Title 30—Mineral Resources–Volume 2
CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR
SUBCHAPTER A—MINERALS REVENUE MANAGEMENT
PARTS 200-202 [RESERVED]
PART 203—RELIEF OR REDUCTION IN ROYALTY RATES
Subpart A—General Provisions
§ 203.0 What definitions apply to this part?
Authorized field means a field:
(1) Located in a water depth of at least 200 meters and in the Gulf of Mexico (GOM) west of 87 degrees, 30 minutes West longitude;
(2) That includes one or more pre-Act leases; and
(3) From which no current pre-Act lease produced, other than test production, before November 28, 1995.
Certified unsuccessful well means an original well or a sidetrack with a sidetrack measured depth (i.e., length) of at least 10,000 feet, on your lease that:
(1) You begin drilling on or after March 26, 2003, and before May 3, 2009, on a lease that is located in water partly or entirely less than 200 meters deep and that is not a non-converted lease, or on or after May 18, 2007, and before May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep;
(2) You begin drilling before your lease produces gas or oil from a well with a perforated interval the top of which is at least 18,000 feet true vertical depth subsea (TVD SS), (i.e., below the datum at mean sea level);
(3) You drill to at least 18,000 feet TVD SS with a target reservoir on your lease, identified from seismic and related data, deeper than that depth;
(4) Fails to meet the producibility requirements of 30 CFR part 550, subpart A, and does not produce gas or oil, or meets those producibility requirements and Bureau of Ocean Energy Management (BOEM) agrees it is not commercially producible; and
(5) For which you have provided the notices and information required under § 203.47.
Complete application means an original and two copies of the six reports consisting of the data specified in §§ 203.81, 203.83, and 203.85 through 203.89, along with one set of digital information, which Bureau of Safety and Environmental Enforcement (BSEE) has reviewed and found complete.
Deep well means either an original well or a sidetrack with a perforated interval the top of which is at least 15,000 feet TVD SS and less than 20,000 feet TVD SS. A deep well subsequently re-perforated at less than 15,000 feet TVD SS in the same reservoir is still a deep well.
Determination means the binding decision by BSEE on whether your field qualifies for relief or how large a royalty-suspension volume must be to make the field economically viable.
Development project means a project to develop one or more oil or gas reservoirs located on one or more contiguous leases that have had no production (other than test production) before the current application for royalty relief and are either:
(1) Located in a planning area offshore Alaska; or
(2) Located in the GOM in a water depth of at least 200 meters and wholly west of 87 degrees, 30 minutes West longitude, and were issued in a sale held after November 28, 2000.
Draft application means the preliminary set of information and assumptions you submit to seek a nonbinding assessment on whether a field could be expected to qualify for royalty relief.
Eligible lease means a lease that:
(1) Is issued as part of an OCS lease sale held after November 28, 1995, and before November 28, 2000;
(2) Is located in the Gulf of Mexico in water depths of 200 meters or deeper;
(3) Lies wholly west of 87 degrees, 30 minutes West longitude; and
(4) Is offered subject to a royalty suspension volume.
Expansion project means a project that meets the following requirements:
(1) You must propose the project in a (BOEM) Development and Production Plan, a BOEM Development Operations Coordination Document (DOCD), or a BOEM Supplement to a DOCD, approved by the Secretary of the Interior after November 28, 1995.
(2) The project must be located on either:
(i) A pre-Act lease in the GOM, or a lease in the GOM issued in a sale held after November 28, 2000, located wholly west of 87 degrees, 30 minutes West longitude; or
(ii) A lease in a planning area offshore Alaska.
(3) On a pre-Act lease in the GOM, the project:
(i) Must significantly increase the ultimate recovery of resources from one or more reservoirs that have not previously produced (extending recovery from reservoirs already in production does not constitute a significant increase); and
(ii) Must involve a substantial capital investment (e.g., fixed-leg platform, subsea template and manifold, tension-leg platform, multiple well project, etc.).
(4) For a lease issued in a planning area offshore Alaska, or in the GOM after November 28, 2000, the project must involve a new well drilled into a reservoir that has not previously produced.
(5) On a lease in the GOM, the project must not include a reservoir the production from which an RSV under §§ 203.30 through 203.36 or §§ 203.40 through 203.48 would be applied.
Fabrication (or start of construction) means evidence of an irreversible commitment to a concept and scale of development. Evidence includes copies of a binding contract between you (as applicant) and a fabrication yard, a letter from a fabricator certifying that continuous construction has begun, and a receipt for the customary down payment.
Field means an area consisting of a single reservoir or multiple reservoirs all grouped on, or related to, the same general geological structural feature or stratigraphic trapping condition. Two or more reservoirs may be in a field, separated vertically by intervening impervious strata or laterally by local geologic barriers, or both.
Lease means a lease or unit.
New production means any production from a current pre-Act lease from which no royalties are due on production, other than test production, before November 28, 1995. Also, it means any additional production resulting from new lease-development activities on a lease issued in a sale after November 28, 2000, or a current pre-Act lease under a BOEM DOCD or a BOEM Supplement approved by the Secretary of the Interior after November 28, 1995.
Nonbinding assessment means an opinion by BSEE of whether your field could qualify for royalty relief. It is based on your draft application and does not entitle the field to relief.
Non-converted lease means a lease located partly or entirely in water less than 200 meters deep issued in a lease sale held after January 1, 2001, and before January 1, 2004, whose original lease terms provided for an RSV for deep gas production and the lessee has not exercised the option under § 203.49 to replace the lease terms for royalty relief with those in § 203.0 and §§ 203.40 through 203.48.
Original well means a well that is drilled without utilizing an existing wellbore. An original well includes all sidetracks drilled from the original wellbore either before the drilling rig moves off the well location or after a temporary rig move that BSEE agrees was forced by a weather or safety threat and drilling resumes within 1 year. A bypass from an original well (e.g., drilling around material blocking the hole or to straighten crooked holes) is part of the original well.
Participating area means that part of the unit area that BSEE determines is reasonably proven by drilling and completion of producible wells, geological and geophysical information, and engineering data to be capable of producing hydrocarbons in paying quantities.
Performance conditions mean minimum conditions you must meet, after we have granted relief and before production begins, to remain qualified for that relief. If you do not meet each one of these performance conditions, we consider it a change in material fact significant enough to invalidate our original evaluation and approval.
Phase 1 ultra-deep well means an ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep for which drilling began before May 18, 2007, and that begins production before May 3, 2009, or that meets the requirements to be a certified unsuccessful well.
Phase 2 ultra-deep well means an ultra-deep well for which drilling began on or after May 18, 2007; and that either meets the requirements to be a certified unsuccessful well or that begins production:
(1) Before the date which is 5 years after the lease issuance date on a non-converted lease; or
(2) Before May 3, 2009, on all other leases located in water partly or entirely less than 200 meters deep; or
(3) Before May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.
Phase 3 ultra-deep well means an ultra-deep well for which drilling began on or after May 18, 2007, and that begins production:
(1) On or after the date which is 5 years after the lease issuance date on a non-converted lease; or
(2) On or after May 3, 2009, on all other leases located in water partly or entirely less than 200 meters deep; or
(3) On or after May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.
Pre-Act lease means a lease that:
(1) Results from a sale held before November 28, 1995;
(2) Is located in the GOM in water depths of 200 meters or deeper; and
(3) Lies wholly west of 87 degrees, 30 minutes West longitude.
Production means all oil, gas, and other relevant products you save, remove, or sell from a tract or those quantities allocated to your tract under a unitization formula, as measured for the purposes of determining the amount of royalty payable to the United States.
Project means any activity that requires at least a permit to drill.
Qualified deep well means:
(1) On a lease that is located in water partly or entirely less than 200 meters deep that is not a non-converted lease, a deep well for which drilling began on or after March 26, 2003, that produces natural gas (other than test production), including gas associated with oil production, before May 3, 2009, and for which you have met the requirements prescribed in § 203.44;
(2) On a non-converted lease, a deep well that produces natural gas (other than test production) before the date which is 5 years after the lease issuance date from a reservoir that has not produced from a deep well on any lease; or
(3) On a lease that is located in water entirely more than 200 meters but entirely less than 400 meters deep, a deep well for which drilling began on or after May 18, 2007, that produces natural gas (other than test production), including gas associated with oil production before May 3, 2013, and for which you have met the requirements prescribed in § 203.44.
Qualified ultra-deep well means:
(1) On a lease that is located in water partly or entirely less than 200 meters deep that is not a non-converted lease, an ultra-deep well for which drilling began on or after March 26, 2003, that produces natural gas (other than test production), including gas associated with oil production, and for which you have met the requirements prescribed in § 203.35 or § 203.44, as applicable; or
(2) On a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep, or on a non-converted lease, an ultra-deep well for which drilling began on or after May 18, 2007, that produces natural gas (other than test production), including gas associated with oil production, and for which you have met the requirements prescribed in § 203.35.
Qualified well means either a qualified deep well or a qualified ultra-deep well.
Redetermination means our reconsideration of our determination on royalty relief because you request it after:
(1) We have rejected your application;
(2) We have granted relief but you want a larger suspension volume;
(3) We withdraw approval; or
(4) You renounce royalty relief.
Renounce means action you take to give up relief after we have granted it and before you start production.
Reservoir means an underground accumulation of oil or natural gas, or both, characterized by a single pressure system and segregated from other such accumulations.
Royalty suspension (RS) lease means a lease that:
(1) Is issued as part of an OCS lease sale held after November 28, 2000;
(2) Is in locations or planning areas specified in a particular Notice of OCS Lease Sale offering that lease; and
(3) Is offered subject to a royalty suspension specified in a Notice of OCS Lease Sale published in the
Royalty suspension supplement (RSS) means a royalty suspension volume resulting from drilling a certified unsuccessful well that is applied to future natural gas and oil production generated at any drilling depth on, or allocated under a BSEE-approved unit agreement to, the same lease.
Royalty suspension volume (RSV) means a volume of production from a lease that is not subject to royalty under the provisions of this part.
Sidetrack means, for the purpose of this subpart, a well resulting from drilling an additional hole to a new objective bottom-hole location by leaving a previously drilled hole. A sidetrack also includes drilling a well from a platform slot reclaimed from a previously drilled well or re-entering and deepening a previously drilled well. A bypass from a sidetrack (e.g., drilling around material blocking the hole, or to straighten crooked holes) is part of the sidetrack.
Sidetrack measured depth means the actual distance or length in feet a sidetrack is drilled beginning where it exits a previously drilled hole to the bottom hole of the sidetrack, that is, to its total depth.
Sunk costs for an authorized field means the after-tax eligible costs that you (not third parties) incur for exploration, development, and production from the spud date of the first discovery on the field to the date we receive your complete application for royalty relief. The discovery well must be qualified as producible under 30 CFR part 550, subpart A. Sunk costs include the rig mobilization and material costs for the discovery well that you incurred before its spud date.
Sunk costs for an expansion or development project means the after-tax eligible costs that you (not third parties) incur for only the first well that encounters hydrocarbons in the reservoir(s) included in the application and that meets the producibility requirements under 30 CFR part 550, subpart A on each lease participating in the application. Sunk costs include rig mobilization and material costs for the discovery wells that you incurred before their spud dates.
Ultra-deep well means either an original well or a sidetrack completed with a perforated interval the top of which is at least 20,000 feet TVD SS. An ultra-deep well subsequently re-perforated less than 20,000 feet TVD SS in the same reservoir is still an ultra-deep well.
Withdraw means action we take on a field that has qualified for relief if you have not met one or more of the performance conditions.
The Outer Continental Shelf (OCS) Lands Act, 43 U.S.C. 1337, as amended by the OCS Deep Water Royalty Relief Act (DWRRA), Public Law 104-58 and the Energy Policy Act of 2005, Public Law 109-058 authorizes us to grant royalty relief in four situations.
(a) Under 43 U.S.C. 1337(a)(3)(A), we may reduce or eliminate any royalty or a net profit share specified for an OCS lease to promote increased production.
(b) Under 43 U.S.C. 1337(a)(3)(B), we may reduce, modify, or eliminate any royalty or net profit share to promote development, increase production, or encourage production of marginal resources on certain leases or categories of leases. This authority is restricted to leases in the GOM that are west of 87 degrees, 30 minutes West longitude, and in the planning areas offshore Alaska.
(c) Under 43 U.S.C. 1337(a)(3)(C), we may suspend royalties for designated volumes of new production from any lease if:
(1) Your lease is in deep water (water at least 200 meters deep);
(2) Your lease is in designated areas of the GOM (west of 87 degrees, 30 minutes West longitude);
(3) Your lease was acquired in a lease sale held before the DWRRA (before November 28, 1995);
(4) We find that your new production would not be economic without royalty relief; and
(5) Your lease is on a field that did not produce before enactment of the DWRRA, or if you propose a project to significantly expand production under a Development Operations Coordination Document (DOCD) or a supplementary DOCD, that the Bureau of Ocean Energy Management (BOEM) approved after November 28, 1995.
(d) Under 42 U.S.C. 15904-15905, we may suspend royalties for designated volumes of gas production from deep and ultra-deep wells on a lease if:
(1) Your lease is in shallow water (water less than 400 meters deep) and you produce from an ultra-deep well (top of the perforated interval is at least 20,000 feet TVD SS) or your lease is in waters entirely more than 200 meters and entirely less than 400 meters deep and you produce from a deep well (top of the perforated interval is at least 15,000 feet TVD SS);
(2) Your lease is in the designated area of the GOM (wholly west of 87 degrees, 30 minutes west longitude); and
(3) Your lease is not eligible for deep water royalty relief.
§ 203.2 How can I obtain royalty relief?
We may reduce or suspend royalties for Outer Continental Shelf (OCS) leases or projects that meet the criteria in the following table.
If you have a lease . . . | And if you . . . | Then we may grant you . . . |
---|---|---|
(a) With earnings that cannot sustain production ( | Would abandon otherwise potentially recoverable resources but seek to increase production by operating beyond the point at which the lease is economic under the existing royalty rate, | A reduced royalty rate on current monthly production and a higher royalty rate on additional monthly production (see §§ 203.50 through 203.56). |
(b) Located in a designated GOM deep water area ( | Propose an expansion project and can demonstrate your project is uneconomic without royalty relief, | A royalty suspension for a minimum production volume plus any additional production large enough to make the project economic (see §§ 203.60 through 203.79). |
(c) Located in a designated GOM deep water area and acquired in a lease sale held before November 28, 1995 | Are on a field from which no current pre-Act lease produced (other than test production) before November 28, 1995, | A royalty suspension for a minimum production volume plus any additional volume needed to make the field economic (see §§ 203.60 through 203.79). |
(d) Located in a designated GOM deep water area and acquired in a lease sale held after November 28, 2000, | Propose a development project and can demonstrate that the suspension volume, if any, for your lease is not enough to make development economic, | A royalty suspension for a minimum production volume plus any additional volume needed to make your project economic (see §§ 203.60 through 203.79). |
(e) Where royalty relief would recover significant additional resources or, offshore Alaska or in certain areas of the GOM, would enable development, | Are not eligible to apply for end-of-life or deep water royalty relief, but show us you meet certain eligibility conditions, | A royalty modification in size, duration, or form that makes your lease or project economic (see § 203.80). |
(f) Located in a designated GOM shallow water area and acquired in a lease sale held before January 1, 2001, or after January 1, 2004, or have exercised an option to substitute for royalty relief in your lease terms, | Drill a deep well on a lease that is not eligible for deep water royalty relief and you have not previously produced oil or gas from a deep well or an ultra-deep well, | A royalty suspension for a volume of gas produced from successful deep and ultra-deep wells, or, for certain unsuccessful deep and ultra-deep wells, a smaller royalty suspension for a volume of gas or oil produced by all wells on your lease (see §§ 203.40 through 203.49). |
(g) Located in a designated GOM shallow water area, | Drill and produce gas from an ultra-deep well on a lease that is not eligible for deep water royalty relief and you have not previously produced oil or gas from an ultra-deep well, | A royalty suspension for a volume of gas produced from successful ultra-deep and deep wells on your lease (see §§ 203.30 through 203.36). |
(h) Located in planning areas offshore Alaska, | Propose an expansion project or propose a development project and can demonstrate that the project is uneconomic without relief or that the suspension volume, if any, for your lease is not enough to make development economic, | A royalty suspension for a minimum production volume plus any additional volume needed to make your project economic (see §§ 203.60, 203.62, 203.67 through 203.70, 203.73, and 203.76 through 203.79). |
§ 203.3 Do I have to pay a fee to request royalty relief?
When you submit an application or ask for a preview assessment, you must include a fee to reimburse us for our costs of processing your application or assessment. Federal policy and law require us to recover the cost of services that confer special benefits to identifiable non-Federal recipients. The Independent Offices Appropriation Act (31 U.S.C. 9701), Office of Management and Budget Circular A-25, and the Omnibus Appropriations Bill (Pub. L. 104-134, 110 Stat. 1321, April 26, 1996) authorize us to collect these fees.
(a) We will specify the necessary fees for each of the types of royalty relief applications and possible BSEE audits in a Notice to Lessees. We will periodically update the fees to reflect changes in costs, as well as provide other information necessary to administer royalty relief.
(b) You must file all payments electronically through the Fees for Services page on the BSEE Web site at http://www.bsee.gov, and you must include a copy of the Pay.gov confirmation receipt page with your application or assessment.
§ 203.4 How do the provisions in this part apply to different types of leases and projects?
The tables in this section summarize the similar application and approval provisions for the discretionary end-of-life and deep water royalty relief programs in §§ 203.50 to 203.91. Because royalty relief for deep gas on leases not subject to deep water royalty relief, as provided for under §§ 203.40 to 203.48, does not involve an application, its provisions do not parallel the other two royalty relief programs and are not summarized in this section.
(a) We require the information elements indicated by an X in the following table and described in §§ 203.51, 203.62, and 203.81 through 203.89 for applications for royalty relief.
Information elements | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) Administrative information report | X | X | X | X |
(2) Net revenue and relief justification report (prescribed format) | X | |||
(3) Economic viability and relief justification report (Royalty Suspension Viability Program (RSVP) model inputs justified with Geological and Geophysical (G&G), Engineering, Production, & Cost reports) | X | X | X | |
(4) G&G report | X | X | X | |
(5) Engineering report | X | X | X | |
(6) Production report | X | X | X | |
(7) Deep water cost report | X | X | X |
(b) We require the confirmation elements indicated by an X in the following table and described in §§ 203.70, 203.81, 203.90 and 203.91 to retain royalty relief.
Confirmation elements | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) Fabricator’s confirmation report | X | X | X | |
(2) Post-production development report approved by an independent certified public accountant (CPA) * * * | X | X | X |
(c) The following table indicates by an X, and §§ 203.50, 203.52, 203.60 and 203.67 describe, the prerequisites for our approval of your royalty relief application.
Approval conditions | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion | Pre-act lease | Development project | ||
(1) At least 12 of the last 15 months have the required level of production | X | |||
(2) Already producing | X | |||
(3) A producible well into a reservoir that has not produced before | X | X | X | |
(4) Royalties for qualifying months exceed 75 percent of net revenue (NR) | X | |||
(5) Substantial investment on a pre-Act lease (e.g., platform, subsea template) | ||||
(6) Determined to be economic only with relief | X | X | X |
(d) The following table indicates by an X, and §§ 203.52, 203.74, and 203.75 describe, the prerequisites for a redetermination of our royalty relief decision.
Redetermination conditions | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) After 12 months under current rate, criteria same as for approval | X | |||
(2) For material change in geologic data, prices, costs, or available technology | X | X | X |
(e) The following table indicates by an X, and §§ 203.53 and 203.69 describe, the characteristics of approved royalty relief.
Relief rate and volume, subject to certain conditions | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) One-half pre-application effective lease rate on the qualifying amount, 1.5 times pre-application effective lease rate on additional production up to twice the qualifying amount, and the pre-application effective lease rate for any larger volumes | X | |||
(2) Qualifying amount is the average monthly production for 12 qualifying months | X | |||
(3) Zero royalty rate on the suspension volume and the original lease rate on additional production | X | X | X | |
(4) Suspension volume is at least 17.5, 52.5 or 87.5 million barrels of oil equivalent (MMBOE) | X | |||
(5) Suspension volume is at least the minimum set in the Notice of Sale, the lease, or the regulations | X | X | ||
(6) Amount needed to become economic | X | X | X |
(f) The following table indicates by an X, and §§ 203.54 and 203.78 describe, circumstances under which we discontinue your royalty relief.
Full royalty resumes when | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) Average NYMEX price for last 12 months is at least 25 percent above the average for the qualifying months. | X | |||
(2) Average NYMEX price for last calendar year exceeds $28/bbl or $3.50/mcf, escalated by the gross domestic product (GDP) deflator since 1994 | X | X | ||
(3) Average prices for designated periods exceed levels we specify in the Notice of Sale or the lease | X | X |
(g) The following table indicates by an X, and §§ 203.55, 203.76, and 203.77 describe, circumstances under which we end or reduce royalty relief.
Relief withdrawn or reduced | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) If recipient requests | X | X | X | X |
(2) Lease royalty rate is at the effective rate for 12 consecutive months | X | |||
(3) Conditions occur that we specified in the approval letter in individual cases | X | |||
(4) Recipient does not submit post-production report that compares expected to actual costs | X | X | X | |
(5) Recipient changes development system | X | X | X | |
(6) Recipient excessively delays starting fabrication | X | X | X | |
(7) Recipient spends less than 80 percent of proposed pre-production costs prior to start of production | X | X | X | |
(8) Amount of relief volume is produced | X | X | X |
(a) The Office of Management and Budget (OMB) has approved the information collection requirements in this part under 44 U.S.C. 3501 et seq., and assigned OMB Control Number 1014-0005. The title of this information collection is “30 CFR part 203, Relief or Reduction in Royalty Rates.”
(b) BSEE collects this information to make decisions on the economic viability of leases requesting a suspension or elimination of royalty or net profit share. Responses are required to obtain a benefit or are mandatory according to 43 U.S.C. 1331 et seq. BSEE will protect information considered proprietary under applicable law and under regulations at § 203.61, “How do I assess my chances for getting relief?” and 30 CFR 250.197, “Data and information to be made available to the public or for limited inspection.”
(c) An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
(d) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.
Subpart B—OCS Oil, Gas, and Sulfur General
Royalty Relief for Drilling Ultra-Deep Wells on Leases Not Subject to Deep Water Royalty Relief
§ 203.30 Which leases are eligible for royalty relief as a result of drilling a phase 2 or phase 3 ultra-deep well?
Your lease may receive a royalty suspension volume (RSV) under §§ 203.31 through 203.36 if the lease meets all the requirements of this section.
(a) The lease is located in the GOM wholly west of 87 degrees, 30 minutes West longitude in water depths entirely less than 400 meters deep.
(b) The lease has not produced gas or oil from a deep well or an ultra-deep well, except as provided in § 203.31(b).
(c) If the lease is located entirely in more than 200 meters and entirely less than 400 meters of water, it must either:
(1) Have been issued before November 28, 1995, and not been granted deep water royalty relief under 43 U.S.C. 1337(a)(3)(C), added by section 302 of the Deep Water Royalty Relief Act; or
(2) Have been issued after November 28, 2000, and not been granted deep water royalty relief under §§ 203.60 through 203.79.
§ 203.31 If I have a qualified phase 2 or qualified phase 3 ultra-deep well, what royalty relief would that well earn for my lease?
(a) Subject to the administrative requirements of § 203.35 and the price conditions in § 203.36, your qualified well earns your lease an RSV shown in the following table in billions of cubic feet (BCF) or in thousands of cubic feet (MCF) as prescribed in § 203.33:
If you have a qualified phase 2 or qualified phase 3 ultra-deep well that is: | Then your lease earns an RSV on this volume of gas production: |
---|---|
(1) An original well, | 35 BCF. |
(2) A sidetrack with a sidetrack measured depth of at least 20,000 feet, | 35 BCF. |
(3) An ultra-deep short sidetrack that is a phase 2 ultra-deep well, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 25 BCF. |
(4) An ultra-deep short sidetrack that is a phase 3 ultra-deep well, | 0 BCF. |
(b)(1) This paragraph applies if your lease:
(i) Has produced gas or oil from a deep well with a perforated interval the top of which is less than 18,000 feet TVD SS;
(ii) Was issued in a lease sale held between January 1, 2004, and December 31, 2005; and
(iii) The terms of your lease expressly incorporate the provisions of §§ 203.41 through 203.47 as they existed at the time the lease was issued.
