22954, June 25, 1974, unless otherwise noted.

§ 98.30-1 Applicability.

(a) This subpart contains regulations concerning transfer of combustible liquids, certain flammable liquids, and other hazardous materials to or from portable tanks and Intermediate Bulk Containers (IBCs) on vessels.


(b) This subpart applies to the following portable tanks and IBCs:


(1) A marine portable tank (MPT).


(2) An IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank.


(3) A portable tank authorized for hazardous materials by the Associate Administrator for Hazardous Materials Safety (AAHMS) of the Pipeline and Hazardous Materials Safety Administration (PHMSA), under a special permit or Competent Authority Approval issued in accordance with 49 CFR part 107, subpart H.


(4) An IBC, but restricted to those metal IBCs as described in § 98.30–6 of this subpart.


[CGD 84–043, 55 FR 37411, Sept. 11, 1990, as amended by CGD 97–057, 62 FR 51046, Sept. 30, 1997; USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-2 Incorporation by Reference.

(a) Certain material is incorporated by reference into this subpart with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG–ENG), 2100 2nd St. SW., Stop 7126, Washington, DC 20593–7126, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(b) International Maritime Organization (IMO), 4 Albert Embankment, London SE1 7SR, United Kingdom, (Phone (44 020 7735 7611); Web site: http://www.imo.org.)


(1) International Maritime Dangerous Goods (IMDG) Code, 2012 Edition, Section: 4.2.0.1, IBR approved for § 98.30–3.


(2) International Maritime Dangerous Goods (IMDG) Code, 2012 Edition, Section: 6.7.2 through 6.7.2.20.3, IBR approved for § 98.30–5.


[USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-3 Definitions.

IBC means an intermediate bulk container as defined in 49 CFR 171.8.


IM 101 portable tank and IM 102 portable tank means a portable tank constructed and approved by PMSA and manufactured on or before January 1, 2003, that meets the requirements for continued use under 49 CFR 173.32.


IMO Type 1 portable tank means a portable tank constructed in accordance with International Maritime Dangerous Goods (IMDG) Code (2012 Edition), that meets the definition of an IMO Type 1 portable tank under Section 4.2.0.1 of the IMDG Code (incorporated by reference, see § 98.30–2), and that meets the provisions for continued use under the IMDG Code.


IMO Type 2 portable tank means a portable tank constructed in accordance with the IMDG Code, that meets the definition of an IMO Type 2 portable tank under Section 4.2.0.1 of the IMDG Code (incorporated by reference, see § 98.30–2), and that meets the provisions for continued use under the IMDG Code.


MPT means a marine portable tank that was inspected and stamped by the Coast Guard on or before September 30, 1992, and that meets the applicable requirements in this part and part 64 of this chapter.


UN portable tank means a portable tank constructed in accordance with 49 CFR 178.274 and 178.275, and approved in accordance with 49 CFR 173.32 and 178.273.


[USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-4 Vessels carrying MPTs.

Each MPT on a vessel to which this part applies must bear, on a metal or other corrosion-resistant tag—


(a) An inspection date for pressure relief devices and vacuum relief devices in accordance with paragraph (b) of § 64.79 of this chapter that is not more than 12 months earlier than the month in which the vessel is operated;


(b) An inspection date in accordance with paragraph (b) of § 64.81 of this chapter that is not more than 30 months earlier than the month during which the vessel is operated; and


(c) A hydrostatic test date in accordance with paragraph (b) of § 64.83 of this chapter that is not more than 60 months earlier than the month during which the vessel is operated.


[CGD 84–043, 55 FR 37411, Sept. 11, 1990. Redesignated by USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-5 Vessels carrying portable tanks other than MPTs.

(a) Each portable tank, other than an MPT, on board a vessel to which this part applies must be one of the following:


(1) An IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank authorized for its contents in accordance with 49 CFR 172.101, Hazardous Materials Table, Columns 7 and 8C.


(2) A portable tank authorized by PHMSA’s AAHMS under a special permit or Competent Authority Approval issued in accordance with 49 CFR part 107, subpart H.


(i) According to the terms of the special permit or Competent Authority Approval, equivalent to an IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank.


(ii) Authorized for its contents under the terms of the special permit or by written acknowledgment from the AAHMS.


(b) Each IM 101, IM 102, or UN portable tank must be tested and inspected in accordance with 49 CFR part 180, subpart G and follow specifications in accordance with 49 CFR 178.275(c).


(c) Each IMO Type 1 or IMO Type 2 portable tank must be tested and inspected in accordance with Sections 6.7.2 through 6.7.2.20.3 of the IMDG Code (incorporated by reference, see § 98.30–2).


(d) Each portable tank authorized under a special permit or Competent Authority Approval from PHMSA’s AAHMS must be inspected, tested, maintained, and used in accordance with the terms of that special permit or Competent Authority Approval.


[CGD 84–043, 55 FR 37411, Sept. 11, 1990; 56 FR 13598, Apr. 3, 1991, as amended by CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; CGD 97–057, 62 FR 51046, Sept. 30, 1997. Redesignated and amended by USCG–2011–0088,78 FR 54785, 54786, Sept. 6, 2013]


§ 98.30-6 Vessels carrying IBCs.

Intermediate Bulk Containers (IBCs) with a classification of 31A may be used on a vessel to which this part applies and must meet at a minimum the following constructional requirements:


(a) The shell thickness must be a minimum 6.36 mm (0.25 inches) in reference steel.


(b) There must be a self-closing relief valve set to open at no less than 5 psig.


(c) Closures used on fill openings, in excess of 20 square inches, must be equipped with a device to prevent them from fully opening without first relieving internal pressure.


(d) All venting requirements must be followed in accordance with 49 CFR 178.345–10, Table 1.


[USCG–2011–0088, 78 FR 54786, Sept. 6, 2013]


§ 98.30-7 Materials authorized for transfer to and from a portable tank.

(a) The following hazardous materials may be transferred to and from a portable tank under this subpart:


(1) Any Grade D or Grade E combustible liquid listed in § 30.25–1 of this chapter that does not meet the definition of any hazard class in 49 CFR part 173 other than that of “flammable liquid”, “combustible liquid”, “hazardous substance, or hazardous waste”;


(2) Any corrosive liquid that—


(i) Is compatible with the materials of the tank;


(ii) Meets the definition of no other hazard class in 49 CFR part 173; and


(iii) Is authorized for transport in an IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank under subpart F of 49 CFR part 173;


(3) Any hazardous material listed in Table 98.30–7(a)—Certain Hazardous Materials Authorized For Transfer To and From Portable Tanks;


(4) Any environmentally hazardous substance, liquid, N.O.S., Class 9, listed in table 1 of appendix A of 49 CFR 172.101, and any aqueous solution of an environmentally hazardous substance, solid, N.O.S., Class 9, listed in that table, that meets the definition of “hazardous substance” in 49 CFR 171.8; and


(5) Other cargoes subject to regulation under 49 CFR parts 171 through 176 when authorized in writing by the Commandant. Requests for such authorization must be submitted as prescribed in § 153.900(d)(1) of this chapter.


(b) Grade D and Grade E combustible liquids with a flashpoint of 100 °F (38 °C) or higher by closed cup test that are not listed by name in the Hazardous Materials Table of 49 CFR 172.101 may be transferred to and from an MPT, IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank conforming to the T Code “T1” specified in 49 CFR 172.102(c)(7)(i).


(c) Sulfuric acid having a concentration of not over 51 percent may be transferred to or from an MPT only if the MPT is lined with rubber or with material equally acid-resistant and equally strong and durable.


(d) Sulfuric acid having a concentration of 65.25 percent or greater may be transferred to or from any portable tank; provided that the corrosion rate on steel, measured at 100 °F (38 °C), of sulfuric acid having a concentration of greater than 65.25 percent is not greater than the corrosion rate of such an acid having a concentration of 65.25 percent.


(e) Environmentally hazardous substances (see paragraph (a)(4) of this section) may be transferred only to and from an MPT, IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank.


(f) A portable tank authorized for transfer of hazardous material in this section may be substituted by another portable tank in accordance with 49 CFR 173.32(b).


(g) No hazardous material not referred to in this section may be transferred to or from a portable tank onboard a vessel.


Table 98.30–7(a)—Certain Hazardous Materials Authorized For Transfer To and From Portable Tanks

Acetone
Alcohols; flash point of 80 °F (27 °C) or less by open-cup test
Benzene
Gasoline
Mixtures of Hydrochloric acid and hydrofluoric acid containing not more than 36 percent hydrochloric acid or 2 percent hydrofluoric acid
1
Methyl Ethyl Ketone
Toluene (Toluol)

Note:


1 Each MPT must be lined with rubber or with material equally acid-resistant and equally strong and durable.


[CGD 84–043, 55 FR 37411, Sept. 11, 1990; 55 FR 40755, Oct. 4, 1990, as amended by CGD 97–057, 62 FR 51046, Sept. 30, 1997. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54786, Sept. 6, 2013]


§ 98.30-8 Materials authorized for transfer to and from an IBC.

Any hazardous material listed in Table 98.30–7(a) of § 98.30–7 may be transferred to and from an IBC under this subpart, with the exception of Liquid Nitrogen.


[USCG–2011–0088, 78 FR 54786, Sept. 6, 2013]


§ 98.30-9 Lifting a portable tank or IBC.

(a) No person may lift a portable tank and/or IBC with another portable tank and/or IBC.


(b) All lifting requirements for IBCs must be followed in accordance with 49 CFR 178.704(c) and (f).


[USCG–2011–0088, 78 FR 54786, Sept. 6, 2013]


§ 98.30-10 Smoking.

No person may smoke within 50 feet of a portable tank or IBC on the deck on which the tank is stowed.


[CGD 73–172, 39 FR 22954, June 25, 1974. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-11 Gaskets and lining.

No person may transfer a hazardous material to or from a portable tank onboard a vessel unless each gasket and the lining of the portable tank are made of a material that is—


(a) Chemically compatible with the product for which the portable tank is approved; and


(b) Resistant to deterioration by the product for which the portable tank is approved.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-12 Stowage of portable tanks and IBCs.

(a) No person may operate a vessel to which this subpart applies unless each portable tank and/or IBC is stowed on an open deck.


(b) No person may stow a portable tank and/or IBC—


(1) In the vicinity of another tank that contains a chemically incompatible product; and


(2) Unless all electrical equipment is explosion-proof or intrinsically safe, as defined in §§ 111.105–9 and 111.105–11 of this chapter, in the area of the tank and its associated equipment that is—


(i) Within 10 feet in any horizontal direction; and


(ii) Within 8 feet above the deck.


(c) All IBCs must be secured as specified in 49 CFR 176.74.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by CGD 84–043, 55 FR 37412, Sept. 11, 1990; 55 FR 47477, Nov. 14, 1990. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-13 Pipe connections, and filling and discharge openings.

(a) No person may transfer a hazardous material to or from a portable tank or IBC onboard a vessel, unless each filling and discharge opening in the tank bottom is equipped with the following:


(1) For an IM 101, IM 102, IMO Type 1, IMO Type 2, or UN portable tank, the closures specified in 49 CFR 178.275.


(2) For an MPT, the valves and closures specified in §§ 64.33 through 64.41 of this chapter.


(3) For an IBC, the closures specified in 49 CFR 178.705.


(b) A manifold cannot be used when transferring a hazardous material to or from a portable tank or IBC onboard a vessel, unless the portable tank or IBC is equipped with a remote or automatic shutoff valve or other automatic means of closure that will activate during an emergency.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-14 Cargo pumps.

No person may operate a cargo pump to transfer a product to or from a portable tank unless the pump is installed—


(a) Above deck; or


(b) Below deck, in conformance with subpart 32.60 of this chapter.


[CGD 73–172, 39 FR 22954, June 25, 1974. Redesignated by USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-15 Ground connection.

No person may transfer an inflammable or combustible product to or from a vessel unless—


(a) The portable tank or IBC and its pumping equipment is electrically grounded to the hull of the vessel; and


(b) The vessel is electrically grounded to an offshore platform, shore piping, or another vessel by a—


(1) Cargo hose constructed with an integral grounding wire if the end connections are used for electrical continuity; or


(2) Separate grounding that is maintained until the cargo hose is disconnected and drained.


[CGD 73–172, 39 FR 22954, June 25, 1974. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787 Sept. 6, 2013]


§ 98.30-16 Requirements for ships carrying NLSs in portable tanks and IBCs.

(a) The person in charge of a ship, except a ship under subpart 98.31 of this chapter, that carries an NLS in a portable tank must ensure that—


(1) The ship’s Certificate of Inspection is endorsed with the name of the NLS;


(2) Any letters issued by the Commandant (CG–ENG) prescribing additional conditions for endorsement are attached; and


(3) Each operating requirement specified in writing by Commandant (CG–ENG) as a condition for endorsement is met.


(b) To have a ship’s Certificate of Inspection endorsed to allow the carriage of NLSs in portable tanks, the—


(1) Owner of the ship must make a request to the Commandant (CG–ENG) following the procedures for requesting alternatives in § 153.10(a) of this chapter; and


(2) The ship must meet any design and equipment requirements specified in writing as a condition for the endorsement by the Commandant (CG–ENG).


(c) Any ship that carries NLSs in an IBC, as described in § 98.30–6, must meet all requirements in accordance with 46 CFR 125.120.


[CGD 81–101, 53 FR 28974, Aug. 1, 1988. Redesignated by CGD 84–043, 55 FR 37411, Sept. 11, 1990, and amended by CGD 84–043, 55 FR 37412, Sept. 11, 1990; CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2012–0832, 77 FR 59780, Oct. 1, 2012. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-17 Leakage containment.

(a) No person may transfer a product to or from a vessel unless there is a container or enclosed deck area that meets the requirements of this section under or around each transfer connection area.


(b) Each container or enclosed deck area must hold, in all conditions of vessel list or trim to be encountered during the transferring operation, 5 gallons or more and must have a means of draining or removing any leakage without mixing incompatible products or discharging into the water.


[CGD 73–172, 39 FR 22954, June 25, 1974. Redesignated by USCG–2011–0088, 78 FR 54785, Sept. 6, 2013]


§ 98.30-18 Qualifications of person in charge.

(a) The operator or agent of each vessel must designate the person in charge of a transfer of liquid cargo in bulk to or from a portable tank or IBC.


(b) Each person designated as person in charge of a transfer of liquid cargo in bulk to or from a portable tank or IBC must—


(1) On a tank barge, hold a “Tankerman-PIC”, restricted “Tankerman-PIC”, “Tankerman-PIC (Barge)”, or restricted “Tankerman-PIC (Barge)” endorsement on his or her merchant mariner credential or merchant mariner’s document authorizing transfer of the classification of cargo involved;


(2) On a self-propelled tank vessel, or on a tankship, carrying oil or hazardous material in bulk, hold a valid merchant mariner credential, license, or certificate authorizing service as a master, mate, pilot, engineer, or operator aboard that vessel, and a Tankerman-PIC or a restricted Tankerman (PIC) endorsement.


[CGD 79–116, 60 FR 17157, Apr. 4, 1995, as amended by 62 FR 25135, May 8, 1997; USCG–2006–24371, 74 FR 11265, Mar. 16, 2009. Redesignated and amended by USCG–2011–0088, 78 FR 54785, 54787, Sept. 6, 2013]


§ 98.30-19 Supervision by person in charge.

(a) No person may connect, top off, disconnect, or engage in any other critical product transfer operation unless the person in charge designated in § 98.30–17, personally supervises the operation.


(b) No person may start the flow of a product to or from a portable tank or IBC unless instructed to do so by the person in charge.


(c) No person may transfer a product to or from a portable tank or IBC unless the person in charge is in the immediate vicinity of the transfer operation and immediately available to the person transferring the product.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-21 Inspection prior to transfer.

No person may transfer to or from a portable tank or IBC a product with a flashpoint of less than 300 °F unless the person in charge of the transfer determines that—


(a) Each warning signal and sign required in §§ 98.30–33 and 98.30–35 is displayed;


(b) No repair work in the vicinity of any portable tank or IBC is done without permission of the person in charge of the transfer operation; and


(c) Riveting, welding, burning, or a similar operation is not done in the vicinity of a portable tank or IBC unless an inspection by the person in charge of the transfer ensures that the operation can be done safely.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-23 Requirements for transfer; general.

No person may transfer a product to or from a portable tank or IBC unless—


(a) The vessel’s moorings are strong enough to hold in all expected conditions of surge, current, and weather and are long enough to allow adjustment for changes in draft, drift, and tide during the transfer operation;


(b) Transfer hoses or loading arms are long enough to allow the vessel to move the limits of its mooring without placing strain on the hose, loading arm, or transfer piping system;


(c) Each transfer hose is supported in a manner that prevents strain on its coupling;


(d) Each part of the transfer system necessary to allow the flow of the product is lined up for the transfer;


(e) Each transfer hose has no loose covers, kinks, bulges, soft spots, and no gouges, cuts, or slashes that penetrate the hose reinforcement;


(f) Each coupling meets the requirements of § 98.30–27;


(g) Each scupper or drain in a discharge containment system is closed;


(h) The person in charge of the transfer operations on the transferring vessel or facility and the person in charge of the transfer operations on the receiving vessel or facility have held a conference, to ensure that each person in charge understands—


(1) The identity of the product to be transferred;


(2) The sequence of transfer operations;


(3) The transfer rate;


(4) The name or title and location of each person participating in the transfer operation;


(5) Particulars of the transferring and receiving systems;


(6) Critical stages of the transfer operations;


(7) Federal, state, and local rules that apply to the transfer of dangerous articles and combustible liquids;


(8) Emergency procedures;


(9) Discharge containment procedures;


(10) Discharge reporting procedures;


(11) Watch or shift arrangement; and


(12) Transfer shutdown procedures;


(i) The person in charge of the transfer operations on the transferring vessel or facility and the person in charge of transfer operations on the receiving vessel or facility agree to begin the transfer operations; and


(j) Each person in charge required in this subpart is present.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-25 Requirements for transfer; cargo handling system.

No person may transfer a product to or from a portable tank or IBC unless the cargo handling system meets the requirements in subpart F of part 64 of this chapter.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-27 Connections.

(a) Each person who makes a connection for a transfer operation must—


(1) Use suitable material in joints and couplings to make a tight seal;


(2) Use a bolt in at least every other hole and in no case less than four bolts in each temporary connection utilizing an American National Standards Institute (ANSI) standard flange coupling;


(3) Use a bolt in each hole of couplings other than ANSI standard flange couplings;


(4) Use a bolt in each hole of each permanently connected flange coupling;


(5) Use bolts of the same size in each bolted coupling; and


(6) Tighten each bolt and nut uniformly to distribute the load.


(b) No person who makes a connection for a transfer operation may use any bolt that shows signs of strain or is elongated or deteriorated.


(c) No person may use a connection for transfer operations unless it is—


(1) A bolted or full threaded connection; or


(2) A quick-connect coupling accepted by the Coast Guard.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-29 Piping incompatible products.

No person may pipe a portable tank or IBC with another tank that contains a chemically incompatible product.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-31 Conditions for pumping.

No person may start pumping a product to or from a portable tank or IBC or if started, continue to pump if—


(a) There is an electrical storm;


(b) A fire occurs—


(1) On the deck;


(2) On the vessel;


(3) In the vicinity; or


(c) The cargo hose ruptures or leaks.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-33 Warning signals.

(a) If the vessel is moored, no person may transfer to or from a portable tank or IBC a product with a flashpoint of less than 300 °F unless the person in charge displays a—


(1) Red flag by day; and


(2) Red electric lantern by night.


(b) If the vessel is at anchor, no person may transfer to or from a portable tank or IBC a product with a flashpoint of less than 300 °F unless the person in charge displays a red flag.


(c) The signal required in paragraphs (a) and (b) of this section must be visible on all sides of the vessel.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-35 Warning sign at gangway.

If a vessel is moored, no person may transfer to or from a portable tank or IBC a product with a flashpoint of less than 300 °F unless the person in charge displays at each gangway or access that is open for use a warning placard containing the following in letters 2 inches in height or larger:


WARNING

No open lights

No smoking

[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-37 Firefighting requirements.

No person may lift a portable tank on or off a vessel, or transfer a product with a flashpoint of less than 300 °F to or from a portable tank or IBC unless—


(a) Water pressure is maintained on the firemain;


(b) Firehoses, fitted with a Coast Guard-approved combination nozzle, are attached to each fire hydrant in the vicinity of the portable tanks;


(c) Except as provided in § 98.30–39, fire extinguishers of a dry chemical type are—


(1) Located to protect the deck area 10 feet in any horizontal direction from each portable tank and its associated cargo handling system;


(2) Coast Guard approved; and


(3) Capable of covering the deck area without being moved;


(d) In a deck area of 500 square feet or less, there are two or more dry chemical fire extinguishers of 300 pounds or more total capacity of extinguishing agent; and


(e) In a deck area of more than 500 square feet, there are three or more dry chemical fire extinguishers of 450 pounds or more total capacity of extinguishing agent.


[CGD 73–172, 39 FR 22954, June 25, 1974, as amended by USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.30-39 Alternate fire extinguishing system.

An alternative to the fire extinguishing system required in § 98.30–37(c) may be approved in accordance with procedures contained in subpart 90.15 of this chapter.


Subpart 98.31—Control of Pollution From NLS Cargoes on Oceangoing Offshore Supply Vessels


Source:CGD 82–004 and CGD 86–074, 62 FR 49321, Sept. 19, 1997, unless otherwise noted.

§ 98.31-5 Applicability.

This subpart applies to each offshore supply vessel contracted for, or the keel of which was laid, before March 15, 1996, that is oceangoing as defined in 33 CFR 151.05(j) and that carries noxious liquid substances (NLSs) as defined in § 153.2 of this chapter in bulk, including carriage in portable tanks.


§ 98.31-10 Certificate of inspection and NLS certificate endorsements.