(2) Subject to the administrative requirements of § 203.35 and the price conditions in § 203.36, your qualified well earns your lease an RSV shown in the following table in BCF or MCF as prescribed in § 203.33:
If you have a qualified phase 2 ultra-deep well that is . . . | Then your lease earns an RSV on this volume of gas production: |
---|---|
(i) An original well or a sidetrack with a sidetrack measured depth of at least 20,000 feet TVD SS, | 10 BCF. |
(ii) An ultra-deep short sidetrack, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 10 BCF. |
(c) Lessees may request a refund of or recoup royalties paid on production from qualified phase 2 or phase 3 ultra-deep wells that:
(1) Occurs before December 18, 2008, and
(2) Is subject to application of an RSV under either § 203.31 or § 203.41.
(d) The following examples illustrate how this section applies. These examples assume that your lease is located in the GOM west of 87 degrees, 30 minutes West longitude and in water less than 400 meters deep (see § 203.30(a)), has no existing deep or ultra-deep wells and that the price thresholds prescribed in § 203.36 have not been exceeded.
§ 203.32 What other requirements or restrictions apply to royalty relief for a qualified phase 2 or phase 3 ultra-deep well?
(a) If a qualified ultra-deep well on your lease is within a unitized portion of your lease, the RSV earned by that well under this section applies only to your lease and not to other leases within the unit or to the unit as a whole.
(b) If your qualified ultra-deep well is a directional well (either an original well or a sidetrack) drilled across a lease line, then either:
(1) The lease with the perforated interval that initially produces earns the RSV or
(2) If the perforated interval crosses a lease line, the lease where the surface of the well is located earns the RSV.
(c) Any RSV earned under § 203.31 is in addition to any royalty suspension supplement (RSS) for your lease under § 203.45 that results from a different wellbore.
(d) If your lease earns an RSV under § 203.31 and later produces from a deep well that is not a qualified well, the RSV is not forfeited or terminated, but you may not apply the RSV earned under § 203.31 to production from the non-qualified well.
(e) You owe minimum royalties or rentals in accordance with your lease terms notwithstanding any RSVs allowed under paragraphs (a) and (b) of § 203.31.
(f) Unused RSVs transfer to a successor lessee and expire with the lease.
§ 203.33 To which production do I apply the RSV earned by qualified phase 2 and phase 3 ultra-deep wells on my lease or in my unit?
(a) You must apply the RSV allowed in § 203.31(a) and (b) to gas volumes produced from qualified wells on or after May 18, 2007, reported on the Oil and Gas Operations Report, Part A (OGOR-A) for your lease under 30 CFR 1210.102. All gas production from qualified wells reported on the OGOR-A, including production not subject to royalty, counts toward the total lease RSV earned by both deep or ultra-deep wells on the lease.
(b) This paragraph applies to any lease with a qualified phase 2 or phase 3 ultra-deep well that is not within a BSEE-approved unit. Subject to the price conditions of § 203.36, you must apply the RSV prescribed in § 203.31 as required under the following paragraphs (b)(1) and (b)(2) of this section.
(1) You must apply the RSV to the earliest gas production occurring on and after the later of May 18, 2007, or the date the first qualified phase 2 or phase 3 ultra-deep well that earns your lease the RSV begins production (other than test production).
(2) You must apply the RSV to only gas production from qualified wells on your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44.
(c) This paragraph applies to any lease with a qualified phase 2 or phase 3 ultra-deep well where all or part of the lease is within a BSEE-approved unit. Under the unit agreement, a share of the production from all the qualified wells in the unit participating area would be allocated to your lease each month according to the participating area percentages. Subject to the price conditions of § 203.36, you must apply the RSV prescribed in § 203.31 as follows:
(1) You must apply the RSV to the earliest gas production occurring on and after the later of May 18, 2007, or the date that the first qualified phase 2 or phase 3 ultra-deep well that earns your lease the RSV begins production (other than test production).
(2) You must apply the RSV to only gas production:
(i) From qualified wells on the non-unitized area of your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44; and
(ii) Allocated to your lease under a BSEE-approved unit agreement from qualified wells on unitized areas of your lease and on other leases in participating areas of the unit, regardless of their depth, for which the requirements in § 203.35 or § 203.44 have been met. The allocated share under paragraph (a)(2)(ii) of this section does not increase the RSV for your lease.
(d) You must begin paying royalties when the cumulative production of gas from all qualified wells on your lease, or allocated to your lease under paragraph (b) of this section, reaches the applicable RSV allowed under § 203.31 or § 203.41. For the month in which cumulative production reaches this RSV, you owe royalties on the portion of gas production from or allocated to your lease that exceeds the RSV remaining at the beginning of that month.
§ 203.34 To which production may an RSV earned by qualified phase 2 and phase 3 ultra-deep wells on my lease not be applied?
You may not apply an RSV earned under § 203.31:
(a) To production from completions less than 15,000 feet TVD SS, except in cases where the qualified well is re-perforated in the same reservoir previously perforated deeper than 15,000 feet TVD SS;
(b) To production from a deep well or ultra-deep well on any other lease, except as provided in paragraph (c) of § 203.33;
(c) To any liquid hydrocarbon (oil and condensate) volumes; or
(d) To production from a deep well or ultra-deep well that commenced drilling before:
(1) March 26, 2003, on a lease that is located entirely or partly in water less than 200 meters deep; or
(2) May 18, 2007, on a lease that is located entirely in water more than 200 meters deep.
§ 203.35 What administrative steps must I take to use the RSV earned by a qualified phase 2 or phase 3 ultra-deep well?
To use an RSV earned under § 203.31:
(a) You must notify the BSEE Regional Supervisor for Production and Development in writing of your intent to begin drilling operations on all your ultra-deep wells.
(b) Before beginning production, you must meet any production measurement requirements that the BSEE Regional Supervisor for Production and Development has determined are necessary under 30 CFR part 250, subpart L.
(c)(1) Within 30 days of the beginning of production from any wells that would become qualified phase 2 or phase 3 ultra-deep wells by satisfying the requirements of this section:
(i) Provide written notification to the BSEE Regional Supervisor for Production and Development that production has begun; and
(ii) Request confirmation of the size of the RSV earned by your lease.
(2) If you produced from a qualified phase 2 or phase 3 ultra-deep well before December 18, 2008, you must provide the information in paragraph (c)(1) of this section no later than January 20, 2009.
(d) If you cannot produce from a well that otherwise meets the criteria for a qualified phase 2 ultra-deep well that is an ultra-deep short sidetrack before May 3, 2009, on a lease that is located entirely or partly in water less than 200 meters deep, or before May 3, 2013, on a lease that is located entirely in water more than 200 meters but less than 400 meters deep, the BSEE Regional Supervisor for Production and Development may extend the deadline for beginning production for up to 1 year, based on the circumstances of the particular well involved, if it meets all the following criteria.
(1) The delay occurred after drilling reached the total depth in your well.
(2) Production (other than test production) was expected to begin from the well before May 3, 2009, on a lease that is located entirely or partly in water less than 200 meters deep or before May 3, 2013, on a lease that is located entirely in water more than 200 meters but less than 400 meters deep. You must provide a credible activity schedule with supporting documentation.
(3) The delay in beginning production is for reasons beyond your control, such as adverse weather and accidents which BSEE deems were unavoidable.
§ 203.36 Do I keep royalty relief if prices rise significantly?
(a) You must pay the Office of Natural Resources Revenue royalties on all gas production to which an RSV otherwise would be applied under § 203.33 for any calendar year in which the average daily closing New York Mercantile Exchange (NYMEX) natural gas price exceeds the applicable threshold price shown in the following table.
A price threshold in year 2007 dollars of . . . | Applies to . . . |
---|---|
(1) $10.15 per MMBtu, | (i) The first 25 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep issued before December 18, 2008; and |
(ii) Any RSV earned under § 203.31(b) by a phase 2 ultra-deep well. | |
(2) $4.55 per MMBtu, | (i) Any RSV earned under § 203.31(a) by a phase 3 ultra-deep well unless the lease terms prescribe a different price threshold; |
(ii) The last 10 BCF of the 35 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep issued before December 18, 2008, and that is not a non-converted lease; | |
(iii) The last 15 BCF of the 35 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a non-converted lease; | |
(iv) Any RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease in water partly or entirely less than 200 meters deep issued on or after December 18, 2008, unless the lease terms prescribe a different price threshold; and | |
(v) Any RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease in water entirely more than 200 meters deep and entirely less than 400 meters deep. | |
(3) $4.08 per MMBtu, | (i) The first 20 BCF of RSV earned by a well that is located on a non-converted lease issued in OCS Lease Sale 178. |
(4) $5.83 per MMBtu, | (i) The first 20 BCF of RSV earned by a well that is located on a non-converted lease issued in OCS Lease Sales 180, 182, 184, 185, or 187. |
(b) For purposes of paragraph (a) of this section, determine the threshold price for any calendar year after 2007 by:
(1) Determining the percentage of change during the year in the Department of Commerce’s implicit price deflator for the gross domestic product; and
(2) Adjusting the threshold price for the previous year by that percentage.
(c) The following examples illustrate how this section applies.
(1) Drills and produces from well no.1, a qualified deep well in 2008 to a depth of 15,500 feet TVD SS that earns a 15 BCF RSV for the lease under § 203.41, which would be subject to a price threshold of $10.15 per MMBtu (adjusted for inflation after 2007), meaning the lease is partly or entirely in less than 200 meters of water;
(2) Later in 2008, drills and produces from well no. 2, a second qualified deep well to a depth of 17,000 feet TVD SS that earns no additional RSV (see § 203.41(c)(1)); and
(3) In 2015, drills and produces from well no. 3, a qualified phase 3 ultra-deep well that earns no additional RSV since the lease already has an RSV established by prior deep well production. Further assume that in 2015, the average daily closing NYMEX natural gas price exceeds $4.55 per MMBtu (adjusted for inflation after 2007) but does not exceed $10.15 per MMBtu (adjusted for inflation after 2007). In 2015, any remaining RSV earned by well no. 1 (which would have been applied to production from well nos. 1 and 2 in the intervening years), would be applied to production from all three qualified wells. Because the price threshold applicable to that RSV was not exceeded, the production from all three qualified wells would be royalty-free until the 15 BCF RSV earned by well no. 1 is exhausted.
(d) You must pay any royalty due under this section no later than March 31 of the year following the calendar year for which you owe royalty. If you do not pay by that date, you must pay late payment interest under 30 CFR 1218.54 from April 1 until the date of payment.
(e) Production volumes on which you must pay royalty under this section count as part of your RSV.
Royalty Relief for Drilling Deep Gas Wells on Leases Not Subject to Deep Water Royalty Relief
§ 203.40 Which leases are eligible for royalty relief as a result of drilling a deep well or a phase 1 ultra-deep well?
Your lease may receive an RSV under §§ 203.41 through 203.44, and may receive an RSS under §§ 203.45 through 203.47, if it meets all the requirements of this section.
(a) The lease is located in the GOM wholly west of 87 degrees, 30 minutes West longitude in water depths entirely less than 400 meters deep.
(b) The lease has not produced gas or oil from a well with a perforated interval the top of which is 18,000 feet TVD SS or deeper that commenced drilling either:
(1) Before March 26, 2003, on a lease that is located partly or entirely in water less than 200 meters deep; or
(2) Before May 18, 2007, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.
(c) In the case of a lease located partly or entirely in water less than 200 meters deep, the lease was issued in a lease sale held either:
(1) Before January 1, 2001;
(2) On or after January 1, 2001, and before January 1, 2004, and, in cases where the original lease terms provided for an RSV for deep gas production, the lessee has exercised the option provided for in § 203.49; or
(3) On or after January 1, 2004, and the lease terms provide for royalty relief under §§ 203.41 through 203.47. (Note: Because the original § 203.41 has been divided into new §§ 203.41 and 203.42 and subsequent sections have been redesignated as §§ 203.43 through 203.48, royalty relief in lease terms for leases issued on or after January 1, 2004, should be read as referring to §§ 203.41 through 203.48.)
(d) If the lease is located entirely in more than 200 meters and less than 400 meters of water, it must either:
(1) Have been issued before November 28, 1995, and not been granted deep water royalty relief under 43 U.S.C. 1337(a)(3)(C), added by section 302 of the Deep Water Royalty Relief Act; or
(2) Have been issued after November 28, 2000, and not been granted deep water royalty relief under §§ 203.60 through 203.79.
§ 203.41 If I have a qualified deep well or a qualified phase 1 ultra-deep well, what royalty relief would my lease earn?
(a) To qualify for a suspension volume under paragraphs (b) or (c) of this section, your lease must meet the requirements in § 203.40 and the requirements in the following table.
If your lease has not . . . | And if it later . . . | Then your lease . . . |
---|---|---|
(1) produced gas or oil from any deep well or ultra-deep well, | Has a qualified deep well or qualified phase 1 ultra-deep well, | earns an RSV specified in paragraph (b) of this section. |
(2) produced gas or oil from a well with a perforated interval whose top is 18,000 feet TVD SS or deeper, | Has a qualified deep well with a perforated interval whose top is 18,000 feet TVD SS or deeper or a qualified phase 1 ultra-deep well, | earns an RSV specified in paragraph (c) of this section. |
(b) If your lease meets the requirements in paragraph (a)(1) of this section, it earns the RSV prescribed in the following table:
If you have a qualified deep well or a qualified phase 1 ultra-deep well that is: | Then your lease earns an RSV on this volume of gas production: |
---|---|
(1) An original well with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 15 BCF. |
(2) A sidetrack with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 15 BCF. |
(3) An original well with a perforated interval the top of which is at least 18,000 feet TVD SS, | 25 BCF. |
(4) A sidetrack with a perforated interval the top of which is at least 18,000 feet TVD SS, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 25 BCF. |
(c) If your lease meets the requirements in paragraph (a)(2) of this section, it earns the RSV prescribed in the following table. The RSV specified in this paragraph is in addition to any RSV your lease already may have earned from a qualified deep well with a perforated interval whose top is from 15,000 feet to less than 18,000 feet TVD SS.
If you have a qualified deep well or a qualified phase 1 ultra-deep well that is . . . | Then you earn an RSV on this amount of gas production: |
---|---|
(1) An original well or a sidetrack with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 0 BCF. |
(2) An original well with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | 10 BCF. |
(3) A sidetrack with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 10 BCF. |
(d) Lessees may request a refund of or recoup royalties paid on production from qualified wells on a lease that is located in water entirely deeper than 200 meters but entirely less than 400 meters deep that:
(1) Occurs before December 18, 2008; and
(2) Is subject to application of an RSV under either § 203.31 or § 203.41.
(e) The following examples illustrate how this section applies, assuming your lease meets the location, prior production, and lease issuance conditions in § 203.40 and paragraph (a) of this section:
(i) A deep well with a perforated interval the top of which is 17,000 feet TVD SS, your lease earns no RSV (see paragraph (c)(1) of this section);
(ii) A qualified deep well that is an original well with a perforated interval the top of which is 19,000 feet TVD SS, your lease earns an RSV of 10 BCF under paragraph (c)(2) of this section. This RSV would be applied to gas production from qualified wells on your lease, as prescribed in §§ 203.43 and 203.48; or
(iii) A qualified deep well that is a sidetrack with a perforated interval the top of which is 19,000 feet TVD SS, that has a sidetrack measured depth of 7,000 feet, your lease earns an RSV of 8.2 BCF under paragraph (c)(3) of this section. This RSV would be applied to gas production from qualified wells on your lease, as prescribed in §§ 203.43 and 203.48.
§ 203.42 What conditions and limitations apply to royalty relief for deep wells and phase 1 ultra-deep wells?
The conditions and limitations in the following table apply to royalty relief under § 203.41.
If . . . | Then . . . |
---|---|
(a) Your lease has produced gas or oil from a well with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | your lease cannot earn an RSV under § 203.41 as a result of drilling any subsequent deep wells or phase 1 ultra-deep wells. |
(b) You determine RSV under § 203.41 for the first qualified deep well or qualified phase 1 ultra-deep well on your lease (whether an original well or a sidetrack) because you drilled and produced it within the time intervals set forth in the definitions for qualified wells, | that determination establishes the total RSV available for that drilling depth interval on your lease ( |
(c) A qualified deep well or qualified phase 1 ultra-deep well on your lease is within a unitized portion of your lease, | the RSV earned by that well under § 203.41 applies only to production from qualified wells on or allocated to your lease and not to other leases within the unit. |
(d) Your qualified deep well or qualified phase 1 ultra-deep well is a directional well (either an original well or a sidetrack) drilled across a lease line, | the lease with the perforated interval that initially produces earns the RSV. However, if the perforated interval crosses a lease line, the lease where the surface of the well is located earns the RSV. |
(e) You earn an RSV under § 203.41, | that RSV is in addition to any RSS for your lease under § 203.45 that results from a different wellbore. |
(f) Your lease earns an RSV under § 203.41 and later produces from a well that is not a qualified well, | the RSV is not forfeited or terminated, but you may not apply the RSV under § 203.41 to production from the non-qualified well. |
(g) You qualify for an RSV under paragraphs (b) or (c) of § 203.41, | you still owe minimum royalties or rentals in accordance with your lease terms. |
(h) You transfer your lease, | unused RSVs transfer to a successor lessee and expire with the lease. |
§ 203.43 To which production do I apply the RSV earned from qualified deep wells or qualified phase 1 ultra-deep wells on my lease?
(a) You must apply the RSV prescribed in § 203.41(b) and (c) to gas volumes produced from qualified wells on or after May 3, 2004, reported on the OGOR-A for your lease under 30 CFR 1210.102, as and to the extent prescribed in §§ 203.43 and 203.48.
(1) Except as provided in paragraph (a)(2) of this section, all gas production from qualified wells reported on the OGOR-A, including production that is not subject to royalty, counts toward the lease RSV.
(2) Production to which an RSS applies under §§ 203.45 and 203.46 does not count toward the lease RSV.
(b) This paragraph applies to any lease with a qualified deep well or qualified phase 1 ultra-deep well when no part of the lease is within a BSEE-approved unit. Subject to the price conditions in § 203.48, you must apply the RSV prescribed in § 203.41 as required under the following paragraphs (b)(1) and (b)(2) of this section.
(1) You must apply the RSV to the earliest gas production occurring on and after the later of:
(i) May 3, 2004, for an RSV earned by a qualified deep well or qualified phase 1 ultra-deep well on a lease that is located entirely or partly in water less than 200 meters deep;
(ii) May 18, 2007, for an RSV earned by a qualified deep well on a lease that is located entirely in water more than 200 meters deep; or
(iii) The date that the first qualified well that earns your lease the RSV begins production (other than test production).
(2) You must apply the RSV to only gas production from qualified wells on your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44.
(c) This paragraph applies to any lease with a qualified deep well or qualified phase 1 ultra-deep well when all or part of the lease is within a BSEE-approved unit. Under the unit agreement, a share of the production from all the qualified wells in the unit participating area would be allocated to your lease each month according to the participating area percentages. Subject to the price conditions in § 203.48, you must apply the RSV prescribed under § 203.41 as required under the following paragraphs (c)(1) through (3) of this section.
(1) You must apply the RSV to the earliest gas production occurring on and after the later of:
(i) May 3, 2004, for an RSV earned by a qualified well or qualified phase 1 ultra-deep well on a lease that is located entirely or partly in water less than 200 meters deep;
(ii) May 18, 2007, for an RSV earned by a qualified deep well on a lease that is located entirely in water more than 200 meters deep; or
(iii) The date that the first qualified well that earns your lease the RSV begins production (other than test production).
(2) You must apply the RSV to only gas production:
(i) From all qualified wells on the non-unitized area of your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44; and,
(ii) Allocated to your lease under a BSEE-approved unit agreement from qualified wells on unitized areas of your lease and on unitized areas of other leases in the unit, regardless of their depth, for which the requirements in § 203.35 or § 203.44 have been met.
(3) The allocated share under paragraph (c)(2)(ii) of this section does not increase the RSV for your lease. None of the volumes produced from a well that is not within a unit participating area may be allocated to other leases in the unit.
(d) You must begin paying royalties when the cumulative production of gas from all qualified wells on your lease, or allocated to your lease under paragraph (c) of this section, reaches the applicable RSV allowed under § 203.31 or § 203.41. For the month in which cumulative production reaches this RSV, you owe royalties on the portion of gas production that exceeds the RSV remaining at the beginning of that month.
(e) You may not apply the RSV allowed under § 203.41 to:
(1) Production from completions less than 15,000 feet TVD SS, except in cases where the qualified deep well is re-perforated in the same reservoir previously perforated deeper than 15,000 feet TVD SS;
(2) Production from a deep well or phase 1 ultra-deep well on any other lease, except as provided in paragraph (c) of this section;
(3) Any liquid hydrocarbon (oil and condensate) volumes; or
(4) Production from a deep well or phase 1 ultra-deep well that commenced drilling before:
(i) March 26, 2003, on a lease that is located entirely or partly in water less than 200 meters deep, or
(ii) May 18, 2007, on a lease that is located entirely in water more than 200 meters deep.
§ 203.44 What administrative steps must I take to use the royalty suspension volume?
(a) You must notify the BSEE Regional Supervisor for Production and Development in writing of your intent to begin drilling operations on all deep wells and phase 1 ultra-deep wells; and
(b) Within 30 days of the beginning of production from all wells that would become qualified wells by satisfying the requirements of this section, you must:
(1) Provide written notification to the BSEE Regional Supervisor for Production and Development that production has begun; and
(2) Request confirmation of the size of the royalty suspension volume earned by your lease.
(c) Before beginning production, you must meet any production measurement requirements that the BSEE Regional Supervisor for Production and Development has determined are necessary under 30 CFR part 250, subpart L.
(d) You must provide the information in paragraph (b) of this section by January 20, 2009, if you produced before December 18, 2008, from a qualified deep well or qualified phase 1 ultra-deep well on a lease that is located entirely in water more than 200 meters and less than 400 meters deep.
(e) The BSEE Regional Supervisor for Production and Development may extend the deadline for beginning production for up to one year for a well that cannot begin production before the applicable date prescribed in the definition of “qualified deep well” in § 203.0 if it meets all of the following criteria.
(1) The well otherwise meets the criteria in the definition of a qualified deep well in § 203.0.
(2) The delay in production occurred after reaching total depth in the well.
(3) Production (other than test production) was expected to begin from the well before the applicable deadline in the definition of a qualified deep well in § 203.0. You must provide a credible activity schedule with supporting documentation.
(4) The delay in beginning production is for reasons beyond your control, such as adverse weather and accidents which BSEE deems were unavoidable.
§ 203.45 If I drill a certified unsuccessful well, what royalty relief will my lease earn?
Your lease may earn a royalty suspension supplement. Subject to paragraph (d) of this section, the royalty suspension supplement is in addition to any royalty suspension volume your lease may earn under § 203.41.
(a) If you drill a certified unsuccessful well and you satisfy the administrative requirements of § 203.47, subject to the price conditions in § 203.48, your lease earns an RSS shown in the following table. The RSS is shown in billions of cubic feet of gas equivalent (BCFE) or in thousands of cubic feet of gas equivalent (MCFE) and is applicable to oil and gas production as prescribed in § 203.46.
If you have a certified unsuccessful well that is:— | Then your lease earns an RSS on this volume of oil and gas production as prescribed in this section and § 203.46:— |
---|---|
(1) An original well and your lease has not produced gas or oil from a deep well or an ultra-deep well, | 5 BCFE. |
(2) A sidetrack (with a sidetrack measured depth of at least 10,000 feet) and your lease has not produced gas or oil from a deep well or an ultra-deep well, | 0.8 BCFE plus 120 MCFE times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 5 BCFE. |
(3) An original well or a sidetrack (with a sidetrack measured depth of at least 10,000 feet) and your lease has produced gas or oil from a deep well with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 2 BCFE. |
(b) This paragraph applies to oil and gas volumes you report on the OGOR-A for your lease under 30 CFR 1210.102.
(1) You must apply the RSS prescribed in paragraph (a) of this section, in accordance with the requirements in § 203.46, to all oil and gas produced from the lease:
(i) On or after December 18, 2008, if your lease is located in water more than 200 meters but less than 400 meters deep; or
(ii) On or after May 3, 2004, if your lease is located in water partly or entirely less than 200 meters deep.
(2) Production to which an RSV applies under §§ 203.31 through 203.33 and §§ 203.41 through 203.43 does not count toward the lease RSS. All other production, including production that is not subject to royalty, counts toward the lease RSS.
(c) The conversion from oil to gas for using the royalty suspension supplement is specified in § 203.73.
(d) Each lease is eligible for up to two royalty suspension supplements. Therefore, the total royalty suspension supplement for a lease cannot exceed 10 BCFE.
(1) You may not earn more than one royalty suspension supplement from a single wellbore.
(2) If you begin drilling a certified unsuccessful well on one lease but the completion target is on a second lease, the entire royalty suspension supplement belongs to the second lease. However, if the target straddles a lease line, the lease where the surface of the well is located earns the royalty suspension supplement.
(e) If the same wellbore that earns an RSS as a certified unsuccessful well later produces from a perforated interval the top of which is 15,000 feet TVD or deeper and becomes a qualified well, it will be subject to the following conditions:
(1) Beginning on the date production starts, you must stop applying the royalty suspension supplement earned by that wellbore to your lease production.
(2) If the completion of this qualified well is on your lease or, in the case of a directional well, is on another lease, then you must subtract from the royalty suspension volume earned by that qualified well the royalty suspension supplement amounts earned by that wellbore that have already been applied either on your lease or any other lease. The difference represents the royalty suspension volume earned by the qualified well.
(f) If the same wellbore that earned a royalty suspension supplement later has a sidetrack drilled from that wellbore, you are not required to subtract any royalty suspension supplement earned by that wellbore from the royalty suspension volume that may be earned by the sidetrack.
(g) You owe minimum royalties or rentals in accordance with your lease terms notwithstanding any royalty suspension supplements under this section.
§ 203.46 To which production do I apply the royalty suspension supplements from drilling one or two certified unsuccessful wells on my lease?
(a) Subject to the requirements of §§ 203.40, 203.43, 203.45, 203.47, and 203.48 you must apply an RSS in § 203.45 to the earliest oil and gas production:
(1) Occurring on and after the day you file the information under § 203.47(b),
(2) From, or allocated under a BSEE-approved unit agreement to, the lease on which the certified unsuccessful well was drilled, without regard to the drilling depth of the well producing the gas or oil.
(b) If you have a royalty suspension volume for the lease under § 203.41, you must use the royalty suspension volumes for gas produced from qualified wells on the lease before using royalty suspension supplements for gas produced from qualified wells.
(c) If you have no current production on which to apply the RSS allowed under § 203.45, your RSS applies to the earliest subsequent production of gas and oil from, or allocated under a BSEE-approved unit agreement to, your lease.
(d) Unused royalty suspension supplements transfer to a successor lessee and expire with the lease.
(e) You may not apply the RSS allowed under § 203.45 to production from any other lease, except for production allocated to your lease from a BSEE-approved unit agreement. If your certified unsuccessful well is on a lease subject to a BSEE-approved unit agreement, the lessees of other leases in the unit may not apply any portion of the RSS for your lease to production from the other leases in the unit.
(f) You must begin or resume paying royalties when cumulative gas and oil production from, or allocated under a BSEE-approved unit agreement to, your lease (excluding any gas produced from qualified wells subject to a royalty suspension volume allowed under § 203.41) reaches the applicable royalty suspension supplement. For the month in which the cumulative production reaches this royalty suspension supplement, you owe royalties on the portion of gas or oil production that exceeds the amount of the royalty suspension supplement remaining at the beginning of that month.
§ 203.47 What administrative steps do I take to obtain and use the royalty suspension supplement?
(a) Before you start drilling a well on your lease targeted to a reservoir at least 18,000 feet TVD SS, you must notify, in writing, the BSEE Regional Supervisor for Production and Development of your intent to begin drilling operations and the depth of the target.
(b) After drilling the well, you must provide the BSEE Regional Supervisor for Production and Development within 60 days after reaching the total depth in your well:
(1) Information that allows BSEE to confirm that you drilled a certified unsuccessful well as defined under § 203.0, including:
(i) Well log data, if your original well or sidetrack does not meet the producibility requirements of 30 CFR part 550, subpart A; or
(ii) Well log, well test, seismic, and economic data, if your well does meet the producibility requirements of 30 CFR part 550, subpart A; and
(2) Information that allows BSEE to confirm the size of the royalty suspension supplement for a sidetrack, including sidetrack measured depth and supporting documentation.
(c) If you commenced drilling a well that otherwise meets the criteria for a certified unsuccessful well on a lease located entirely in more than 200 meters and entirely less than 400 meters of water on or after May 18, 2007, and finished it before December 18, 2008, you must provide the information in paragraph (b) of this section no later than February 17, 2009.
§ 203.48 Do I keep royalty relief if prices rise significantly?
(a) You must pay royalties on all gas and oil production for which an RSV or an RSS otherwise would be allowed under §§ 203.40 through 203.47 for any calendar year when the average daily closing NYMEX natural gas price exceeds the applicable threshold price shown in the following table.
For a lease located in water . . . | And issued . . . | The applicable threshold price is . . . |
---|---|---|
(1) Partly or entirely less than 200 meters deep, | before December 18, 2008, | $10.15 per MMBtu, adjusted annually after calendar year 2007 for inflation. |
(2) Partly or entirely less than 200 meters deep, | after December 18, 2008, | $4.55 per MMBtu, adjusted annually after calendar year 2007 for inflation unless the lease terms prescribe a different price threshold. |
(3) Entirely more than 200 meters and entirely less than 400 meters deep, | on any date, | $4.55 per MMBtu, adjusted annually after calendar year 2007 for inflation unless the lease terms prescribe a different price threshold. |
(b) Determine the threshold price for any calendar year after 2007 by adjusting the threshold price in the previous year by the percentage that the implicit price deflator for the gross domestic product, as published by the Department of Commerce, changed during the calendar year.
(c) You must pay any royalty due under this section no later than March 31 of the year following the calendar year for which you owe royalty. If you do not pay by that date, you must pay late payment interest under 30 CFR 1218.54 from April 1 until the date of payment.
(d) Production volumes on which you must pay royalty under this section count as part of your RSV and RSS.
§ 203.49 May I substitute the deep gas drilling provisions in this part for the deep gas royalty relief provided in my lease terms?
(a) You may exercise an option to replace the applicable lease terms for royalty relief related to deep-well drilling with those in § 203.0 and §§ 203.40 through 203.48 if you have a lease issued with royalty relief provisions for deep-well drilling. Such leases:
(1) Must be issued as part of an OCS lease sale held after January 1, 2001, and before April 1, 2004; and
(2) Must be located wholly west of 87 degrees, 30 minutes West longitude in the GOM entirely or partly in water less than 200 meters deep.
(b) To exercise the option under paragraph (a) of this section, you must notify, in writing, the BSEE Regional Supervisor for Production and Development of your decision before September 1, 2004, or 180 days after your lease is issued, whichever is later, and specify the lease and block number.
(c) Once you exercise the option under paragraph (a) of this section, you are subject to all the activity, timing, and administrative requirements pertaining to deep gas royalty relief as specified in §§ 203.40 through 203.48.
(d) Exercising the option under paragraph (a) of this section is irrevocable. If you do not exercise this option, then the terms of your lease apply.
Royalty Relief for End-of-Life Leases
§ 203.50 Who may apply for end-of-life royalty relief?
You may apply for royalty relief in two situations.
(a) Your end-of-life lease (as defined in § 203.2) is an oil and gas lease and has average daily production of at least 100 barrels of oil equivalent (BOE) per month (as calculated in § 203.73) in at least 12 of the past 15 months. The most recent of these 12 months are considered the qualifying months. These 12 months should reflect the basic operation you intend to use until your resources are depleted. If you changed your operation significantly (e.g., begin re-injecting rather than recovering gas) during the qualifying months, or if you do so while we are processing your application, we may defer action on your application until you revise it to show the new circumstances.
(b) Your end-of-life lease is other than an oil and gas lease (e.g., sulphur) and has production in at least 12 of the past 15 months. The most recent of these 12 months are considered the qualifying months.
§ 203.51 How do I apply for end-of-life royalty relief?
You must submit a complete application and the required fee to the appropriate BSEE Regional Director. Your BSEE regional office will provide specific guidance on the report formats. A complete application for relief includes:
(a) An administrative information report (specified in § 203.83) and
(b) A net revenue and relief justification report (specified in § 203.84).
§ 203.52 What criteria must I meet to get relief?
(a) To qualify for relief, you must demonstrate that the sum of royalty payments over the 12 qualifying months exceeds 75 percent of the sum of net revenues (before-royalty revenues minus allowable costs, as defined in § 203.84).
(b) To re-qualify for relief, e.g., either applying for additional relief on top of relief already granted, or applying for relief sometime after your earlier agreement terminated, you must demonstrate that:
(1) You have met the criterion listed in paragraph (a) of this section, and
(2) The 12 required qualifying months of operation have occurred under the current royalty arrangement.
§ 203.53 What relief will BSEE grant?
(a) If we approve your application and you meet certain conditions, we will reduce the pre-application effective royalty rate by one-half on production up to the relief volume amount. If you produce more than the relief volume amount:
(1) We will impose a royalty rate equal to 1.5 times the effective royalty rate on your additional production up to twice the relief volume amount; and
(2) We will impose a royalty rate equal to the effective rate on all production greater than twice the relief volume amount.
(b) Regardless of the level of production or prices (see § 203.54), royalty payments due under end-of-life relief will not exceed the royalty obligations that would have been due at the effective royalty rate.
(1) The effective royalty rate is the average lease rate paid on production during the 12 qualifying months.
(2) The relief volume amount is the average monthly BOE production for the 12 qualifying months.
§ 203.54 How does my relief arrangement for an oil and gas lease operate if prices rise sharply?
In those months when your current reference price rises by at least 25 percent above your base reference price, you must pay the effective royalty rate on all monthly production.
(a) Your current reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas over the most recent full 12 calendar months;
(b) Your base reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas during the qualifying months; and
(c) Your weighting factors are the proportions of your total production volume (in BOE) provided by oil and gas during the qualifying months.
§ 203.55 Under what conditions can my end-of-life royalty relief arrangement for an oil and gas lease be ended?
(a) If you have an end-of-life royalty relief arrangement, you may renounce it at any time. The lease rate will return to the effective rate during the qualifying period in the first full month following our receipt of your renouncement of the relief arrangement.
(b) If you pay the effective lease rate for 12 consecutive months, we will terminate your relief. The lease rate will return to the effective rate in the first full month following this termination.
(c) We may stipulate in the letter of approval for individual cases certain events that would cause us to terminate relief because they are inconsistent with an end-of-life situation.
§ 203.56 Does relief transfer when a lease is assigned?
Yes. Royalty relief is based on the lease circumstances, not ownership. It transfers upon lease assignment.
Royalty Relief for Pre-Act Deep Water Leases and for Development and Expansion Projects
§ 203.60 Who may apply for royalty relief on a case-by-case basis in deep water in the Gulf of Mexico or offshore of Alaska?
You may apply for royalty relief under §§ 203.61(b) and 203.62 for an individual lease, unit or project if you:
(a) Hold a pre-Act lease (as defined in § 203.0) that we have assigned to an authorized field (as defined in § 203.0);
(b) Propose an expansion project (as defined in § 203.0); or
(c) Propose a development project (as defined in § 203.0).
§ 203.61 How do I assess my chances for getting relief?
You may ask for a nonbinding assessment (a formal opinion on whether a field would qualify for royalty relief) before turning in your first complete application on an authorized field. This field must have a qualifying well under 30 CFR part 550, subpart A, or be on a lease that has allocated production under an approved unit agreement.
(a) To request a nonbinding assessment, you must:
(1) Submit a draft application in the format and detail specified in guidance from the BSEE regional office for the GOM;
(2) Propose to drill at least one more appraisal well if you get a favorable assessment; and
(3) Pay a fee under § 203.3.
(b) You must wait at least 90 days after receiving our assessment to apply for relief under § 203.62.
(c) This assessment is not binding because a complete application may contain more accurate information that does not support our original assessment. It will help you decide whether your proposed inputs for evaluating economic viability and your supporting data and assumptions are adequate.
§ 203.62 How do I apply for relief?
(a) You must send a complete application and the required fee to the BSEE Regional Director for your region.
(b) Your application for royalty relief offshore Alaska or in deep water in the GOM must include an original and two copies (one set of digital information) of:
(1) Administrative information report;
(2) Economic viability and relief justification report;
(3) G&G report;
(4) Engineering report;
(5) Production report; and
(6) Cost report.
(c) Section 203.82 explains why we are authorized to require these reports.
(d) Sections 203.81, 203.83, and 203.85 through 203.89 describe what these reports must include. The BSEE regional office for your region will guide you on the format for the required reports, and we encourage you to contact this office before preparing your application for this guidance.
§ 203.63 Does my application have to include all leases in the field?
(a) For authorized fields, we will accept only one joint application for all leases that are part of the designated field on the date of application, except as provided in paragraph (a)(3) of this section and § 203.64. However, we will evaluate all acreage that may eventually become part of the authorized field. Therefore, if you have any other leases that you believe may eventually be part of the authorized field, you must submit data for these leases according to § 203.81.
(1) The Regional Director maintains a Field Names Master List with updates of all leases in each designated field.
(2) To avoid sharing proprietary data with other lessees on the field, you may submit your proprietary G&G report separately from the rest of your application. Your application is not complete until we receive all the required information for each lease on the field. We will not disclose proprietary data when explaining our assumptions and reasons for our determinations under § 203.67.
(3) We will not require a joint application if you show good cause and honest effort to get all lessees in the field to participate. If you must exclude a lease from your application because its lessee will not participate, that lease is ineligible for the royalty relief for the designated field.
(b) If your application seeks only relief for a development project or an expansion project, your application does not have to include all leases in the field.
§ 203.64 How many applications may I file on a field or a development project?
You may file one complete application for royalty relief during the life of the field or for a development project or an expansion project designed to produce a reservoir or set of reservoirs. However, you may send another application if:
(a) You are eligible to apply for a redetermination under § 203.74;
(b) You apply for royalty relief for an expansion project;
(c) You withdraw the application before we make a determination; or
(d) You apply for end-of-life royalty relief.
§ 203.65 How long will BSEE take to evaluate my application?
(a) We will determine within 20 working days if your application for royalty relief is complete. If your application is incomplete, we will explain in writing what it needs. If you withdraw a complete application, you may reapply.
(b) We will evaluate your first application on a field within 180 days, evaluate your first application on a development project or an expansion project within 150 days and evaluate a redetermination under § 203.75 within 120 days after we determine that it is complete.
(c) We may ask to extend the review period for your application under the conditions in the following table.
If . . . | Then we may . . . |
---|---|
(1) We need more records to audit sunk costs, | Ask to extend the 120-day or 180-day evaluation period. The extension we request will equal the number of days between when you receive our request for records and the day we receive the records. |
(2) We cannot evaluate your application for a valid reason, such as missing vital information or inconsistent or inconclusive supporting data, | Add another 30 days. We may add more than 30 days, but only if you agree. |
(3) We need more data, explanations, or revision, | Ask to extend the 120-day or 180-day evaluation period. The extension we request will equal the number of days between when you receive our request and the day we receive the information. |
(d) We may change your assumptions under § 203.62 if our technical evaluation reveals others that are more appropriate. We may consult with you before a final decision and will explain any changes.
(e) We will notify all designated lease operators within a field when royalty relief is granted.
§ 203.66 What happens if BSEE does not act in the time allowed?
If we do not act within the timeframes established under § 203.65, you get royalty relief according to the following table.
If you apply for royalty relief for | And we do not decide within the time specified, | As long as you |
---|---|---|
(a) An authorized field, | You get the minimum suspension volumes specified in § 203.69, | Abide by §§ 203.70 and 203.76. |
(b) An expansion project, | You get a royalty suspension for the first year of production, | Abide by §§ 203.70 and 203.76. |
(c) A development project, | You get a royalty suspension for initial production for the number of months that a decision is delayed beyond the stipulated timeframes set by § 203.65, plus all the royalty suspension volume for which you qualify, | Abide by §§ 203.70 and 203.76. |
We will not approve applications if we determine that royalty relief cannot make the field, development project, or expansion project economically viable. Your field or project must be uneconomic while you are paying royalties and must become economic with royalty relief.
§ 203.68 What pre-application costs will BSEE consider in determining economic viability?
(a) We will not consider ineligible costs as set forth in § 203.89(h) in determining economic viability for purposes of royalty relief.
(b) We will consider sunk costs according to the following table.
We will . . . | When determining . . . |
---|---|
(1) Include sunk costs, | Whether a field that includes a pre-Act lease which has not produced, other than test production, before the application or redetermination submission date needs relief to become economic. |
(2) Not include sunk costs, | Whether an authorized field, a development project, or an expansion project can become economic with full relief (see § 203.67). |
(3) Not include sunk costs, | How much suspension volume is necessary to make the field, a development project, or an expansion project economic (see § 203.69(c)). |
(4) Include sunk costs for the project discovery well on each lease, | Whether a development project or an expansion project needs relief to become economic. |
§ 203.69 If my application is approved, what royalty relief will I receive?
If we approve your application, subject to certain conditions, we will not collect royalties on a specified suspension volume for your field, development project, or expansion project. Suspension volumes include volumes allocated to a lease under an approved unit agreement, but exclude any volumes of production that are not normally royalty-bearing under the lease or the regulations of this chapter (e.g., fuel gas).
(a) For authorized fields, the minimum royalty-suspension volumes are:
(1) 17.5 million barrels of oil equivalent (MMBOE) for fields in 200 to 400 meters of water;
(2) 52.5 MMBOE for fields in 400 to 800 meters of water; and
(3) 87.5 MMBOE for fields in more than 800 meters of water.
(b) For development projects, any relief we grant applies only to project wells and replaces the royalty relief, if any, with which we issued your lease.
(c) If your project is economic given the royalty relief with which we issued your lease, we will reject the application.
(d) If the lease has earned or may earn deep gas royalty relief under §§ 203.40 through 203.49 or ultra-deep gas royalty relief under §§ 203.30 through 203.36, we will take the deep gas royalty relief or ultra-deep gas royalty relief into account in determining whether further royalty relief for a development project is necessary for production to be economic.
(e) If neither paragraph (c) nor (d) of this section apply, the minimum royalty suspension volumes are as shown in the following table:
For . . . | The minimum royalty suspension volume is . . . | Plus . . . |
---|---|---|
(1) RS leases in the GOM or leases offshore Alaska, | A volume equal to the combined royalty suspension volumes (or the volume equivalent based on the data in your approved application for other forms of royalty suspension) with which BSEE issued the leases participating in the application that have or plan a well into a reservoir identified in the application, | 10 percent of the median of the distribution of known recoverable resources upon which BSEE based approval of your application from all reservoirs included in the project. |
(2) Leases offshore Alaska or other deep water GOM leases issued in sales after November 28, 2000, | A volume equal to 10 percent of the median of the distribution of known recoverable resources upon which BSEE based approval of your application from all reservoirs included in the project. |
(f) If your application includes pre-Act leases in different categories of water depth, we apply the minimum royalty suspension volume for the deepest such lease then assigned to the field. We base the water depth and makeup of a field on the water-depth delineations in the “Lease Terms and Economic Conditions” map and the “Fields Directory” documents and updates in effect at the time your application is deemed complete. These publications are available from the BSEE Gulf of Mexico Regional Office.
(g) You will get a royalty suspension volume above the minimum if we determine that you need more to make the field or development project economic.
(h) For expansion projects, the minimum royalty suspension volume equals 10 percent of the median of the distribution of known recoverable resources upon which we based approval of your application from all reservoirs included in your project plus any suspension volumes required under § 203.66. If we determine that your expansion project may be economic only with more relief, we will determine and grant you the royalty suspension volume necessary to make the project economic.
(i) The royalty suspension volume applicable to specific leases will continue through the end of the month in which cumulative production reaches that volume. You must calculate cumulative production from all the leases in the authorized field or project that are entitled to share the royalty suspension volume.
§ 203.70 What information must I provide after BSEE approves relief?
You must submit reports to us as indicated in the following table. Sections 203.81, 203.90, and 203.91 describe what these reports must include. The BSEE Regional Office for your region will prescribe the formats.
Required report | When due to BSEE | Due date extensions |
---|---|---|
(a) Fabricator’s confirmation report. | Within 18 months after approval of relief. | BSEE Director may grant you an extension under § 203.79(c) for up to 6 months. |
(b) Post-production report. | Within 120 days after the start of production that is subject to the approved royalty suspension volume. | With acceptable justification from you, the BSEE Regional Director for your region may extend the due date up to 30 days. |
§ 203.71 How does BSEE allocate a field’s suspension volume between my lease and other leases on my field?
The allocation depends on when production occurs, when we issued the lease, when we assigned it to the field, and whether we award the volume suspension by an approved application or establish it in the lease terms, as prescribed in this section.
(a) If your authorized field has an approved royalty suspension volume under §§ 203.67 and 203.69, we will suspend payment of royalties on production from all leases in the field that participate in the application until their cumulative production equals the approved volume. The following conditions also apply:
If . . . | Then . . . | And . . . |
---|---|---|
(1) We assign an eligible lease to your authorized field after we approve relief, | We will not change your authorized field’s royalty suspension volume determined under § 203.69, | Production from the assigned eligible lease(s) counts toward the royalty suspension volume for the authorized field, but the eligible lease will not share any remaining royalty suspension volume for the authorized field after the eligible lease has produced the volume applicable under 30 CFR 560.114. |
(2) We assign a pre-Act or post-November 2000 deep water lease to your field after we approve your application, | We will not change your field’s royalty suspension volume, | The assigned lease(s) may share in any remaining royalty relief by filing the short-form application specified in § 203.83 and authorized in § 203.82. An assigned RS lease also gets any portion of its royalty suspension volume remaining even after the field has produced the approved relief volume. |
(3) We assign another lease that you operate to your field while we are evaluating your application, | In our evaluation of your authorized field, we will take into account the value of any royalty relief the added lease already has under 30 CFR 560.114 or its lease document. If we find your authorized field still needs additional royalty suspension volume, that volume will be at least the combined royalty suspension volume to which all added leases on the field are entitled, or the minimum suspension volume of the authorized field, whichever is greater, | (i) You toll the time period for evaluation until you modify your application to be consistent with the newly constituted field; (ii) We have an additional 60 days to review the new information; and (iii) The assigned pre-Act lease or royalty suspension lease shares the royalty suspension we grant to the newly constituted field. An eligible lease does not share the royalty suspension we grant to the new field. If you do not agree to toll, we will have to reject your application due to incomplete information. Production from an assigned eligible lease counts toward the royalty suspension volume that we grant under § 203.69 for your authorized field, but you will not owe royalty on production from the eligible lease until it has produced the volume applicable under 30 CFR 560.114. |
(4) We assign another operator’s lease to your field while we are evaluating your application, | We will change your field’s minimum suspension volume provided the assigned lease joins the application and is entitled to a larger minimum suspension volume, | (i) You both toll the time period for evaluation until both of you modify your application to be consistent with the new field; (ii) We have an additional 60 days to review the new information; and (iii) The assigned lease(s) shares the royalty suspension we grant to the new field. If you (the original applicant) do not agree to toll, the other operator’s lease retains any suspension volume it has or may share in any relief that we grant by filing the short form application specified in § 203.83 and authorized in § 203.82. |
(5) We reassign a well on a pre-Act, eligible, or royalty suspension lease from field A to field B, | The past production from the well counts toward the royalty suspension volume that we grant under § 203.69 to field B, | For any field based relief, the past production for that well will not count toward any royalty suspension volume that we grant under § 203.69 to field A. Moreover, past production from that well will count toward the royalty suspension volume applicable for the lease under 30 CFR 560.114 if the well is on an eligible lease or under 30 CFR 560.124 if the well is on a royalty suspension lease. |
(b) When a project has more than one lease, the royalty suspension volume for each lease equals that lease’s actual production from the project (or production allocated under an approved unit agreement) until total production for all leases in the project equals the project’s approved royalty suspension volume.