(a) The Coast Guard issues the endorsed Certificate of Inspection or NLS Certificate required by § 98.31–15 for every vessel under this subpart to carry NLSs if the vessel—


(1) Has the Cargo Record Book prescribed in § 153.490(a)(1) of this chapter; and


(2) Unless it discharges no NLS residues as defined in § 153.2 of this chapter to the sea, meets the requirements in §§ 153.470 through 153.491 of this chapter.


(b) Each vessel under this subpart that does not meet the requirements in §§ 153.470 through 153.491 of this chapter must have a statement on its Certificate of Inspection or NLS Certificate stating that the vessel is prohibited from discharging NLS residues to the sea.


§ 98.31-15 Operating requirements.

No person may operate a vessel that carries a bulk liquid cargo of NLS unless the vessel—


(a) Has on board a Certificate of Inspection and, if it is a vessel making a foreign voyage, an NLS Certificate endorsed under § 98.31–10 with the name of the NLS cargo;


(b) Discharges no NLS residues to the sea unless the vessel meets—


(1) The equipment requirements in § 98.31–10(a)(2); and


(2) The operating requirements prescribed for oceangoing ships carrying NLSs in §§ 153.901, 153.903, 153.909, and 153.1100 through 153.1132 of this chapter.


Subpart 98.33— Portable Tanks and IBCs for Certain Grade E Combustible Liquids and Other Regulated Materials


Source:CGD 84–043, 55 FR 37412, Sept. 11, 1990, unless otherwise noted.

§ 98.33-1 Applicability.

(a) This subpart contains regulations concerning transfer of certain low-hazard materials to and from portable tanks on vessels


(b) This subpart applies to the following portable tanks:


(1) A DOT-specification 57 portable tank constructed on or before October 1, 1996, or a UN portable tank (see 49 CFR 173.32 and § 98.30–3).


(2) A portable tank authorized under 49 CFR 176.340(b).


(3) A portable tank approved by the Commandant under subpart 50.20 of this chapter.


(4) An Intermediate Bulk Container (IBC), but restricted to those metal IBCs as described in § 98.30–6.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990; 56 FR 13598, Apr. 3, 1991, as amended by CGD 97–057, 62 FR 51046, Sept. 30, 1997; USCG–2012–0832, 77 FR 59780, Oct. 1, 2012; USCG–2011–0088, 78 FR 54787, Sept. 6, 2013]


§ 98.33-3 Cargoes authorized.

The following cargoes are authorized for transfer to and from portable tanks or IBCs authorized by § 98.33–5:


(a) Grade E combustible liquids that have a closed-cup flashpoint of 300 °F or higher and that meet the definition of no DOT hazard class in 49 CFR part 173;


(b) Any environmentally hazardous substance, liquid N.O.S., Class 9, listed in table 1 of appendix A of 49 CFR 172.101, and any aqueous solution of an environmentally hazardous substance, solid, N.O.S., Class 9, listed in that table, that meets the definition of “Hazardous substance” in 49 CFR 171.8.


(c) Other cargoes subject to regulation under 49 CFR parts 171 through 176 when authorized in writing by the Commandant (CG–ENG). Requests for such authorization must be submitted as prescribed in § 153.900(d)(1) of this chapter.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990, as amended by CGD 97–057, 62 FR 51046, Sept. 30, 1997; USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-5 Portable tanks and IBCs authorized.

(a) The cargoes authorized under § 98.33–3 may be transferred to and from portable tanks to which this subpart applies if the portable tanks have:


(1) A minimum design pressure of 9 psig.


(2) Pressure-relief devices that may be frangible pressure-relief devices (rupture disks), and that do not open at less than 3 psig.


(b) The cargoes authorized under § 98.33–3 may be transferred to and from IBCs to which this subpart applies if the IBCs meet the requirements in § 98.30–6.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990; 55 FR 47477, Nov. 14, 1990; USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-7 Pipe and hose connections.

If a portable tank or IBC authorized under § 98.33–5 of this part has a pipe or hose connection in its bottom, the connection must have a manually operated valve and a bolted flange, threaded cap, or similar device, to protect against leakage of the tank’s contents.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990, as amended by USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-9 Stowage.

Each portable tank or IBC authorized under § 98.33–5 of this part must be secured to the vessel by devices of sufficient strength and number to prevent the tank from moving in any direction during transport.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990, as amended by USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-11 Smoking.

No person may smoke when—


(a) Within 50 feet of a portable tank or IBC containing a combustible liquid; and


(b) On the deck where the tank or IBC is stowed.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990, as amended by USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-13 Cargo-handling systems.

A cargo authorized under § 98.33–3 of this part may not be transferred to or from a portable tank or IBC authorized under § 98.33–5 of this part unless the cargo-handling system meets the requirements of subpart F of part 64 of this chapter.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990, as amended by USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


§ 98.33-15 Transfers.

A cargo authorized under § 98.33–3 of this part may not be transferred to or from a portable tank or IBC authorized under § 98.33–5 of this part unless the following requirements are met:


(a) Cargo pumps comply with § 98.30–14 of this part;


(b) Ground connection complies with § 98.30–15 of this part;


(c) Leakage containment complies with § 98.30–17 of this part;


(d) Qualification of person in charge complies with § 98.30–18 of this part;


(e) Supervision of person in charge complies with § 98.30–19 of this part;


(f) Transfers, general, comply with § 98.30–23 of this part;


(g) Connections comply with § 98.30–27 of this part;


(h) Pumping of incompatible products complies with § 98.30–29 of this part;


(i) Conditions for pumping comply with § 98.30–31 of this part; and


(j) Carriage of NLSs complies with § 98.30–16 of this part.


[CGD 84–043, 55 FR 37412, Sept. 11, 1990; 55 FR 47477, Nov. 14, 1990; USCG–2011–0088, 78 FR 54788, Sept. 6, 2013]


PART 105—COMMERCIAL FISHING VESSELS DISPENSING PETROLEUM PRODUCTS


Authority:6 U.S.C. 468(b); 33 U.S.C. 1321(j); 46 U.S.C. 2103, 3306, 3703, 4502; 49 U.S.C. 5103; E.O. 12777, sec. 2(d)(2) and (f), 56 FR 54757, 3 CFR, 1991 Comp., p. 351; Department of Homeland Security Delegation No. 0170.1(II) (80), (92.a), (92.b).



Source:81 FR 13283, Mar. 14, 2016, unless otherwise noted.

§ 105.1 Purpose and applicability.

This part implements 46 U.S.C. 3702(d), concerning the applicability to fish processing vessels of statutes relating to the carriage of liquid bulk dangerous cargoes. This part applies to each vessel of not more than 5,000 gross tons, the primary use of which is as a commercial fish processing vessel, and that incidental to its primary use, carries and dispenses limited quantities of flammable or combustible liquid cargo in bulk. Certain provisions in §§ 105.12 and 105.13 apply only to vessels the construction of which was contracted for before May 31, 1976.


§ 105.3 Incorporation by reference.

(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at Coast Guard Headquarters. Contact Commandant (CG–CVC), Attn: Office of Commercial Vessel Compliance, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7501; telephone 202–372–1244. Also, it is available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(b) ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428–2959, telephone: 610–832–9500, fax: 610–832–9555, http://www.astm.org.


(1) ASTM D 323–08, “Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method),” approved December 15, 2008, incorporation by reference approved for § 105.5.


(2) [Reserved]


(c) UL (formerly Underwriters Laboratories, Inc.), 12 Laboratory Drive, Research Triangle Park, NC 27709–3995, 919–549–1400, http://www.ul.com.


(1) UL 19, Standard for Safety—Lined Fire Hose and Hose Assemblies, Twelfth edition, approved November 30, 2001, incorporation by reference approved for § 105.14(d).


(2) [Reserved]


§ 105.5 Definitions.

As used in this part, the italicized terms have the meanings indicated in this section.


Approved means approved by the Commandant, U.S. Coast Guard, unless otherwise stated.


Bulk means a quantity of a commodity carried as a liquid cargo or liquid-cargo residue, without mark or count, in an integral, fixed, or portable tank. It does not include liquid cargo packaged in a portable tank that is loaded and discharged from a vessel with the contents intact.


Cargo means a combustible liquid or flammable liquid transported in commerce by a commercial fish processing vessel for delivery to a recipient inside or outside the fishing industry. It does not include combustible liquids or flammable liquids carried in a tank for use only by machinery and boats carried aboard the processing vessel, or for use only by vessels that are directly supporting the processing vessel’s primary operations.


Certificate of compliance means the document issued and displayed in accordance with § 105.10.


Combustible liquid means any liquid having a flashpoint above 80 °F (as determined from an open cup tester, as used for testing of burning oils). A Grade D combustible liquid is one having a flashpoint above 80 °F and below 150 °F. A Grade E combustible liquid is one having a flashpoint of 150 °F or above.


Commercial fish processing vessel means a self-propelled manned vessel that commercially prepares fish or fish products other than by gutting, decapitating, gilling, skinning, shucking, icing, freezing, or brine chilling.


Dispensing means the unloading of any quantity of flammable or combustible liquids in bulk.


Dispensing tank means any tank from which a quantity of a flammable or combustible liquid is filled or emptied onboard the vessel by means of pumping, gravitation, or displacement.


Examination means a careful and critical assessment of the vessel and its appurtenances carried out by an authorized examiner or an organization designated by the Commandant, U.S. Coast Guard. This includes, where necessary, a visual assessment of the vessel’s hull, structures, electrical systems, and machinery, supplemented by other means such as measurement and/or nondestructive testing.


Flammable liquid means any liquid that gives off flammable vapors (as determined by flashpoint from an open cup tester, as used for testing of burning oils) at or below 80 °F. Flammable liquids are referred to by grades as follows:


(1) Grade A. Any flammable liquid having a Reid vapor pressure of 14 pounds or more, as measured in accordance with ASTM D 323 (incorporated by reference, see § 105.3).


(2) Grade B. Any flammable liquid having a Reid vapor pressure of less than 14 pounds and more than 8
1/2 pounds, as measured in accordance with ASTM D 323.


(3) Grade C. Any flammable liquid having a Reid vapor pressure of 8
1/2 pounds or less and a flashpoint of 80 °F or below, as measured in accordance with ASTM D 323.


Fuel tank means a tank other than a dispensing tank used to transport flammable or combustible liquid for the purpose of supplying fuel for propulsion of the vessel to which it is attached.


Limited quantities means not more than 20 percent of a vessel’s deadweight tonnage as applied to bulk liquid cargoes or carried in permanent or temporary tanks.


New vessel means a vessel whose construction is contracted for on or after May 31, 1976.


Pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed places.


§ 105.10 Vessel examination.

(a) Each examination referred to in this section must be conducted by the Coast Guard to determine whether the examined vessel is in substantial compliance with this part. An examination may include any test or verification that the examiner deems necessary for determining the vessel’s safety and seaworthiness.


(1) The owner or operator of each vessel subject to this part must apply, using Form CG–3752, available at http://www.uscg.mil/forms/cg/cg_3752.pdf, to the cognizant Officer in Charge, Marine Inspection, for the vessel to be examined in accordance with paragraph (b) of this section. In applying for a vessel’s initial examination under this section, the application must be accompanied by a plan or sketch of each cargo tank and piping system for filling and dispensing bulk flammable or combustible cargoes, and a brief description of those systems, including their dimensions and materials used. If cargo tanks are located in enclosed compartments or below decks, the plans or sketches must show the ventilation system. Plans or sketches need not be submitted if the cargo tanks and piping systems have previously been accepted by the Coast Guard.


(2) Each vessel must be examined before its first use in loading, transporting, or dispensing combustible or flammable liquids in bulk, and at least annually thereafter if the vessel carries such liquids in temporarily installed cargo tanks or containers, or at least biennially thereafter if the vessel carries such liquids in permanently installed cargo tanks.


(3) A vessel that is laid up, dismantled, or out of commission is exempt from the requirements of this section.


(b) After examining a vessel and finding it to be in substantial compliance with this part, the Coast Guard will issue, and the vessel’s owner or operator must display on board, a certificate of compliance that describes the amounts of bulk liquid flammable or combustible cargoes that the vessel may carry, the number of crewmembers required to hold merchant mariner credentials and tankerman endorsements in accordance with 46 U.S.C. 8304 and 46 CFR part 13, and any conditions applicable to the carriage or dispensation of those cargoes. Each certificate of compliance is valid for not more than 2 years or until suspended or revoked. A letter of compliance may be issued as an alternative to a certificate of compliance.


§ 105.11 Prohibitions.

Each vessel to which this part applies is prohibited from transporting Grade A flammable liquids in bulk, or carrying bulk flammable or combustible liquids in portable or temporarily installed dispensing tanks or containers that are either below deck or in closed compartments on or above deck.


§ 105.12 Cargo tank and pumping system requirements.

(a) Cargo tanks for the carriage of bulk flammable or combustible liquids must be constructed of iron, steel, copper, nickel alloy, copper alloy, or aluminum. Tanks must be designed to withstand the maximum head to which they may be subjected, and tanks of more than 150 gallons capacity must have at least the thickness indicated in Table 1 of § 105.12.


Table 1 to § 105.12—Tank Thickness

Material
ASTM specification (latest edition)
Thickness in inches and gauge number
2 3
Nickel copperB127, hot rolled sheet or plate0.107 (USSG 12).
Copper nickel
1
B122, Alloy No. 50.128 (AWG 8).
Copper
1
B152, Type ETP0.182 (AWG 5).
Copper silicon
1
B97, Alloys A, B, and C0.144 (AWG 7).
Steel or iron0.179 (MSG 7).
Aluminum
4
B209, Alloy
5
5086 0.250 (USSG 3).


1 Tanks fabricated with these materials must not be utilized for the carriage of diesel oil.


2 The gauge numbers used in this table may be found in many standard engineering reference books. The letters “USSG” stand for “U.S. Standard Gauge” which was established by the act of March 3, 1892 (15 U.S.C. 206) for sheet and plate iron and steel. The letters “AWG” stand for “American Wire Gauge” (or Brown and Sharpe Gauge) for nonferrous sheet thicknesses. The letters “MSG” stand for “Manufacturers’ Standard Gauge” for sheet steel thicknesses.


3 Tanks of more than 400 gallons capacity must be designed with a factor of safety of four on the ultimate strength of the tank material used with a design head of not less than 4 feet of liquid above the top of the tank.


4 Anodic to most common metals. Avoid dissimilar-metal contact with tank body unless galvanically compatible.


5 And other alloys acceptable to the Commandant.


(1) All tank joints, connections, and fittings must be welded or brazed, and tanks may not have flanged-up top edges.


(2) A tank exceeding 30 inches in any horizontal dimension must be fitted with vertical baffle plates of the same material as the tank, unless the tank has a greater thickness than minimum requirements and is reinforced with stiffeners. Limber holes at the bottom and air holes at the top of all baffles must be provided.


(3) An opening fitted with a threaded pipe plug may be used on the bottom of the tank for cleaning purposes.


(b) Supports. Tanks must be adequately supported and braced to prevent movement. Supports and braces must be insulated from contact with the tank surface using a nonabrasive and nonabsorbent material.


(c) Fittings. (1) Filling lines must be at least 1
1/2 inches standard pipe size and extend to within 1
1/2–pipe diameters of the bottom of the tank.


(2) Suction lines from diesel oil tanks may be taken from the bottom provided a shutoff valve is installed at the tank. Tanks for Grades B and C liquids must have top suctions only.


(3) Vent lines must be at least equal in size to the filling lines.


(4) When a cargo tank contains Grades B or C liquids, the vent lines must be terminated with an approved pressure vacuum relief valve not less than 3 feet above the weather deck. When a cargo tank contains Grades D or E liquids, the vent line may be terminated with a gooseneck fitted with a flame screen at a reasonable height above the weather deck.


(d) Hydrostatic tests. Tanks vented to the atmosphere must be hydrostatically tested to a pressure of 5 pounds per square inch or 1
1/2 times the maximum head to which they may be subjected in service. A standpipe of 11
1/2 feet in length attached to the tanks may be filled with water to accomplish the 5 pounds per square inch test.


(e) Piping systems. (1) Piping must be copper, nickel copper, or copper nickel, with a minimum wall thickness of 0.035 inches; except that seamless steel piping or tubing providing equivalent safety may be used for diesel cargo systems.


(2) Valves must be of a suitable nonferrous metallic Union Bonnet type with ground seats, except that steel or nodular iron may be used in cargo systems that use steel pipe or tubing.


(3) Aluminum or aluminum alloy valves and fittings may not be used in cargo lines.


(f) Pumps. (1) Pumps for cargo dispensing must be of a type satisfactory for the purpose.


(2) A relief valve must be provided on the discharge side of the pump if the pressure under shutoff conditions exceeds 60 pounds. When a relief valve is installed, it must discharge back to the suction of the pump.


(3) Where electric motors are installed with dispensing pumps, they must be explosion-proof and so labeled by UL or another recognized laboratory, as suitable for Class I, Group D atmospheres.


(g) Grounding. (1) All tanks and associated lines must be electrically grounded to the vessel’s common ground.


(2) A grounded type hose and nozzle must be used for dispensing fuels.


(h) Cargo tanks installed below decks—additional requirements. (1) Compartments or areas containing tanks or pumping systems must be closed off from the remainder of the vessel by gastight bulkheads. Such gastight bulkheads may be pierced for a drive shaft and pump engine control rods if the openings are fitted with stuffing boxes or other acceptable gland arrangements.


(2) Each compartment must be provided with a mechanical exhaust system capable of ventilating the compartment with a complete change of air every 3 minutes. The intake duct or ducts must be of a sufficient size to permit the required air change. The exhaust duct or ducts must be located so as to remove vapors from the lower portion of the space or bilges.


(3) The ventilation outlets must terminate more than 10 feet from any opening to the interior of the vessel that normally contains sources of vapor ignition. The ventilation fan must be explosion-proof and unable to act as a source of ignition.


(4) Cargo pumps must not be installed in the cargo tank compartment unless the drive system is outside the compartment. Suction pipelines from cargo tanks must be run directly to the pump, but not through working or crew spaces of the vessel.


(5) Tanks must be located so as to provide at least 15 inches of space around the tank, including top and bottom, to permit external examination.


(6) Shutoff valves must be provided in the suction lines as close to the tanks as possible. Valves must be installed so as to shut off against the flow. Remote control of the shutoff valve must be provided where the examiner deems necessary.


(i) Exemption for older vessels. Tanks, containers, and associated piping systems in use prior to December 1, 1969, on a vessel the construction of which was contracted for before May 31, 1976, are exempt from the requirements of this section provided they are maintained in a condition that the Officer in Charge, Marine Inspection, finds satisfactory, and provided that major repairs or replacement of exempted equipment and systems is in accordance with this part.


§ 105.13 Electrical fittings and fixtures.

(a) In compartments or areas containing tanks or pumps handling petroleum products other than Grade E products, no electrical fittings, fixtures, or equipment may be installed or used unless approved for a Class I, Group D hazardous location and labeled as such by UL or another recognized laboratory.


(b) All electrical equipment, fixtures, and fittings located within 10 feet of a vent outlet or a dispensing outlet must be explosion-proof and labeled as such by UL or another recognized laboratory, as suitable for Class I, Group D atmospheres.


(c) All electrical equipment must be grounded to the vessel’s common ground.


(d) Tanks, containers, and associated piping systems in use prior to December 1, 1969, on a vessel the construction of which was contracted for before May 31, 1976, are exempt from the requirements of this section provided they are maintained in a condition that the Officer in Charge, Marine Inspection, finds satisfactory, and provided that major repairs or replacement of exempted equipment and systems is in accordance with this part.


§ 105.14 Fire extinguishing equipment.

(a) Each vessel must carry at least two B–II dry chemical or foam portable fire extinguishers that comply with 46 CFR 28.160 and bear the UL marine type label, and must be located at or near each dispensing area. This equipment must be examined prior to issuing a letter of compliance.


(b) Each vessel must be provided with a hand-operated portable fire pump having a capacity of at least 5 gallons per minute and equipped with a suction and discharge hose suitable for use in firefighting. The pump may also serve as a bilge pump.


(c) A self-priming power-driven fire pump must be installed on each vessel of more than 65 feet in length overall. The pump must be able to discharge an effective stream from a hose connected to the highest outlet, must be fitted with a pressure gauge, and must have a minimum capacity of 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump must be self-priming and connected to the fire main and may be driven off a propulsion engine or other source of power. The pump may also be connected to the bilge system so that it can serve as either a fire pump or a bilge pump.


(d) Each vessel that must have a power-driven fire pump must also have a fire main system that includes a fire main, hydrants, hoses, and nozzles.


(1) Fire hydrants must be of sufficient number and located such that any part of the vessel may be reached with an effective stream of water from a single length of hose.


(2) All piping, valves, and fittings must be in accordance with good marine practice and suitable for the purpose intended.


(3) One length of the fire hose must be attached to each fire hydrant at all times. The fire hose may be a commercial fire hose or equivalent of not more than a 1
1/2-inch diameter, or a garden hose of not less than a
5/8-inch nominal inside diameter. The hose must be in one piece, not less than 25 feet, and not more than 50 feet in length. If a 1
1/2-inch diameter fire hose is used after January 1, 1980, each length of hose must be lined as a commercial fire hose that conforms to UL 19 (incorporated by reference; see § 105.3). A hose that bears a UL label as a lined fire hose is accepted as conforming to this requirement. The hose must have a combination nozzle approved by the Commandant in accordance with 46 CFR subpart 162.027. If a garden hose is used, it must be of a good commercial grade constructed of an inner rubber tube, plies of braided cotton reinforcement, and an outer rubber cover, or of equivalent material, and must be fitted with a commercial garden hose nozzle of good-grade bronze or equivalent metal. All fittings on fire hoses must be of brass, copper, or other suitable corrosion-resistant metal.


§ 105.15 Cargo transfer operations.