(c) You may receive a royalty-suspension volume only if your entire lease is west of 87 degrees, 30 minutes West longitude. If the field lies on both sides of this meridian, only leases located entirely west of the meridian will receive a royalty-suspension volume.
§ 203.72 Can my lease receive more than one suspension volume?
Yes. You may apply for royalty relief that involves more than one suspension volume under § 203.62 in two circumstances.
(a) Each field that includes your lease may receive a separate royalty-suspension volume, if it meets the evaluation criteria of § 203.67.
(b) An expansion project on your lease may receive a separate royalty-suspension volume, even if we have already granted a royalty-suspension volume to the field that encompasses the project. But the reserves associated with the project must not have been part of our original determination, and the project must meet the evaluation criteria of § 203.67.
§ 203.73 How do suspension volumes apply to natural gas?
You must measure natural gas production under the royalty-suspension volume as follows: 5.62 thousand cubic feet of natural gas, measured in accordance with 30 CFR part 250, subpart L, equals one barrel of oil equivalent.
§ 203.74 When will BSEE reconsider its determination?
You may request a redetermination after we withdraw approval or after you renounce royalty relief, unless we withdraw approval due to your providing false or intentionally inaccurate information. Under certain conditions you may also request a redetermination if we deny your application or if you want your approved royalty suspension volume to change. In these instances, to be eligible for a redetermination, at least one of the following four conditions must occur.
(a) You have significant new G&G data and you previously have not either requested a redetermination or reapplied for relief after we withdrew approval or you relinquished royalty relief. “Significant” means that the new G&G data:
(1) Results from drilling new wells or getting new three-dimensional seismic data and information (but not reinterpreting old data);
(2) Did not exist at the time of the earlier application; and
(3) Changes your estimates of gross resource size, quality, or projected flow rates enough to materially affect the results of our earlier determination.
(b) You demonstrate in your new application that the technology that most efficiently develops this field or lease was not considered or deemed feasible in the original application. Your newly proposed technology must improve the profitability, under equivalent market conditions, of the field or lease relative to the development system proposed in the prior application.
(c) Your current reference price decreases by more than 25 percent from your base reference price as calculated under this paragraph.
(1) Your current reference price is a weighted-average of daily closing prices on the NYMEX for light sweet crude oil and natural gas over the most recent full 12 calendar months;
(2) Your base reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas for the full 12 calendar months preceding the date of your most recently approved application for this royalty relief; and
(3) The weighting factors are the proportions of the total production volume (in BOE) for oil and gas associated with the most likely scenario (identified in §§ 203.85 and 203.88) from your most recently approved application for this royalty relief.
(d) Before starting to build your development and production system, you have revised your estimated development costs, and they are more than 120 percent of the eligible development costs associated with the most likely scenario from your most recently approved application for this royalty relief.
§ 203.75 What risk do I run if I request a redetermination?
If you request a redetermination after we have granted you a suspension volume, you could lose some or all of the previously granted relief. This can happen because you must file a new complete application and pay the required fee, as discussed in § 203.62. We will evaluate your application under § 203.67 using the conditions prevailing at the time of your redetermination request. In our evaluation, we may find that you should receive a larger, equivalent, smaller, or no suspension volume. This means we could find that you do not qualify for the amount of relief previously granted or for any relief at all.
§ 203.76 When might BSEE withdraw or reduce the approved size of my relief?
We will withdraw approval of relief for any of the following reasons.
(a) You change the type of development system proposed in your application (e.g., change from a fixed platform to floating production system, or from an independent development and production system to one with subsea wells tied back to a host production facility, etc.).
(b) You do not start building the proposed development and production system within 18 months of the date we approved your application, unless the BSEE Director grants you an extension under § 203.79(c). If you start building the proposed system and then suspend its construction before completion, and you do not restart continuous building of the proposed system within 18 months of our approval, we will withdraw the relief we granted.
(c) Your actual development costs are less than 80 percent of the eligible development costs estimated in your application’s most likely scenario, and you do not report that fact in your post-production development report (§ 203.70). Development costs are those expenditures defined in § 203.89(b) incurred between the application submission date and start of production. If you report this fact in the post-production development report, you may retain the lesser of 50 percent of the original royalty suspension volume or 50 percent of the median of the distribution of the potentially recoverable resources anticipated in your application.
(d) We granted you a royalty-suspension volume after you qualified for a redetermination under § 203.74(c), and we find out your actual development costs are less than 90 percent of the eligible development costs associated with your application’s most likely scenario. Development costs are those expenditures defined in § 203.89(b) incurred between your application submission date and start of production.
(e) You do not send us the fabrication confirmation report or the post-production development report, or you provide false or intentionally inaccurate information that was material to our granting royalty relief under this section. You must pay royalties and late-payment interest determined under 30 U.S.C. 1721 and 30 CFR 1218.54 on all volumes for which you used the royalty suspension. You also may be subject to penalties under other provisions of law.
§ 203.77 May I voluntarily give up relief if conditions change?
Yes, you may voluntarily give up relief by sending a letter to that effect to the BSEE Regional office for your region.
§ 203.78 Do I keep relief approved by BSEE under this part for my lease, unit or project if prices rise significantly?
If prices rise above a base price threshold for light sweet crude oil or natural gas, you must pay full royalties on production otherwise subject to royalty relief approved by BSEE under §§ 203.60-203.77 for your lease, unit or project as prescribed in this section.
(a) The following table shows the base price threshold for various types of leases, subject to paragraph (b) of this section. Note that, for post-November 2000 deepwater leases in the GOM, price thresholds apply on a lease basis, so different leases on the same development project or expansion project approved for royalty relief may have different price thresholds.
For . . . | The base price threshold is . . . |
---|---|
(1) Pre-Act leases in the GOM, | set by statute. |
(2) Post-November 2000 deep water leases in the GOM or leases offshore of Alaska for which the lease or Notice of Sale set a base price threshold, | indicated in your original lease agreement or, if none, those in the Notice of Sale under which your lease was issued. |
(3) Post-November 2000 deep water leases in the GOM or leases offshore of Alaska for which the lease or Notice of Sale did not set a base price threshold, | the threshold set by statute for pre-Act leases. |
(b) An exception may occur if we determine that the price thresholds in paragraphs (a)(2) or (a)(3) of this section mean the royalty suspension volume set under § 203.69 and in lease terms would provide inadequate encouragement to increase production or development, in which circumstance we could specify a different set of price thresholds on a case-by-case basis.
(c) Suppose your base oil price threshold set under paragraph (a) is $28.00 per barrel, and the daily closing NYMEX light sweet crude oil prices for the previous calendar year exceeds $28.00 per barrel, as adjusted in paragraph (h) of this section. In this case, we retract the royalty relief authorized in this subpart and you must:
(1) Pay royalties on all oil production for the previous year at the lease stipulated royalty rate plus interest (under 30 U.S.C. 1721 and 30 CFR 1218.54) by March 31 of the current calendar year, and
(2) Pay royalties on all your oil production in the current year.
(d) Suppose your base gas price threshold set under paragraph (a) is $3.50 per million British thermal units (Btu), and the daily closing NYMEX light sweet crude oil prices for the previous calendar year exceeds $3.50 per million Btu, as adjusted in paragraph (h) of this section. In this case, we retract the royalty relief authorized in this subpart and you must:
(1) Pay royalties on all gas production for the previous year at the lease stipulated royalty rate plus interest (under 30 U.S.C. 1721 and 30 CFR 1218.54) by March 31 of the current calendar year, and
(2) Pay royalties on all your gas production in the current year.
(e) Production under both paragraphs (c) and (d) of this section counts as part of the royalty-suspension volume.
(f) You are entitled to a refund or credit, with interest, of royalties paid on any production (that counts as part of the royalty-suspension volume):
(1) Of oil if the arithmetic average of the closing prices for the current calendar year is $28.00 per barrel or less, as adjusted in paragraph (h) of this section, and
(2) Of gas if the arithmetic average of the closing natural gas prices for the current calendar year is $3.50 per million Btu or less, as adjusted in paragraph (h) of this section.
(g) You must follow our regulations in the Office of Natural Resources Revenue, 30 CFR chapter XII, for receiving refunds or credits.
(h) We change the prices referred to in paragraphs (c), (d), and (f) of this section periodically. For pre-Act leases, these prices change during each calendar year after 1994 by the percentage that the implicit price deflator for the gross domestic product changed during the preceding calendar year. For post-November 2000 deepwater leases, these prices change as indicated in the lease instrument or in the Notice of Sale under which we issued the lease.
(a) Once we have designated your lease as part of a field and notified you and other affected operators of the designation, you can request reconsideration by sending the BSEE Director a letter within 15 days that also states your reasons. The BSEE Director’s response is the final agency action.
(b) Our decisions on your application for relief from paying royalty under § 203.67 and the royalty-suspension volumes under § 203.69 are final agency actions.
(c) If you cannot start construction by the deadline in § 203.76(b) for reasons beyond your control (e.g., strike at the fabrication yard), you may request an extension up to 1 year by writing the BSEE Director and stating your reasons. The BSEE Director’s response is the final agency action.
(d) We will notify you of all final agency actions by certified mail, return receipt requested. Final agency actions are not subject to appeal to the Interior Board of Land Appeals under 30 CFR part 290 and 43 CFR part 4. They are judicially reviewable under section 10(a) of the Administrative Procedure Act (5 U.S.C. 702) only if you file an action within 30 days of the date you receive our decision.
§ 203.80 When can I get royalty relief if I am not eligible for royalty relief under other sections in the subpart?
We may grant royalty relief when it serves the statutory purposes summarized in § 203.1 and our formal relief programs, including but not limited to the applicable levels of the royalty suspension volumes and price thresholds, provide inadequate encouragement to promote development or increase production. Unless your lease lies offshore of Alaska or wholly west of 87 degrees, 30 minutes West longitude in the GOM, your lease must be producing to qualify for relief. Before you may apply for royalty relief apart from our programs for end-of-life leases or for pre-Act deep water leases and development and expansion projects, we must agree that your lease or project has two or more of the following characteristics:
(a) The lease has produced for a substantial period and the lessee can recover significant additional resources. Significant additional resources mean enough to allow production for at least a year more than would be profitable without royalty relief.
(b) Valuable facilities (e.g., a platform or pipeline that would be removed upon lease relinquishment) exist that we do not expect a successor lessee to use. If the facilities are located off the lease, their preservation must depend on continued production from the lease applying for royalty relief. We will only consider an allocable share of costs for off-lease facilities in the relief application.
(c) A substantial risk exists that no new lessee will recover the resources.
(d) The lessee made major efforts to reduce operating costs too recently to use the formal program for royalty relief (e.g., recent significant change in operations).
(e) Circumstances beyond the lessee’s control, other than water depth, preclude reliance on one of the existing royalty relief programs.
Required Reports
§ 203.81 What supplemental reports do royalty-relief applications require?
(a) You must send us the supplemental reports, indicated in the following table by an X, that apply to your field. Sections 203.83 through 203.91 describe these reports in detail.
Required reports | End-of-life lease | Deep water | ||
---|---|---|---|---|
Expansion project | Pre-act lease | Development project | ||
(1) Administrative information Report | X | X | X | X |
(2) Net revenue & relief justification report | X | |||
(3) Economic viability & relief justification report (RSVP model inputs justified by other required reports) | X | X | X | |
(4) G&G report | X | X | X | |
(5) Engineering report | X | X | X | |
(6) Production report | X | X | X | |
(7) Deep water cost report | X | X | X | |
(8) Fabricator’s confirmation report | X | X | X | |
(9) Post-production development report | X | X | X |
(b) You must certify that all information in your application, fabricator’s confirmation and post-production development reports is accurate, complete, and conforms to the most recent content and presentation guidelines available from the BSEE Regional office for your region.
(c) With your application and post-production development report, you must submit an additional report prepared by an independent CPA that:
(1) Assesses the accuracy of the historical financial information in your report; and
(2) Certifies that the content and presentation of the financial data and information conform to our most recent guidelines on royalty relief. This means the data and information must:
(i) Include only eligible costs that are incurred during the qualification months; and
(ii) Be shown in the proper format.
(d) You must identify the people in the CPA firm who prepared the reports referred to in paragraph (c) of this section and make them available to us to respond to questions about the historical financial information. We may also further review your records to support this information.
The Office of Management and Budget (OMB) approved the information collection requirements in part 203 under 44 U.S.C. 3501 et seq., and assigned OMB control number 1010-0071.
(a) We use the information to determine whether royalty relief will result in production that wouldn’t otherwise occur. We rely largely on your information to make these determinations.
(1) Your application for royalty relief must contain enough information on finances, economics, reservoirs, G&G characteristics, production, and engineering estimates for us to determine whether:
(i) We should grant relief under the law, and
(ii) The requested relief will ultimately recover more resources and return a reasonable profit on project investments.
(2) Your fabricator confirmation and post-production development reports must contain enough information for us to verify that your application reasonably represented your plans.
(b) Applicants (respondents) are Federal OCS oil and gas lessees. Applications are required to obtain or retain a benefit. Therefore, if you apply for royalty relief, you must provide this information. We will protect information considered proprietary under applicable law and under regulations at § 203.63 and 30 CFR part 250.
(c) The Paperwork Reduction Act of 1995 requires us to inform you that we may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.
(d) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.
§ 203.83 What is in an administrative information report?
This report identifies the field or lease for which royalty relief is requested and must contain the following items:
(a) The field or lease name;
(b) The serial number of leases we have assigned to the field, names of the lease title holders of record, the lease operators, and whether any lease is part of a unit;
(c) Well number, API number, location, and status of each well that has been drilled on the field or lease or project (not required for non-oil and gas leases);
(d) The location of any new wells proposed under the terms of the application (not required for non-oil and gas leases);
(e) A description of field or lease history;
(f) Full information as to whether you will pay royalties or a share of production to anyone other than the United States, the amount you will pay, and how much you will reduce this payment if we grant relief;
(g) The type of royalty relief you are requesting;
(h) Confirmation that BOEM approved a DOCD or supplemental DOCD (Deep Water expansion project applications only); and
(i) A narrative description of the development activities associated with the proposed capital investments and an explanation of proposed timing of the activities and the effect on production (Deep Water applications only).
§ 203.84 What is in a net revenue and relief justification report?
This report presents cash flow data for 12 qualifying months, using the format specified in the “Guidelines for the Application, Review, Approval, and Administration of Royalty Relief for End-of-Life Leases”, U.S. Department of the Interior, BSEE. Qualifying months for an oil and gas lease are the most recent 12 months out of the last 15 months that you produced at least 100 BOE per day on average. Qualifying months for other than oil and gas leases are the most recent 12 of the last 15 months having some production.
(a) The cash flow table you submit must include historical data for:
(1) Lease production subject to royalty;
(2) Total revenues;
(3) Royalty payments out of production;
(4) Total allowable costs; and
(5) Transportation and processing costs.
(b) Do not include in your cash flow table the non-allowable costs listed at 30 CFR 1220.013 or:
(1) OCS rental payments on the lease(s) in the application;
(2) Damages and losses;
(3) Taxes;
(4) Any costs associated with exploratory activities;
(5) Civil or criminal fines or penalties;
(6) Fees for your royalty relief application; and
(7) Costs associated with existing obligations (e.g., royalty overrides or other forms of payment for acquiring the lease, depreciation on previously acquired equipment or facilities).
(c) We may, in reviewing and evaluating your application, disallow costs when you have not shown they are necessary to operate the lease, or if they are inconsistent with end-of-life operations.
§ 203.85 What is in an economic viability and relief justification report?
This report should show that your project appears economic without royalties and sunk costs using the RSVP model we provide. The format of the report and the assumptions and parameters we specify are found in the “Guidelines for the Application, Review, Approval and Administration of the Deep Water Royalty Relief Program,” U.S. Department of the Interior, BSEE. Clearly justify each parameter you set in every scenario you specify in the RSVP. You may provide supplemental information, including your own model and results. The economic viability and relief justification report must contain the following items for an oil and gas lease.
(a) Economic assumptions we provide which include:
(1) Starting oil and gas prices;
(2) Real price growth;
(3) Real cost growth or decline rate, if any;
(4) Base year;
(5) Range of discount rates; and
(6) Tax rate (for use in determining after-tax sunk costs).
(b) Analysis of projected cash flow (from the date of the application using annual totals and constant dollar values) which shows:
(1) Oil and gas production;
(2) Total revenues;
(3) Capital expenditures;
(4) Operating costs;
(5) Transportation costs; and
(6) Before-tax net cash flow without royalties, overrides, sunk costs, and ineligible costs.
(c) Discounted values which include:
(1) Discount rate used (selected from within the range we specify).
(2) Before-tax net present value without royalties, overrides, sunk costs, and ineligible costs.
(d) Demonstrations that:
(1) All costs, gross production, and scheduling are consistent with the data in the G&G, engineering, production, and cost reports (§§ 203.86 through 203.89) and
(2) The development and production scenarios provided in the various reports are consistent with each other and with the proposed development system. You can use up to three scenarios (conservative, most likely, and optimistic), but you must link each to a specific range on the distribution of resources from the RSVP Resource Module.
§ 203.86 What is in a G&G report?
This report supports the reserve and resource estimates used in the economic evaluation and must contain each of the following elements.
(a) Seismic data which includes:
(1) Non-interpreted 2D/3D survey lines reflecting any available state-of-the-art processing technique in a format readable by BSEE and specified by the deep water royalty relief guidelines;
(2) Interpreted 2D/3D seismic survey lines reflecting any available state-of-the-art processing technique identifying all known and prospective pay horizons, wells, and fault cuts;
(3) Digital velocity surveys in the format of the GOM region’s letter to lessees of 10/1/90;
(4) Plat map of “shot points;” and
(5) “Time slices” of potential horizons.
(b) Well data which includes:
(1) Hard copies of all well logs in which—
(i) The 1-inch electric log shows pay zones and pay counts and lithologic and paleo correlation markers at least every 500-feet,
(ii) The 1-inch type log shows missing sections from other logs where faulting occurs,
(iii) The 5-inch electric log shows pay zones and pay counts and labeled points used in establishing resistivity of the formation, 100 percent water saturated (R
(iv) The 5-inch porosity logs show pay zones and pay counts and labeled points used in establishing reservoir porosity or labeled points showing values used in calculating reservoir porosity such as bulk density or transit time;
(2) Digital copies of all well logs spudded before December 1, 1995;
(3) Core data, if available;
(4) Well correlation sections;
(5) Pressure data;
(6) Production test results;
(7) Pressure-volume-temperature analysis, if available; and
(8) A table listing the wells and completions, and indicating which sands and fault blocks will be targeted for completion or recompletion.
(c) Map interpretations which includes for each reservoir in the field:
(1) Structure maps consisting of top and base of sand maps showing well and seismic shot point locations;
(2) Isopach maps for net sand, net oil, net gas, all with well locations;
(3) Maps indicating well surface and bottom hole locations, location of development facilities, and shot points; and
(4) An explanation for excluding the reservoirs you are not planning to develop.
(d) Reservoir-specific data which includes:
(1) Probability of reservoir occurrence with hydrocarbons;
(2) Probability the hydrocarbon in the reservoir is all oil and the probability it is all gas;
(3) Distributions or point estimates (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for the parameters used to estimate reservoir size, i.e., acres and net thickness;
(4) Most likely values for porosity, salt water saturation, volume factor for oil formation, and volume factor for gas formation;
(5) Distributions or point estimates (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for recovery efficiency (in percent) and oil or gas recovery (in stock-tank-barrels per acre-foot or in thousands of cubic feet per acre foot);
(6) A gas/oil ratio distribution or point estimate (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for each reservoir;
(7) A yield distribution or point estimate (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for each gas reservoir; and
(8) Reserve or resource distribution by reservoir.
(e) Aggregated reserve and resource data which includes:
(1) The aggregated distributions for reserves and resources (in BOE) and oil fraction for your field computed by the resource module of our RSVP model;
(2) A description of anticipated hydrocarbon quality (i.e., specific gravity); and
(3) The ranges within the aggregated distribution for reserves and resources that define the development and production scenarios presented in the engineering and production reports. Typically there will be three ranges specified by two positive reserve and resource points on the aggregated distribution. The range at the low end of the distribution will be associated with the conservative development and production scenario; the middle range will be related to the most likely development and production scenario; and, the high end range will be consistent with the optimistic development and production scenario.
§ 203.87 What is in an engineering report?
This report defines the development plan and capital requirements for the economic evaluation and must contain the following elements.
(a) A description of the development concept (e.g., tension leg platform, fixed platform, floater type, subsea tieback, etc.) which includes:
(1) Its size along with basic design specifications and drawings; and
(2) The construction schedule.
(b) An identification of planned wells which includes:
(1) The number;
(2) The type (platform, subsea, vertical, deviated, horizontal);
(3) The well depth;
(4) The drilling schedule;
(5) The kind of completion (single, dual, horizontal, etc.); and
(6) The completion schedule.
(c) A description of the production system equipment which includes:
(1) The production capacity for oil and gas and a description of limiting component(s);
(2) Any unusual problems (low gravity, paraffin, etc.);
(3) All subsea structures;
(4) All flowlines; and
(5) Schedule for installing the production system.
(d) A discussion of any plans for multi-phase development which includes the conceptual basis for developing in phases and goals or milestones required for starting later phases.
(e) A set of development scenarios consisting of activity timing and scale associated with each of up to three production profiles (conservative, most likely, optimistic) provided in the production report for your field (§ 203.88). Each development scenario and production profile must denote the likely events should the field size turn out to be within a range represented by one of the three segments of the field size distribution. If you send in fewer than three scenarios, you must explain why fewer scenarios are more efficient across the whole field size distribution.
§ 203.88 What is in a production report?
This report supports your development and production timing and product quality expectations and must contain the following elements.
(a) Production profiles by well completion and field that specify the actual and projected production by year for each of the following products: oil, condensate, gas, and associated gas. The production from each profile must be consistent with a specific level of reserves and resources on the aggregated distribution of field size.
(b) Production drive mechanisms for each reservoir.
§ 203.89 What is in a cost report?
This report lists all actual and projected costs for your field, must explain and document the source of each cost estimate, and must identify the following elements.
(a) Sunk costs. Report sunk costs in dollars not adjusted for inflation and only if you have documentation.
(b) Appraisal, delineation and development costs. Base them on actual spending, current authorization for expenditure, engineering estimates, or analogous projects. These costs cover:
(1) Platform well drilling and average depth;
(2) Platform well completion;
(3) Subsea well drilling and average depth;
(4) Subsea well completion;
(5) Production system (platform); and
(6) Flowline fabrication and installation.
(c) Production costs based on historical costs, engineering estimates, or analogous projects. These costs cover:
(1) Operation;
(2) Equipment; and
(3) Existing royalty overrides (we will not use the royalty overrides in evaluations).
(d) Transportation costs, based on historical costs, engineering estimates, or analogous projects. These costs cover:
(1) Oil or gas tariffs from pipeline or tankerage;
(2) Trunkline and tieback lines; and
(3) Gas plant processing for natural gas liquids.
(e) Abandonment costs, based on historical costs, engineering estimates, or analogous projects. You should provide the costs to plug and abandon only wells and to remove only production systems for which you have not incurred costs as of the time of application submission. You should also include a point estimate or distribution of prospective salvage value for all potentially reusable facilities and materials, along with the source and an explanation of the figures provided.
(f) A set of cost estimates consistent with each one of up to three field-development scenarios and production profiles (conservative, most likely, optimistic). You should express costs in constant real dollar terms for the base year. You may also express the uncertainty of each cost estimate with a minimum and maximum percentage of the base value.
(g) A spending schedule. You should provide costs for each year (in real dollars) for each category in paragraphs (a) through (f) of this section.
(h) A summary of other costs which are ineligible for evaluating your need for relief. These costs cover:
(1) Expenses before first discovery on the field;
(2) Cash bonuses;
(3) Fees for royalty relief applications;
(4) Lease rentals, royalties, and payments of net profit share and net revenue share;
(5) Legal expenses;
(6) Damages and losses;
(7) Taxes;
(8) Interest or finance charges, including those embedded in equipment leases;
(9) Fines or penalties; and
(10) Money spent on previously existing obligations (e.g., royalty overrides or other forms of payment for acquiring a financial position in a lease, expenditures for plugging wells and removing and abandoning facilities that existed on the application submission date).