During a transfer operation involving bulk liquid flammable or combustible cargoes—


(a) The operation must comply with any conditions listed in the vessel’s certificate of compliance;


(b) The person in charge of the operation must ensure that—


(1) Any galley fire is safely maintained during the operation or immediately extinguished if it cannot be so maintained; and


(2) No smoking takes place in the vicinity of the operation.


(c) A red flag by day or a red electric lantern at night, visible on all sides, must be used to signal a dockside transfer operation. For non-dockside transfer operations, a red flag must be used to signal the operation; and


(d) During a dockside transfer operation, a placard must be displayed to warn persons approaching the gangway. The placard must use letters at least 2 inches high, bear the heading “Warning,” and prohibit open lights, smoking, or visitors.


(e) The vessel, personnel, and operation are subject to all applicable pollution prevention requirements set forth in 33 CFR parts 155 and 156.


PART 106—REQUIREMENTS FOR NONQUALIFIED VESSELS THAT PERFORM CERTAIN AQUACULTURE SUPPORT OPERATIONS


Authority:Sec. 901(c)(2), Pub. L. 111–281, 124 Stat. 2905, Title IX; Department of Homeland Security Delegation No. 0170.1.



Source:81 FR 63426, Sept. 15, 2016, unless otherwise noted.

§ 106.100 Purpose.

The regulations in this part implement 46 U.S.C. 12102(d).


§ 106.105 Applicability.

The regulations in this part apply to a documented vessel with only a registry endorsement or a foreign-flagged vessel that has been issued an Aquaculture Support Operations Waiver by the Department of Transportation (DOT) under 46 U.S.C. 12102(d)(1), for the purpose of conducting aquaculture support operations.


§ 106.110 Definitions.

Aquaculture support operations means activities that treat aquaculture fish for or protect aquaculture fish from disease, parasitic infestation, or other threats to their health.


§ 106.115 Notification requirements.

(a) Prior to operating in U.S. waters, a vessel owner, operator, or charterer that has been issued an Aquaculture Support Operations Waiver by DOT’s Maritime Administration (MARAD) to conduct aquaculture support operations must notify the Coast Guard in writing of its status. The notification must include the following information:


(1) The vessel(s) name(s);


(2) The vessel’s official and/or International Maritime Organization number;


(3) The geographic location within the waters of the United States where the vessel(s) will conduct treatment operations;


(4) The period of time during which the Aquaculture Support Operations Waiver for the vessel(s) is approved including:


(i) The start date (MM/DD/YYYY); and


(ii) The expiration date (MM/DD/YYYY); and


(5) A copy of the MARAD-issued Aquaculture Support Operations Waiver.


(b) Written notification must be made to the Commandant (CG–CVC), ATTN: Office of Commercial Vessel Compliance, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7501, or by email to [email protected].


§ 106.120 Operational and geographic requirements.

(a) Vessels with a MARAD-issued Aquaculture Support Operations Waiver, issued under 46 U.S.C. 12102(d)(1), for the purpose of performing aquaculture support operations are subject to the following restrictions:


(1) Commercial operations in U.S. waters other than operations that treat or protect aquaculture fish are prohibited;


(2) While conducting aquaculture support operations, vessels will operate solely within the geographic location(s) identified in the waiver issued by MARAD; and


(3) Vessels will not conduct aquaculture support operations beyond the period of time approved in the waiver issued by MARAD.


(b) Vessels conducting aquaculture support operations will, at all times, maintain a copy of the waiver issued by MARAD on board the vessel as proof of its eligibility to conduct aquaculture support operations.


§ 106.125 Penalties.

A person who violates any requirement prescribed by the regulations in this part is subject to penalty under 46 U.S.C. 12151.


SUBCHAPTER I-A—MOBILE OFFSHORE DRILLING UNITS

PART 107—INSPECTION AND CERTIFICATION


Authority:43 U.S.C. 1333; 46 U.S.C. 3306, 3307; 46 U.S.C. 3316; DHS Delegation 00170.1, Revision No. 01.2. Section 107.05 is also issued under the authority of 44 U.S.C. 3507.



Source:CGD 73–251, 43 FR 56802, Dec. 4, 1978, unless otherwise noted.


Editorial Note:Nomenclature changes to part appear by USCG–2012–0832, 77 FR 59780, Oct. 1, 2012.

Subpart A—General

§ 107.01 Purpose of subchapter.

This subchapter prescribes rules for the design, construction, equipment, inspection and operation of mobile offshore drilling units operating under the U.S. flag. The regulations in this subchapter (parts 107 through 109) have preemptive effect over State or local regulation within the same fields.


[USCG–2012–0196, 81 FR 48265, July 22, 2016]


§ 107.01-3 Right of appeal.

Any person directly affected by a decision or action taken under this subchapter, by or on behalf of the Coast Guard, may appeal therefrom in accordance with subpart 1.03 of this chapter.


[CGD 88–033, 54 FR 50380, Dec. 6, 1989]


§ 107.05 OMB control numbers assigned pursuant to the Paperwork Reduction Act.

(a) Purpose. This section collects and displays the control numbers assigned to information collection and recordkeeping requirements in this subchapter by the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.). The Coast Guard intends that this section comply with the requirements of 44 U.S.C. 3507(f) which requires that agencies display a current control number assigned by the Director of the OMB for each approved agency information collection requirement.


(b) Display.


46 CFR part or section where identified or described
Current OMB control No.
§ 107.3051625–0038
§ 107.3091625–0038
§ 109.2271625–0064

[49 FR 38121, Sept. 27, 1984, as amended by CGD 89–037, 57 FR 41823, Sept. 11, 1992; USCG–2004–18884, 69 FR 58348, Sept. 30, 2004]


§ 107.111 Definitions.

As used in this subchapter:


Accommodation means a cabin or other covered or enclosed place intended to carry persons.


Anniversary date means the day and the month of each year, which corresponds to the date of expiration of the Certificate of Inspection.


Approval series means the first six digits of a number assigned by the Coast Guard to approved equipment. Where approval is based on a subpart of subchapter Q of this chapter, the approval series corresponds to the number of the subpart. A listing of current and formerly approved equipment and materials may be found on the Internet at: http://cgmix.uscg.mil/equipment.


Approved means approved by the Commandant.


Column stabilized unit means a unit with the main deck connected to the underwater hull of footings by columns or caissons.


Commandant means the Commandant of the Coast Guard or his authorized representative.


District Commander means an officer of the Coast Guard who commands a Coast Guard District described in 33 CFR Part 3 or his authorized representative.


Drillship means a surface type unit with a single shipshape displacement hull.


Embarkation ladder means the ladder provided at survival craft embarkation stations to permit safe access to survival craft after launching.


Embarkation station means the place where a survival craft is boarded.


Float-free launching means the method of launching a survival craft or lifesaving appliance whereby the craft or appliance is automatically released from a sinking unit and is ready for use.


Free-fall launching means the method of launching a survival craft whereby the craft, with its full complement of persons and equipment on board, is released and allowed to fall into the sea without any restraining apparatus.


Headquarters means Commandant (CG–00), Attn: Commandant, U.S. Coast Guard Stop 7000, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7000.


Immersion suit means protective suit that reduces loss of body heat of a person wearing it in cold water.


Industrial systems and components means any machinery or equipment except diving systems on board a mobile offshore drilling unit for use in the industrial function of the unit.


Inflatable appliance means an appliance that depends upon nonrigid, gas-filled chambers for buoyancy and that is normally kept uninflated until ready for use.


Inflated appliance means an appliance that depends upon nonrigid, gas-filled chambers for buoyancy and that is kept inflated and ready for use at all times.


International service means operation of a mobile offshore drilling unit on an international voyage or in waters under the jurisdiction of foreign nations or the United Nations.


Launching appliance or launching arrangement means the method or devices for transferring a survival craft or rescue boat from its stowed position to the water. For a launching arrangement using a davit, the term includes the davit, winch, and falls.


Lifejacket means a flotation device approved as a life preserver or lifejacket.


Marine evacuation system means an appliance designed to rapidly transfer large numbers of persons from an embarkation station by means of a passage to a floating platform for subsequent embarkation into associated survival craft, or directly into associated survival craft.


Marine inspector means any person designated by an Officer in Charge, Marine Inspection, as a marine inspector.


Master or Person in charge means a person designated under § 109.107.


Mobile offshore drilling unit or unit means a vessel, except a public vessel of the United States, capable of engaging in drilling operations for the exploration or exploitation of subsea resources that is—


(1) Seagoing and 300 or more gross tons and self-propelled by motor;


(2) Seagoing and 100 or more gross tons and non-self-propelled; or


(3) More than 65 feet in length and propelled by steam.


Muster station means the place where the crew and industrial personnel assemble before boarding a survival craft.


Non-self-propelled unit means a unit which is not self-propelled.


Novel lifesaving appliance or arrangement means one that has new features not fully covered by the provisions of this subchapter but providing an equal or higher standard of safety.


Officer in Charge, Marine Inspection means an officer of the Coast Guard who commands a Marine Inspection Zone described in 33 CFR Part 3 or his authorized representative.


Pilot boarding equipment means a pilot ladder, accommodation ladder, pilot hoist, or combination of them as required by this subchapter.


Point of access means the place on deck of a vessel where a person steps onto or off of pilot boarding equipment.


Rescue boat means a boat designed to rescue persons in distress and to marshal survival craft.


Retrieval means the safe recovery of survivors.


Seagoing condition means the operating condition of the unit with the personnel, equipment, fluids, and ballast necessary for safe operation on the waters where the unit operates. For bottom-bearing mobile offshore drilling units (MODU), the term also applies in the bottom-bearing mode, but the lightest seagoing condition is considered to be the highest anticipated operating condition.


Self-elevating unit means a unit with moveable legs capable of raising its hull above the surface of the sea.


Self-propelled unit means a unit that has propulsion machinery that provides for independent underway navigation.


Surface type unit means a unit with a ship shape or barge type displacement hull of single or multiple hull construction intended for operation in the floating condition.


Survival craft means a craft capable of sustaining the lives of persons in distress after abandoning the unit on which they were carried. The term includes lifeboats and liferafts, but does not include rescue boats.


Watertight means designed and constructed to withstand a static head of water without any leakage, except that watertight equipment means enclosed equipment so constructed that a stream of water from a hose (not less than 1 inch in diameter) under head of about 35 feet from a distance of about 10 feet, and for a period of 5 minutes, can be played on the apparatus without leakage.


Weathertight means that water will not penetrate into the unit in any sea condition, except that weathertight equipment means equipment so constructed or protected that exposure to a beating rain will not result in the entrance of water.


Widely-separated locations as the term applies to the location of lifeboats on self-elevating units, means locations on different sides or ends of the unit separated by sufficient distance or structure to protect the lifeboats in one location from a fire or explosion occurring at or near the lifeboats in another location on the unit. Locations across from each other at the apex of a unit with a triangular deck are not widely-separated locations unless there is a substantial solid structure between them.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 79–032, 49 FR 25455, June 21, 1984; CGD 88–070, 53 FR 34534, Sept. 7, 1988; CGD 84–069, 61 FR 25289, May 20, 1996; 63 FR 52814, Oct. 1, 1998; USCG–1999–4976, 65 FR 6503, Feb. 9, 2000; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013; USCG–2015–0867, 80 FR 62469, Oct. 16, 2015]


§ 107.113 Industrial personnel.

Industrial personnel are all persons, exclusive of the required crew as set forth in the Certificate of Inspection, carried on board a mobile offshore drilling unit for the sole purpose of carrying out the industrial business or functions of the unit.


§ 107.115 Incorporation by reference.

(a) The standards referred to in this subchapter are incorporated by reference. The incorporation by reference was approved by the Director of the Federal Register under the provisions of 1 CFR Part 51 on November 7, 1978.


(b) The standards are on file in the Federal Register library and are available from the appropriate organizations whose addresses are listed below:


(1) American Bureau of Shipping, ABS Plaza, 16855 Northchase Drive, Houston, TX 77060.


(2) American National Standards Institute Standards (ANSIS), American Society of Mechanical Engineers (ASME) International, Three Park Avenue, New York, NY 10016–5990.


(3) American Petroleum Institute, 1220 L Street NW., Washington, D.C. 20005–4070.


(4) International Cargo Gear Bureau, Inc., 321 West 44th Street, New York, New York 10036, on the Internet at http://www.icgb.com.


(5) National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02269-9101.


(6) Underwriters Laboratories, 12 Laboratory Drive, Research Triangle Park, NC 27709–3995.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978]


Editorial Note:For Federal Register citations affecting § 107.115, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.

§ 107.117 Coast Guard addresses.

When approval of the Commandant is required under this subchapter, the following addresses are to be used:


(a) For approval by Commandant (CG–CVC)—Attn: Office of Commercial Vessel Compliance, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7501.


(b) For approval by Commandant (CG–ENG)—Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 82–063b, 48 FR 4781, Feb. 3, 1983; CGD 88–070, 53 FR 34534, Sept. 7, 1988; CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2009–0702, 74 FR 49232, Sept. 25, 2009; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013]


Subpart B—Inspection and Certification

§ 107.201 Purpose.

This subpart prescribes rules for the—


(a) Original inspection and issuance of an original Certificate of Inspection required by 46 U.S.C. 3301, 3307 and 3309;


(b) Inspection for certification and renewal of a Certificate of Inspection required by 46 U.S.C. 3301, 3307, 3309;


(c) Annual and periodic inspections required by 46 U.S.C. 3308;


(d) Inspection after an accident required by 46 U.S.C. 3308; and


(e) Inspection of repairs or alterations, or both, required by 46 U.S.C. 3308 and 3313;


(f) Amendments to Certificates of Inspection;


(g) Issuance of Temporary Certificate of Inspection; and


(h) Issuance of Permit to Proceed to Another Port for Repairs.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 83–067, 49 FR 39161, Oct. 4, 1984; USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 107.205 Alternate compliance.

(a) In place of compliance with other applicable provisions of this subchapter, the owner or operator of a vessel subject to plan review and inspection under this subchapter for initial issuance or renewal of a Certificate of Inspection may comply with the Alternate Compliance Program provisions of part 8 of this chapter.


(b) For the purposes of this section, a list of authorized classification societies, including information for ordering copies of approved classification society rules and supplements, is available at Coast Guard Headquarters. Contact Commandant (CG–ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7509; telephone 202–372–1372 or fax 202–372–1925. Approved classification society rules and supplements are incorporated by reference into 46 CFR 8.110(b).


[CGD 95–010, 62 FR 67536, Dec. 24, 1997, as amended by USCG–1999–5004, 64 FR 30439, June 8, 1999; USCG–2004–18884, 69 FR 58348, Sept. 30, 2004; USCG–2006–25697, 71 FR 55746, Sept. 25, 2006; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013]


§ 107.211 Original Certificate of Inspection.

(a) The owner or builder of a unit applies for an inspection for an original Certificate of Inspection by submitting before construction is started:


(1) A completed Application for Inspection of U.S. Vessel, Form CG–3752, to the Officer in Charge, Marine Inspection, of the marine inspection zone in which the unit is to be constructed; and


(2) Plans and information indicating the proposed arrangement and construction of the unit to the Coast Guard in accordance with Subpart C of this part.


(b) An original Certificate of Inspection is issued if the Coast Guard finds, during the inspections conducted while the unit is being constructed, that a unit contracted for on or after January 3, 1979 meets § 107.231.


(c) An original Certificate of Inspection is issued if the Coast Guard finds that an uncertificated unit contracted for before January 3, 1979 meets the applicable requirements of this Subchapter as specified in the Navigation and Vessel Inspection Circular, “Inspection and Certification of Existing Mobile Offshore Drilling Units” (Appendix A). Existing structure, arrangements, materials, equipment, and facilities will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Repairs and minor alterations may be made to the same standards as originally used. Major alterations and conversions shall be in compliance with the provisions of each subpart of this part to the satisfaction of the Officer in Charge, Marine Inspection.


(d) A Certificate of Inspection is valid for 5 years.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 107.215 Renewal of Certificate of Inspection.

(a) The master, owner, or agent of a certificated unit may apply for an inspection for the renewal of a Certificate of Inspection by submitting a completed Application for Inspection of U.S. Vessel, Form CG–3752, to the Officer in Charge, Marine Inspection, in or nearest to the port where the inspection will be made.


(b) The master, owner, or agent of a certificated unit operating in international service may apply for renewal of a Certificate of Inspection by submitting a completed Application for Inspection of U.S. Vessel Form CG–3752, to the appropriate Officer in Charge, Marine Inspection, at least 30 days before the expiration date that appears on the unit’s unexpired Certificate of Inspection.


(c) A Certificate of Inspection is renewed if the Coast Guard finds, during the inspection for certification, that—


(1) A unit contracted for on or after January 3, 1979 meets the requirements of this Subchapter; or


(2) A unit contracted for before January 3 1979, and issued a Certificate of Inspection under Subchapter I of this chapter, continues to meet the requirements of that subchapter and meets the applicable requirements of this subchapter as specified in Navigation and Vessel Inspection Circular, “Inspection and Certification of Existing Mobile Offshore Drilling Units” (Appendix A).


(d) A Certificate of Inspection is valid for 5 years.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by USCG–1999–4976, 65 FR 6503, Feb. 9, 2000]


§ 107.219 Permit to proceed to another port for repairs.

(a) If a unit fails to meet the requirements in § 107.231, and the Coast Guard withholds reissuance of a Certificate of Inspection, or suspends an unexpired Certificate of Inspection, as described in § 107.279, a Permit to Proceed to Another Port for Repairs (Form CG–948) is issued by the Coast Guard if—


(1) The owner, master, person in charge, or agent makes a written request for a permit to the Officer in Charge, Marine Inspection, that includes—


(i) The reason the permit is requested;


(ii) The port in which the repairs are to be made; and


(iii) The period of time for the voyage;


(2) The Officer in Charge, Marine Inspection finds that the unit is seaworthy for the voyage.


(b) A Permit to Proceed to Another Port for Repairs states the conditions under which it was issued and is in force for the period of the voyage to the port in which the repairs are to be made.


§ 107.223 Temporary Certificate of Inspection: Period in effect.

A Temporary Certificate of Inspection, issued under 46 U.S.C. 3309 is effective until a Certificate of Inspection is issued to the unit.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 83–067, 49 FR 39161, Oct. 4, 1984]


§ 107.227 Certificate of Inspection Amendment.

The Coast Guard issues a Certificate of Inspection Amendment, Form CG–858, to a certificated unit if a requirement for equipment and data listed on the unexpired Certificate of Inspection is changed.


§ 107.231 Inspection for certification.

A unit is issued a Certificate of Inspection under § 107.211 or § 107.215(c) if the inspector finds the following:


(a) The unit and its equipment comply with—


(1) Part 108 of this subchapter;


(2) Subchapter J of this chapter, Electrical Engineering;
1




1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter.


(3) Subchapter F of this chapter, Marine Engineering;
2




2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter.


(4) Subchapter E of this chapter, Load Lines;
3




3 Requirements for load lines are not applicable to bottom supported units when they are being supported by, or being lowered to or raised from the seabed.


(5) Part 64 or Part 98 of this chapter, or both, if the unit carries marine portable tanks or portable tanks;


(6) The vessel design and equipment requirements of the oil pollution regulations (33 CFR Part 155, Subpart B);


(7) The Rules of the Road requirements for the waters in which the unit navigates, contained in—


(i) 33 U.S.C. Chapters 3, 4, 5, or 21; and


(ii) 33 CFR Parts 80, 85, or 86.


(8) Subchapter S of this chapter.


Lifesaving Equipment

(b) The survival craft and rescue boat launching appliances are in proper condition and operating properly at loads ranging from light load to full load.


(c) The lifeboats and rescue boats, including engines and release mechanisms are in proper condition and operating properly.


(d) The flotation equipment such as lifebuoys, lifejackets, immersion suits, work vests, lifefloats, buoyant apparatus, and associated equipment are in proper condition.


(e) Each inflatable liferaft and inflatable lifejacket has been serviced as required under this chapter;


(f) Each hydrostatic release unit, other than a disposable hydrostatic release unit, has been serviced as required under this chapter.


(g) The crew has the ability to effectively carry out abandonment and fire fighting procedures.


Fire Fighting Equipment

(h) Each hand portable fire extinguisher and each semiportable fire extinguisher is inspected, and serviced if required, in accordance with § 107.235(a).


(i) Each fixed fire-extinguishing system is inspected, and serviced if required, in accordance with § 107.235(b).


(j) Each fire main system meets the testing requirements in § 107.251.


(k) Each fire hose meets the testing requirements in § 107.257.


Cranes

(l) The rated load test for cranes in § 107.260 is met.


(m) Each crane is inspected and tested in accordance with § 107.258.


Miscellaneous

(n) Each watertight door is operative.


(o) Each valve with a remote control is operative.


(p) Each means of escape on the unit is safe for the intended service.


(q) There is not an accumulation of oil which might create a fire hazard on tank tops, decks, in drip pans, machinery spaces, and pumproom bilges.


(r) Each accommodation space is sanitary.


(s) The unit meet the drydocking requirement in § 107.261 or the special examination in § 107.265.


(t) The unit meets the equipment and data information requirements on its certificate of inspection.


(u) Each record in Subpart D of Part 109 is maintained as prescribed.


(v) Tests and inspections of the lifesaving equipment shall be carried out during the initial inspection for certification, and whenever any new item of lifesaving equipment is installed on the unit. The tests and inspections shall determine that the installation of each item of lifesaving equipment is consistent with each condition of its approval, as listed on its Coast Guard Certificate of Approval. The tests and inspections shall also demonstrate, as applicable,—


(1) The proper condition and operation of the survival craft and rescue boat launching appliances at loads ranging from light load to 10 percent overload;


(2) The proper condition and operation of lifeboats and rescue boats, including engines and release mechanisms;


(3) The proper condition of flotation equipment such as lifebuoys, lifejackets, immersion suits, work vests, and associated equipment;


(4) The proper condition of distress signaling equipment, including EPIRB’s, SART’s, and pyrotechnic signaling devices;


(5) The proper condition of line-throwing appliances;


(6) The proper condition and operation of embarkation and debarkation appliances, including embarkation-debarkation ladders, and alternate means of escape;


(7) The ability of the crew to effectively carry out abandonment and firefighting procedures; and


(8) The ability to meet the egress and survival craft launching requirements of this part.


Installation Tests

(w) Piping for each halocarbon and inert gas extinguishing system must be tested in accordance with 46 CFR 95.16–60.


(x) Piping for each carbon dioxide extinguishing system meets the installation test in § 108.449 of this chapter.


(y) Each sliding watertight door meets the installation tests in § 163.001–6(b) of this chapter.


Other Tests and Inspections

(z) The unit and its equipment meet any other test or inspection deemed necessary by the inspector to determine if they are suitable for the service in which they are to be employed.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 79–023, 48 FR 51008, Nov. 4, 1983; CGD 82–075a, 49 FR 4485, Feb. 7, 1984; CGD 84–069, 61 FR 25290, May 20, 1996; 63 FR 52814, Oct. 1, 1998; USCG–2006–24797, 77 FR 33881, June 7, 2012]


§ 107.235 Servicing of portable fire extinguishers, semi-portable fire extinguishers and fixed fire extinguishing systems.

(a) Except as provided in the following paragraphs, portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain a copy from National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617–770–3000, http://www.nfpa.org. You may inspect a copy at the U.S. Coast Guard, Office of Design and Engineering Standards (CG–ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(1) Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements of NFPA 10 for annual maintenance and recharging of extinguishers.


(2) Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew.


(3) Non-rechargeable or non-refillable extinguishers must be inspected and maintained in accordance with NFPA 10; however, the annual maintenance need not be conducted by a certified person and can be conducted by the owner, operator, person-in-charge, or a designated member of the crew.


(4) The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records has not been properly maintained, a qualified servicing facility must perform the required inspections, maintenance procedures, and hydrostatic pressure tests. A tag issued by a qualified servicing organization, and attached to each extinguisher, may be accepted as evidence that the necessary maintenance procedures were conducted.


(b) Each fixed fire extinguishing system must be examined for excessive corrosion and general condition and checked and serviced as indicated, depending on the extinguishing agent used by the system.


(1) Carbon dioxide: Weigh cylinders. Recharge cylinder if weight loss exceeds 10 percent of the weight of the charge. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Inspect hoses for damage or decay. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible connections on fixed carbon dioxide systems must be tested or renewed, as required by 46 CFR 147.60 and 147.65.


(2) Halon 1301 or Halocarbon: Recharge or replace if weight loss exceeds 5 percent of the weight of the charge or, if cylinder has a pressure gauge, recharge cylinder if pressure loss exceeds 10 percent, adjusted for temperature. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Inspect hoses for damage or decay. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible Halon 1301 and halocarbon connections must be tested or renewed as required by 46 CFR 147.60 and 147.65 or 147.67. Note that Halon 1301 system approvals have expired, but that existing systems may be retained if they are in good and serviceable condition to the satisfaction of the Coast Guard inspector.


(3) Inert gas: Recharge or replace cylinder if cylinder pressure loss exceeds 5 percent of specified gauge pressure, adjusted for temperature. Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer’s instruction manual. Inspect hoses for damage or decay. Ensure that nozzles are unobstructed. Cylinders must be tested and marked, and all flexible connections must be tested or renewed as required by 46 CFR 147.60 and 147.66.


(4) Foam, except premix systems: Discharge foam for approximately 15 seconds from a nozzle designated by the marine inspector. Discharge water from all other lines and nozzles. Submit a sample of the foam liquid to the manufacturer or its authorized representative for determination of specific gravity, pH, percentage of water dilution, and solid content and for certification as a suitable firefighting foam.


(5) Premix aqueous film forming foam: Remove the pressure cartridge and replace the cartridge if the seal is punctured, sampling the premix solution in accordance with the manufacturer’s instructions, and replacing any cylinders that are discharged.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 84–044, 53 FR 7749, Mar. 10, 1988; USCG–2006–24797, 77 FR 33881, June 7, 2012; USCG–2012–0196, 81 FR 48265, July 22, 2016]


§ 107.251 Testing of the fire main.

Each fire main system must be opened and the pressure checked at—


(a) The most remote outlet; and


(b) The highest outlet.


§ 107.257 Testing of fire hose.

Each fire hose must be subjected to a test pressure equivalent to the maximum pressure to which it may be subjected during operation. However, each fire hose must be subjected to a pressure of at least 100 p.s.i.


§ 107.258 Crane certification.

(a) The Coast Guard may accept current certificates issued by approved organizations as evidence of condition and suitability of cranes. The following organizations are approved by the Coast Guard as crane certifying authorities:


(1) American Bureau of Shipping, ABS Plaza, 16855 Northchase Drive, Houston, TX 77060.


(2) International Cargo Gear Bureau, Inc., 321 West 44th Street, New York, NY 10036, on the Internet at http://www.icgb.com.


(b) Crane certification must be based upon—


(1) A review of plans submitted under § 107.309; and


(2) The continuing program of tests and inspections in § 107.259.


(c) Each load test and inspection by the certifying authority must be recorded in the unit’s Crane Record Book required in § 109.437.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2000–7790, 65 FR 58461, Sept. 29, 2000; USCG–2007–29018, 72 FR 53966, Sept. 21, 2007; USCG–2008–0906, 73 FR 56510, Sept. 29, 2008]


§ 107.259 Crane inspection and testing.

(a) Each crane must be inspected and tested in accordance with Section 3 of the American Petroleum Institute (A.P.I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition (October 1972) with supplement 1, except that the rated load test must be performed in accordance with § 107.260.


(b) The tests are witnessed and the inspections are conducted by—


(1) A Coast Guard marine inspector; or


(2) The American Bureau of Shipping (A.B.S.), or the International Cargo Gear Bureau, Inc. (I.C.G.B.) for cranes under certification by these organizations.


(c) If the tests and inspections are conducted by the A.B.S. or the I.C.G.B., the surveyor shall certify that the tests and inspections were conducted in accordance with the A.P.I. specification; or modified by § 107.260.


§ 107.260 Rated load test for cranes.

(a) To meet the requirements in § 107.231(l), each crane must meet the following rated load test at both the maximum and minimum boom angles usually employed in material transfers over the side of the unit:


Rated load of assembled gear
Proof load
Less than or equal to 20 tons25 pct in excess.
Greater than 20 tons but less than or equal to 50 tons5 tons in excess.
Greater than 50 tons10 pct in excess.

(b) The weight of the hook, hook blocks, slings, rib, and other rigging, except the hoist rope, must be considered part of the load for the rated load test.


(c) The rated load test must be performed—


(1) When the crane is installed;


(2) Each 60 months; and


(3) After repairs or alterations to any structural component of the crane.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by USCG–1999–6216, 64 FR 53226, Oct. 1, 1999; USCG–1999–4976, 65 FR 6504, Feb. 9, 2000]


§ 107.261 Drydock or special examination.

(a) Except as provided in paragraphs (b), (c), and (d), each unit must be drydocked in the presence of a Coast Guard inspector at least once during each 24 month period after it is issued a Certificate of Inspection.


(b) If a unit is column-stabilized, it may be specially examined in lieu of drydocking in accordance with § 107.265 in the presence of a Coast Guard inspector.


(c) If a unit is self-elevating, it may be specially examined in lieu of drydocking in accordance with § 107.267 in the presence of a Coast Guard inspector.


(d) If a unit is a surface type, it may be specially examined in lieu of drydocking in accordance with § 107.265 in the presence of a Coast Guard inspector if the examination is specifically approved by the Commandant.


(e) The master, person in charge, owner, or agent of a certificated unit must notify the appropriate Officer in Charge, Marine Inspection before the unit is drydocked, or specially examined.


(f) The master, person in charge, owner, or agent of a certificated unit operating in international service must notify the appropriate Officer in Charge, Marine Inspection at least 60 days before the unit is drydocked or specially examined under § 107.265 or § 107.267.


§ 107.265 Special examination in lieu of drydocking for column stabilized units or surface type units when specifically approved by the Commandant.

(a) A column stabilized unit, or surface type unit when approved by the Commandant, must be specially examined in accordance with a plan—


(1) Submitted in accordance with paragraph (b) of this section; and


(2) Accepted by the Commandant (CG–CVC).


(b) To meet the requirements in paragraph (a) of this section, the owner or operator of the unit must submit a plan to the Coast Guard that provides the methods used to determine the condition of the hull and that contains the following information:


(1) The planned location where the unit is to be examined.


(2) The draft at which the unit is to be examined.


(3) The names of the diver or diving company selected for the examination.


(4) The method of visual presentation for the examination.


(5) The method used to clean the underwater portion of the hull.


(6) The method and location of gauging the underwater portion of the hull.


(7) The number of underwater hull fittings and number of compartments to be opened.


(8) The underwater high stress areas and the welds in those areas to be examined.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009]


§ 107.267 Special examination in lieu of drydocking for self-elevating units.

(a) A self-elevating unit must be specially examined in accordance with a plan—


(1) Submitted in accordance with paragraph (b) of this section; and


(2) Approved by the Commandant (CG–CVC).


(b) To meet the requirements in paragraph (a) of this section, the owner or operator of the unit must submit a plan to the Commandant (CG-CVC) that provides for—


(1) Examination of the unit’s hull while it is in the elevated position; and


(2) Examination of the supporting mat, spud cans, or footings while the unit is afloat.


(c) The plan required in paragraph (b) of this section must contain the following information:


(1) The planned location where the unit is to be examined.


(2) The methods to be used to conduct the hull examination.


(3) The method of visual presentation for examination of the underwater components.


(4) The methods of determining the condition of the underwater components.


(5) The underwater high stress areas and the welds in those areas that are to be examined.


(6) The names of the diver or diving company selected for the examination.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009]


§ 107.269 Annual inspection.

(a) Your mobile offshore drilling unit (MODU) must undergo an annual inspection within the 3 months before or after each anniversary date, except as specified in § 107.270.


(b) You must contact the cognizant OCMI to schedule an inspection at a time and place which he or she approves. No written application is required.


(c) The scope of the annual inspection is the same as the inspection for certification as specified in § 107.231, except § 107.231(x) and (y), but in less detail unless the cognizant OCMI finds deficiencies or determines that a major change has occurred since the last inspection. If deficiencies are found or a major change to the MODU has occurred, the OCMI will conduct an inspection more detailed in scope to ensure that the MODU is in satisfactory condition and fit for the service for which it is intended. If your MODU passes the annual inspection, the OCMI will endorse your current Certificate of Inspection.


(d) If the annual inspection reveals deficiencies in your MODU’s maintenance, you must make any or all repairs or improvements within the time period specified by the OCMI.


(e) Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel’s seaworthiness.


[USCG–1999–4976, 65 FR 6504, Feb. 9, 2000, as amended by USCG–2009–0702, 74 FR 49233, Sept. 25, 2009]


§ 107.270 Periodic inspection.

(a) Your vessel must undergo a periodic inspection within 3 months before or after the second or third anniversary of the date of your vessel’s Certificate of Inspection. This periodic inspection will take the place of an annual inspection.


(b) You must contact the cognizant OCMI to schedule an inspection at a time and place which he or she approves. No written application is required.


(c) The scope of the periodic inspection is the same as that for the inspection for certification, as specified in § 107.231 except § 107.231(x) and (y). The OCMI will insure that the MODU is in satisfactory condition and fit for the service for which it is intended. If your MODU passes the periodic inspection, the marine inspector will endorse your current Certificate of Inspection.


(d) If the periodic inspection reveals deficiencies in your MODU’s maintenance, you must make any or all repairs or improvements within the time period specified by the OCMI.


(e) Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel’s seaworthiness.


[USCG–1999–4976, 65 FR 6504, Feb. 9, 2000]


§ 107.271 Inspection: Alterations.

After plans are approved for alterations affecting the safety of the unit the Coast Guard conducts inspections of the affected—


(a) Hull;


(b) Machinery; or


(c) Equipment.


§ 107.275 Other inspections.

When the Coast Guard receives the report required in § 109.411 or § 109.425, the Coast Guard conducts the following inspections of a unit to determine if the unit meets the requirements under which it was issued its original Certificate of Inspection:


(a) An inspection after an accident.


(b) An inspection after a defect is found that affects—


(1) The seaworthiness of the unit; or


(2) The safety or efficiency of a lifesaving device, or firefighting device.


(c) An inspection of repairs made because of an accident or a defect.


§ 107.279 Certificate of Inspection: Failure to meet requirements.

If a unit fails to meet the requirements in § 107.231, the Coast Guard may—


(a) Withhold issuance of an original Certificate of Inspection after an original inspection for certification, until the unit meets the requirements in § 107.231;


(b) Withhold renewal of the Certificate of Inspection until the MODU meets the requirements of § 107.231, except § 107.231(x) and (y).


(c) Suspend a valid Certificate of Inspection after an annual or periodic inspection until the MODU meets the requirements of § 107.231, except § 107.231(x) and (y).


(d) Revoke a valid Certificate of Inspection after an annual or periodic inspection if the unit operates without complying with Coast Guard orders to correct unlawful conditions.


(e) Revoke or suspend an unexpired Certificate of Inspection;


(f) Withhold issuance of a safety equipment certificate;


(g) Withhold renewal of safety equipment certificate;


(h) Suspend an unexpired safety equipment certificate;


(i) Revoke an unexpired safety equipment certificate; and


(j) Withhold, suspend, or revoke an exemption certificate.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by USCG–1999–6216, 64 FR 53226, Oct. 1, 1999; USCG–1999–4976, 65 FR 6504, Feb. 9, 2000]


§ 107.283 Certificate of Inspection: Conditions of validity.

To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in §§ 107.269 and 107.270 and your Certificate of Inspection must be endorsed.


[USCG–1999–4976, 65 FR 6504, Feb. 9, 2000]


Subpart C—Plan Approval

§ 107.301 Purpose.

This subpart prescribes procedures for submitting plans and specifications for plan approval and describes the information that must be submitted.


§ 107.305 Plans and information.

Each applicant for approval of plans must submit three copies of each of the following described plans, specifications, and structural calculations concerning the construction, arrangement, required equipment, and safety features of the unit:


General

(a) Specifications.


(b) General arrangement plan of decks, holds, inner bottoms, etc. including inboard and outboard profile.


Hull Structure
1




1 The asterisk (*) indicates items that are approved by the American Bureau of Shipping for vessels classed by it. Items approved by the American Bureau of Shipping are generally accepted as satisfactory unless the law or Coast Guard regulations contain requirements that are not covered by the American Bureau of Shipping.


(c) *Inner bottom plating and framing.


(d) *Midship section.


(e) *Shell plating and framing.


(f) *Stern, stern frame, and rudder.


(g) *Structural deck plans for strength decks.


(h) *Pillars and girders.


(i) *Watertight and oiltight bulkheads.


(j) *Foundations for main machinery and boilers.


(k) *Arrangement of ports, doors, and airports in shell plating.


(l) *Hatch coamings and covers in weather and watertight decks.


(m) *Details of hinged subdivision watertight doors and operating gear.


(n) *Scuppers and drains penetrating shell plating.


(o) Arrangement of cranes.


(p) For self-elevating units, column stabilized units, and units with special hull configuration, structural calculations and plans showing special structural features.


Stability

(q) The plans and information required by Subchapter S of this chapter.


(r) For vessels of 100 meters (328 feet) or more in length contracted for on or after September 7, 1990, a plan must be included which shows how visibility from the navigation bridge will meet the standards contained in § 108.801 of this subchapter.


(s)–(u) [Reserved]


Fire Control

(v) General arrangement plans showing, for each deck, the control stations, fire sections enclosed by fire resisting bulkheads, alarm and extinguishing systems, fire extinguishers, means of access to compartments and other decks, and the ventilation system, including location of ventilation shutdowns, positions of dampers, and the numbers identifying each system.


(w) Ventilation diagram, including dampers and other fire control features.


(x) Details of fire alarm systems.


(y) Details of fixed fire extinguishing systems.


Marine Engineering

(z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter.


Electrical Engineering

(aa) Plans required for electrical engineering equipment and systems by Subchapter J of this chapter.


Life Saving Equipment

(bb) The location and arrangement of each lifesaving system including each embarkation deck, showing each overboard discharge and clearances from projections and obstructions in the way of launching lifeboats, rescue boats, and liferafts throughout the range of list and trim angles required under part 108, subpart E of this chapter.


(cc) The design weight of each lifeboat, rescue boat, and davit-launched liferaft when fully equipped and loaded.


(dd) Working loads of davits and winches.


(ee) Types and sizes of falls.


(ff) Manufacturer’s name and identification of each item of equipment.


Personnel Accommodations

(gg) Arrangement plans showing each accommodation space, ventilation, and means of escape.


Construction Portfolio
2




2 This portfolio may be included in the operating manual required in § 109.121.


(hh) A construction portfolio must be prepared for each unit and must be approved by the Coast Guard. The portfolio must document the location and extent of application of different grades and strengths of materials and include a description of the materials and welding procedures employed and any other relevant construction information. The portfolio must contain the following:


(1) Structural plans showing areas incorporating different grades and strengths of materials. A simplified plan may be included in the portfolio if it adequately defines the different areas of application.


(2) A list of different grades or strengths of material that conform to American Bureau of Shipping (ABS) or American Society of Testing and Materials (ASTM) specifications. For materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and physical properties, special testing and any heat treatment.


(3) Each approved weld procedure for the fabrication of each structure using different grades or strengths of material and each approved weld test procedure.


(4) Information, restrictions or prohibitions regarding repairs or modifications.


Operating Manual

(ii) The operating manual required in § 109.121. If an approved manual is changed, only the pages affected by the change need be submitted if the manual is bound in such a way as to allow old pages to be removed easily and new ones inserted and if the manual has a record of page changes.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 79–023, 48 FR 51008, Nov. 4, 1983; CGD 83–071, 52 FR 6978, Mar. 6, 1987; CGD 85–099, 55 FR 32248, Aug. 8, 1990; CGD 88–032, 56 FR 35826, July 29, 1991; CGD 84–069, 61 FR 25290, May 20, 1996; 63 FR 52814, Oct. 1, 1998]


§ 107.309 Crane plans and information.

(a) Three copies of each of the following must be submitted:


(1) Stress and arrangement diagrams, bill of materials, and supporting calculations for all structural components listed in API Spec. 2C, Second Edition, February 1972 (with supplement 2).


(2) Drawings of foundations and substructures with supporting calculations for support and stability of each crane under its rated load.


(3) Plans showing the installation of the safety features required in § 108.601.


(4) Drawings of the means provided to stop motion and set brakes during a power failure.



Note to § 107.309(a)(4):

These plans must be submitted to the Coast Guard, if the crane is not certified. If the crane is to be certified, four copies must be sent to the American Bureau of Shipping or the International Cargo Gear Bureau, Inc.


(b) In addition to the plans and information required in paragraph (a), the following plans and information must be submitted to the Coast Guard only:


(1) One line diagrams of the electrical power circuits of the electric power crane overload protection required in Subpart 111.50 of this chapter.


(2) Diagrams of the hydraulic or pneumatic power and control systems, as required by Subpart 58.30–40 or 58.30–50 of this chapter, as applicable.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by USCG–2008–0906, 73 FR 56510, Sept. 29, 2008]


§ 107.317 Addresses for submittal of plans, specifications, and calculations.

The copies of each plan, specification, and calculation required under § 107.305 and § 107.309 must be submitted to one of the following as applicable:


(a) The Officer in Charge, Marine Inspection, in the zone in which the unit is to be built or altered.


(b) By visitors to the Commanding Officer, Marine Safety Center, U.S. Coast Guard, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593, or by mail to: Commanding Officer (MSC), Attn: Marine Safety Center, U.S. Coast Guard Stop 7430, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593–7430, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC.


(c) The American Bureau of Shipping, (ABS) ABS Plaza, 16855 Northchase Drive, Houston, TX 77060.



Note:

For classed vessels, the American Bureau of Shipping will, upon request by the submitter, arrange to forward the plans indicated with an asterisk in § 107.305 to the Coast Guard indicating ABS’s action thereon.


(d) International Cargo Gear Bureau, Inc., 481 Eighth Avenue, New York, NY 10001, on the internet at http://www.icgb.com.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 85–048b, 51 FR 15498, Apr. 24, 1986; CGD 89–025, 54 FR 19571, May 8, 1989; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2000–7790, 65 FR 58461, Sept. 29, 2000; USCG–2007–29018, 72 FR 53966, Sept. 21, 2007; USCG–2008–0906, 73 FR 56510, Sept. 29, 2008; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009; USCG–2013–0671, 78 FR 60151, Sept. 30, 2013; USCG–2016–0498, 82 FR 35091, July 28, 2017; USCG–2021–0348, 87 FR 3224, Jan. 21, 2022]


Subpart D—Certificates Under International Convention for Safety of Life at Sea, 1974

§ 107.401 Purpose and definition.

(a) The International Convention for Safety of Life at Sea, 1974, requires one or more of the certificates described in this subpart to be carried on self-propelled vessels of 500 gross tons or over engaged in international voyages. This subpart prescribes rules for the issuance of these certificates to mobile offshore drilling units.