§ 203.90 What is in a fabricator’s confirmation report?
This report shows you have committed in a timely way to the approved system for production. This report must include the following (or its equivalent for unconventionally acquired systems):
(a) A copy of the contract(s) under which the fabrication yard is building the approved system for you;
(b) A letter from the contractor building the system to the BSEE Regional Director for your region certifying when construction started on your system; and
(c) Evidence of an appropriate down payment or equal action that you’ve started acquiring the approved system.
§ 203.91 What is in a post-production development report?
For each cost category in the deep water cost report, you must compare actual costs up to the date when production starts to your planned pre-production costs. If your application included more than one development scenario, you need to compare actual costs with those in your scenario of most likely development. Also, you must have this report certified by an independent CPA according to § 203.81(c).
Subpart C—Federal and Indian Oil [Reserved]
Subpart D—Federal and Indian Gas [Reserved]
Subpart E—Solid Minerals, General [Reserved]
Subpart F [Reserved]
Subpart G—Other Solid Minerals [Reserved]
Subpart H—Geothermal Resources [Reserved]
Subpart I—OCS Sulfur [Reserved]
SUBCHAPTER B—OFFSHORE
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart A—General
Authority and Definition of Terms
§ 250.101 Authority and applicability.
The Secretary of the Interior (Secretary) authorized the Bureau of Safety and Environmental Enforcement (BSEE) to regulate oil, gas, and sulphur exploration, development, and production operations on the Outer Continental Shelf (OCS). Under the Secretary’s authority, the Director requires that all operations:
(a) Be conducted according to the OCS Lands Act (OCSLA), the regulations in this part, BSEE orders, the lease or right-of-way, and other applicable laws, regulations, and amendments; and
(b) Conform to sound conservation practice to preserve, protect, and develop mineral resources of the OCS to:
(1) Make resources available to meet the Nation’s energy needs;
(2) Balance orderly energy resource development with protection of the human, marine, and coastal environments;
(3) Ensure the public receives a fair and equitable return on the resources of the OCS;
(4) Preserve and maintain free enterprise competition; and
(5) Minimize or eliminate conflicts between the exploration, development, and production of oil and natural gas and the recovery of other resources.
§ 250.102 What does this part do?
(a) This part 250 contains the regulations of the BSEE Offshore program that govern oil, gas, and sulphur exploration, development, and production operations on the OCS. When you conduct operations on the OCS, you must submit requests, applications, and notices, or provide supplemental information for BSEE approval.
(b) The following table of general references shows where to look for information about these processes.
For information about . . . | Refer to . . . |
---|---|
(1) Applications for permit to drill, | 30 CFR part 250, subpart D. |
(2) Development and Production Plans (DPP), | 30 CFR part 550, subpart B. |
(3) Downhole commingling, | 30 CFR part 250, subpart K. |
(4) Exploration Plans (EP), | 30 CFR part 550, subpart B. |
(5) Flaring, | 30 CFR part 250, subpart K. |
(6) Gas measurement, | 30 CFR part 250, subpart L. |
(7) Off-lease geological and geophysical permits, | 30 CFR part 551. |
(8) Oil spill financial responsibility coverage, | 30 CFR part 553. |
(9) Oil and gas production safety systems, | 30 CFR part 250, subpart H. |
(10) Oil spill response plans, | 30 CFR part 254. |
(11) Oil and gas well-completion operations, | 30 CFR part 250, subpart E. |
(12) Oil and gas well-workover operations, | 30 CFR part 250, subpart F. |
(13) Decommissioning Activities, | 30 CFR part 250, subpart Q. |
(14) Platforms and structures, | 30 CFR part 250, subpart I. |
(15) Pipelines and Pipeline Rights-of-Way, | 30 CFR part 250, subpart J and 30 CFR part 550, subpart J. |
(16) Sulphur operations, | 30 CFR part 250, subpart P. |
(17) Training, | 30 CFR part 250, subpart O. |
(18) Unitization, | 30 CFR part 250, subpart M. |
(19) Safety and Environmental Management Systems (SEMS), | 30 CFR part 250, subpart S. |
§ 250.103 Where can I find more information about the requirements in this part?
BSEE may issue Notices to Lessees and Operators (NTLs) that clarify, supplement, or provide more detail about certain requirements. NTLs may also outline what you must provide as required information in your various submissions to BSEE.
§ 250.104 How may I appeal a decision made under BSEE regulations?
To appeal orders or decisions issued under BSEE regulations in 30 CFR parts 250 to 282, follow the procedures in 30 CFR part 290.
§ 250.105 Definitions.
Terms used in this part will have the meanings given in the Act and as defined in this section:
Act means the OCS Lands Act, as amended (43 U.S.C. 1331 et seq.).
Affected State means with respect to any program, plan, lease sale, or other activity proposed, conducted, or approved under the provisions of the Act, any State:
(1) The laws of which are declared, under section 4(a)(2) of the Act, to be the law of the United States for the portion of the OCS on which such activity is, or is proposed to be, conducted;
(2) Which is, or is proposed to be, directly connected by transportation facilities to any artificial island or installation or other device permanently or temporarily attached to the seabed;
(3) Which is receiving, or according to the proposed activity, will receive oil for processing, refining, or transshipment that was extracted from the OCS and transported directly to such State by means of vessels or by a combination of means including vessels;
(4) Which is designated by the Secretary as a State in which there is a substantial probability of significant impact on or damage to the coastal, marine, or human environment, or a State in which there will be significant changes in the social, governmental, or economic infrastructure, resulting from the exploration, development, and production of oil and gas anywhere on the OCS; or
(5) In which the Secretary finds that because of such activity there is, or will be, a significant risk of serious damage, due to factors such as prevailing winds and currents to the marine or coastal environment in the event of any oil spill, blowout, or release of oil or gas from vessels, pipelines, or other transshipment facilities.
Air pollutant means any airborne agent or combination of agents for which the Environmental Protection Agency (EPA) has established, under section 109 of the Clean Air Act, national primary or secondary ambient air quality standards.
Analyzed geological information means data collected under a permit or a lease that have been analyzed. Analysis may include, but is not limited to, identification of lithologic and fossil content, core analysis, laboratory analyses of physical and chemical properties, well logs or charts, results from formation fluid tests, and descriptions of hydrocarbon occurrences or hazardous conditions.
Ancillary activities mean those activities on your lease or unit that you:
(1) Conduct to obtain data and information to ensure proper exploration or development of your lease or unit; and
(2) Can conduct without Bureau of Ocean Energy Management (BOEM) approval of an application or permit.
Archaeological interest means capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurement, controlled collection, analysis, interpretation, and explanation.
Archaeological resource means any material remains of human life or activities that are at least 50 years of age and that are of archaeological interest.
Arctic OCS means the Beaufort Sea and Chukchi Sea Planning Areas (for more information on these areas, see the Proposed Final OCS Oil and Gas Leasing Program for 2012-2017 (June 2012) at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/2012-2017/Program-Area-Maps/index.aspx).
Arctic OCS conditions means, for the purposes of this part, the conditions operators can reasonably expect during operations on the Arctic OCS. Such conditions, depending on the time of year, include, but are not limited to: Extreme cold, freezing spray, snow, extended periods of low light, strong winds, dense fog, sea ice, strong currents, and dangerous sea states. Remote location, relative lack of infrastructure, and the existence of subsistence hunting and fishing areas are also characteristic of the Arctic region.
Attainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) not to exceed any primary or secondary ambient air quality standards established by EPA.
Best available and safest technology (BAST) means the best available and safest technologies that the BSEE Director determines to be economically feasible wherever failure of equipment would have a significant effect on safety, health, or the environment.
Best available control technology (BACT) means an emission limitation based on the maximum degree of reduction for each air pollutant subject to regulation, taking into account energy, environmental and economic impacts, and other costs. The Regional Supervisor will verify the BACT on a case-by-case basis, and it may include reductions achieved through the application of processes, systems, and techniques for the control of each air pollutant.
BOP systems and related equipment includes all pressure controlling and pressure containing well control equipment that may or will be exposed to the well’s MASP during drilling, completion, workover, intervention, or abandonment. Well control equipment includes equipment that is installed for the purpose of pressure control and pressure containment when it becomes necessary to physically enter a well bore during drilling, completion, workover, intervention, or abandonment modes of operation.
Cap and flow system means an integrated suite of equipment and vessels, including a capping stack and associated flow lines, that, when installed or positioned, is used to control the flow of fluids escaping from the well by conveying the fluids to the surface to a vessel or facility equipped to process the flow of oil, gas, and water. A cap and flow system is a high pressure system that includes the capping stack and piping necessary to convey the flowing fluids through the choke manifold to the surface equipment.
Capping stack means a mechanical device, including one that is pre-positioned, that can be installed on top of a subsea or surface wellhead or blowout preventer to stop the uncontrolled flow of fluids into the environment.
Coastal environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the terrestrial ecosystem from the shoreline inward to the boundaries of the coastal zone.
Coastal zone means the coastal waters (including the lands therein and thereunder) and the adjacent shorelands (including the waters therein and thereunder) strongly influenced by each other and in proximity to the shorelands of the several coastal States. The coastal zone includes islands, transition and intertidal areas, salt marshes, wetlands, and beaches. The coastal zone extends seaward to the outer limit of the U.S. territorial sea and extends inland from the shorelines to the extent necessary to control shorelands, the uses of which have a direct and significant impact on the coastal waters, and the inward boundaries of which may be identified by the several coastal States, under the authority in section 305(b)(1) of the Coastal Zone Management Act (CZMA) of 1972.
Competitive reservoir means a reservoir in which there are one or more producible or producing well completions on each of two or more leases or portions of leases, with different lease operating interests, from which the lessees plan future production.
Containment dome means a non-pressurized container that can be used to collect fluids escaping from the well or equipment below the sea surface or from seeps by suspending the device over the discharge or seep location. The containment dome includes all of the equipment necessary to capture and convey fluids to the surface.
Correlative rights when used with respect to lessees of adjacent leases, means the right of each lessee to be afforded an equal opportunity to explore for, develop, and produce, without waste, minerals from a common source.
Data means facts and statistics, measurements, or samples that have not been analyzed, processed, or interpreted.
Departures mean approvals granted by the appropriate BSEE or BOEM representative for operating requirements/procedures other than those specified in the regulations found in this part. These requirements/procedures may be necessary to control a well; properly develop a lease; conserve natural resources, or protect life, property, or the marine, coastal, or human environment.
Development means those activities that take place following discovery of minerals in paying quantities, including but not limited to geophysical activity, drilling, platform construction, and operation of all directly related onshore support facilities, and which are for the purpose of producing the minerals discovered.
Development geological and geophysical (G&G) activities mean those G&G and related data-gathering activities on your lease or unit that you conduct following discovery of oil, gas, or sulphur in paying quantities to detect or imply the presence of oil, gas, or sulphur in commercial quantities.
Director means the Director of BSEE of the U.S. Department of the Interior, or an official authorized to act on the Director’s behalf.
District Manager means the BSEE officer with authority and responsibility for operations or other designated program functions for a district within a BSEE Region. For activities on the Alaska OCS, any reference in this part to District Manager means the BSEE Regional Supervisor.
Eastern Gulf of Mexico means all OCS areas of the Gulf of Mexico the BOEM Director decides are adjacent to the State of Florida. The Eastern Gulf of Mexico is not the same as the Eastern Planning Area, an area established for OCS lease sales.
Emission offsets mean emission reductions obtained from facilities, either onshore or offshore, other than the facility or facilities covered by the proposed Exploration Plan (EP) or Development and Production Plan (DPP).
Enhanced recovery operations mean pressure maintenance operations, secondary and tertiary recovery, cycling, and similar recovery operations that alter the natural forces in a reservoir to increase the ultimate recovery of oil or gas.
Existing facility, as used in 30 CFR 550.303, means an OCS facility described in an Exploration Plan or a Development and Production Plan approved before June 2, 1980.
Exploration means the commercial search for oil, gas, or sulphur. Activities classified as exploration include but are not limited to:
(1) Geophysical and geological (G&G) surveys using magnetic, gravity, seismic reflection, seismic refraction, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur; and
(2) Any drilling conducted for the purpose of searching for commercial quantities of oil, gas, and sulphur, including the drilling of any additional well needed to delineate any reservoir to enable the lessee to decide whether to proceed with development and production.
Facility means:
(1) As used in § 250.130, all installations permanently or temporarily attached to the seabed on the OCS (including manmade islands and bottom-sitting structures). They include mobile offshore drilling units (MODUs) or other vessels engaged in drilling or downhole operations, used for oil, gas or sulphur drilling, production, or related activities. They include all floating production systems (FPSs), variously described as column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. They also include facilities for product measurement and royalty determination (e.g., lease Automatic Custody Transfer Units, gas meters) of OCS production on installations not on the OCS. Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with processing equipment and one or more satellite or secondary installations is a single facility. The Regional Supervisor may decide that the complexity of the individual installations justifies their classification as separate facilities.
(2) As used in 30 CFR 550.303, means all installations or devices permanently or temporarily attached to the seabed. They include mobile offshore drilling units (MODUs), even while operating in the “tender assist” mode (i.e., with skid-off drilling units) or other vessels engaged in drilling or downhole operations. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.
(3) As used in § 250.490(b), means a vessel, a structure, or an artificial island used for drilling, well completion, well-workover, or production operations.
(4) As used in §§ 250.900 through 250.921, means all installations or devices permanently or temporarily attached to the seabed. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.
(5) As used in subpart S of this part, all types of structures permanently or temporarily attached to the seabed (e.g., mobile offshore drilling units (MODUs); floating production systems; floating production, storage and offloading facilities; tension-leg platforms; and spars) that are used for exploration, development, and production activities for oil, gas, or sulphur in the OCS. Facilities also include DOI-regulated pipelines.
Flaring means the burning of natural gas as it is released into the atmosphere.
Gas reservoir means a reservoir that contains hydrocarbons predominantly in a gaseous (single-phase) state.
Gas-well completion means a well completed in a gas reservoir or in the associated gas-cap of an oil reservoir.
Geological and geophysical (G&G) explorations mean those G&G surveys on your lease or unit that use seismic reflection, seismic refraction, magnetic, gravity, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur in commercial quantities.
Governor means the Governor of a State, or the person or entity designated by, or under, State law to exercise the powers granted to such Governor under the Act.
H
(1) Drilling, logging, coring, testing, or producing operations have confirmed the absence of H
(2) Drilling in the surrounding areas and correlation of geological and seismic data with equivalent stratigraphic units have confirmed an absence of H
H
H
HPHT environment means when one or more of the following well conditions exist:
(1) The drilling, completion, workover, intervention, injection, production, or abandonment of the well requires pressure controlling or pressure containing equipment, including well control equipment, assigned a pressure rating greater than 15,000 psia or a temperature rating greater than 350 degrees Fahrenheit;
(2) The MASP or SITP is greater than 15,000 psia at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead; or
(3) The flowing temperature is greater than 350 degrees Fahrenheit at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead.
Human environment means the physical, social, and economic components, conditions, and factors that interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.
Interpreted geological information means geological knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of data and analyzed geological information.
Interpreted geophysical information means geophysical knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of geophysical data and analyzed geophysical information.
Lease means an agreement that is issued under section 8 or maintained under section 6 of the Act and that authorizes exploration for, and development and production of, minerals. The term also means the area covered by that authorization, whichever the context requires.
Lease term pipelines mean those pipelines owned and operated by a lessee or operator that are completely contained within the boundaries of a single lease, unit, or contiguous (not cornering) leases of that lessee or operator.
Lessee means a person who has entered into a lease with the United States to explore for, develop, and produce the leased minerals. The term lessee also includes the BOEM-approved assignee of the lease, and the owner or the BOEM-approved assignee of operating rights for the lease.
Major Federal action means any action or proposal by the Secretary that is subject to the provisions of section 102(2)(C) of the National Environmental Policy Act of 1969, 42 U.S.C. (2)(C) (i.e., an action that will have a significant impact on the quality of the human environment requiring preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act).
Marine environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the marine ecosystem. These include the waters of the high seas, the contiguous zone, transitional and intertidal areas, salt marshes, and wetlands within the coastal zone and on the OCS.
Material remains mean physical evidence of human habitation, occupation, use, or activity, including the site, location, or context in which such evidence is situated.
Maximum efficient rate (MER) means the maximum sustainable daily oil or gas withdrawal rate from a reservoir that will permit economic development and depletion of that reservoir without detriment to ultimate recovery.
Maximum production rate (MPR) means the approved maximum daily rate at which oil or gas may be produced from a specified oil-well or gas-well completion.
Minerals include oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals that are authorized by an Act of Congress to be produced.
Natural resources include, without limiting the generality thereof, oil, gas, and all other minerals, and fish, shrimp, oysters, clams, crabs, lobsters, sponges, kelp, and other marine animal and plant life but does not include water power or the use of water for the production of power.
Nonattainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) to exceed any primary or secondary ambient air quality standard established by EPA.
Nonsensitive reservoir means a reservoir in which ultimate recovery is not decreased by high reservoir production rates.
Oil reservoir means a reservoir that contains hydrocarbons predominantly in a liquid (single-phase) state.
Oil reservoir with an associated gas cap means a reservoir that contains hydrocarbons in both a liquid and gaseous (two-phase) state.
Oil-well completion means a well completed in an oil reservoir or in the oil accumulation of an oil reservoir with an associated gas cap.
Operating rights mean any interest held in a lease with the right to explore for, develop, and produce leased substances.
Operator means the person the lessee(s) designates as having control or management of operations on the leased area or a portion thereof. An operator may be a lessee, the BSEE-approved or BOEM-approved designated agent of the lessee(s), or the holder of operating rights under a BOEM-approved operating rights assignment.
Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside of the area of lands beneath navigable waters as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301) whose subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.
Person includes a natural person, an association (including partnerships, joint ventures, and trusts), a State, a political subdivision of a State, or a private, public, or municipal corporation.
Pipelines are the piping, risers, and appurtenances installed for transporting oil, gas, sulphur, and produced waters.
Processed geological or geophysical information means data collected under a permit or a lease that have been processed or reprocessed. Processing involves changing the form of data to facilitate interpretation. Processing operations may include, but are not limited to, applying corrections for known perturbing causes, rearranging or filtering data, and combining or transforming data elements. Reprocessing is the additional processing other than ordinary processing used in the general course of evaluation. Reprocessing operations may include varying identified parameters for the detailed study of a specific problem area.
Production means those activities that take place after the successful completion of any means for the removal of minerals, including such removal, field operations, transfer of minerals to shore, operation monitoring, maintenance, and workover operations.
Production areas are those areas where flammable petroleum gas, volatile liquids or sulphur are produced, processed (e.g., compressed), stored, transferred (e.g., pumped), or otherwise handled before entering the transportation process.
Projected emissions mean emissions, either controlled or uncontrolled, from a source or sources.
Prospect means a geologic feature having the potential for mineral deposits.
Regional Director means the BSEE officer with responsibility and authority for a Region within BSEE.
Regional Supervisor means the BSEE officer with responsibility and authority for operations or other designated program functions within a BSEE Region.
Right-of-Use and Easement (RUE) means a right to use a portion of the seabed at an OCS site, other than on a lease you own, to construct, secure to the seafloor, use, modify, or maintain platforms, sea floor production equipment, artificial islands, facilities, installations, and other devices, established to support the exploration, development, or production of oil and gas, mineral, or energy resources from an OCS or State submerged lands lease.
Right-of-way pipelines are those pipelines that are contained within:
(1) The boundaries of a single lease or unit, but are not owned and operated by a lessee or operator of that lease or unit;
(2) The boundaries of contiguous (not cornering) leases that do not have a common lessee or operator;
(3) The boundaries of contiguous (not cornering) leases that have a common lessee or operator but are not owned and operated by that common lessee or operator; or
(4) An unleased block(s).
Routine operations, for the purposes of subpart F, mean any of the following operations conducted on a well with the tree installed:
(1) Cutting paraffin;
(2) Removing and setting pump-through-type tubing plugs, gas-lift valves, and subsurface safety valves that can be removed by wireline operations;
(3) Bailing sand;
(4) Pressure surveys;
(5) Swabbing;
(6) Scale or corrosion treatment;
(7) Caliper and gauge surveys;
(8) Corrosion inhibitor treatment;
(9) Removing or replacing subsurface pumps;
(10) Through-tubing logging (diagnostics);
(11) Wireline fishing;
(12) Setting and retrieving other subsurface flow-control devices; and
(13) Acid treatments.
Sensitive reservoir means a reservoir in which the production rate will affect ultimate recovery.
Significant archaeological resource means those archaeological resources that meet the criteria of significance for eligibility to the National Register of Historic Places as defined in 36 CFR 60.4, or its successor.
Source control and containment equipment (SCCE) means the capping stack, cap and flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels the collective purpose of which is to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment. “Surface devices” refers to equipment mounted or staged on a barge, vessel, or facility to separate, treat, store and/or dispose of fluids conveyed to the surface by the cap and flow system or the containment dome. “Subsea devices” includes, but is not limited to, remotely operated vehicles, anchors, buoyancy equipment, connectors, cameras, controls and other subsea equipment necessary to facilitate the deployment, operation, and retrieval of the SCCE. The SCCE does not include a blowout preventer.
Suspension means a granted or directed deferral of the requirement to produce (Suspension of Production (SOP)) or to conduct leaseholding operations (Suspension of Operations (SOO)).
Venting means the release of gas into the atmosphere without igniting it. This includes gas that is released underwater and bubbles to the atmosphere.
Waste of oil, gas, or sulphur means:
(1) The physical waste of oil, gas, or sulphur;
(2) The inefficient, excessive, or improper use, or the unnecessary dissipation of reservoir energy;
(3) The locating, spacing, drilling, equipping, operating, or producing of any oil, gas, or sulphur well(s) in a manner that causes or tends to cause a reduction in the quantity of oil, gas, or sulphur ultimately recoverable under prudent and proper operations or that causes or tends to cause unnecessary or excessive surface loss or destruction of oil or gas; or
(4) The inefficient storage of oil.
Welding means all activities connected with welding, including hot tapping and burning.
Wellbay is the area on a facility within the perimeter of the outermost wellheads.
Well-completion operations mean the work conducted to establish production from a well after the production-casing string has been set, cemented, and pressure-tested.
Well-control fluid means drilling mud, completion fluid, or workover fluid as appropriate to the particular operation being conducted.
Western Gulf of Mexico means all OCS areas of the Gulf of Mexico except those the BOEM Director decides are adjacent to the State of Florida. The Western Gulf of Mexico is not the same as the Western Planning Area, an area established for OCS lease sales.
Workover operations mean the work conducted on wells after the initial well-completion operation for the purpose of maintaining or restoring the productivity of a well.
You means a lessee, the owner or holder of operating rights, a designated operator or agent of the lessee(s), a pipeline right-of-way holder, or a State lessee granted a right-of-use and easement.
Performance Standards
§ 250.106 What standards will the Director use to regulate lease operations?
The Director will regulate all operations under a lease, right-of-use and easement, or right-of-way to:
(a) Promote orderly exploration, development, and production of mineral resources;
(b) Prevent injury or loss of life;
(c) Prevent damage to or waste of any natural resource, property, or the environment; and
(d) Cooperate and consult with affected States, local governments, other interested parties, and relevant Federal agencies.
§ 250.107 What must I do to protect health, safety, property, and the environment?
(a) You must protect health, safety, property, and the environment by:
(1) Performing all operations in a safe and workmanlike manner;
(2) Maintaining all equipment and work areas in a safe condition;
(3) Utilizing recognized engineering practices that reduce risks to the lowest level practicable when conducting design, fabrication, installation, operation, inspection, repair, and maintenance activities; and
(4) Complying with all lease, plan, and permit terms and conditions.
(b) You must immediately control, remove, or otherwise correct any hazardous oil and gas accumulation or other health, safety, or fire hazard.
(c) Best available and safest technology. (1) On all new drilling and production operations and, except as provided in paragraph (c)(3) of this section, on existing operations, you must use the best available and safest technologies (BAST) which the Director determines to be economically feasible whenever the Director determines that failure of equipment would have a significant effect on safety, health, or the environment, except where the Director determines that the incremental benefits are clearly insufficient to justify the incremental costs of utilizing such technologies.
(2) Conformance with BSEE regulations will be presumed to constitute the use of BAST unless and until the Director determines that other technologies are required pursuant to paragraph (c)(1) of this section.
(3) The Director may waive the requirement to use BAST on a category of existing operations if the Director determines that use of BAST by that category of existing operations would not be practicable. The Director may waive the requirement to use BAST on an existing operation at a specific facility if you submit a waiver request demonstrating that the use of BAST would not be practicable.
(d) BSEE may issue orders to ensure compliance with this part, including, but not limited to, orders to produce and submit records and to inspect, repair, and/or replace equipment. BSEE may also issue orders to shut-in operations of a component or facility because of a threat of serious, irreparable, or immediate harm to health, safety, property, or the environment posed by those operations or because the operations violate law, including a regulation, order, or provision of a lease, plan, or permit.
§ 250.108 What requirements must I follow for cranes and other material-handling equipment?
(a) All cranes installed on fixed platforms must be operated in accordance with American Petroleum Institute’s Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D (as incorporated by reference in § 250.198).
(b) All cranes installed on fixed platforms must be equipped with a functional anti-two block device.
(c) If a fixed platform is installed after March 17, 2003, all cranes on the platform must meet the requirements of American Petroleum Institute Specification for Offshore Pedestal Mounted Cranes, API Spec 2C (as incorporated by reference in § 250.198).
(d) All cranes manufactured after March 17, 2003, and installed on a fixed platform, must meet the requirements of API Spec 2C.
(e) You must maintain records specific to a crane or the operation of a crane installed on an OCS fixed platform, as follows:
(1) Retain all design and construction records, including installation records for any anti-two block safety devices, for the life of the crane. The records must be kept at the OCS fixed platform.
(2) Retain all inspection, testing, and maintenance records of cranes for at least 4 years. The records must be kept at the OCS fixed platform.
(3) Retain the qualification records of the crane operator and all rigger personnel for at least 4 years. The records must be kept at the OCS fixed platform.
(f) You must operate and maintain all other material-handling equipment in a manner that ensures safe operations and prevents pollution.
(a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan.
(b) You must keep the following at the site where welding occurs:
(1) A copy of the plan and its approval letter; and
(2) Drawings showing the designated safe-welding areas.
§ 250.110 What must I include in my welding plan?
You must include all of the following in the welding plan that you prepare under § 250.109:
(a) Standards or requirements for welders;
(b) How you will ensure that only qualified personnel weld;
(c) Practices and procedures for safe welding that address:
(1) Welding in designated safe areas;
(2) Welding in undesignated areas, including wellbay;
(3) Fire watches;
(4) Maintenance of welding equipment; and
(5) Plans showing all designated safe-welding areas.
(d) How you will prevent spark-producing activities (i.e., grinding, abrasive blasting/cutting and arc-welding) in hazardous locations.
§ 250.111 Who oversees operations under my welding plan?
A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is properly qualified according to the welding plan. This person also must inspect all welding equipment before welding.
§ 250.112 What standards must my welding equipment meet?
Your welding equipment must meet the following requirements:
(a) All engine-driven welding equipment must be equipped with spark arrestors and drip pans;
(b) Welding leads must be completely insulated and in good condition;
(c) Hoses must be leak-free and equipped with proper fittings, gauges, and regulators; and
(d) Oxygen and fuel gas bottles must be secured in a safe place.
§ 250.113 What procedures must I follow when welding?
(a) Before you weld, you must move any equipment containing hydrocarbons or other flammable substances at least 35 feet horizontally from the welding area. You must move similar equipment on lower decks at least 35 feet from the point of impact where slag, sparks, or other burning materials could fall. If moving this equipment is impractical, you must protect that equipment with flame-proofed covers, shield it with metal or fire-resistant guards or curtains, or render the flammable substances inert.
(b) While you weld, you must monitor all water-discharge-point sources from hydrocarbon-handling vessels. If a discharge of flammable fluids occurs, you must stop welding.
(c) If you cannot weld in one of the designated safe-welding areas that you listed in your safe welding plan, you must meet the following requirements:
(1) You may not begin welding until:
(i) The welding supervisor or designated person in charge advises in writing that it is safe to weld.
(ii) You and the designated person in charge inspect the work area and areas below it for potential fire and explosion hazards.
(2) During welding, the person in charge must designate one or more persons as a fire watch. The fire watch must:
(i) Have no other duties while actual welding is in progress;
(ii) Have usable firefighting equipment;
(iii) Remain on duty for 30 minutes after welding activities end; and
(iv) Maintain a continuous surveillance with a portable gas detector during the welding and burning operation if welding occurs in an area not equipped with a gas detector.
(3) You may not weld piping, containers, tanks, or other vessels that have contained a flammable substance unless you have rendered the contents inert and the designated person in charge has determined it is safe to weld. This does not apply to approved hot taps.
(4) You may not weld within 10 feet of a wellbay unless you have shut in all producing wells in that wellbay.
(5) You may not weld within 10 feet of a production area, unless you have shut in that production area.
(6) You may not weld while you drill, complete, workover, or conduct wireline operations unless:
(i) The fluids in the well (being drilled, completed, worked over, or having wireline operations conducted) are noncombustible; and
(ii) You have precluded the entry of formation hydrocarbons into the wellbore by either mechanical means or a positive overbalance toward the formation.
§ 250.114 How must I install, maintain, and operate electrical equipment?
The requirements in this section apply to all electrical equipment on all platforms, artificial islands, fixed structures, and their facilities.
(a) You must classify all areas according to API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 (as incorporated by reference in § 250.198), or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2 (as incorporated by reference in § 250.198).
(b) Employees who maintain your electrical systems must have expertise in area classification and the performance, operation and hazards of electrical equipment.
(c) You must install all electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Division 1, and Division 2 Locations (as incorporated by reference in § 250.198), or API RP 14FZ, Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1, and Zone 2 Locations (as incorporated by reference in § 250.198).
(d) On each engine that has an electric ignition system, you must use an ignition system designed and maintained to reduce the release of electrical energy.
§ 250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part?
For the documents incorporated by reference in this part:
(a) Incorporation by reference of a document is limited to the edition of the document, or the specific edition and supplement or addendum, that is cited in § 250.198. Future amendments or revisions of the incorporated document are not included. BSEE will publish any changes to the incorporation of the document in the
(b) BSEE may make a rule amending the incorporation of a document effective without prior opportunity for public comment when BSEE determines:
(1) That the revisions to the document result in safety improvements or represent new industry standard technology and do not impose undue costs on the affected parties; and
(2) BSEE meets the requirements for making a rule immediately effective under 5 U.S.C. 553.
(c) The effect of incorporation by reference of a document into the regulations in this part is that the incorporated document is a requirement. When a section in this part refers to an incorporated document, you are responsible for complying with the provisions of that entire document, except to the extent that the section that refers to the document provides otherwise. When a section in this part refers to a part of an incorporated document, you are responsible for complying with that part of the document as provided in that section.
(d) Under §§ 250.141 and 250.142, you may comply with a later edition of a specific document incorporated by reference, provided:
(1) You show that complying with the later edition provides a degree of protection, safety, or performance equal to or better than would be achieved by compliance with the listed edition; and
(2) You obtain prior written approval for alternative compliance from the authorized BSEE official.
§§ 250.116-250.117 [Reserved]
Gas Storage or Injection
§ 250.118 Will BSEE approve gas injection?
The Regional Supervisor may authorize you to inject gas on the OCS, on and off-lease, to promote conservation of natural resources and to prevent waste.
(a) To receive BSEE approval for injection, you must:
(1) Show that the injection will not result in undue interference with operations under existing leases; and
(2) Submit a written application to the Regional Supervisor for injection of gas.
(b) The Regional Supervisor will approve gas injection applications that:
(1) Enhance recovery;
(2) Prevent flaring of casinghead gas; or
(3) Implement other conservation measures approved by the Regional Supervisor.
§ 250.119 [Reserved]
§ 250.120 How does injecting, storing, or treating gas affect my royalty payments?
(a) If you produce gas from an OCS lease and inject it into a reservoir on the lease or unit for the purposes cited in § 250.118(b), you are not required to pay royalties until you remove or sell the gas from the reservoir.
(b) If you produce gas from an OCS lease and store it according to 30 CFR 550.119, you must pay royalty before injecting it into the storage reservoir.
(c) If you produce gas from an OCS lease and treat it at an off-lease or off-unit location, you must pay royalties when the gas is first produced.
§ 250.121 What happens when the reservoir contains both original gas in place and injected gas?
If the reservoir contains both original gas in place and injected gas, when you produce gas from the reservoir you must use a BSEE-approved formula to determine the amounts of injected or stored gas and gas original to the reservoir.
§ 250.122 What effect does subsurface storage have on the lease term?
If you use a lease area for subsurface storage of gas, it does not affect the continuance or expiration of the lease.
§ 250.123 [Reserved]
§ 250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
To receive the Regional Supervisor’s approval to inject gas into the cap rock of a salt dome containing a sulphur deposit, you must show that the injection:
(a) Is necessary to recover oil and gas contained in the cap rock; and
(b) Will not significantly increase potential hazards to present or future sulphur mining operations.
Fees
§ 250.125 Service fees.
(a) The table in this paragraph (a) shows the fees that you must pay to BSEE for the services listed. The fees will be adjusted periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document in the
Service—processing of the following: | Fee amount | 30 CFR citation |
---|---|---|
(1) Suspension of Operations/Suspension of Production (SOO/SOP) Request | $2,469 | § 250.171(e). |
(2) Deepwater Operations Plan (DWOP) Process: | ||
(i) Project Conceptual Plan | $2,697 | 250.226 |
(ii) New or Unusual Technology Conceptual Plan | 7,964 | 250.226 |
(iii) New or Unusual Technology Barrier Equipment Conceptual Plan | 15,104 | 250.226 |
(iv) DWOP | 10,647 | 250.235 |
(v) Revised DWOP | 963 | 250.246 |
(vi) Combined Project Conceptual Plan/DWOP | 13,856 | 250.245 |
(vii) Supplemental DWOP | 9,626 | 250.247 |
(3) Application for Permit to Drill (APD; Form BSEE-0123) | $2,458 for initial applications only; no fee for revisions | § 250.410(d); § 250.513(b); § 250.1617(a). |
(4) Application for Permit to Modify (APM; Form BSEE-0124) | $145 | § 250.465(b); § 250.513(b); § 250.613(b); § 250.1618(a); § 250.1704(g). |
(5) New Facility Production Safety System Application for facility with more than 125 components | $6,312
A $16,610 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $8,638 for an inspection of a facility while in a shipyard A component is a piece of equipment or ancillary system that is protected by one or more of the safety devices required by API RP 14C (as incorporated by reference in § 250.198) | § 250.842. |
(6) New Facility Production Safety System Application for facility with 25-125 components | $1,528
A $10,430 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $5,980 for an inspection of a facility while in a shipyard | § 250.842. |
(7) New Facility Production Safety System Application for facility with fewer than 25 components | $758 | § 250.842. |
(8) Production Safety System Application—Modification with more than 125 components reviewed | $704 | § 250.842. |
(9) Production Safety System Application—Modification with 25-125 components reviewed | $252 | § 250.842. |
(10) Production Safety System Application—Modification with fewer than 25 components reviewed | $107 | § 250.842. |
(11) Platform Application—Installation—Under the Platform Verification Program | $26,444 | § 250.905(l). |
(12) Platform Application—Installation—Fixed Structure Under the Platform Approval Program | $3,787 | § 250.905(l). |
(13) Platform Application—Installation—Caisson/Well Protector | $1,927 | § 250.905(l). |
(14) Platform Application—Modification/Repair | $4,518 | § 250.905(l). |
(15) New Pipeline Application (Lease Term) | $4,119 | § 250.1000(b). |
(16) Pipeline Application—Modification (Lease Term) | $2,392 | § 250.1000(b). |
(17) Pipeline Application—Modification (ROW) | $4,849 | § 250.1000(b). |
(18) Pipeline Repair Notification | $451 | § 250.1008(e). |
(19) Pipeline Right-of-Way (ROW) Grant Application | $3,223 | § 250.1015(a). |
(20) Pipeline Conversion of Lease Term to ROW | $275 | § 250.1015(a). |
(21) Pipeline ROW Assignment | $234 | § 250.1018(b). |
(22) 500 Feet from Lease/Unit Line Production Request | $4,527 | § 250.1156(a). |
(23) Gas Cap Production Request | $5,761 | § 250.1157(b). |
(24) Downhole Commingling Request | $6,722 | § 250.1158(a). |
(25) Complex Surface Commingling and Measurement Application | $4,718 | § 250.1202(a); § 250.1203(b); § 250.1204(a). |
(26) Simple Surface Commingling and Measurement Application | $1,595 | § 250.1202(a); § 250.1203(b); § 250.1204(a). |
(27) Voluntary Unitization Proposal or Unit Expansion | $14,678 | § 250.1303(d). |
(28) Unitization Revision | $1,042 | § 250.1303(d). |
(29) Application to Remove a Platform or Other Facility | $5,448 | § 250.1727. |
(30) Application to Decommission a Pipeline (Lease Term) | $1,328 | § 250.1751(a) or § 250.1752(a). |
(31) Application to Decommission a Pipeline (ROW) | $2,524 | § 250.1751(a) or § 250.1752(a). |
(b) Payment of the fees listed in paragraph (a) of this section must accompany the submission of the document for approval or be sent to an office identified by the Regional Director. Once a fee is paid, it is nonrefundable, even if an application or other request is withdrawn. If your application is returned to you as incomplete, you are not required to submit a new fee when you submit the amended application.
(c) Verbal approvals are occasionally given in special circumstances. Any action that will be considered a verbal permit approval requires either a paper permit application to follow the verbal approval or an electronic application submittal within 72 hours. Payment must be made with the completed paper or electronic application.
§ 250.126 Electronic payment instructions.
(a) You must file all payments electronically through the Fees for Services Page on the BSEE website at https://www.bsee.gov/who-we-are/working-with-us/Fees-for-Services. This includes, but is not limited to, all OCS applications, permits, or any filing fees. You must include a copy of the Pay.gov confirmation receipt page with your application, permit, or filing fee.
(b) If you submitted an application or permit through eWell, you must use the interactive payment feature in that system, which directs you through Pay.gov to make a payment. It is recommended that you keep a copy of your payment confirmation receipt in the event that any questions arise regarding your transaction.
Inspections of Operations
§ 250.130 Why does BSEE conduct inspections?
BSEE will inspect OCS facilities and any vessels engaged in drilling or other downhole operations. These include facilities under jurisdiction of other Federal agencies that we inspect by agreement. We conduct these inspections:
(a) To verify that you are conducting operations according to the Act, the regulations, the lease, right-of-way, the BOEM-approved Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws and regulations; and
(b) To determine whether equipment designed to prevent or ameliorate blowouts, fires, spillages, or other major accidents has been installed and is operating properly according to the requirements of this part.
§ 250.131 Will BSEE notify me before conducting an inspection?
BSEE conducts both scheduled and unscheduled inspections.
§ 250.132 What must I do when BSEE conducts an inspection?
(a) When BSEE conducts an inspection, you must provide:
(1) Access to all platforms, artificial islands, and other installations on your leases or associated with your lease, right-of-use and easement, or right-of-way; and
(2) Helicopter landing sites and refueling facilities for any helicopters we use to regulate offshore operations.
(b) You must make the following available for us to inspect:
(1) The area covered under a lease, right-of-use and easement, right-of-way, or permit;
(2) All improvements, structures, and fixtures on these areas; and
(3) All records of design, construction, operation, maintenance, repairs, or investigations on or related to the area.
Upon request, BSEE will reimburse you for food, quarters, and transportation that you provide for BSEE representatives while they inspect lease facilities and operations. You must send us your reimbursement request within 90 days of the inspection.
Disqualification
§ 250.135 What will BSEE do if my operating performance is unacceptable?
BSEE will determine if your operating performance is unacceptable. BSEE will refer a determination of unacceptable performance to BOEM, who may disapprove or revoke your designation as operator on a single facility or multiple facilities. We will give you adequate notice and opportunity for a review by BSEE officials before making a determination that your operating performance is unacceptable.
§ 250.136 How will BSEE determine if my operating performance is unacceptable?
In determining if your operating performance is unacceptable, BSEE will consider, individually or collectively:
(a) Accidents and their nature;
(b) Pollution events, environmental damages and their nature;
(c) Incidents of noncompliance;
(d) Civil penalties;
(e) Failure to adhere to OCS lease obligations; or
(f) Any other relevant factors.
Special Types of Approvals
§ 250.140 When will I receive an oral approval?
When you apply for BSEE approval of any activity, we normally give you a written decision. The following table shows circumstances under which we may give an oral approval.
When you . . . | We may . . . | And . . . |
---|---|---|
(a) Request approval orally | Give you an oral approval, | You must then confirm the oral request by sending us a written request within 72 hours. |
(b) Request approval in writing, | Give you an oral approval if quick action is needed, | We will send you a written approval afterward. It will include any conditions that we place on the oral approval. |
(c) Request approval orally for gas flaring, | Give you an oral approval, | You don’t have to follow up with a written request unless the Regional Supervisor requires it. When you stop the approved flaring, you must promptly send a letter summarizing the location, dates and hours, and volumes of liquid hydrocarbons produced and gas flared by the approved flaring (see 30 CFR 250, subpart K). |
§ 250.141 May I ever use alternate procedures or equipment?
You may use alternate procedures or equipment after receiving approval as described in this section.
(a) Any alternate procedures or equipment that you propose to use must provide a level of safety and environmental protection that equals or surpasses current BSEE requirements.
(b) You must receive the District Manager’s or Regional Supervisor’s written approval before you can use alternate procedures or equipment.
(c) To receive approval, you must either submit information or give an oral presentation to the appropriate Regional Supervisor. Your presentation must describe the site-specific application(s), performance characteristics, and safety features of the proposed procedure or equipment.
§ 250.142 How do I receive approval for departures?
We may approve departures to the operating requirements. You may apply for a departure by writing to the District Manager or Regional Supervisor.
§§ 250.143-250.144 [Reserved]
§ 250.145 How do I designate an agent or a local agent?
(a) You or your designated operator may designate for the Regional Supervisor’s approval, or the Regional Director may require you to designate an agent empowered to fulfill your obligations under the Act, the lease, or the regulations in this part.
(b) You or your designated operator may designate for the Regional Supervisor’s approval a local agent empowered to receive notices and submit requests, applications, notices, or supplemental information.
§ 250.146 Who is responsible for fulfilling leasehold obligations?
(a) When you are not the sole lessee, you and your co-lessee(s) are jointly and severally responsible for fulfilling your obligations under the provisions of 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 unless otherwise provided in these regulations.
(b) If your designated operator fails to fulfill any of your obligations under 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582, the Regional Supervisor may require you or any or all of your co-lessees to fulfill those obligations or other operational obligations under the Act, the lease, or the regulations.
(c) Whenever the regulations in 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 require the lessee to meet a requirement or perform an action, the lessee, operator (if one has been designated), and the person actually performing the activity to which the requirement applies are jointly and severally responsible for complying with the regulation.
Naming and Identifying Facilities and Wells (Does Not Include MODUs)
§ 250.150 How do I name facilities and wells in the Gulf of Mexico Region?
(a) Assign each facility a letter designation except for those types of facilities identified in paragraph (c)(1) of this section. For example, A, B, CA, or CB.
(1) After a facility is installed, rename each predrilled well that was assigned only a number and was suspended temporarily at the mudline or at the surface. Use a letter and number designation. The letter used must be the same as that of the production facility, and the number used must correspond to the order in which the well was completed, not necessarily the number assigned when it was drilled. For example, the first well completed for production on Facility A would be renamed Well A-1, the second would be Well A-2, and so on; and
(2) When you have more than one facility on a block, each facility installed, and not bridge-connected to another facility, must be named using a different letter in sequential order. For example, EC 222A, EC 222B, EC 222C.
(3) When you have more than one facility on multiple blocks in a local area being co-developed, each facility installed and not connected with a walkway to another facility should be named using a different letter in sequential order with the block number corresponding to the block on which the platform is located. For example, EC 221A, EC 222B, and EC 223C.
(b) In naming multiple well caissons, you must assign a letter designation.
(c) In naming single well caissons, you must use certain criteria as follows:
(1) For single well caissons not attached to a facility with a walkway, use the well designation. For example, Well No. 1;
(2) For single well caissons attached to a facility with a walkway, use the same designation as the facility. For example, rename Well No.10 as A-10; and
(3) For single well caissons with production equipment, use a letter designation for the facility name and a letter plus number designation for the well. For example, the Well No. 1 caisson would be designated as Facility A, and the well would be Well A-1.
§ 250.151 How do I name facilities in the Pacific Region?
The operator assigns a name to the facility.
§ 250.152 How do I name facilities in the Alaska Region?
Facilities will be named and identified according to the Regional Director’s directions.
§ 250.153 Do I have to rename an existing facility or well?
You do not have to rename facilities installed and wells drilled before January 27, 2000, unless the Regional Director requires it.
§ 250.154 What identification signs must I display?
(a) You must identify all facilities, artificial islands, and mobile offshore drilling units with a sign maintained in a legible condition.
(1) You must display an identification sign that can be viewed from the waterline on at least one side of the platform. The sign must use at least 3-inch letters and figures.
(2) When helicopter landing facilities are present, you must display an additional identification sign that is visible from the air. The sign must use at least 12-inch letters and figures and must also display the weight capacity of the helipad unless noted on the top of the helipad. If this sign is visible to both helicopter and boat traffic, then the sign in paragraph (a)(1) of this section is not required.
(3) Your identification sign must:
(i) List the name of the lessee or designated operator;
(ii) In the GOM OCS Region, list the area designation or abbreviation and the block number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps;
(iii) In the Pacific OCS Region, list the lease number on which the facility is located; and
(iv) List the name of the platform, structure, artificial island, or mobile offshore drilling unit.
(b) You must identify singly completed wells and multiple completions as follows:
(1) For each singly completed well, list the lease number and well number on the wellhead or on a sign affixed to the wellhead;
(2) For wells with multiple completions, downhole splitter wells, and multilateral wells, identify each completion in addition to the well name and lease number individually on the well flowline at the wellhead; and
(3) For subsea wells that flow individually into separate pipelines, affix the required sign on the pipeline or surface flowline dedicated to that subsea well at a convenient location on the receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is required.
§§ 250.160-250.167 [Reserved]
Suspensions
§ 250.168 May operations or production be suspended?
(a) You may request approval of a suspension, or the Regional Supervisor may direct a suspension (Directed Suspension), for all or any part of a lease or unit area.
(b) Depending on the nature of the suspended activity, suspensions are labeled either Suspensions of Operations (SOO) or Suspensions of Production (SOP).
§ 250.169 What effect does suspension have on my lease?
(a) A suspension may extend the term of a lease (see § 250.180(b), (d), and (e)). The extension is equal to the length of time the suspension is in effect, except as provided in paragraph (b) of this section.
(b) A Directed Suspension does not extend the term of a lease when the Regional Supervisor directs a suspension because of:
(1) Gross negligence; or
(2) A willful violation of a provision of the lease or governing statutes and regulations.
§ 250.170 How long does a suspension last?
(a) BSEE may issue suspensions for up to 5 years per suspension. The Regional Supervisor will set the length of the suspension based on the conditions of the individual case involved. BSEE may grant consecutive suspension periods.
(b) An SOO ends automatically when the suspended operation commences.
(c) An SOP ends automatically when production begins.
(d) A Directed Suspension normally ends as specified in the letter directing the suspension.
(e) BSEE may terminate any suspension when the Regional Supervisor determines the circumstances that justified the suspension no longer exist or that other lease conditions warrant termination. The Regional Supervisor will notify you of the reasons for termination and the effective date.
§ 250.171 How do I request a suspension?
You must submit your request for a suspension to the Regional Supervisor, and BSEE must receive the request before the end of the lease term (i.e., end of primary term, end of the 1-year period following the last leaseholding operation, and end of a current suspension). Your request must include:
(a) The justification for the suspension including the length of suspension requested;
(b) A reasonable schedule of work leading to the commencement or restoration of the suspended activity;
(c) A statement that a well has been drilled on the lease and determined to be producible according to § 250.1603 (SOP only), 30 CFR 550.115, or 30 CFR 550.116;
(d) A commitment to production (SOP only); and
(e) The service fee listed in § 250.125 of this subpart.