(b) “International voyage” has the same meaning as stated in Regulation 2(d) of part A, chapter I in the International Convention for Safety of Life at Sea, 1974. (SOLAS 74), which is: “a voyage from a country to which the present Convention applies to a port outside such country, or conversely. The Coast Guard has interpreted this definition to include the following:


(1) A voyage from a country to which SOLAS 1974 applies, to a port outside that country or the reverse;


(2) A voyage from any territory, including the Commonwealth of Puerto Rico, all possessions of the United States, and all lands held by the United States under a protectorate or mandate, whose international relations are the responsibility of a contracting SOLAS 74 government, or which is administered by the United Nations, to a port outside that territory or the reverse;


The Coast Guard has interpreted this definition to not include a “Great Lakes voyage” which means a voyage solely on the Great Lakes of North America and the St. Lawrence River west of a straight line drawn from Capedes Rosiers to West Point, Anticosti Island and, on the north side of Anticosti Island, the 63rd Meridian.

[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 90–008, 55 FR 30662, July 26, 1990]


§ 107.405 Safety Equipment Certificate.

(a) A self-propelled unit of at least 500 gross tons that engages in international voyages is issued a safety equipment certificate if the inspector issues it a certificate of inspection under § 107.211 or § 107.215 and it meets chapter 3 of the International Convention for Safety of Life at Sea, 1974.


(b) A Safety Equipment Certificate expires 60 months after the date of issue.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 90–008, 55 FR 30662, July 26, 1990; USCG–1999–4976, 65 FR 6504, Feb. 9, 2000]


§ 107.409 Safety Construction Certificate.

(a) Application for a Safety Construction Certificate is made by indicating in the space provided on the Application for Inspection Form CG–3752 whether the American Bureau of Shipping or the Coast Guard is to issue the certificate.


(b) The American Bureau of Shipping or the Coast Guard may issue a self-propelled unit of at least 500 gross tons that engages on international voyages a Safety Construction Certificate if the unit meets the requirements in Regulation 12 (a)(ii), Chapter I of the International Convention for Safety of Life at Sea, 1974.


(c) A Safety Construction Certificate expires 60 months after the date of issue.


(d) If a unit fails to meet the requirements in Regulation 12(a)(ii), the Coast Guard may—


(1) Suspend an unexpired Safety Construction Certificate; and


(2) Revoke an unexpired Safety Construction Certificate.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 90–008, 55 FR 30662, July 26, 1990]


§ 107.413 Exemption certificate.

(a) An owner or operator of a unit may request an exemption from the requirements of the International Convention for Safety of Life at Sea, 1974 (SOLAS 74) by writing to the appropriate OCMI.


(b) The Commandant (CG–CVC) may exempt a self-propelled unit of at least 500 gross tons on an international voyage from any of the requirements in the International Convention for Safety of Life at Sea, 1974 (SOLAS 74) if the unit meets the conditions of Regulation 4 of Part A, Chapter I, of SOLAS 74 which states the following:



a. A ship which is not normally engaged on international voyages but which, in exceptional circumstances, is required to undertake a single international voyage may be exempted by the Administration from any of the requirements of the present Regulations provided that it complies with safety requirements which are adequate in the opinion of the Administration for the voyage which is to be undertaken by the ship.


b. The Administration may exempt any ship which embodies features of a novel kind from any of the provisions of Chapters II–1, II–2, III and IV of these Regulations the application of which might seriously impede research into the development of such features and their incorporation in ships engaged on international voyages. Any such ship shall, however, comply with safety requirements which, in the opinion of that Administration, are adequate for the service for which it is intended and are such as to ensure the overall safety of the ship and which are acceptable to the Governments of the States to be visited by the ship. The Administration which allows any such exemption shall communicate to the Organization particulars of same and the reasons therefor which the Organization shall circulate to the Contracting Governments for their information.


(c) The Commandant (CG–CVC) may exempt a self-propelled unit of at least 500 gross tons on an international voyage from the requirements of Chapter III (Lifesaving Appliances, &C.) of SOLAS 74 if the unit meets the conditions of Regulation 2 of chapter III which states in part:



The Administration may, if it considers that the sheltered nature and conditions of the voyage are such as to render the application of any specific requirements of this chapter unreasonable or unnecessary, exempt from those requirements individual ships or classes of ships which, in the course of their voyage, do not proceed more than 20 miles from the nearest land.


(d) The Commandant (CG–CVC) may exempt a unit from the requirements of Chapters II–1 (Construction—Subdivision and stability, machinery and electrical installations) or II–2 (Construction—Fire protection, fire detection and fire extinction) of SOLAS 74 if the unit meets the conditions of Regulation 1–4 of Part A Chapter II–1 or Regulation 1–4.1 of Part A Chapter II–2, respectively, of SOLAS 74 which state the following: The Administration of a State may, if it considers that the sheltered nature and conditions of the voyage are such as to render the application of any specific requirements of this chapter unreasonable or unnecessary, exempt from those requirements individual ships or classes of ships entitled to fly the flag of the State which, in the course of their voyage, do not proceed more than 20 miles from the nearest land.


(e) An Exemption Certificate is in force for the period of validity of the certificate to which it refers.


[CGD 73–251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 90–008, 55 FR 30662, July 26, 1990; CGD 95–072, 60 FR 50464, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009]


§ 107.415 Safety Management Certificate.

(a) All self-propelled mobile offshore drilling units of 500 gross tons or over to which 33 CFR part 96 applies, on an international voyage must have a valid Safety Management Certificate and a copy of their company’s valid Document of Compliance certificate on board.


(b) A Safety Management Certificate is issued for a period of not more than 60 months.


[CGD 95–073, 62 FR 67515, Dec. 24, 1997]


PART 108—DESIGN AND EQUIPMENT


Authority:43 U.S.C. 1333; 46 U.S.C. 3102, 3306; Department of Homeland Security Delegation No. 0170.1.


Source:CGD 73–251, 43 FR 56808, Dec. 4, 1978, unless otherwise noted.

Subpart A—General

§ 108.101 Incorporation by reference.

(a) Certain material is incorporated by reference into this subchapter with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG–ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593–7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


(b) ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428, 877–909–2786, http://www.astm.org.


(1) ASTM D 93–97, Standard Test Methods for Flash Point by Pensky-Martens Closed Cup Tester, IBR approved for § 108.500(b).


(2) ASTM F 1014–92, Standard Specification for Flashlights on Vessels, IBR approved for § 108.497(b).


(3) ASTM F1121–87 (Reapproved 2010), Standard Specification for International Shore Connections for Marine Fire Applications, (approved March 1, 2010), IBR approved for § 108.427(a).


(c) International Maritime Organization (IMO) Publishing, 4 Albert Embankment, London SE1 7SR, United Kingdom, +44 (0)20 7735 7611, http://www.imo.org.


(1) Resolution A.520(13), Code of Practice for the Evaluation, Testing and Acceptance of Prototype Novel Life-saving Appliances and Arrangements, 17 November 1983, IBR approved for § 108.105(c).


(2) Resolution A.649(16), Code for the Construction and Equipment of Mobile Offshore Drilling Units (MODU Code),19 October 1989 with amendments of June 1991, IBR approved for § 108.503.


(3) Resolution A.658(16), Use and Fitting of Retro-reflective Materials on Life-saving Appliances, 20 November 1989, IBR approved for §§ 108.645(a) and 108.649(a) and (e).


(4) Resolution A.760(18), Symbols Related to Life-saving Appliances and Arrangements, 17 November 1993, IBR approved for §§ 108.646(a), 108.647, 108.649(b), (d), (f), and (g), and 108.655(e).


(d) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617–770–3000, http://www.nfpa.org.


(1) NFPA 13, Standard for the Installation of Sprinkler Systems, 2010 Edition, effective August 26, 2009, IBR approved for § 108.430.


(2) [Reserved]


[USCG–2012–0196, 81 FR 48266, July 22, 2016]


§ 108.102 Preemptive effect.

The regulations in this part have preemptive effect over State or local regulations in the same field.


[USCG–2006–29747, 77 FR 33882, June 7, 2012]


§ 108.103 Equipment not required on a unit.

Each item of lifesaving and firefighting equipment carried on board the unit in addition to equipment of the type required under this subchapter, must—


(a) Be approved; or


(b) Be acceptable to the cognizant OCMI, for use on the unit.


[CGD 84–069, 61 FR 25291, May 20, 1996]


§ 108.105 Substitutes for required fittings, material, apparatus, equipment, arrangements, calculations, and tests.

(a) Where this subchapter requires a particular fitting, material, apparatus, equipment, arrangement, calculation or test, the Commandant (CG–ENG) may accept any substitution that is at least as effective as that specified. If necessary, the Commandant (CG–ENG) may require engineering evaluations and tests to demonstrate the equivalence of the substitution.


(b) In any case where it is shown to the satisfaction of the Commandant that the use of any particular equipment, apparatus, arrangement, or test is unreasonable or impracticable, the Commandant may permit the use of alternate equipment, apparatus, arrangement, or test to such an extent and upon such condition as will insure, to his satisfaction, a degree of safety consistent with the minimum standards set forth in this subchapter.


(c) The Commandant (CG–ENG) may accept a novel lifesaving appliance or arrangement, if it provides a level of safety equivalent to the requirements of this part and the appliance or arrangement—


(1) Is evaluated and tested in accordance with IMO Resolution A.520(13), Code of Practice for the Evaluation, Testing and Acceptance of Prototype Novel Life-saving Appliances and Arrangements; or


(2) Has successfully undergone evaluation and tests that are substantially equivalent to those recommendations.


(d) During a unit’s construction and when any modification to the lifesaving arrangement is done after construction, the owner must obtain acceptance of lifesaving arrangements from the Commandant Marine Safety Center.


(e) The OCMI may accept substitute lifesaving appliances other than those required by this part, except for—


(1) Survival craft and rescue boats; and


(2) Survival craft and rescue boat launching and embarkation appliances.


(f) Acceptance of lifesaving appliances and arrangements will remain in effect unless—


(1) The OCMI deems their condition to be unsatisfactory or unfit for the service intended; or


(2) The OCMI deems the crew’s ability to use and assist others in the use of the lifesaving appliances or arrangements to be inadequate.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 95–072, 60 FR 50465, Sept. 29, 1995; CGD 84–069, 61 FR 25291, May 20, 1996; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009; USCG–2012–0832, 77 FR 59781, Oct. 1, 2012]


§ 108.109 Classification society standards.

(a) Any person who desires to use the rules of a classification society, other than the American Bureau of Shipping, to meet requirements in this Subchapter must request recognition of that society from the Commanding Officer, Marine Safety Center. The relevant rules must be submitted with the request.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 95–072, 60 FR 50465, Sept. 29, 1995]


Subpart B—Construction and Arrangement

Hull Structure

§ 108.113 Structural standards.

Except as provided in § 108.109, each unit must meet the structural standards of the American Bureau of Shipping’s Rules for Building and Classing Offshore Mobile Drilling Units, 1978.


§ 108.114 Appliances for watertight and weathertight integrity.

(a) Appliances to ensure watertight integrity include watertight doors, hatches, scuttles, bolted manhole covers, or other watertight closures for openings in watertight decks and bulkheads.


(b) Appliances to ensure weathertight integrity include weathertight doors and hatches, closures for air pipes, ventilators, ventilation intakes and outlets, and closures for other openings in deckhouses and superstructures.


(c) Each internal opening fixed with appliances to ensure watertight integrity which are used intermittently during operation of the unit while afloat must meet the following:


(1) Each door, hatch, and scuttle must—


(i) Be remotely controlled from a normally manned control station, and be operable locally from both sides of the bulkhead; or


(ii) If there is no means of remote control there must be an alarm system which signals whether the appliance is open or closed both locally at each appliance and in a normally manned control station.


(2) Each closing appliance must remain watertight under the design water pressure of the watertight boundary of which it is a part.


(d) Each external opening fitted with an appliance to ensure weathertight integrity must be located so that it would not be submerged below the final equilibrium waterline if the unit is subjected simultaneously to—


(1) Damage causing flooding described in § 174.075 through § 174.085 of this chapter; and


(2) A wind heeling moment calculated in accordance with § 174.055 of this chapter using a wind velocity of 50 knots (25.8 meters per second).


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 79–023, 48 FR 51008, Nov. 4, 1983]


Fire Protection: General

§ 108.123 Isolation of combustible material.

Each internal combustion engine exhaust, boiler and galley uptake, and similar heat source must be separated or insulated from combustible materials.


§ 108.127 Storage lockers for combustibles.

Each oil and paint locker must be made of steel or an equivalent material or be completely lined with steel or an equivalent material as described in § 108.131(c) of this subpart.


Structural Fire Protection

§ 108.131 Definitions.

(a) Standard Fire Test means the test in which specimens of the relevant bulkheads or decks, having a surface of approximately 4.65 square meters (50 square feet) and a height of 2.44 meters (8 feet) resembling as closely as possible the intended construction and including, where appropriate, at least one joint, are exposed in a test furnace to a series of temperature relationships approximately as follows:


(1) At the end of 5 minutes—538 °C. (1,000 °F.)


(2) At the end of 10 minutes—704 °C. (1,300 °F.)


(3) At the end of 30 minutes—843 °C. (1,550 °F.)


(4) At the end of 60 minutes—927 °C. (1,700 °F.).


(b) Bulkheads and decks are defined and classed as follows:


(1) A class bulkhead or deck means a bulkhead or deck that—


(i) Is made of steel or other equivalent material; and


(ii) Prevents the passage of flame and smoke for 60 minutes if subjected to the standard fire test.


(2) A 60 bulkhead or deck means an A class bulkhead or deck that—


(i) Is insulated with approved insulation, bulkhead panels, or deck covering;


(ii) If subjected to the standard fire test for 60 minutes, has an average temperature rise on the unexposed side of the insulated bulkhead or deck of less than 139 °C. (250 °F.) above the temperature before the standard fire test and has a temperature rise at any point on the unexposed surface, including any joint, of less than 180 °C. (325 °F.) above the temperature before the standard fire test.


(3) B class bulkhead or deck means a bulkhead or deck that—


(i) Is made of approved noncombustible material;


(ii) Prevents flame from passing through it for 30 minutes if subjected to the standard fire test.


(4) C class bulkhead or deck means a bulkhead or deck made of approved noncombustible material.


(c) Equivalent material means a material that by itself or with insulation has smoke and fire retardant properties equal to that of the steel required for “A” or “B” class bulkheads or decks and has structural qualities equivalent to steel at the end of the applicable fire exposure.


(d) Approved material means a material approved under one of the following subparts of Subchapter Q of this chapter:


(1) Deck coverings, Subpart 164.006.


(2) Structural insulation, Subpart 164.007.


(3) Bulkhead panel, Subpart 164.008.


(4) Noncombustible materials, Subpart 164.009;


(5) Interior finishes, Subpart 164.012.


(e) Stairtower means a stairway that penetrates more than one deck within the same enclosure, or two or more stairways that—


(1) Are arranged vertically one above the other; or


(2) Penetrate both the deck and the overhead within the same enclosure.


(f) Accommodation space includes, sleeping, mess, hospital, recreational, toilet, washing and shower spaces, and corridors.


§ 108.133 Hull superstructure, structural bulkheads, decks, and deckhouses.

Each hull superstructure, structural bulkhead, deck, and deckhouse must be made of steel or an equivalent material.


§ 108.135 Boundary bulkheads, decks of galleys, and combustible material lockers.

Each boundary bulkhead and deck of each galley, each combination galley and messroom, and each combustible material storage locker must be an A class bulkhead and A class deck respectively.


§ 108.137 Bulkhead and deck separations of accommodation spaces.

Each boundary bulkhead and deck that separates an accommodation space or control station from the following must be an A class bulkhead and A class deck respectively—


(a) Machinery space;


(b) Galley or combination galley and messroom;


(c) Main pantry;


(d) Classified space;


(e) Store room.


§ 108.139 Boundary bulkheads and decks of a space containing emergency power.

Each boundary bulkhead and deck of a space containing an emergency electric power source or components of an emergency electric power source must be an A class bulkhead and A class deck respectively. When separate but adjoining spaces are provided for such equipment, boundary bulkhead type construction is not required for the separating partitions common to each space.


§ 108.141 Boundary bulkheads and decks between the emergency power source and service generators.

Each boundary bulkhead and deck of a space containing an emergency electric power source or components of an emergency electric power source that adjoins a space containing a ship’s service generator, the components of a ship’s service generator, or a classified space must be an A–60 bulkhead and A–60 deck.


§ 108.143 Accommodation space.

(a) Each corridor bulkhead in an accommodation space must be an A class or B class bulkhead except if an A class bulkhead is specifically required by this part.


(b) No door in a corridor bulkhead in an accommodation space may have a louver, except that a stateroom, lounge, or recreation room door may have louvers in its lower half.


(c) Each stairtower, elevator, and dumbwaiter, and other trunk must be enclosed by A class bulkheads.


(d) Each bulkhead not described under paragraph (a) of this section must be either A class, B class, or C class bulkheads.


(e) At least one opening to each stairway must be enclosed by either A class or B class bulkheads and doors.


(f) Each stairtower must have doors at all levels and each must be an A class door.


(g) Each door required by paragraphs (e) and (f) of this section—


(1) Must be self-closing;


(2) May not have any means to permanently hold the door open, except for magnetic holdbacks that are operated from the bridge or other remote location.


(h) Interior stairs, including stringers and treads, must be made of steel or an equivalent material.


(i) Except in washrooms and toilet spaces, each deck covering in an accommodation space must be made of an approved material, except an overlay on a deck for leveling or finishing that is not more than 9.375 millimeters (
3/8 inch) thick.


(j) Except as provided in paragraph (1), each ceiling, lining, insulation, and pipe and duct lagging in an accommodation space must be made of an approved material that is noncombustible.


(k) Each sheathing, furring, or holding piece used to secure a bulkhead, ceiling, lining, or insulation in an accommodation space must be made of an approved material that is non-combustible.


(l) No bulkhead, lining, or ceiling in an accommodation space may have a combustible veneer greater than 2 millimeters (
1/12 inch) in thickness.


(m) Each corridor or hidden space in an accommodation space may be covered by an approved interior finish or a reasonable number of coats of paint. However, no corridor or hidden space may have combustible veneer, trim, or decoration except material approved under Subpart 164.012 of this chapter.


§ 108.145 Hatches and tonnage openings.

Each hatch, except a hatch between storage spaces and each tonnage opening closure, must be made of steel or an equivalent material of the same class as the bulkhead or deck where the opening occurs.


§ 108.147 Certain paints prohibited.

No nitrocellulose or other highly flammable or noxious fume-producing paint or lacquer may be used on a unit.


Means of Escape

§ 108.151 Two means required.

(a) Each of the following must have at least 2 means of escape:


(1) Each accommodation space with a deck area of at least 27 sq. meters (300 sq. ft.).


(2) Each space, other than an accommodation space, that is continuously manned or used on a regular working basis except for routine security checks.


(3) Weather deck areas where personnel may be normally employed.


(b) When two means of escape are required from a space below the main deck, one the means of escape must provide for a rapid escape through openings that are not required to be watertight by damage stability considerations.


(c) When two means of escape are required from a space above the main deck, one of the means of escape must provide for a rapid escape to a weather deck.


§ 108.153 Location of means of escape.

The required two means of escape must be through exits that minimize the possibility of having both exits blocked if a fire or other casualty occurs in the area.


§ 108.155 Restrictions on means of escape utilized.

A required means of escape may not be a vertical ladder or deck scuttle, except that one of the means of escape may be a vertical ladder or deck scuttle if a stairway would be impracticable.


§ 108.157 Locked doors.

No door to the required means of escape may be designed to lock except—


(a) A crash door or a door that has a locking device that can be easily forced, if on both sides of the door a permanent and easily seen instruction is placed; or


(b) An outside door to a deckhouse if the door can be locked by key only and if the master or person in charge has control of the key to the door’s lock.


§ 108.159 Stairways and exterior inclined ladders.

Each stairway, except a stairway in a machinery or storage space, and each exterior inclined ladder must be at least 70 centimeters (28 inches) wide with an angle of inclination from the horizontal of not more than 50 degrees, except that special consideration may be given to the installation if a 70 centimeters (28 inch) width is impracticable.


§ 108.160 Vertical ladders.

(a) Each vertical ladder must have rungs that are—


(1) At least 41 centimeters (16 inches) in length;


(2) Not more than 30 centimeters (12 inches) apart, uniform for the length of the ladder; and


(3) At least 18 centimeters (7 inches) from the nearest permanent object in back of the ladder.


(b) Except when unavoidable obstructions are encountered, there must be at least 11.5 centimeters (4
1/2 inches) clearance above each rung.


(c) Except as provided in § 108.540(h)(3)(ii), each exterior vertical ladder more than 6 meters (20 ft.) in length must be fitted with a cage or ladder safety device meeting ANSI Standard 14.3 (1974) for fixed ladders.


(d) No vertical fixed ladders may be made of wood.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by USCG–2002–13058, 67 FR 61279, Sept. 30, 2002]


§ 108.161 Dead end corridors.

No dead end corridor may be more than 13 meters (43 feet) long.


§ 108.165 Access to lifeboats and liferafts.

Each unit must be designed to provide direct access to the lifeboat and liferaft embarkation areas.


§ 108.167 Weather deck ladders.

Each unit must have at least one permanent, inclined ladder between each weather deck.


Classified Locations

§ 108.170 Definitions.

(a) Classified locations are those in which flammable hydrocarbon gas or vapors, resulting from the drilling operations, may be present in quantities sufficient to produce an explosive or ignitable mixture. Location of these areas affect the design of the units’ machinery, electrical, and ventilation systems. (See Notes 1 and 2).


(b) For the purpose of this subpart “semi-enclosed location” means a location where natural conditions of ventilation are notably different from those on open decks due to the presence of structures such as roofs, windbreaks, or bulkheads.



Notes:

1. Further requirements with respect to hazardous locations are contained in part 111, subpart 111.105, of this chapter.


2. For specific requirements for machinery and electrical installations on mobile offshore drilling units see Subchapters “F” and “J” of this chapter.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 94–108, 61 FR 28270, June 4, 1996]


§ 108.171 Class I, Division 1 locations.

The following are Class I, Division 1 locations:


(a) An enclosed space that contains any part of the mud circulating system that has an opening into the space and is between the well and final degassing discharge.