§ 250.172 When may the Regional Supervisor grant or direct an SOO or SOP?
The Regional Supervisor may grant or direct an SOO or SOP under any of the following circumstances:
(a) When necessary to comply with judicial decrees prohibiting any activities or the permitting of those activities. The effective date of the suspension will be the effective date required by the action of the court;
(b) When activities pose a threat of serious, irreparable, or immediate harm or damage. This would include a threat to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment. BSEE may require you to do a site-specific study (see § 250.177(a)).
(c) When necessary for the installation of safety or environmental protection equipment;
(d) When necessary to carry out the requirements of NEPA or to conduct an environmental analysis; or
(e) When necessary to allow for inordinate delays encountered in obtaining required permits or consents, including administrative or judicial challenges or appeals.
§ 250.173 When may the Regional Supervisor direct an SOO or SOP?
The Regional Supervisor may direct a suspension when:
(a) You failed to comply with an applicable law, regulation, order, or provision of a lease or permit; or
(b) The suspension is in the interest of National security or defense.
§ 250.174 When may the Regional Supervisor grant or direct an SOP?
The Regional Supervisor may grant or direct an SOP when the suspension is in the National interest, and it is necessary because the suspension will meet one of the following criteria:
(a) It will allow you to properly develop a lease, including time to construct and install production facilities;
(b) It will allow you time to obtain adequate transportation facilities;
(c) It will allow you time to enter a sales contract for oil, gas, or sulphur. You must show that you are making an effort to enter into the contract(s); or
(d) It will avoid continued operations that would result in premature abandonment of a producing well(s).
§ 250.175 When may the Regional Supervisor grant an SOO?
(a) The Regional Supervisor may grant an SOO when necessary to allow you time to begin drilling or other operations when you are prevented by reasons beyond your control, such as unexpected weather, unavoidable accidents, or drilling rig delays.
(b) The Regional Supervisor may grant an SOO when all of the following conditions are met:
(1) The lease was issued with a primary lease term of 5 years, or with a primary term of 8 years with a requirement to drill within 5 years;
(2) Before the end of the third year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that indicates:
(i) The presence of a salt sheet;
(ii) That all or a portion of a potential hydrocarbon-bearing formation may lie beneath or adjacent to the salt sheet; and
(iii) The salt sheet interferes with identification of the potential hydrocarbon-bearing formation.
(3) The interpreted geophysical information required under paragraph (b)(2) of this section must include full 3-D depth migration beneath the salt sheet and over the entire lease area.
(4) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing formation.
(5) You demonstrate that additional time is necessary to:
(i) Complete current processing or interpretation of existing geophysical data or information;
(ii) Acquire, process, or interpret new geophysical data or information; or
(iii) Drill into the potential hydrocarbon-bearing formation identified as a result of the activities conducted in paragraphs (b)(2), (b)(4), and (b)(5) of this section.
(c) The Regional Supervisor may grant an SOO to conduct additional geological and geophysical data analysis that may lead to the drilling of a well below 25,000 feet true vertical depth below the datum at mean sea level (TVD SS) when all of the following conditions are met:
(1) The lease was issued with a primary lease term of:
(i) Five years; or
(ii) Eight years with a requirement to drill within 5 years.
(2) Before the end of the fifth year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that:
(i) Indicates that all or a portion of a potential hydrocarbon-bearing formation lies below 25,000 feet TVD SS; and
(ii) Includes full 3-D depth migration over the entire lease area.
(3) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing geologic structure or stratigraphic trap lying below 25,000 feet TVD SS.
(4) You demonstrate that additional time is necessary to:
(i) Complete current processing or interpretation of existing geophysical data or information;
(ii) Acquire, process, or interpret new geophysical or geological data or information that would affect the decision to drill the same geologic structure or stratigraphic trap, as determined by the Regional Supervisor, identified in paragraphs (c)(2) and (c)(3) of this section; or
(iii) Drill a well below 25,000 feet TVD SS into the geologic structure or stratigraphic trap identified as a result of the activities conducted in paragraphs (c)(2), (c)(3), and (c)(4)(i) and (ii) of this section.
§ 250.176 Does a suspension affect my royalty payment?
A directed suspension may affect the payment of rental or royalties for the lease as provided in 30 CFR 1218.154.
§ 250.177 What additional requirements may the Regional Supervisor order for a suspension?
If BSEE grants or directs a suspension under paragraph § 250.172(b), the Regional Supervisor may require you to:
(a) Conduct a site-specific study.
(1) The Regional Supervisor must approve or prescribe the scope for any site-specific study that you perform.
(2) The study must evaluate the cause of the hazard, the potential damage, and the available mitigation measures.
(3) You must pay for the study unless you request, and the Regional Supervisor agrees to arrange, payment by another party.
(4) You must furnish copies and results of the study to the Regional Supervisor.
(5) BSEE will make the results available to other interested parties and to the public.
(6) The Regional Supervisor will use the results of the study and any other information that becomes available:
(i) To decide if the suspension can be lifted; and
(ii) To determine any actions that you must take to mitigate or avoid any damage to the environment, life, or property.
(b) Submit a revised Exploration Plan (including any required mitigating measures);
(c) Submit a revised Development and Production Plan (including any required mitigating measures); or
(d) Submit a revised Development Operations Coordination Document according to 30 CFR part 550, subpart B.
Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations
§ 250.180 What am I required to do to keep my lease term in effect?
(a) If your lease is in its primary term:
(1) You must submit a report to the District Manager according to paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases during the last year of the primary term, and whenever production resumes during the last year of the primary term.
(2) Your lease expires at the end of its primary term unless you are conducting operations on your lease (see 30 CFR part 556). For purposes of this section, the term operations means, drilling, well-reworking, or production in paying quantities. The objective of the drilling or well-reworking must be to establish production in paying quantities on the lease.
(b) If you stop conducting operations during the last year of your primary lease term, your lease will expire unless you either resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.
(c) If you extend your lease term under paragraph (b) of this section, you must pay rental or minimum royalty, as appropriate, for each year or part of the year during which your lease continues in force beyond the end of the primary lease term.
(d) If you stop conducting operations on a lease that has continued beyond its primary term, your lease will expire unless you resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.
(e) You may ask the Regional Supervisor to allow you more than a year to resume operations on a lease continued beyond its primary term when operating conditions warrant. The request must be in writing and explain the operating conditions that warrant a longer period. In allowing additional time, the Regional Supervisor must determine that the longer period is in the National interest, and it conserves resources, prevents waste, or protects correlative rights.
(f) When you begin conducting operations on a lease that has continued beyond its primary term, you must immediately notify the District Manager either orally or by fax or e-mail and follow up with a written report according to paragraph (g) of this section.
(g) If your lease is continued beyond its primary term, you must submit a report to the District Manager under paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases, whenever production resumes before the end of the 1-year period after having ceased, or whenever drilling or well-reworking operations begin before the end of the 1-year period.
(h) The reports required by paragraphs (a) and (g) of this section must contain:
(1) Name of lessee or operator;
(2) The well number, lease number, area, and block;
(3) As appropriate, the unit agreement name and number; and
(4) A description of the operation and pertinent dates.
(i) You must submit the reports required by paragraphs (a) and (g) of this section within the following timeframes:
(1) Initialization of production—within 5 days of initial production.
(2) Cessation of production—within 15 days after the first full month of zero production.
(3) Resumption of production—within 5 days of resuming production after ceasing production under paragraph (i)(2) of this section.
(4) Drilling or well reworking operations—within 5 days of beginning and completing the leaseholding operations.
(j) For leases continued beyond the primary term, you must immediately report to the District Manager if operations do not begin before the end of the 1-year period.
§§ 250.181-250.185 [Reserved]
Information and Reporting Requirements
§ 250.186 What reporting information and report forms must I submit?
(a) You must submit information and reports as BSEE requires.
(1) You may obtain copies of forms from, and submit completed forms to, the District Manager or Regional Supervisor.
(2) Instead of paper copies of forms available from the District Manager or Regional Supervisor, you may use your own computer-generated forms that are equal in size to BSEE’s forms. You must arrange the data on your form identical to the BSEE form. If you generate your own form and it omits terms and conditions contained on the official BSEE form, we will consider it to contain the omitted terms and conditions.
(3) You may submit digital data when the Region/District is equipped to accept it.
(b) When BSEE specifies, you must include, for public information, an additional copy of such reports.
(1) You must mark it Public Information
(2) You must include all required information, except information exempt from public disclosure under § 250.197 or otherwise exempt from public disclosure under law or regulation.
§ 250.187 What are BSEE’s incident reporting requirements?
(a) You must report all incidents listed in § 250.188(a) and (b) to the District Manager. The specific reporting requirements for these incidents are contained in §§ 250.189 and 250.190.
(b) These reporting requirements apply to incidents that occur on the area covered by your lease, right-of-use and easement, pipeline right-of-way, or other permit issued by BOEM or BSEE, and that are related to operations resulting from the exercise of your rights under your lease, right-of-use and easement, pipeline right-of-way, or permit.
(c) Nothing in this subpart relieves you from making notifications and reports of incidents that may be required by other regulatory agencies.
(d) You must report all spills of oil or other liquid pollutants in accordance with 30 CFR 254.46.
§ 250.188 What incidents must I report to BSEE and when must I report them?
(a) You must report the following incidents to the District Manager immediately via oral communication, and provide a written follow-up report (hard copy or electronically transmitted) within 15 calendar days after the incident:
(1) All fatalities.
(2) All injuries that require the evacuation of the injured person(s) from the facility to shore or to another offshore facility.
(3) All losses of well control. “Loss of well control” means:
(i) Uncontrolled flow of formation or other fluids. The flow may be to an exposed formation (an underground blowout) or at the surface (a surface blowout);
(ii) Flow through a diverter; or
(iii) Uncontrolled flow resulting from a failure of surface equipment or procedures.
(4) All fires and explosions.
(5) All reportable releases of hydrogen sulfide (H
(6) All collisions that result in property or equipment damage greater than $25,000. “Collision” means the act of a moving vessel (including an aircraft) striking another vessel, or striking a stationary vessel or object (e.g., a boat striking a drilling rig or platform). “Property or equipment damage” means the cost of labor and material to restore all affected items to their condition before the damage, including, but not limited to, the OCS facility, a vessel, helicopter, or equipment. It does not include the cost of salvage, cleaning, gas-freeing, dry docking, or demurrage.
(7) All incidents involving structural damage to an OCS facility. “Structural damage” means damage severe enough so that operations on the facility cannot continue until repairs are made.
(8) All incidents involving crane or personnel/material handling operations.
(9) All incidents that damage or disable safety systems or equipment (including firefighting systems).
(b) You must provide a written report of the following incidents to the District Manager within 15 calendar days after the incident:
(1) Any injuries that result in one or more days away from work or one or more days on restricted work or job transfer. One or more days means the injured person was not able to return to work or to all of their normal duties the day after the injury occurred;
(2) All gas releases that initiate equipment or process shutdown;
(3) All incidents that require operations personnel on the facility to muster for evacuation for reasons not related to weather or drills;
(4) All other incidents, not listed in paragraph (a) of this section, resulting in property or equipment damage greater than $25,000.
(c) On the Arctic OCS, in addition to the requirements of paragraphs (a) and (b) of this section, you must provide to the BSEE inspector on location, if one is present, or to the Regional Supervisor, both of the following:
(1) An immediate oral report if any of the following occur:
(i) Any sea ice movement or condition that has the potential to affect your operation or trigger ice management activities;
(ii) The start and termination of ice management activities; or
(iii) Any “kicks” or operational issues that are unexpected and could result in the loss of well control.
(2) Within 24 hours after completing ice management activities, a written report of such activities that conforms to the content requirements in § 250.190.
§ 250.189 Reporting requirements for incidents requiring immediate notification.
For an incident requiring immediate notification under § 250.188(a), you must notify the District Manager via oral communication immediately after aiding the injured and stabilizing the situation. Your oral communication must provide the following information:
(a) Date and time of occurrence;
(b) Operator, and operator representative’s, name and telephone number;
(c) Contractor, and contractor representative’s name and telephone number (if a contractor is involved in the incident or injury/fatality);
(d) Lease number, OCS area, and block;
(e) Platform/facility name and number, or pipeline segment number;
(f) Type of incident or injury/fatality;
(g) Operation or activity at time of incident (i.e., drilling, production, workover, completion, pipeline, crane, etc.); and
(h) Description of the incident, damage, or injury/fatality.
§ 250.190 Reporting requirements for incidents requiring written notification.
(a) For any incident covered under § 250.188, you must submit a written report within 15 calendar days after the incident to the District Manager. The report must contain the following information:
(1) Date and time of occurrence;
(2) Operator, and operator representative’s name and telephone number;
(3) Contractor, and contractor representative’s name and telephone number (if a contractor is involved in the incident or injury);
(4) Lease number, OCS area, and block;
(5) Platform/facility name and number, or pipeline segment number;
(6) Type of incident or injury;
(7) Operation or activity at time of incident (i.e., drilling, production, workover, completion, pipeline, crane etc.);
(8) Description of incident, damage, or injury (including days away from work, restricted work or job transfer), and any corrective action taken; and
(9) Property or equipment damage estimate (in U.S. dollars).
(b) You may submit a report or form prepared for another agency in lieu of the written report required by paragraph (a) of this section, provided the report or form contains all required information.
(c) The District Manager may require you to submit additional information about an incident on a case-by-case basis.
§ 250.191 How does BSEE conduct incident investigations?
Any investigation that BSEE conducts under the authority of sections 22(d)(1) and (2) of the Act (43 U.S.C. 1348(d)(1) and (2)) is a fact-finding proceeding with no adverse parties. The purpose of the investigation is to prepare a public report that determines the cause or causes of the incident. The investigation may involve panel meetings conducted by a chairperson appointed by BSEE. The following requirements apply to any panel meetings involving persons giving testimony:
(a) A person giving testimony may have legal or other representative(s) present to provide advice or counsel while the person is giving testimony. The chairperson may require a verbatim transcript to be made of all oral testimony. The chairperson also may accept a sworn written statement in lieu of oral testimony.
(b) Only panel members, and any experts the panel deems necessary, may address questions to any person giving testimony.
(c) The chairperson may issue subpoenas to persons to appear and provide testimony or documents at a panel meeting. A subpoena may not require a person to attend a panel meeting held at a location more than 100 miles from where a subpoena is served.
(d) Any person giving testimony may request compensation for mileage, and fees for services, within 90 days after the panel meeting. The compensated expenses must be similar to mileage and fees the U.S. District Courts allow.
§ 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
(a) You must submit evacuation statistics to the Regional Supervisor for a natural occurrence, such as a hurricane, a tropical storm, or an earthquake. Statistics include facilities and rigs evacuated and the amount of production shut-in for gas and oil. You must:
(1) Submit the statistics by fax or e-mail (for activities in the BSEE GOM OCS Region, use Form BSEE-0132) as soon as possible when evacuation occurs. In lieu of submitting your statistics by fax or e-mail, you may submit them electronically in accordance with 30 CFR 250.186(a)(3);
(2) Submit the statistics on a daily basis by 11 a.m., as conditions allow, during the period of shut-in and evacuation;
(3) Inform BSEE when you resume production; and
(4) Submit the statistics either by BSEE district, or the total figures for your operations in a BSEE region.
(b) If your facility, production equipment, or pipeline is damaged by a natural occurrence, you must:
(1) Submit an initial damage report to the Regional Supervisor within 48 hours after you complete your initial evaluation of the damage. You must use Form BSEE-0143, Facility/Equipment Damage Report, to make this and all subsequent reports. In lieu of submitting Form BSEE-0143 by fax or e-mail, you may submit the damage report electronically in accordance with 30 CFR 250.186(a)(3). In the report, you must:
(i) Name the items damaged (e.g., platform or other structure, production equipment, pipeline);
(ii) Describe the damage and assess the extent of the damage (major, medium, minor); and
(iii) Estimate the time it will take to replace or repair each damaged structure and piece of equipment and return it to service. The initial estimate need not be provided on the form until availability of hardware and repair capability has been established (not to exceed 30 days from your initial report).
(2) Submit subsequent reports monthly and immediately whenever information submitted in previous reports changes until the damaged structure or equipment is returned to service. In the final report, you must provide the date the item was returned to service.
§ 250.193 Reports and investigations of possible violations.
(a) Any person may report to BSEE any hazardous or unsafe working condition on any facility engaged in OCS activities, and any possible violation or failure to comply with:
(1) Any provision of the Act,
(2) Any provision of a lease, approved plan, or permit issued under the Act,
(3) Any provision of any regulation or order issued under the Act, or
(4) Any other Federal law relating to safety of offshore oil and gas operations.
(b) To make a report under this section, a person is not required to know whether any legal requirement listed in paragraph (a) of this section has been violated.
(c) When BSEE receives a report of a possible violation, or when a BSEE employee detects a possible violation, BSEE will investigate according to BSEE procedures and notify any other Federal agency(ies) for further investigation, as appropriate.
(d) BSEE investigations of possible violations may include:
(1) Conducting interviews of personnel;
(2) Requiring the prompt production of documents, data, and other evidence;
(3) Requiring the preservation of all relevant evidence and access for BSEE investigators to such evidence; and
(4) Taking other actions and imposing other requirements as necessary to investigate possible violations and assure an orderly investigation.
(e)(1) Reports should contain sufficient credible information to establish a reasonable basis for BSEE to investigate whether a violation or other hazardous or unsafe working condition exists.
(2) To report hazardous or unsafe working conditions or a possible violation:
(i) Contact BSEE by:
(A) Phone at 1-877-440-0173 (BSEE Toll-free Safety Hotline),
(B) Internet at www.bsee.gov, or
(C) Mail to: U.S. DOI/BSEE, 1849 C Street NW., Mail Stop 5438, Washington, DC 20240 Attention: IRU Hotline Operations.
(ii) Include the following items in the report:
(A) Name, address, and telephone number should be provided if you do not want to remain anonymous;
(B) The specific concern, provision or Federal law, if known, referenced in (a) that a person violated or with which a person failed to comply; and
(C) Any other facts, data, and applicable information.
(f) When a possible violation is reported, BSEE will protect a person’s identity to the extent authorized by law.
§ 250.194 How must I protect archaeological resources?
(a)-(b) [Reserved]
(c) If you discover any archaeological resource while conducting operations in the lease or right-of-way area, you must immediately halt operations within the area of the discovery and report the discovery to the BSEE Regional Director. If investigations determine that the resource is significant, the Regional Director will tell you how to protect it.
§ 250.195 What notification does BSEE require on the production status of wells?
You must notify the appropriate BSEE District Manager when you successfully complete or recomplete a well for production. You must:
(a) Notify the District Manager within 5 working days of placing the well in a production status. You must confirm oral notification by telefax or e-mail within those 5 working days.
(b) Provide the following information in your notification:
(1) Lessee or operator name;
(2) Well number, lease number, and OCS area and block designations;
(3) Date you placed the well on production (indicate whether or not this is first production on the lease);
(4) Type of production; and
(5) Measured depth of the production interval.
§ 250.196 Reimbursements for reproduction and processing costs.
(a) BSEE will reimburse you for costs of reproducing data and information that the Regional Director requests if:
(1) You deliver geophysical and geological (G&G) data and information to BSEE for the Regional Director to inspect or select and retain;
(2) BSEE receives your request for reimbursement and the Regional Director determines that the requested reimbursement is proper; and
(3) The cost is at your lowest rate or at the lowest commercial rate established in the area, whichever is less.
(b) BSEE will reimburse you for the costs of processing geophysical information (that does not include cost of data acquisition):
(1) If, at the request of the Regional Director, you processed the geophysical data or information in a form or manner other than that used in the normal conduct of business; or
(2) If you collected the information under a permit that BSEE issued to you before October 1, 1985, and the Regional Director requests and retains the information.
(c) When you request reimbursement, you must identify reproduction and processing costs separately from acquisition costs.
(d) BSEE will not reimburse you for data acquisition costs or for the costs of analyzing or processing geological information or interpreting geological or geophysical information.
§ 250.197 Data and information to be made available to the public or for limited inspection.
BSEE will protect data and information that you submit under this part, and 30 CFR part 203, as described in this section. Paragraphs (a) and (b) of this section describe what data and information will be made available to the public without the consent of the lessee, under what circumstances, and in what time period. Paragraph (c) of this section describes what data and information will be made available for limited inspection without the consent of the lessee, and under what circumstances.
(a) All data and information you submit on BSEE forms will be made available to the public upon submission, except as specified in the following table:
On form . . . | Data and information not immediately available are . . . | Excepted data will be made available . . . |
---|---|---|
(1) BSEE-0123, Application for Permit to Drill, | Items 15, 16, 22 through 25, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. |
(2) BSEE-0123S, Supplemental APD Information Sheet, | Items 3, 7, 8, 15 and 17, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. |
(3) BSEE-0124, Application for Permit to Modify, | Item 17, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. |
(4) BSEE-0125, End of Operations Report, | Items 12, 13, 17, 21, 22, 26 through 38, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. However, items 33 through 38 will not be released when the well goes on production unless the period of time in the table in paragraph (b) has expired. |
(5) BSEE-0126, Well Potential Test Report, | Item 101, | 2 years after you submit it. |
(6) [Reserved] | ||
(7) BSEE-0133 Well Activity Report, | Item 10 Fields [WELLBORE START DATE, TD DATE, OP STATUS, END DATE, MD, TVD, AND MW PPG]. Item 11 Fields [WELLBORE START DATE, TD DATE, PLUGBACK DATE, FINAL MD, AND FINAL TVD] and Items 12 through 15, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. |
(8) BSEE-0133S Open Hole Data Report, | Boxes 7 and 8, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. |
(9) [Reserved] | ||
(10) [Reserved] |
(b) BSEE will release lease and permit data and information that you submit and BSEE retains, but that are not normally submitted on BSEE forms, according to the following table:
If . . . | BSEE will release . . . | At this time . . . | Special provisions . . . |
---|---|---|---|
(1) The Director determines that data and information are needed for specific scientific or research purposes for the Government, | Geophysical data, Geological data Interpreted G&G information, Processed G&G information, Analyzed geological information, | At any time, | BSEE will release data and information only if release would further the National interest without unduly damaging the competitive position of the lessee. |
(2) Data or information is collected with high-resolution systems (e.g., bathymetry, side-scan sonar, subbottom profiler, and magnetometer) to comply with safety or environmental protection requirements, | Geophysical data, Geological data, Interpreted G&G information, Processed geological information, Analyzed geological information, | 60 days after BSEE receives the data or information, if the Regional Supervisor deems it necessary, | BSEE will release the data and information earlier than 60 days if the Regional Supervisor determines it is needed by affected States to make decisions under 30 CFR 550, subpart B. The Regional Supervisor will reconsider earlier release if you satisfy him/her that it would unduly damage your competitive position. |
(3) Your lease is no longer in effect, | Geophysical data, Geological data, Processed G&G information Interpreted G&G information, Analyzed geological information, | When your lease terminates, | This release time applies only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. The release time applies to the geophysical data and information only if acquired postlease for a lessee’s exclusive use. |
(4) Your lease is still in effect, | Geophysical data, Processed geophysical information, Interpreted G&G information, | 10 years after you submit the data and information, | This release time applies only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. This release time applies to the geophysical data and information only if acquired postlease for a lessee’s exclusive use. |
(5) Your lease is still in effect and within the primary term specified in the lease, | Geological data, Analyzed geological information, | 2 years after the required submittal date or 60 days after a lease sale if any portion of an offered lease is within 50 miles of a well, whichever is later, | These release times apply only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. If the primary term specified in the lease is extended under the heading of “Suspensions” in this subpart, the extension applies to this provision. |
(6) Your lease is in effect and beyond the primary term specified in the lease, | Geological data, Analyzed geological information, | 2 years after the required submittal date, | None. |
(7) Data or information is submitted on well operations, | Descriptions of downhole locations, operations, and equipment, | When the well goes on production or when geological data is released according to §§ 250.197(b)(5) and (b)(6), whichever occurs earlier, | Directional survey data may be released earlier to the owner of an adjacent lease according to Subpart D of this part. |
(8) Data and information are obtained from beneath unleased land as a result of a well deviation that has not been approved by the District Manager or Regional Supervisor, | Any data or information obtained, | At any time, | None. |
(9) Except for high-resolution data and information released under paragraph (b)(2) of this section data and information acquired by a permit under 30 CFR part 551 are submitted by a lessee under 30 CFR part 203, 30 CFR part 250, or 30 CFR part 550, | G&G data, analyzed geological information, processed and interpreted G&G information, | Geological data and information: 10 years after BOEM issues the permit; Geophysical data: 50 years after BOEM issues the permit; Geophysical information: 25 years after BOEM issues the permit, | None. |
(c) BSEE may allow limited inspection, but only by persons with a direct interest in related BSEE decisions and issues in specific geographic areas, and who agree in writing to its confidentiality, of G&G data and information submitted under this part or 30 CFR part 203 that BSEE uses to:
(1) Make unitization determinations on two or more leases;
(2) Make competitive reservoir determinations;
(3) Ensure proper plans of development for competitive reservoirs;
(4) Promote operational safety;
(5) Protect the environment;
(6) [Reserved]; or
(7) Determine eligibility for royalty relief.