(b) An enclosed or semi-enclosed location that is below the drill floor, and contains a possible source of gas release.


(c) An enclosed space that is on the drill floor, and is not separated by a solid, gas-light floor from the spaces specified in paragraph (b) of this section.


(d) A space that would normally be considered a Division 2 location under § 108.173 but where combustible or flammable gases might accumulate.


(e) A location in the weather, or a semi-enclosed location, except as provided in paragraph (b) of this section that is within 1.5 m (5 ft.) of the boundary of any—


(1) Equipment or opening specified in paragraph (a) of this section;


(2) Ventilation outlet, access, or other opening to a Class I, Division 1 space; or


(3) Gas vent outlet.


(f) Except as provided in § 108.175, an enclosed space that has an opening into a Class I, Division 1 location.


§ 108.173 Class I, Division 2 locations.

The following are Class I, Division 2 locations:


(a) An enclosed space that has any open portion of the mud circulating system from the final degassing discharge to the mud suction connection at the mud pit.


(b) A location in the weather that is—


(1) Within the boundaries of the drilling derrick up to a height of 3 m (10 ft.) above the drill floor;


(2) Below the drill floor and within a radius of 3 m (10 ft.) of a possible source of gas release; or


(3) Within 1.5 m (5 ft.) of the boundaries of any ventilation outlet, access, or other opening to a Class I, Division 2 space.


(c) A location that is—


(1) Within 1.5 m (5 ft.) of a semi-enclosed Class I, Division 1 location indicated in § 108.171(b); or


(2) Within 1.5 m (5 ft.) of a Class I, Division 1 space indicated in § 108.171(e).


(d) A semi-enclosed area that is below and contiguous with the drill floor to the boundaries of the derrick or to the extent of any enclosure which is liable to trap gasses.


(e) A semi-enclosed derrick to the extent of its enclosure above the drill floor or to a height of 3 m (10 ft.) above the drill floor, whichever is greater.


(f) Except as provided in § 108.175 an enclosed space that has an opening into a Class I, Division 2 location.


§ 108.175 Contiguous locations.

An enclosed space that has direct access to a Division 1 or Division 2 location is the same division as that location, except—


(a) An enclosed space that has direct access to a Division 1 location is not a hazardous location if—


(1) The access has self-closing gas-tight doors that form an air lock;


(2) The ventilation causes greater pressure in the space than in the Division 1 location; and


(3) Loss of ventilation overpressure activates an alarm at a manned station;


(b) An enclosed space that has direct access to a Division 1 location can be considered as a Division 2 location if—


(1) The access has a self-closing, gas-tight door that opens into the space and that has no hold-back device;


(2) Ventilation causes the air to flow with the door open from the space into the Division 1 location; and


(3) Loss of ventilation activates an alarm at a manned control station; and


(c) An enclosed space that has direct access to a Division 2 location is not a hazardous location if—


(1) The access has a self-closing, gas-tight door that opens into the space and that has no hold-back device;


(2) Ventilation causes the air to flow with the door open from the space into the Division 2 location; and


(3) Loss of ventilation activates an alarm at a manned control station.


§ 108.177 Electrical equipment in classified locations.

Electrical equipment and devices installed in spaces made non-hazardous by the methods indicated in § 108.175 must only be essential equipment.


Ventilation

§ 108.181 Ventilation for enclosed spaces.

(a) Each enclosed space must be vented or ventilated.


(b) There must be a means to close each vent or ventilating system.


(c) Each fan in a ventilating system must have remote controls installed in accordance with part 111, subpart 111.103, of this chapter.


(d) There must be a means to close each doorway, ventilator, and annular space around each funnel or other opening to machinery, stowage, or working spaces. The means must be located outside the space.


(e) Each intake in a ventilating system must be located so as to prevent, as far as practicable, the intake of noxious fumes.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 94–108, 61 FR 28270, June 4, 1996]


§ 108.185 Ventilation for enclosed classified locations.

(a) The ventilation system for each enclosed classified location must be designed to maintain a pressure differential between the enclosed classified location and each non-classified location adjacent to the enclosed classified location, so as to prevent the discharge of ignitable gases into the non-classified adjacent locations.


(b) Each air intake must be outside of enclosed classified locations.


(c) Each unit must have alarms that are powered independently of the ventilation motor power and control circuitry and sound at a continuously manned station when—


(1) Gas is present in an enclosed classified location; or


(2) The ventilation system for the space is not working.


(d) Each ventilation system for enclosed classified locations must provide a complete change of air every five minutes.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 94–108, 61 FR 28270, June 4, 1996]


§ 108.187 Ventilation for brush type electric motors in classified spaces.

Ventilation for brush type electric motors in classified locations must meet N.F.P.A. 496–1974 “Standard for Purged and Pressurized Enclosures for Electrical Equipment in Hazardous Locations”, except audible and visual alarms may be used if shutting down the motors may cause unsafe conditions.


Accommodation Spaces

§ 108.193 Restrictions.

(a) There must be no direct communication between the accommodation spaces and any chainlocker, stowage, or machinery space, except through solid, close-fitted doors or hatches.


(b) No access, vent, or sounding tube from a fuel or oil tank may open into any accommodation space, except that accesses and sounding tubes may open into corridors.


§ 108.195 Location of accommodation spaces.

(a) On surface type units, accommodation spaces must not be located forward of a vertical plane located at 5 percent of the unit’s length aft of the stem, at the designed summer load line.


(b) On all units, the deckhead of each accommodation space must be above the deepest load line.


§ 108.197 Construction of accommodation spaces.

(a) Each sleeping, mess, recreational, or hospital space that is adjacent to or immediately above a stowage or machinery space, paint locker, drying room, washroom, toilet space, or other odor source must be made odorproof.


(b) Each accommodation space that is adjacent to or immediately above a galley, machinery space, machinery casing, boiler room, or other noise or heat source, must be protected from the heat and noise.


(c) Where the shell or an unsheathed weather deck forms a boundary of an accommodation space, the shell of deck must have a covering that prevents the formation of moisture.


(d) The deckheads of each accommodation space must be a light color.


(e) Each accommodation space in which water may accumulate must have a drain scupper located in the lowest part of the space, considering the average trim of the unit.


(f) Each public toilet space must be constructed and located so that its odors do not readily enter any sleeping, mess, recreational, or hospital space.


§ 108.199 Arrangement of sleeping spaces.

To the extent practicable, each occupation group must be berthed together in sleeping spaces arranged to minimize disturbance created by personnel leaving for or arriving from a working period.


§ 108.201 Size of sleeping spaces.

(a) No sleeping space may berth more than four persons, except that a sleeping space for personnel not regularly employed on a unit may berth up to six persons if the space meets § 108.199 and berthing of six persons in that space is authorized by the Commandant (CG–OES).


(b) Without deducting any equipment used by the occupants, each sleeping space must have for each occupant—


(1) 2.8 square meters (approximately 30 square feet) of deck area; and


(2) 6 cubic meters (approximately 210 cubic feet) of volume.


(c) Each sleeping space must have at least 191 centimeters (approximately 6 feet 3 inches) of headroom over clear deck areas.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 82–063b, 48 FR 4781, Feb. 3, 1983; CGD 95–072, 60 FR 50465, Sept. 29, 1995; CGD 96–041, 61 FR 50730, Sept. 27, 1996; USCG–2009–0702, 74 FR 49233, Sept. 25, 2009; USCG–2012–0832, 77 FR 59781, Oct. 1, 2012]


§ 108.203 Berths and lockers.

(a) Each sleeping space must have a separate berth for each occupant.


(b) No more than one berth may be placed over another.


(c) Each berth must have a framework of hard, smooth material that is not likely to corrode or harbor vermin.


(d) Each berth must be arranged to provide ample room for easy occupancy.


(e) Each berth must be at least 76 centimeters (approximately 30 inches) wide by 193 centimeters (approximately 76 inches) long.


(f) Adjacent berths must be separated by a partition that extends at least 46 centimeters (approximately 18 inches) above the sleeping surface.


(g) The bottom of a lower berth must be at least 30 centimeters (approximately 12 inches) above the deck.


(h) The bottom of an upper berth must be at least 76 centimeters (approximately 2 feet 6 inches) from the bottom of the berth below it and from the deck or any pipe, ventilating duct, or other overhead installation.


(i) Each berth must have a berth light.


(j) Each occupant of a sleeping space must have a readily accessible locker of hard, smooth material.


(k) Each locker must be at least .194 square meters (approximately 300 square inches) in cross section and 1.53 meters (approximately 60 inches) high.


§ 108.205 Wash spaces; toilet spaces; and shower spaces.

(a) For the purposes of this section—


(1) “Private facility” means a toilet, washing, or shower space that is accessible only from one single or double occupancy sleeping space;


(2) “Semi-private facility” means a toilet, washing or shower space that is accessible from either of two one-to-four person occupancy sleeping spaces; and


(3) “Public facility” means a toilet, washing, or shower space that is not private or semi-private.


(b) Each private facility must have one toilet, one shower, and one washbasin, all of which may be in a single space.


(c) Each semi-private facility must have at least one toilet and one shower, which may be in a single space.


(d) Each room adjoining a semi-private facility must have a washbasin if a washbasin is not installed in a semi-private facility.


(e) Each unit must have enough public facilities to provide at least one toilet, one shower, and one washbasin for each eight persons who occupy sleeping spaces that do not have private or semi-private facilities.


(f) Urinals may be installed in toilet rooms, but no toilet required in this section may be replaced by a urinal.


(g) Each public toilet space and washing space must be convenient to the sleeping space that it serves.


(h) No public facility may open into any sleeping space.


(i) Each washbasin, shower, and bathtub must have hot and cold running water.


(j) Adjacent toilets must be separated by a partition that is open at the top and bottom for ventilation and cleaning.


(k) Public toilet facilities and shower facilities must be separated.


(l) Each public facility that is a toilet space must have at least one washbasin unless the only access to the toilet space is through a washing space.


(m) Each toilet must have an open front seat.


(n) Each washing space and toilet space must be so constructed and arranged that it can be kept in a clean and sanitary condition and the plumbing and mechanical appliances kept in good working order.


(o) Washbasins may be located in sleeping spaces.


§ 108.207 Messrooms.

(a) Each messroom that is not adjacent to the galley that serves it must be equipped with a steamtable.


(b) Each messroom must seat the number of persons expected to eat in the messroom at one time.


§ 108.209 Hospital spaces.

(a) Each unit carrying twelve or more persons on a voyage of more than three days must have a hospital space.


(b) Each hospital space must be suitably separated from other spaces.


(c) No hospital space may be used for any other purpose, when used for care of the sick.


(d) An entrance to each hospital space must be wide enough and arranged to readily admit a person on a stretcher.


(e) Each berth in a hospital space must be made of metal.


(f) Each upper berth must be hinged and arranged so that it can be secured clear of the lower berth.


(g) Each hospital space must have at least one berth that is accessible from both sides.


(h) Each hospital space must have one berth for every 12 persons or portion thereof on board, who are not berthed in single occupancy rooms, but the number of berths need not exceed six.


(i) Each hospital space must have a toilet, washbasin, and bathtub or shower accessible from the hospital space.


(j) Each hospital space must have clothes lockers, a table, and seats.


§ 108.210 Hospital space not required.

(a) The hospital space required under § 108.209 is not required on a unit if one single or double occupancy sleeping space, designated and equipped as a treatment or isolation room or both is available for immediate medical use, and has—


(1) An entrance that is wide enough and arranged to readily admit a person on a stretcher;


(2) A single berth or examination table that is accessible from both sides; and


(3) A washbasin in or immediately adjacent to it.


§ 108.211 Miscellaneous accommodation spaces.

(a) Each unit must have enough facilities for personnel to wash their own clothes, including at least one tub or sink that has hot and cold running water.


(b) Each unit must have enough equipment or space for the personnel to dry their own clothes.


(c) Each unit must have an accommodation space that can be used for recreation.


§ 108.213 Heating requirements.

(a) Each accommodation space must be heated by a heating system that can maintain at least 20 °C. (68 °F.).


(b) Radiators and other heating apparatuses must be constructed, located or shielded so as to avoid risk of—


(1) Fire;


(2) Danger; and


(3) Discomfort


to the occupants of each accommodation space.

(c) Each exposed pipe in an accommodation space, leading to a radiator or other heating apparatus must be insulated.


§ 108.215 Insect screens.

(a) Accommodation spaces must be protected against the admission of insects.


(b) Insect screens must be installed when natural ventilation is provided.


Rails

§ 108.217 Guardrails and bulwarks.

(a) Each unit must have guardrails or bulwarks along the edge of the bridge, of each deck, and of each deck opening.


(b) Each guardrail and bulwark must extend at least one meter (39.37 inches) above the deck except where this height may interfere with the normal operation of the unit, a lesser height may be approved.


(c) Removable guardrails may be installed where operating conditions warrant their use.


§ 108.219 Guardrails.

(a) Except for exposed peripheries of a freeboard or superstructure deck, each guardrail must have at least two evenly spaced courses.


(b) At exposed peripheries of a freeboard or superstructure deck, each guardrail must have at least three courses not more than 38 centimeters (15 in.) apart with the lowest course not more than 23 centimeters (9 in.) above the deck.


(c) For a rounded gunwale, the guardrail must be at the edge of the flat of the deck.


§ 108.221 Storm rails.

Each unit must have a storm rail in the following locations:


(a) On each deckhouse side that is normally accessible.


(b) On each side of each passageway that is wider than 1.83 meters (6 feet).


(c) On at least one side of each passageway that is less than 1.83 meters (6 feet) wide.


§ 108.223 Guards on exposed equipment.

Each unit must have hand covers, guards, or rails installed on all belts, gears, shafts, pulleys, sprockets, spindles, flywheels or other reciprocating, rotating or moving parts of machinery or equipment normally exposed to contact by personnel.


Helicopter Facilities

§ 108.231 Application.

Sections 108.231 through 108.241 apply to each unit with a helicopter landing facility.


§ 108.233 Location and size.

(a) Each helicopter deck must be—


(1) At least the size of the rotor diameter of the largest single main rotor helicopter that will be used on the facility; or


(2) If tandem main rotor helicopters use the facility, at least of a size to provide a longitudinal axis of
9/10 the overall length of the helicopter, and a width of
3/4 of the overall length of the helicopter.



Note:

For the purpose of paragraph (a)(2) the overall length is measured across both main rotors in the fore and aft line.


(b) Each helicopter deck must be located so as to provide clear approach/departure paths to enable the largest helicopter using the facility to operate in all weather conditions which allow helicopter operations.


§ 108.235 Construction.

(a) Each helicopter deck must be designed to accommodate the loadings (static and dynamic) imposed by operation and stowage of helicopters intended to use the facility as well as environmental loadings (wind, wave, water, snow, etc.) anticipated for the unit.


(b) The adequacy of each helicopter deck for the loadings required in paragraph (a) of this section must be shown by design calculations. Where the placement of a load affects the suitability of a structural member, the load must be evaluated in the most unfavorable position for each member.


(c) The analysis required in paragraph (b) of this section must be based on the dead load of the structure, existing stresses in the deck when it is an integral part of a unit’s structure, and each of the following loading conditions:


(1) Uniform distributed loading. A loading of 2kg/m
2 (42 lb/ft
2) applied to the helicopter deck area.


(2) Helicopter landing impact loading. The limit load established by the limit drop test in 14 CFR 29.725, or a load of not less than 75 percent of the helicopter maximum weight taken on a square area of 0.3 × 0.3 m (1 ft. × 1 ft.) under each main landing gear unit applied anywhere on the helicopter deck area.


(3) Stowed helicopter loading. The helicopter maximum weight plus inertial forces from the helicopter due to anticipated unit motions, and applicable environmental loadings including wind loads.


(d) The landing area of each helicopter facility must—


(1) Have a non-skid surface;


(2) Have drainage facilities that prevent the collection of liquids and prevent liquids from spreading to or falling on other parts of the unit;


(3) Have recessed tie-down points; and


(4) Be free of projections, except that landing lights or other projections may be installed around the periphery of the landing deck provided they do not interfere with landing and take-off operations.


(e) The unprotected perimeter of each helicopter facility must have a safety net at least 1.5 meters (4.92 ft.) wide. The outer edge of the net must not extend more than 15 centimeters (6 in.) above the surface of the deck.


(f) Each helicopter facility must have both a main and an emergency access/egress route located as far apart from each other as practicable.


§ 108.237 Fuel storage facilities.

(a) Helicopter fuel storage tanks must be installed as far as practicable from—


(1) The landing area; and


(2) Each source of vapor ignition.


(b) Independent tanks must meet Subpart 58.50 of this Chapter.


(c) Marine portable fuel stowage tanks must meet Part 64 of this chapter.


(d) Each marine portable fuel stowage tank must have a means to contain fuel spills or leaks.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by USCG–1999–6216, 64 FR 53226, Oct. 1, 1999]


§ 108.239 Fuel transfer equipment.

(a) Each nozzle must be a “deadman” type.


(b) Each hose must have a storage reel.


(c) Each hose must have a static grounding device.


(d) Each electric fuel transfer pump must have a control with a fuel transfer pump operation indicator light at the pump.


(e) There must be a fuel pump shut off at each of the access routes required by § 108.235(f).


(f) Each fuel transfer pump and each hose reel must have a means to contain fuel spills or leaks.


(g) Each hose must meet chapter 3 “Aircraft Fueling Hose” of National Fire Protection Association Standard for Aircraft Fuel Servicing (N.F.P.A. No. 407–1975).


§ 108.241 Visual aids.

(a) Each helicopter deck must—


(1) Have a wind direction indicator located in an unobstructed area readily visible to helicopter pilots approaching the deck;


(2) Be fitted around the perimeter with yellow and blue lights in alternate order, not more than 3 meters (10 ft.) apart; and


(3) Be marked with—


(i) The unit’s identification;


(ii) A continuous line 40 centimeters (16 in.) wide on the perimeter; and


(iii) Aiming circles as may be appropriate considering deck configuration, helicopter type, and operational requirements.


(b) All markings must be in a contrasting color to the surface of the deck.


Subpart C—Stability

§ 108.301 Stability.

Each unit must meet the requirements in Subchapter S of this chapter that apply to Mobile Offshore Drilling Units.


[CGD 79–023, 48 FR 51008, Nov. 4, 1983]


Subpart D—Fire Extinguishing Systems

§ 108.401 Fire main system.

Each unit must have a fire main system.


§ 108.403 Fire extinguishing systems: General.

(a) Each of the following on a unit must have an approved fixed gaseous type extinguishing system:


(1) Each paint locker, oil room, and similar space.


(2) Each enclosed space containing internal combustion or gas turbine main propulsion machinery.


(3) Each enclosed space containing internal combustion machinery with an aggregate power of at least 1000 B.H.P.


(4) Each enclosed space containing a fuel oil unit, including purifiers, valves, or manifolds for main propulsion machinery or internal combustion machinery with an aggregate power of at least 1000 B.H.P.


(5) Each enclosed ventilation system for electric motors or generators used for vital services including bilge pumps, fire pumps, or propulsion.


(b) Each space containing an oil fired boiler, the fuel oil unit or valves for the boiler, or manifolds in the line between the fuel settling tanks and the boiler on a unit must have a fixed gas type, foam, or other approved fire extinguishing system.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 95–027, 61 FR 26008, May 23, 1996]


§ 108.403a Fire extinguishing systems: Non-vital services.

Each enclosed ventilating system for electric motors or generators not used for vital services must have an access into the system for firefighting or be protected by a fixed fire protection system.


§ 108.404 Selection of fire detection system.

(a) If a fire detector is in a space, it must provide effective detection of fires most likely to occur in the space.


(b) The fire detection system must be designed to minimize false alarms.


§ 108.405 Fire detection system.

(a) Each fire detection system and each smoke detection system on a unit must—


(1) Be approved by the Commandant in accordance with 46 CFR 161.002; and


(2) Have a visual alarm and an audible alarm in the pilothouse or at a normally manned control station for the system.


(b) Each fire detection system must be divided into zones to limit the area covered by any particular alarm signal.


(c) Each visual alarm must—


(1) Have a chart or diagram next to the alarm that shows the location of the zones in the system and that contains the instructions for operating, and testing the system;


(2) When activated show the zone in the system where fire has been detected; and


(3) Be in a noticeable location in the pilothouse or control station.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, USCG–2012–0196, 81 FR 48266, July 22, 2016]


§ 108.407 Detectors for electric fire detection system.

(a) Each detector in an electric fire detection system must be located where—


(1) No portion of the overhead of a space protected is more than 3 meters (10 feet) from a detector;


(2) Beams and girders extending below the ceiling of the space protected and any other obstructions do not detract from the effectiveness of the detector; and


(3) Damage to the detector is unlikely to occur if it is not protected.


(b) Each detector must be set to activate at not less than 57 °C (135 °F) and at not more than 73 °C (165 °F), except that if a space normally has a high ambient temperature each detector may be set to activate at not less than 80 °C (175 °F) and not more than 107 °C (225 °F).


§ 108.409 Location and spacing of tubing in pneumatic fire detection system.

(a) All tubing in a pneumatic fire detection system must be on the overhead or within 300 millimeters (12 inches) of the overhead on a bulkhead in a location where—


(1) No portion of the overhead is more than 3.6 meters (12 feet) from the nearest point of tubing;


(2) Beams or girders extending below the ceiling or other obstructions do not detract from the effectiveness of the tubing; and


(3) Damage to the tubing, is unlikely to occur if it is not protected.


(b) If tubing in a tubing circuit is installed in an enclosed space, at least 5% of the tubing in the circuit must be exposed in the space, except that at least 7.6 meters (25 feet) of tubing must always be exposed in the space.


(c) A pneumatic fire detection system must be set to activate after approximately a 22 °C. (40 °F.) per minute increase in temperature at the center of the circuit in the system.


§ 108.411 Smoke detection system.

Each smoke accumulator in a smoke detection system must be located on the overhead of the compartment protected by the system in a location—


(a) Where no portion of the overhead of the compartment is more than 12 meters (40 feet) from an accumulator;


(b) That is no closer to the opening of a ventilator than 3 times the diameter or equivalent size of the opening.


(c) Where damage to the accumulator is unlikely to occur if it is not protected.


§ 108.413 Fusible element fire detection system.

(a) A fusible element fire detection system may be installed.


(b) The arrangements for the system must be acceptable to the Commandant.


Fire Main System

§ 108.415 Fire pump: General.

A fire main system must have at least two independently driven fire pumps that can each deliver water at a continuous pitot tube pressure of at least 3.5 kilograms per square centimeter (approximately 50 pounds per square inch) at least two fire hose nozzles that are connected to the highest two fire hydrants on the unit. Alternative designs that meet the pressure requirement of this paragraph will be considered for column stabilized and self elevating units.


§ 108.417 Fire pump components and associated equipment.

(a) Each fire pump in a fire main system must have a relief valve on its discharge side that is set to relieve at 1.75 kilograms per square centimeter (approximately 25 pounds per square inch) in excess of the pump discharge pressure necessary to meet the pressure required in § 108.415 for the pump or 8.6 kilograms per square centimeters (approximately 125 pounds per square inch), whichever is greater. A relief valve may be omitted if the pump operating under shut off condition is not capable of developing the pressure described in § 108.415 plus 1.75 kilograms per square centimeter (25 pounds per square inch).


(b) Each fire pump in a fire main system must have a pressure gauge on its discharge side.


(c) Fire pumps may be used for other purposes. One of the required pumps must be kept available for use on the fire system at all times. If a fire pump is used in a system other than the fire main system, except for branch lines connected to the fire main for deck washing, each pipe connecting the other system must be connected to the pump discharge through a shut off valve at a manifold near the pump. If the fire pump exceeds the pressure in § 108.417(a), the pipe leading from the discharge manifold to other portions of the fire main system must have a reducing station and a pressure gauge in addition to the pressure gauge required by paragraph (b) of this section.


(d) If a fire pump has a reducing station, the relief valve required by paragraph (a) of this section for the pump and the additional pressure gauge required in paragraph (c) of this section must not be located on the discharge side of the reducing station.


(e) An oil line must not be connected to a fire pump.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 95–028, 62 FR 51208, Sept. 30, 1997]


§ 108.419 Fire main capacity.

The diameter of the fire main must be sufficient for the effective distribution of the maximum required discharge from two fire pumps operating simultaneously.


§ 108.421 Location of fire pumps and associated equipment.

Each fire pump required by § 108.415, and the source of power, controls, sea connections for the fire pump, and booster pumps, if installed, must be installed in locations where, if a fire occurs in an enclosed space, all of the fire pumps on the unit are not made inoperative, except that if compliance with this requirement is impracticable, a gas type extinguishing system may be installed to protect at least one of the fire pumps, its source of power, and controls.


§ 108.423 Fire hydrants and associated equipment.

(a) A fire main system must have enough fire hydrants so that each accessible space may be sprayed with at least two spray patterns of water.


(b) In a main machinery space, except a shaft alley with no assigned space for stowage of combustibles, each spray pattern of water must be from one length of fire hose and each must be from a separate outlet. In all other spaces at least one spray pattern of water must be from one length of fire hose.


(c) No outlet on a fire hydrant may point above the horizontal.


(d) Each fire hydrant must have at least one spanner and at least one fire hose rack or reel.


§ 108.425 Fire hoses and associated equipment.

(a) Each length of fire hose in a fire main system must be—


(1) Of 1
1/2 or 2
1/2 inch nominal hose size diameter;


(2) Of 50 foot nominal hose size length; and


(3) Lined commercial fire hose that meets Standard 19 of the Underwriters’ Laboratories, Inc., (1971 edition) or Federal Specification ZZ-H-451f.


(b) Fire station hydrant connections shall be brass, bronze, or other equivalent metal. Couplings shall either:


(1) Use National Standard fire hose coupling threads for the 1
1/2 inch (38 millimeter) and 2
1/2 inch (64 millimeter) hose sizes, i.e., 9 threads per inch for 1
1/2 inch hose, and 7
1/2 threads per inch for 2
1/2 inch hose; or


(2) Be a uniform design for each hose diameter throughout the vessel.


(c) Each nozzle for a firehose in a fire main system must be a combination solid stream and water spray firehose nozzle that is approve under subpart 162.027. Combination solid stream and water spray nozzles previously approved under subpart 162.027 of this chapter may be retained so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(d) A combination solid stream and water spray firehose nozzle previously approved under subpart 162.027 of this chapter, must have a low-velocity water spray applicator also previously approved under subpart 162.027 of this chapter when installed in—


(1) Machinery spaces containing oil fired boilers, internal combustion machinery or oil fuel units; and


(2) Helicopter decks.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 95–027, 61 FR 26008, May 23, 1996; CGD 95–028, 62 FR 51208, Sept. 30, 1997]


§ 108.427 International shore connection.

A fire main system on a unit in international service must have—


(a) At least one international shore connection that meets ASTM F 1121 (incorporated by reference, see § 105.01–3).


(b) A cutoff valve and check valve for each connection; and


(c) Facilities available enabling the connection to be used on either side of the unit.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 88–032, 56 FR 35826, July 29, 1991; USCG–2000–7790, 65 FR 58462, Sept. 29, 2000]


§ 108.429 Fire main system protection.

(a) Each pipe and fire hydrant in a fire main system must be installed to the extent practicable in locations that are not exposed to damage by materials that are moved on or onto the deck.


(b) Each part of the fire main system located on an exposed deck must either be protected against freezing or be fitted with cutout valves and drain valves to shut off and drain the entire exposed system in freezing weather.


Automatic Sprinkling Systems

§ 108.430 General.

Automatic sprinkler systems must comply with Chapter 25 of NFPA 13 (incorporated by reference, see § 108.101).


[USCG–2012–0196, 81 FR 48266, July 22, 2016]


Fixed Carbon Dioxide Fire Extinguishing Systems

§ 108.431 Carbon dioxide systems: General.

(a) Sections 108.431 through 108.457 apply to high pressure carbon dioxide fire extinguishing systems.


(b) Low pressure systems, that is, those in which the carbon dioxide is stored in liquid form at low temperature, must be approved by the Commandant.


(c) Each carbon dioxide system cylinder must be fabricated, tested, and marked in accordance with §§ 147.60 and 147.65 of this chapter.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 84–044, 53 FR 7749, Mar. 10, 1988]


§ 108.433 Quantity of CO2: General.

Each CO2 system must have enough gas to meet the quantity requirements of § 108.439 for the space requiring the greatest amount of CO2.


§ 108.437 Pipe sizes and discharge rates for enclosed ventilation systems for rotating electrical equipment.

(a) The minimum pipe size for the initial charge must meet table 108.441 and the discharge of the required amount of CO2 must be completed within 2 minutes.


(b) The minimum pipe size for the delayed discharge must be at least 1.25 centimeters (
1/2 inch) standard pipe.


(c) The pipe used for the initial discharge must not be used for the delayed discharge, except systems having a volume of less than 57 cubic meters (2,000 cubic feet).


§ 108.439 Quantity of CO2 for protection of spaces.

(a) The number of pounds of CO2 required to protect a space must be equal to the gross volume of the space divided by the appropriate factor from Table 108.439.


(b) If a machinery space includes a casing, the gross volume of the space may be calculated using the reductions allowed in 46 CFR 95.10–5(e).


(c) If fuel can drain from a space to an adjacent space or if two spaces are not entirely separate, the requirements for both spaces must be used to determine the amount of CO2 to be provided and the CO2 system must be arranged to discharge into both spaces simultaneously.


Table 108.439—CO2 Supply Factors

[Gross volume of space in cubic feet]

Over
Not over
Factor
050015
5001,60016
1,6004,50018
4,50050,00020
50,000 22

§ 108.441 Piping and discharge rates for CO2 systems.

(a) The size of branch lines to spaces protected by a CO2 system must meet Table 108.441.


(b) Distribution piping within a space must be proportioned from the supply line to give proper distribution to the outlets without throttling.


(c) The number, type, and location of discharge outlets must distribute the CO2 uniformly throughout the space.


Table 108.441—CO2 System Pipe Size

CO2 supply in system, kilograms (pounds)
Minimum pipe size (inches), millimeters (inches)
45 (100)12.7 (
1/2).
104 (225)19.05 (
3/4).
136 (300)25.4 (1).
272 (600)31.75 (1
1/4).
450 (1,000)38.10 (1
1/2).
1,110 (2,450)50.80 (2).
1,130 (2,500)63.5 (2
1/2).
2,023 (4,450)76.2 (3).
3,229 (7,100)88.9 (3
1/2).
4,750 (10,000)101.6 (4).
6,818 (15,000)114.3 (4
1/2).

(d) The total area of all discharge outlets must be more than 35 percent and less than 85 percent of the nominal cylinder outlet area or the area of the supply pipe, whichever is smaller. The nominal cylinder outlet area in square centimeters is determined by multiplying the factor 0.0313 by the number of kilograms of CO2 required. (The nominal cylinder outlet area in square inches is determined by multiplying the factor 0.0022 by the number of pounds of CO2 required). The nominal cylinder outlet area must not be less than 71 square millimeters (0.110 square inches).


(e) A CO2 system must discharge at least 85 percent of the required amount within 2 minutes.


§ 108.443 Controls and valves.

(a) At least one control for operating a CO2 system must be outside the space or spaces that the system protects and in a location that would be accessible if a fire occurred in any space that the system protects. Control valves must not be located in a protected space unless the CO2 cylinders are also in the protected space.


(b) A CO2 system that protects more than one space must have a manifold with a stop valve, the normal position of which is closed, that directs the flow of CO2 to each protected space.


(c) A CO2 system that protects only one space must have a stop valve installed between the cylinders and the discharge outlets in the system, except on a system that has a CO2 supply of 136 kilograms (300 pounds) or less.


(d) At least one of the control stations in a CO2 system that protects a machinery space must be as near as practicable to one of the main escapes from that space.


(e) All distribution valves and controls must be of an approved type.


(f) Each CO2 system that has a stop valve must have a remote control that operates only the stop valve and must have a separate remote control for releasing the required amount of CO2 into the space protected by the system.


(g) Each CO2 system that does not have a stop valve must be operated by a remote control that releases the required amount of CO2 into the space protected by the system.


(h) Remote controls to each space must be in an enclosure.


(i) Each system must have a manual control at its cylinders for releasing CO2 from the cylinders, except that if the system has pilot cylinders, a manual control is not required for other than pilot cylinders.


(j) If gas pressure is used to release CO2 from a system having more than 2 cylinders, the system must have at least 2 pilot cylinders to release the CO2 from the remaining cylinders.


(k) If the entrance to a space containing the CO2 supply or controls of a CO2 system has a lock, the space must have a key to the lock in a break-glass type box that is next to and visible from the entrance.


§ 108.444 Lockout valves.

(a) A lockout valve must be provided on any carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or altered after July 9, 2013. “Altered” means modified or refurbished beyond the maintenance required by the manufacturer’s design, installation, operation and maintenance manual.


(b) The lockout valve must be a manually operated valve located in the discharge manifold prior to the stop valve or selector valves. When in the closed position, the lockout valve must provide complete isolation of the system from the protected space or spaces, making it impossible for carbon dioxide to discharge in the event of equipment failure during maintenance.


(c) The lockout valve design or locking mechanism must make it obvious whether the valve is open or closed.


(d) A valve is considered a lockout valve if it has a hasp or other means of attachment to which, or through which, a lock can be affixed, or it has a locking mechanism built into it.


(e) The master or person-in-charge must ensure that the valve is locked open at all times, except while maintenance is being performed on the extinguishing system, when the valve must be locked in the closed position.


(f) Lockout valves added to existing systems must be approved by the Commandant as part of the installed system.


[USCG–2006–24797, 77 FR 33882, June 7, 2012]


§ 108.445 Alarm and means of escape.

(a) Each CO2 system that has a supply of more than 136 kilograms (300 pounds) of CO2, except a system that protects a tank, must have an alarm that sounds for at least 20 seconds before the CO2 is released into the space.


(b) Each audible alarm for a CO2 system must have the CO2 supply for the system as its source of power and must be in a visible location in the spaces protected.


§ 108.446 Odorizing units.

Each carbon dioxide extinguishing system installed or altered after July 9, 2013, must have an approved odorizing unit to produce the scent of wintergreen, the detection of which will serve as an indication that carbon dioxide gas is present in a protected area and any other area into which the carbon dioxide may migrate. “Altered” means modified or refurbished beyond the maintenance required by the manufacturer’s design, installation, operation and maintenance manual.


[USCG–2006–24797, 77 FR 33882, June 7, 2012]


§ 108.447 Piping.

(a) Each pipe, valve, and fitting in a CO2 system must have a bursting pressure of at least 420 kilograms per square centimeter (6,000 pounds per square inch).


(b) All piping for a CO2 system of nominal size of 19.05 millimeters (
3/4 inch) inside diameter or less must be at least Schedule 40 (standard weight) and all piping of nominal size over 19.05 millimeters (
3/4 inch) inside diameter must be at least Schedule 80 (extra heavy).


(c) Each pipe, valve, and fitting made of ferrous materials in a CO2 system must be protected inside and outside from corrosion.


(d) Each CO2 system must have a pressure relief valve set to relieve between 168 and 196 kilograms per square centimeter (2,400 and 2,800 pounds per square inch) in the distribution manifold or other location that protects the piping when all branch line shut off valves are closed.


(e) The end of each branch line in a CO2 system must extend at least 50 millimeters (2 inches) beyond the last discharge outlet and be closed with a cap or plug.


(f) Piping, valves, and fittings in a CO2 system must be securely supported and protected from damage.


(g) Each CO2 system must have drains and dirt traps located where dirt or moisture can accumulate in the system.


(h) Discharge piping in a CO2 system may not be used for any other purpose except as part of a fire detection system.


(i) Piping in a CO2 system that passes through accommodation spaces must not have drains or other openings within these spaces.


§ 108.449 Piping tests.

(a) Each test prescribed in (b), (c), and (d) of this section must be performed upon completion of the piping installation.


(b) When tested with CO2 or other inert gas under a pressure of 70 kilograms per square centimeter (1000 pounds per square inch), with no additional gas introduced into the system, the leakage in the piping from the cylinders to the stop valves in the manifold must not allow a pressure drop of more than 10.5 kilograms per square centimeter (150 pounds per square inch) per minute for a 2 minute period.


(c) When tested with CO2 or other inert gas under a pressure of 42 kilograms per square centimeter (600 pounds per square inch), with no additional gas introduced into the system, the leakage in each branch line must not allow a pressure drop of more than 10.5 kilograms per square centimeter (150 pounds per square inch) per minute for a 2-minute period. The distribution piping must be capped within the protected space.


(d) Small independent systems protecting emergency generator rooms, lamp lockers and similar small spaces need not meet the tests prescribed in paragraphs (a) and (b) of this section if they are tested by blowing out the piping with air at a pressure of at least 7 kilograms per square centimeter (100 pounds per square inch).


§ 108.451 CO2 storage.

(a) Except as provided in paragraph (b) of this section, each cylinder of a CO2 system must be outside each space protected by the system and in a location that would be accessible if a fire occurred in any space protected by the system.


(b) A CO2 system that has a CO2 supply of 136 kilograms (300 pounds) or less may have one or more cylinders in the space protected by the system if the space has a heat detection system to activate the system automatically in addition to the remote and manual controls required by this subpart.


(c) Each space that contains cylinders of a CO2 system must be ventilated and designed to prevent an ambient temperature of more than 54 °C. (130 °F.)


(d) Each cylinder in a CO2 system must be securely fastened, supported, protected from damage, in an accessible location, and capable of removal from that location.


(e) Each unit must have a means for weighing cylinders of a CO2 system.


(f) A cylinder in a CO2 system may not be mounted in a position that is inclined more than 30° from a vertical position, except that a cylinder having flexible or bent siphon tubes may be mounted in a position that is inclined up to 80° from the vertical. The bottom of each cylinder when mounted must be at least 5 centimeters (2 inches) from the deck.


(g) If a cylinder does not have a check valve on its independent cylinder discharge, it must have a plug or cap to close the outlet when the cylinder is moved.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 84–044, 53 FR 7749, Mar. 10, 1988]


§ 108.453 Discharge outlets.

Each discharge outlet must be of an approved type.


§ 108.455 Enclosure openings.

(a) Mechanical ventilation for spaces protected by a CO2 system must be designed to shut down automatically when the system is activated.


(b) Each space that is protected by a CO2 system and that has natural ventilation must have a means for closing that ventilation.


(c) Each space protected by a CO2 system must have the following means for closing the openings to the space from outside the space:


(1) Doors, shutters, or dampers for closing each opening in the lower portion of the space.


(2) Doors, shutters, dampers or temporary means such as canvas or other material normally on board a unit may be used for closing each opening in the upper portion of the space.


§ 108.457 Pressure release.

Each air tight or vapor tight space, such as a paint locker, that is protected by a CO2 system must have a means for releasing pressure that accumulates within the space if CO2 is discharged into the space.


Halogenated Gas Extinguishing Systems

§ 108.458 General.

Halogenated gas extinguishing systems may be installed if approved by the Commandant.


Foam Extinguishing Systems

§ 108.459 Number and location of outlets.

(a) A foam extinguishing system in a space must have enough outlets to spread a layer of foam of uniform thickness over the deck or bilge areas of the space.


(b) A foam extinguishing system in a space that has a boiler on a flat that is open to or can drain into a lower portion of the space must have enough outlets to spread a layer of foam of uniform thickness over the—


(1) Flat; and


(2) Deck or bilge areas of the space.


(c) A foam extinguishing system for a tank must have enough outlets to spread a layer of foam of uniform thickness over the surface of the liquid in the tank.


§ 108.461 Coamings.

Each machinery flat in a space that has a foam extinguishing system must have coamings that are high enough to retain spilled oil and foam on the flat on all openings except deck drains.


§ 108.463 Foam rate: Protein.

(a) If the outlets of a protein foam extinguishing system are in a space, the foam rate at each outlet must be at least 6.52 liters per minute for each square meter (.16 gallons per minute for each square foot) of area covered by the systems.


(b) If the outlets of a protein foam extinguishing system are in a tank, the foam rate at each outlet must be at least 4.07 liters per minute for each square meter (.1 gallon per minute for each square foot) of liquid surface in the tank.


§ 108.467 Water supply.

The water supply of a foam extinguishing system must not be the water supply of the fire main system on the unit unless when both systems are operated simultaneously—


(a) The water supply rate to the foam production equipment meets the requirements of this section; and


(b) Water supply rate to the fire hydrants required by § 108.415 of this subpart allows compliance with the pressure requirement in that section.


§ 108.469 Quantity of foam producing materials.

(a) Except as provided in paragraph (b) of this section, each foam extinguishing system with outlets—


(1) In a tank must have enough foam producing material to discharge foam for at least 5 minutes at each outlet; and


(2) In a space must have enough foam producing material to discharge foam for at least 3 minutes at each outlet.


(b) If a foam system has outlets in more than one tank or space, the system need have only enough foam producing material to cover the largest space that the system covers or, if the liquid surface of a tank covered by the system is larger, the tank with the largest liquid surface.


§ 108.471 Water pump.

Each water pump in a foam extinguishing system must be outside each machinery space in which the system has outlets and must not receive power from any of those spaces.


§ 108.473 Foam system components.

(a) Each foam agent, each tank for a foam agent, each discharge outlet, each control, and each valve for the operation of a foam extinguishing system must be approved by the Commandant.


(b) Each foam agent tank and each control and valve for the operation of a foam extinguishing system with outlets in a space must be outside the space and must not be in a space that may become inaccessible if a fire occurs in the space.


(c) Each control for a foam extinguishing system with outlets in a space must be near a main escape from the space.


§ 108.474 Aqueous film forming foam systems.

Aqueous film forming foam systems may be installed if approved by the Commandant.


§ 108.475 Piping.

(a) Each pipe, valve, and fitting in a foam extinguishing system must meet the applicable requirements in Subchapter F of this chapter.


(b) Each pipe, valve, and fitting made of ferrous material must be protected inside and outside from corrosion.


(c) Each pipe, valve, and fitting must have support and protection from damage.


(d) Each foam extinguishing system must have enough—


(1) Dirt traps to prevent the accumulation of dirt in its pipes; and


(2) Drains to remove liquid from the system.


(e) Piping in a foam extinguishing system must be used only for discharging foam.


§ 108.477 Fire hydrants.

(a) If a fixed foam extinguishing system has outlets in a main machinery space, at least 2 fire hydrants, in addition to the fire hydrants required by § 108.423 of this subpart, must be installed outside the entrances to the space with each at a separate entrance.


(b) Each hydrant must have enough hose to spray any part of the space.


(c) Each hydrant must have a combination nozzle and applicator.


Fire Protection for Helicopter Facilities

§ 108.486 Helicopter decks.

At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit’s fire main system located next to them.


§ 108.487 Helicopter deck fueling operations.

(a) Each helicopter landing deck on which fueling operations are conducted must have a fire protection system that discharges protein foam or aqueous film forming foam.


(b) a system that only discharges foam must—


(1) Have enough foam agent to discharge foam continuously for at least 5 minutes at maximum discharge rate;


(2) Have at least the amount of foam agent needed to cover an area equivalent to the swept rotor area of the largest helicopter for which the deck is designed with foam at—


(i) If protein foam is used, 6.52 liters per minute for each square meter (.16 gallons per minute for each square foot) of area covered for five minutes;


(ii) If aqueous film forming foam is used, 4.07 liters per minute for each square meter (.1 gallons per minute for each square foot) of area covered for five minutes; and


(3) Be capable of discharging from each hose at 7 kilograms per square centimeter (100 pounds per square inch) pressure—


(i) A single foam stream at a rate of at least 340 liters (90 gallons) per minute; and


(ii) A foam spray at a rate of at least 190 liters (50 gallons) per minute.


(c) Each system must have operating controls at each of its hose locations, be protected from icing and freezing, and be capable of operation within 10 seconds after activation of its controls.


(d) Each system must have at least one hose at each of the two access routes required by § 108.235(f) of this part. Each hose must be reel mounted and long enough to cover any point on the helicopter deck. Each hose that discharges foam must have a nozzle that has foam stream, foam spray, and off positions.


§ 108.489 Helicopter fueling facilities.

(a) Each helicopter fueling facility must have a fire protection system that discharges one of the following agents in the amounts prescribed for the agents over the area of the fuel containment systems around marine portable tanks, fuel transfer pumps and fuel hose reels:


(1) Protein foam at the rate of 6.52 liters per minute for each square meter (.16 gallons per minute for each square foot) of area covered for five minutes.


(2) Aqueous film forming foam at the rate of 4.07 liters per minute for each square meter (.1 gallon per minute for each square foot) of area covered for five minutes.


(3) 22.5 kilograms (50 pounds) of dry chemical (B-V semi-portable) for each fueling facility of up to 27.87 square meters (300 square feet).


(b) If the fire protection system required by § 108.487 of this subpart is arranged so that it covers both a helicopter fueling facility and a landing deck, the system must have the quantity of agents required by this section in addition to the quantity required by § 108.487.


Hand Portable and Semiportable Fire Extinguishing Systems

§ 108.491 General.

(a) Each portable and semi-portable fire extinguisher on a unit must be approved under subpart 162.028 or 162.039 of this chapter.


(b) Vessels contracted for prior to August 22, 2016 must meet the following requirements:


(1) Previously installed extinguishers with extinguishing capacities smaller than what is required in Table 108.495 of this subpart need not be replaced and may be continued in service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.


(2) All new equipment and installations must meet the applicable requirements in this subpart for new vessels.


[USCG–2012–0196, 81 FR 48266, July 22, 2016]


§ 108.493 Location.

(a) Each unit must have the hand portable and semiportable fire extinguishers prescribed in Table 108.495(a) of this subpart and installed in the locations prescribed in the table.


(b) Each portable and semi-portable fire extinguisher must be visible and readily accessible.


(c) The location, size, and number of each portable and semiportable fire extinguisher on a unit must be acceptable to the appropriate OCMI. The OCMI may require extinguishers in addition to those prescribed in Table 108.495(a) if he considers them necessary for fire protection on the unit.


(d) Each hand portable and semiportable fire extinguisher that has a nameplate which states that it is to be protected from freezing, must be located where freezing temperatures do not occur.


§ 108.495 Locations and number of fire extinguishers required.

Table 108.495 of this section indicates the minimum required number and type of fire extinguishers for each space listed. Extinguishers with larger numerical ratings or multiple letter designations may be used if the extinguishers meet the requirements of the table.


Table 108.495—Carriage of Portable Fire Extinguishers

Space
Minimum required rating
Quantity and location
Safety Areas
Wheelhouse and control room20–B:C2 in the vicinity of the exit.
Stairway and elevator enclosureNone required.
Corridors2–A1 in each corridor not more than 150 ft (45 m) apart. (May be located in stairways.)
Lifeboat embarkation and lowering stationsNone required.
Radio room10–B:C2 in the vicinity of the exit.
Accommodations
Staterooms, toilet spaces, public spaces, offices, lockers, small storerooms, pantries, open decks, and similar spacesNone required.
Service Spaces
Galleys40–B:C1 for each 2,500 sq ft (232.2 sq m) or fraction thereof suitable for the hazards involved.
Paint and lamp rooms40:B1 outside each room in the vicinity of the exit.
Storerooms2–A1 for each 2,500 sq ft (232.2 sq m) or fraction thereof located in the vicinity of the exits, either inside or outside the spaces.
Workshop and similar spaces20B:C1 outside each space in the vicinity of the exit.
Machinery Spaces
Oil-fired boilers: Spaces containing oil-fired boilers, either main or auxiliary, or their fuel oil units40–B2 required in each space.
160–B1 required in each space. See note 1.
Internal combustion or gas turbine propelling machinery spaces40–B1 for each 1,000 brake horsepower but not less than 2 and not more than 6 in each space.
120–B1 required in each space. See note 1.
Motors or generators of electric propelling machinery that do not have an enclosed ventilating system40–B:C1 for each motor or generator.
Motors and generators of electric propelling machinery that have enclosed ventilating systemsNone required.
Auxiliary Spaces
Internal combustion engines or gas turbine40–BOutside the space containing engines or turbines in the vicinity of the exit.
Electric emergency motors or generators40–B:C1 outside the space containing motors or generators in the vicinity of the exit.
Steam driven auxiliary machineryNone required.
Trunks to machinery spacesNone required.
Fuel tanksNone required.
Miscellaneous Areas
Helicopter landing decks160–B1 at each access route.
Helicopter fueling facilities160–B1 at each fuel transfer facility. See note 2.
Drill floor40–B:C2 required.
Cranes with internal combustion engines40–B:C1 required.
Spare Units
2–A10 percent of the total required rounded up.
40–B:C10 percent of the total required rounded up.


1 Not required where a fixed gas extinguishing system is installed.


2 Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart.


[USCG–2012–0196, 81 FR 48266, July 22, 2016]


§ 108.496 Semi-portable fire extinguishers.

(a) The frame or support of each semi-portable

fire extinguisher required by Table 108.495(a), except a wheeled semi-portable extinguisher provided for a helicopter landing deck, must be welded or otherwise permanently attached to a bulkhead or deck.


(b) If the following semi-portable fire extinguishers have wheels, they must be securely stowed when not in use to prevent them from rolling out of control under heavy sea conditions:


(1) Each extinguisher required for a helicopter landing deck.


(2) Each extinguisher that is not required by Table 108.495(a).


(c) Semi-portable extinguishers must be fitted with suitable hoses and nozzles, or other practicable means, so that all areas of the space can be protected.


[CGD 77–039, 44 FR 34133, June 14, 1979, as amended by USCG–2012–0196, 81 FR 48267, July 22, 2016]


Miscellaneous Firefighting Equipment

§ 108.497 Fireman’s outfits.

Each unit must have at least 2 fireman’s outfits. Each fireman’s outfit on a unit must consist of—


(a) A pressure-demand, open-circuit, self-contained breathing apparatus, approved by the Mine Safety and Health Administration (MSHA) and by the National Institute for Occupational Safety and Health (NIOSH) and having at a minimum a 30-minute air supply, a full facepiece, and a spare charge; but a self-contained compressed-air breathing apparatus previously approved by MSHA and NIOSH under part 160, subpart 160.011, of this chapter may continue in use as required equipment if it was part of the vessel’s equipment on November 23, 1992, and as long as it is maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection;


(b) A Type II or Type III flashlight constructed and marked in accordance with ASTM F 1014 (incorporated by reference, see § 108.101).


(c) An oxygen and explosive meter with the Underwriter’s Laboratories, Inc. label or the Factory Mutual label;


(d) A lifeline that—


(1) Is attached to a belt or a suitable harness;


(2) Is made of bronze wire rope, inherently corrosion resistant steel wire rope, or galvanized or tinned steel wire rope;


(3) Is made up of enough 15.2 meters (50 foot) or greater lengths of wire rope to permit use of the outfit in any location on the unit;


(4) Has each end fitted with a hook with a 16 millimeters (
5/8 inch) throat opening for the keeper; and


(5) Has a minimum breaking strength of 680 kilograms (1,500 pounds).


(e) Boots and gloves that are made of rubber or other electrically non-conductive material;


(f) A helmet that meets the requirements in ANSI standard Z–89.1–1969; and


(g) Clothing that protects the skin from scalding steam and the heat of fire and that has a water resistant outer surface.


[CGD 73–251, 43 FR 56808, Dec. 4, 1978, as amended by CGD 82–042, 53 FR 17705, May 18, 1988; CGD 86–036, 57 FR 48326, Oct. 23, 1992; USCG–1999–5151, 64 FR 67182, Dec. 1, 1999]


§ 108.499 Fire axes.

Each unit must have at least two fire axes.


Subpart E—Lifesaving Equipment


Source:CGD 84–069, 61 FR 25291, May 20, 1996, unless otherwise noted.

§ 108.500 General.

(a) Each unit, other than a drillship, must meet the requirements in this subpart.


(b) Each drillship must meet the lifesaving system requirements in subchapter W of this chapter for a tank vessel certificated to carry cargoes that have a flash point less than 60 °C as determined under ASTM D 93 (incorporated by reference, see § 108.101).


(c) The OCMI may require a unit to carry specialized or additional lifesaving equipment other than as required by this part, if the OCMI determines the conditions of the unit’s service present uniquely hazardous circumstances which are not adequately addressed by existing requirements.


[CGD 84–069, 61 FR 25291, May 20, 1996, as amended at 63 FR 52814, Oct. 1, 1998; USCG–1999–5151, 64 FR 67182, Dec. 1, 1999]


§ 108.503 Relationship to international standards.

For the purposes of this part, any unit carrying a valid IMO MODU Safety Certificate, including a listing of lifesaving equipment as required by the 1989 IMO MODU Code, is considered to have met the requirements of this subpart if, in addition to the requirements of the 1989 IMO MODU Code, it meets the following requirements:


(a) Each new lifeboat and launching appliance may be of aluminum construction only if its stowage location is protected with a water spray system in accordance with § 108.550(d) of this chapter.


(b) Each lifejacket, immersion suit, and emergency position indicating radiobeacon (EPIRB) must be marked with the unit’s name in accordance with §§ 108.649 and 108.650.


(c) Inflatable lifejackets, if carried, must be of the same or similar design as required by § 108.580(b).


(d) Containers for lifejackets, immersions suits, and anti-exposure suits must be marked as specified in § 108.649(g).


(e) Each liferaft must be arranged to permit it to drop into the water from the deck on which it is stowed as required in § 108.530(c)(3).


(f) Survival craft must be arranged to allow safe disembarkation onto the unit after a drill in accordance with § 108.540(f).


(g) The requirements for guarding of falls in §§ 108.553 (d) and (f) must be met.


(h) The winch drum requirements described in § 108.553(e) must be met for all survival craft winches, not just multiple drum winches.


(i) The maximum lowering speed requirements from §§ 108.553 (h) and (i) must be met.


(j) An auxiliary line must be kept with each line-throwing appliance in accordance with § 108.597(c)(2).


(k) Immersion suits are required on all units, except those operating between the 32 degrees north and 32 degrees south latitude in accordance with § 108.580(c).


(l) All abandonment drills conducted on units carrying immersion suits must include immersion suits.


§ 108.510 Application.

(a) For the purposes of this subpart—


(1) Similar stage of construction means the stage at which—


(i) Construction identifiable with a specific unit begins; and


(ii) Assembly of that unit comprising at least 50 metric tons (55.1 U.S. tons) or 1 percent of the estimated mass of all structural material, whichever is less, has been achieved.


(2) Unit constructed means a unit, the keel of which is laid or which is at a similar stage of construction.


(b) Subject to § 108.515, each unit constructed before October 1, 1996, must meet the requirements of this subpart, except for the number, type, and arrangement of lifeboats (including survival capsules), lifeboat davits, winches, inflatable liferafts, liferaft launching equipment, and rescue boats.


(c)(1) If a District Commander determines that the overall safety of the persons on board a unit will not be significantly reduced, the District Commander may grant an exemption from compliance with a provision of this part to a specific unit for a specified geographic area within the boundaries of the Coast Guard District. This exemption may be limited to certain periods of the year.


(2) Requests for exemption under this paragraph must be in writing to the OCMI for transmission to the District Commander in the area in which the unit is in service or will be in service.


(3) If the exemption is granted by the District Commander, the OCMI will endorse the unit’s Certificate of Inspection with a statement describing the exemption.


§ 108.515 Requirements for units built before October 1, 1996.

(a) Units which were constructed prior to October 1, 1996, must—


(1) By October 1, 1997, have either—


(i) Lifeboats and liferafts that meet § 108.525; or


(ii) Totally enclosed fire-protected lifeboats of sufficient capacity to accommodate 100 percent of the persons permitted on board, plus additional totally enclosed lifeboats or davit-launched liferafts of sufficient capacity to accommodate 100 percent of the persons permitted on board the unit. The following exceptions apply:


(A) An open lifeboat may be used instead of davit-launched liferafts as long as it is in good working order. An open lifeboat requiring extensive repairs must be replaced with either a totally enclosed fire-protected lifeboat, or davit-launched liferafts.


(B) A submersible unit constructed before January 3, 1979, may continue to use the lifesaving arrangements described on the units Certificate of Inspection in effect on October 1, 1996.


(2) By October 1, 1997, fit retro-reflective material on all floating appliances, lifejackets, and immersion suits.


(3) Except for the requirements in paragraphs (a)(1) and (a)(2) of this section, units may retain the arrangement of lifesaving appliances previously required and approved for the unit, as long as the arrangement or appliance is maintained in good condition to the satisfaction of the OCMI.


(b) When any lifesaving appliance or arrangement on a unit subject to this part is replaced, or when the unit undergoes repairs, alterations or modifications of a major character involving replacement of, or any addition to, the existing lifesaving appliances or arrangements, each new lifesaving appliance and arrangement must meet the requirements of this part, unless the OCMI determines that the unit cannot accommodate the new appliance or arrangement, except that—


(1) A survival craft is not required to meet the requirements of this part if it is replaced without replacing its davit and winch; and


(2) A davit and its winch are not required to meet the requirements of this part if one or both are replaced without replacing the survival craft.


§ 108.520 Type of survival craft.

(a) Each lifeboat must be a fire-protected lifeboat approved under approval series 160.035. A lifeboat of aluminum construction in the hull or canopy must be protected in its stowage position by a water spray system meeting the requirements of part 34, subpart 34.25 of this chapter.


(b) Each inflatable liferaft must be approved under approval series 160.151. Each rigid liferaft must be approved under approval series 160.118. Each liferaft must have a capacity of six persons or more.


[CGD 84–069, 61 FR 25291, May 20, 1996, as amended by USCG–2006–25697, 71 FR 55746, Sept. 25, 2006]


§ 108.525 Survival craft number and arrangement.

(a) Each unit must carry the following:


(1) Lifeboats installed in at least two widely separated locations on different sides or ends of the unit. The arrangement of the lifeboats must provide sufficient capacity to accommodate the total number of persons permitted on board if—


(i) All the lifeboats in any one location are lost or rendered unusable; or


(ii) All the lifeboats on any one side or end of the unit are lost or rendered unusable.


(2) Liferafts arranged for float-free launching and having an aggregate capacity that will accommodate the total number of persons permitted on board.


(b) In the case of a self-elevating unit where, due to its size or configuration, lifeboats can not be located in the widely separated locations required under paragraph (a)(1) of this section, the OCMI may accept the following number and arrangement of survival craft:


(1) Lifeboats with an aggregate capacity to accommodate the total number of persons permitted on board.


(2) Liferafts served by launching appliances or marine evacuation systems of an aggregate capacity to accommodate the total number of persons permitted on board. These liferafts may be the float-free liferafts under paragraph (a)(2) of this section, or liferafts in addition to the float-free liferafts.


§ 108.530 Stowage of survival craft.

(a) General. Each survival craft required to be served by a launching appliance or marine evacuation system must be stowed as follows:


(1) Each survival craft must be stowed as close to the accommodation and service spaces as possible.


(2) Each survival craft must be stowed in a way that neither the survival craft nor its stowage arrangements will interfere with the embarkation and operation of any other survival craft or rescue boat at any other launching station.


(3) Each survival craft must be stowed as near the water surface as is safe and practicable.


(4) Each survival craft must be stowed where the survival craft, in the embarkation position, is above the waterline with the unit—


(i) In the fully loaded condition; and


(ii) Listed up to 20 degrees either way, or to the angle where the unit’s weatherdeck edge becomes submerged, whichever is less.


(5) Each survival craft must be sufficiently ready for use so that two crew members can complete preparations for embarkation and launching in less than 5 minutes.


(6) Each survival craft must be fully equipped as required under this subpart.


(7) Each survival craft must be in a secure and sheltered position and protected from damage by fire and explosion, as far as practicable.


(8) Each survival craft must not require lifting from its stowed position in order to launch, except that a davit-launched liferaft may be lifted by a manually powered winch from its stowed position to its embarkation position.


(b) Additional lifeboat-specific stowage requirements. In addition to meeting the requirements of paragraph (a) of this section, each lifeboat must be stowed as follows:


(1) The unit must be arranged so each lifeboat, in its stowed position, is protected from damage by heavy seas.


(2) Each lifeboat must be stowed attached to its launching appliance.


(3) Each lifeboat must be provided a means for recharging the lifeboat batteries from the unit’s power supply at a supply voltage not exceeding 50 volts.


(c) Additional liferaft-specific stowage requirements. In addition to meeting the requirements of paragraph (a) of this section, each liferaft must be stowed as follows:


(1) Each liferaft must be stowed to permit manual release from its securing arrangements.


(2) Each liferaft must be stowed at a height above the waterline in the lightest seagoing condition, not greater than the maximum stowage height indicated on the liferaft. Each liferaft without an indicated maximum stowage height must be stowed not more than 18 meters (59 feet) above the waterline in the unit’s lightest seagoing condition.


(3) Each liferaft must be arranged to permit it to drop into the water from the deck on which it is stowed. A liferaft stowage arrangement meets this requirement if it—


(i) Is outboard of the rail or bulwark;


(ii) Is on stanchions or on a platform adjacent to the rail or bulwark; or


(iii) Has a gate or other suitable opening to allow the liferaft to be pushed directly overboard.


(4) Each davit-launched liferaft must be stowed within reach of its lifting hook, unless some means of transfer is provided that is not rendered inoperable—


(i) Within the list limits specified in paragraph (a)(4)(ii) of this section;


(ii) By unit motion; or


(iii) By power failure.


(5) Each rigid container for an inflatable liferaft to be launched by a launching appliance must be secured in a way that the container or parts of it are prevented from falling into the water during and after inflation and launching of the contained liferaft.


(6) Each liferaft must have a painter system providing a connection between the unit and the liferaft.


(7) Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts when released and inflated, are not dragged under by the sinking unit. A hydrostatic release unit used in a float-free arrangement must be approved under approval series 160.162.


§ 108.540 Survival craft muster and embarkation arrangements.

(a) Each muster station must have sufficient space to accommodate all persons assigned to muster at that station. One or more muster stations must be close to each embarkation station.


(b) Each muster station and embarkation station must be readily accessible from accommodation and work areas.


(c) Each lifeboat must be arranged to be boarded and launched directly from the stowed position.


(d) Each lifeboat must be arranged to be boarded by its full complement of persons within 3 minutes from the time the instruction to board is given.


(e) Each davit-launched and free-fall survival craft muster station and embarkation station for a survival craft which is boarded before it is launched must be arranged to enable stretcher cases to be placed in the survival craft.


(f) Means must be provided for bringing each davit-launched survival craft against the side of the unit and holding it alongside to allow persons to be—


(1) Safely embarked in the case of a survival craft intended to be boarded over the edge of the deck; and


(2) Safely disembarked after a drill in the case of a survival craft not intended to be moved to the stowed position with a full complement of persons on board.


(g) Each davit-launched liferaft launching arrangement must have a means to hold the liferaft in the embarkation position that—


(1) Will hold the liferaft securely in high winds;


(2) Can be rapidly engaged in the proper position for boarding; and


(3) Can be rapidly released for launching by one person from within the loaded liferaft.


(h) Each launching station or each two adjacent launching stations must have an embarkation ladder as follows:


(1) Each embarkation ladder must be approved under approval series 160.117 or be a rope ladder approved under approval series 160.017, and must be installed in a way that—


(i) Each embarkation ladder must extend in a single length, from the deck to the waterline in the lightest seagoing condition with the unit listed not less than up to 15 degrees either way; or


(ii) Each embarkation ladder may be replaced by a device approved to provide safe and rapid access to survival craft in the water, if the OCMI permits the device, provided that there is at least one embarkation ladder on each side of the unit.


(2) An embarkation ladder is not required if—


(i) The distance from the embarkation deck to the unit’s lightest operating waterline is less than 3 meters (10 feet); and


(ii) The unit is not in international service.


(3) If the embarkation ladders cannot be supported against a vertical flat surface, the unit must instead be provided with at least two widely-separated fixed metal ladders or stairways extending from the deck to the surface of the water and meet the following:


(i) Each inclined fixed ladder must meet the requirements under § 108.159.


(ii) Each vertical fixed ladder must meet the requirements under § 108.160 for fixed ladders, except that the vertical bars in cages must be open at least 500 millimeters (20 inches) on one side throughout the length of the ladder, and cages are not required in the area subject to wave action or on ladders inside the legs of a self-elevating unit.


(iii) If a fixed ladder cannot be installed, the OCMI may accept an alternate means of embarkation with sufficient capacity for all persons permitted on board to safely descend to the waterline.


(4) Alternate means of embarkation under paragraphs (h)(1)(ii) and (h)(3) of this section, such as portable slides, safety booms, moveable ladders, elevators, and controlled descent devices, must be acceptable to the OCMI. An alternate means of embarkation must have sufficient capacity to permit persons to safely descend to the waterline at a rate comparable to the device which the alternate means of embarkation replaces.


[CGD 84–069, 61 FR 25291, May 20, 1996, as amended at 63 FR 52814, Oct. 1, 1998]


§ 108.545 Marine evacuation system launching arrangements.

(a) Arrangements. Each marine evacuation system must have the following arrangements:


(1) Each marine evacuation system must be capable of being deployed by one person.