References
§ 250.198 Documents incorporated by reference.
Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at BSEE and at the National Archives and Records Administration (NARA). Contact BSEE at: the Houston BSEE office at 1919 Smith Street Suite 14042, Houston, Texas 77002; 1-844-259-4779. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email: [email protected]. The material may be obtained from the following sources:
(a) American Concrete Institute (ACI), ACI Standards, 38800 Country Club Drive, Farmington Hills, MI 48331-3439: http://www.concrete.org; phone: 248-848-3700:
(1) ACI Standard 318-95, Building Code Requirements for Reinforced Concrete, 1995; incorporated by reference at § 250.901.
(2) ACI 318R-95, Commentary on Building Code Requirements for Reinforced Concrete, 1995; incorporated by reference at § 250.901.
(3) ACI 357R-84, Guide for the Design and Construction of Fixed Offshore Concrete Structures, 1984; reapproved 1997, incorporated by reference at § 250.901.
(b) American Gas Association (AGA Reports), 400 North Capitol Street NW, Suite 450, Washington, DC 20001, http://www.aga.org; phone: 202-824-7000;
(1) AGA Report No. 7—Measurement of Natural Gas by Turbine Meters; Revised February 2006; incorporated by reference at § 250.1203(b);
(2) AGA Report No. 9—Measurement of Gas by Multipath Ultrasonic Meters; Second Edition, April 2007; incorporated by reference at § 250.1203(b);
(3) AGA Report No. 10—Speed of Sound in Natural Gas and Other Related Hydrocarbon Gases; Copyright 2003; incorporated by reference at § 250.1203(b).
(c) American Institute of Steel Construction, Inc. (AISC), AISC Standards, One East Wacker Drive, Suite 700, Chicago, IL 60601-1802; http://www.aisc.org; phone: 312-670-2400:
(1) ANSI/AISC 360-05, Specification for Structural Steel Buildings, incorporated by reference at § 250.901.
(2) [Reserved]
(d) American National Standards Institute (ANSI), http.www./webstore.ansi.org/; phone: 212-642-4900:
(1) ANSI/ASME B 16.5-2003, Pipe Flanges and Flanged Fittings, incorporated by reference at § 250.1002;
(2) ANSI/ASME B 31.8-2003, Gas Transmission and Distribution Piping Systems, incorporated by reference at § 250.1002;
(3) ANSI Z88.2-1992, American National Standard for Respiratory Protection, incorporated by reference at § 250.490.
(e) American Petroleum Institute (API), API Recommended Practices (RP), Specs, Standards, Manual of Petroleum Measurement Standards (MPMS) chapters, 1220 L Street, NW, Washington, DC 20005-4070; http://www.api.org; phone: 202-682-8000:
(1) API 510, Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration, Tenth Edition, May 2014; Addendum 1, May 2017; incorporated by reference at §§ 250.851(a) and 250.1629(b);
(2) API 570, Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems, Fourth Edition, February 2016; Addendum 1, May 2017; incorporated by reference at § 250.841(b).
(3) API Bulletin 2INT-DG, Interim Guidance for Design of Offshore Structures for Hurricane Conditions, May 2007; incorporated by reference at § 250.901;
(4) API Bulletin 2INT-EX, Interim Guidance for Assessment of Existing Offshore Structures for Hurricane Conditions, May 2007; incorporated by reference at § 250.901;
(5) API Bulletin 2INT-MET, Interim Guidance on Hurricane Conditions in the Gulf of Mexico, May 2007; incorporated by reference at § 250.901;
(6) API Bulletin 92L, Drilling Ahead Safely with Lost Circulation in the Gulf of Mexico, First Edition, August 2015; incorporated by reference at § 250.427(b);
(7) API MPMS Chapter 1—Vocabulary, Second Edition, July 1994; incorporated by reference at § 250.1201;
(8) API MPMS Chapter 2—Tank Calibration, Section 2A—Measurement and Calibration of Upright Cylindrical Tanks by the Manual Tank Strapping Method, First Edition, February 1995; reaffirmed August 2017; incorporated by reference at § 250.1202;
(9) API MPMS Chapter 2—Tank Calibration, Section 2B—Calibration of Upright Cylindrical Tanks Using the Optical Reference Line Method, First Edition, March 1989; reaffirmed April 2019 (including Addendum 1, October 2019); incorporated by reference at § 250.1202;
(10) API MPMS Chapter 3—Tank Gauging, Section 1A—Standard Practice for the Manual Gauging of Petroleum and Petroleum Products, Second Edition, August 2005; incorporated by reference at § 250.1202;
(11) API MPMS Chapter 3—Tank Gauging, Section 1B—Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging, Second Edition, June 2001; reaffirmed February 2016; incorporated by reference at § 250.1202;
(12) API MPMS Chapter 4—Proving Systems, Section 1—Introduction, Third Edition, February 2005; reaffirmed June 2014; incorporated by reference at § 250.1202;
(13) API MPMS Chapter 4—Proving Systems, Section 2—Displacement Provers, Third Edition, September 2003; incorporated by reference at § 250.1202;
(14) API MPMS Chapter 4—Proving Systems, Section 4—Tank Provers, Second Edition, May 1998, reaffirmed May 2015; incorporated by reference at § 250.1202;
(15) API MPMS Chapter 4—Proving Systems, Section 5—Master-Meter Provers, Second Edition, May 2000, reaffirmed, August 2005; incorporated by reference at § 250.1202;
(16) API MPMS Chapter 4—Proving Systems, Section 6—Pulse Interpolation, Second Edition, May 1999; Errata April 2007; reaffirmed October 2013; incorporated by reference at § 250.1202;
(17) API MPMS Chapter 4—Proving Systems, Section 7—Field Standard Test Measures, Second Edition, December 1998; reaffirmed 2003; incorporated by reference at § 250.1202;
(18) API MPMS Chapter 4—Proving Systems, Section 8—Operation of Proving Systems; First Edition, reaffirmed March 2007; incorporated by reference at § 250.1202(a), (f), and (g);
(19) API MPMS Chapter 5—Metering, Section 1—General Considerations for Measurement by Meters, Fourth Edition, September 2005; incorporated by reference at § 250.1202;
(20) API MPMS Chapter 5—Metering, Section 2—Measurement of Liquid Hydrocarbons by Displacement Meters, Third Edition, September 2005; reaffirmed July 2015; incorporated by reference at § 250.1202;
(21) API MPMS Chapter 5—Metering, Section 3—Measurement of Liquid Hydrocarbons by Turbine Meters, Fifth Edition, September 2005; reaffirmed August 1, 2014; incorporated by reference at § 250.1202;
(22) API MPMS Chapter 5—Metering, Section 4—Accessory Equipment for Liquid Meters, Fourth Edition, September 2005; reaffirmed August 2015; incorporated by reference at § 250.1202;
(23) API MPMS Chapter 5—Metering, Section 5—Fidelity and Security of Flow Measurement Pulsed-Data Transmission Systems, Second Edition, August 2005; reaffirmed August 2015; incorporated by reference at § 250.1202;
(24) API MPMS Chapter 5—Metering, Section 6—Measurement of Liquid Hydrocarbons by Coriolis Meters; First Edition, October 2002; reaffirmed November 2013; incorporated by reference at § 250.1202;
(25) API MPMS Chapter 5—Metering, Section 8—Measurement of Liquid Hydrocarbons by Ultrasonic Flow Meters Using Transit Time Technology; First Edition, February 2005; incorporated by reference at § 250.1202(a);
(26) API MPMS Chapter 6—Metering Assemblies, Section 1—Lease Automatic Custody Transfer (LACT) Systems, Second Edition, May 1991; reaffirmed May 2012; incorporated by reference at § 250.1202;
(27) API MPMS Chapter 6—Metering Assemblies, Section 6—Pipeline Metering Systems, Second Edition, May 1991; reaffirmed December 2017; incorporated by reference at § 250.1202;
(28) API MPMS Chapter 6—Metering Assemblies, Section 7—Metering Viscous Hydrocarbons, Second Edition, May 1991; reaffirmed March 2018; incorporated by reference at § 250.1202;
(29) API MPMS Chapter 7—Temperature Determination, First Edition, June 2001; reaffirmed, March 2007; incorporated by reference at § 250.1202;
(30) API MPMS Chapter 8—Sampling, Section 1—Standard Practice for Manual Sampling of Petroleum and Petroleum Products, Third Edition, October 1995; reaffirmed, March 2006; incorporated by reference at § 250.1202;
(31) API MPMS Chapter 8—Sampling, Section 2—Standard Practice for Automatic Sampling of Liquid Petroleum and Petroleum Products, Second Edition, October 1995; reaffirmed, June 2005; incorporated by reference at § 250.1202;
(32) API MPMS Chapter 9—Density Determination, Section 1—Standard Test Method for Density, Relative Density (Specific Gravity), or API Gravity of Crude Petroleum and Liquid Petroleum Products by Hydrometer Method, Second Edition, December 2002; reaffirmed October 2005; incorporated by reference at § 250.1202(a) and (l);
(33) API MPMS Chapter 9—Density Determination, Section 2—Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure Hydrometer, Second Edition, March 2003; incorporated by reference at § 250.1202;
(34) API MPMS Chapter 10—Sediment and Water, Section 1—Standard Test Method for Sediment in Crude Oils and Fuel Oils by the Extraction Method, Third Edition, November 2007; reaffirmed October 2012; incorporated by reference at § 250.1202;
(35) API MPMS Chapter 10—Sediment and Water, Section 2—Standard Test Method for Water in Crude Oil by Distillation, Second Edition, November 2007; incorporated by reference at § 250.1202;
(36) API MPMS Chapter 10—Sediment and Water, Section 3—Standard Test Method for Water and Sediment in Crude Oil by the Centrifuge Method (Laboratory Procedure), Third Edition, May 2008; incorporated by reference at § 250.1202;
(37) API MPMS Chapter 10—Sediment and Water, Section 4—Determination of Water and/or Sediment in Crude Oil by the Centrifuge Method (Field Procedure), Third Edition, December 1999; incorporated by reference at § 250.1202;
(38) API MPMS Chapter 10—Sediment and Water, Section 9—Standard Test Method for Water in Crude Oils by Coulometric Karl Fischer Titration, Second Edition, December 2002; reaffirmed 2005; incorporated by reference at § 250.1202;
(39) API MPMS Chapter 11.1—Volume Correction Factors, Volume 1, Table 5A—Generalized Crude Oils and JP-4 Correction of Observed API Gravity to API Gravity at 60 °F, and Table 6A—Generalized Crude Oils and JP-4 Correction of Volume to 60 °F Against API Gravity at 60 °F, API Standard 2540, First Edition, August 1980; reaffirmed March 1997; incorporated by reference at § 250.1202;
(40) API MPMS Chapter 11.2.2—Compressibility Factors for Hydrocarbons: 0.350-0.637 Relative Density (60 °F/60 °F) and −50 °F to 140 °F Metering Temperature, Second Edition, October 1986; reaffirmed: December 2007; incorporated by reference at § 250.1202;
(41) API MPMS Chapter 11—Physical Properties Data, Section 1—Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils; May 2004 (incorporating Addendum 1, September 2007); incorporated by reference at § 250.1202(a), (g), and (l);
(42) API MPMS Chapter 11—Physical Properties Data, Addendum to Section 2, Part 2—Compressibility Factors for Hydrocarbons, Correlation of Vapor Pressure for Commercial Natural Gas Liquids, First Edition, December 1994; reaffirmed, December 2002; incorporated by reference at § 250.1202;
(43) API MPMS, Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 1—Introduction, Second Edition, May 1995; reaffirmed March 2014; incorporated by reference at § 250.1202;
(44) API MPMS, Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 2—Measurement Tickets, Third Edition, June 2003; reaffirmed February 2016; incorporated by reference at § 250.1202;
(45) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 3—Proving Reports; First Edition, October 1998, reaffirmed March 2014; incorporated by reference at § 250.1202(a) and (g);
(46) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 4—Calculation of Base Prover Volumes by the Waterdraw Method, First Edition, December 1997; reaffirmed September 2014; incorporated by reference at § 250.1202(a), (f), and (g);
(47) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 3—Concentric, Square-Edged Orifice Meters, Part 1—General Equations and Uncertainty Guidelines, Third Edition, September 1990; reaffirmed, January 2003; incorporated by reference at § 250.1203;
(48) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 3—Concentric, Square-Edged Orifice Meters, Part 2—Specification and Installation Requirements, Fourth Edition, April 2000; reaffirmed March 2006; incorporated by reference at § 250.1203;
(49) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 3—Concentric, Square-Edged Orifice Meters; Part 3—Natural Gas Applications; Third Edition, August 1992; Errata March 1994, reaffirmed, February 2009; incorporated by reference at § 250.1203;
(50) API MPMS, Chapter 14.5/GPA Standard 2172-09; Calculation of Gross Heating Value, Relative Density, Compressibility and Theoretical Hydrocarbon Liquid Content for Natural Gas Mixtures for Custody Transfer; Third Edition, January 2009; reaffirmed February 2014; incorporated by reference at § 250.1203;
(51) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 6—Continuous Density Measurement, Second Edition, April 1991; reaffirmed, February 2006; incorporated by reference at § 250.1203;
(52) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 8—Liquefied Petroleum Gas Measurement, Second Edition, July 1997; reaffirmed, March 2006; incorporated by reference at § 250.1203;
(53) API MPMS Chapter 20—Section 1—Allocation Measurement, First Edition, September 1993; reaffirmed October 2006; incorporated by reference at § 250.1202;
(54) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Section 1—Electronic Gas Measurement, First Edition, August 1993; reaffirmed, July 2005; incorporated by reference at § 250.1203;
(55) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Section 2—Electronic Liquid Volume Measurement Using Positive Displacement and Turbine Meters; First Edition, June 1998; reaffirmed October 2016; incorporated by reference at § 250.1202(a);
(56) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Addendum to Section 2—Flow Measurement Using Electronic Metering Systems, Inferred Mass; First Edition, reaffirmed February 2006; incorporated by reference at § 250.1202(a);
(57) API RP 2A-WSD, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms—Working Stress Design, Twenty-first Edition, December 2000; Errata and Supplement 1, December 2002; Errata and Supplement 2, September 2005; Errata and Supplement 3, October 2007; incorporated by reference at §§ 250.901, 250.908, 250.919, and 250.920;
(58) API RP 2D, Operation and Maintenance of Offshore Cranes, Sixth Edition, May 2007; incorporated by reference at § 250.108;
(59) API RP 2FPS, RP for Planning, Designing, and Constructing Floating Production Systems; First Edition, March 2001; incorporated by reference at § 250.901;
(60) API RP 2I, In-Service Inspection of Mooring Hardware for Floating Structures; Third Edition, April 2008; incorporated by reference at § 250.901(a) and (d);
(61) ANSI/API RP 2N, Third Edition, “Recommended Practice for Planning, Designing, and Constructing Structures and Pipelines for Arctic Conditions”, Third Edition, April 2015; incorporated by reference at § 250.470(g);
(62) API RP 2RD, Recommended Practice for Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs), First Edition, June 1998; reaffirmed, May 2006, Errata, June 2009; incorporated by reference at §§ 250.733, 250.800(c), 250.901(a), (d), and 250.1002(b);
(63) API RP 2SK, Design and Analysis of Stationkeeping Systems for Floating Structures, Third Edition, October 2005, Addendum, May 2008, reaffirmed June 2015; incorporated by reference at §§ 250.800(c) and 250.901(a) and (d);
(64) API RP 2SM, Recommended Practice for Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring, First Edition, March 2001, Addendum, May 2007; incorporated by reference at §§ 250.800(c) and 250.901(a) and (d);
(65) API RP 2T, Recommended Practice for Planning, Designing, and Constructing Tension Leg Platforms, Second Edition, August 1997; incorporated by reference at § 250.901(a) and (d);
(66) ANSI/API RP 14B, Design, Installation, Operation, Test, and Redress of Subsurface Safety Valve Systems, Sixth Edition, September 2015; incorporated by reference at §§ 250.802(b), 250.803(a), 250.814(d), 250.828(c), and 250.880(c);
(67) API RP 14C, Recommended Practice for Analysis, Design, Installation, and Testing of Basic Surface Safety Systems for Offshore Production Platforms, Seventh Edition, March 2001, reaffirmed: March 2007; incorporated by reference at §§ 250.125(a), 250.292(j), 250.841(a), 250.842(a), 250.850, 250.852(a), 250.855, 250.856(a), 250.858(a), 250.862(e), 250.865(a), 250.867(a), 250.869(a) through (c), 250.872(a), 250.873(a), 250.874(a), 250.880(b) and (c), 250.1002(d), 250.1004(b), 250.1628(c) and (d), 250.1629(b), and 250.1630(a);
(68) API RP 14E, Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems, Fifth Edition, October 1991; reaffirmed, January 2013; incorporated by reference at §§ 250.841(b), 250.842(a), and 250.1628(b) and (d);
(69) API RP 14F, Recommended Practice for Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class 1, Division 1 and Division 2 Locations, Upstream Segment, Fifth Edition, July 2008, reaffirmed: April 2013; incorporated by reference at §§ 250.114(c), 250.842(c), 250.862(e), and 250.1629(b);
(70) API RP 14FZ, Recommended Practice for Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1 and Zone 2 Locations, Second Edition, May 2013; incorporated by reference at §§ 250.114(c), 250.842(c), 250.862(e), and 250.1629(b);
(71) API RP 14G, Recommended Practice for Fire Prevention and Control on Fixed Open-type Offshore Production Platforms, Fourth Edition, April 2007; Reaffirmed, January 2013; incorporated by reference at §§ 250.859(a), 250.862(e), 250.880(c), and 250.1629(b);
(72) API RP 14J, Recommended Practice for Design and Hazards Analysis for Offshore Production Facilities, Second Edition, May 2001; reaffirmed: January 2013; incorporated by reference at §§ 250.800(b) and (c), 250.842(c), and 250.901(a) and (d);
(73) API RP 17H, Remotely Operated Tools and Interfaces on Subsea Production Systems, Second Edition, June 2013; Errata, January 2014; incorporated by reference at § 250.734(a);
(74) API RP 65, Recommended Practice for Cementing Shallow Water Flow Zones in Deepwater Wells, First Edition, September 2002; incorporated by reference at § 250.415;
(75) API RP 75, Recommended Practice for Development of a Safety and Environmental Management Program for Offshore Operations and Facilities, Third Edition, May 2004, reaffirmed May 2008; incorporated by reference at §§ 250.1900, 250.1902, 250.1903, 250.1909, 250.1920;
(76) API RP 86, API Recommended Practice for Measurement of Multiphase Flow; First Edition, September 2005; incorporated by reference at §§ 250.1202(a) and 250.1203(b);
(77) API RP 90, Annular Casing Pressure Management for Offshore Wells, First Edition, August 2006; incorporated by reference at § 250.519;
(78) API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, Third Edition, December 2012; Errata January 2014, incorporated by reference at §§ 250.114(a), 250.459, 250.842(a), 250.862(a) and (e), 250.872(a), 250.1628(b) and (d), and 250.1629(b);
(79) API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2, First Edition, November 1997; reaffirmed, August 2013; incorporated by reference at §§ 250.114(a), 250.459, 250.842(a), 250.862(a) and (e), 250.872(a), 250.1628(b) and (d), and 250.1629(b);
(80) API RP 2556, Recommended Practice for Correcting Gauge Tables for Incrustation, Second Edition, August 1993; reaffirmed November 2003; incorporated by reference at § 250.1202;
(81) API Spec. 2C, Specification for Offshore Pedestal Mounted Cranes, Sixth Edition, March 2004, Effective Date: September 2004; incorporated by reference at § 250.108;
(82) ANSI/API Spec. 6A, Specification for Wellhead and Christmas Tree Equipment, Twentieth Edition, October 2010; Addendum 1, November 2011; Errata 2, November 2011; Addendum 2, November 2012; Addendum 3, March 2013; Errata 3, June 2013; Errata 4, August 2013; Errata 5, November 2013; Errata 6, March 2014; Errata 7, December 2014; Errata 8, February 2016; Addendum 4, June 2016; Errata 9, June 2016; Errata 10, August 2016; incorporated by reference at §§ 250.518(c), 250.619(c), 250.730, 250.802(a), 250.803(a), 250.833, 250.873(b), 250.874(g); 250.1002(b).
(83) API Spec. 6AV1, Specification for Verification Test of Wellhead Surface Safety Valves and Underwater Safety Valves for Offshore Service, Second Edition, February 2013; incorporated by reference at §§ 250.802(a), 250.833, 250.873(b), and 250.874(g);
(84) API STD 6AV2, Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety Valves Offshore; First Edition, March 2014; Errata 1, August 2014; incorporated by reference at §§ 250.820, 250.834, 250.836, and 250.880(c)
(85) ANSI/API Spec. 6D, Specification for Pipeline Valves, Twenty-third Edition, April 2008; Effective Date: October 1, 2008, Errata 1, June 2008; Errata 2, November 2008; Errata 3, February 2009; Addendum 1, October 2009; Contains API Monogram Annex as Part of U.S. National Adoption; ISO 14313:2007 (Identical), Petroleum and natural gas industries—Pipeline transportation systems—Pipeline valves; incorporated by reference at § 250.1002(b);
(86) ANSI/API Spec. 11D1, Packers and Bridge Plugs, Third Edition, April 2015; including Errata 1, August 2019; incorporated by reference at §§ 250.518(e), 250.619(e); 250.1703.
(87) ANSI/API Spec. 14A, Specification for Subsurface Safety Valve Equipment, Eleventh Edition, October 2005, reaffirmed, June 2012; incorporated by reference at §§ 250.802 and 250.803(a);
(88) ANSI/API Spec. 16A, Specification for Drill-through Equipment, Third Edition, June 2004, reaffirmed August 2010; incorporated by reference at § 250.730;
(89) ANSI/API Spec. 16C, Specification for Choke and Kill Systems, First Edition, January 1993, reaffirmed July 2010; incorporated by reference at § 250.730;
(90) API Spec. 16D, Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment, Second Edition, July 2004, reaffirmed August 2013; incorporated by reference at § 250.730;
(91) ANSI/API Spec. 17D, Design and Operation of Subsea Production Systems—Subsea Wellhead and Tree Equipment, Second Edition, Reaffirmed November 2018; Addendum 1, September 2015; Errata, September 2011; Errata 2, January 2012; Errata 3, June 2013; Errata 4, July 2013; Errata 5, October 2013; Errata 6, August 2015; Errata 7, October 2015; incorporated by reference at §§ 250.518(c); 250.619(c); 250.730.
(92) ANSI/API Spec. 17J, Specification for Unbonded Flexible Pipe, Third Edition, July 2008, incorporated by reference at §§ 250.852(e), 250.1002(b), and 250.1007(a).
(93) ANSI/API Spec. Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry, Ninth Edition, June 2013; Errata, February 2014; Errata 2, March 2014; Addendum 1, June 2016; incorporated by reference at §§ 250.730 and 250.801(b) and (c);
(94) API Standard 53, Blowout Prevention Equipment Systems for Drilling Wells, Fourth Edition, November 2012, Addendum 1, July 2016, incorporated by reference at §§ 250.730, 250.734, 250.735, 250.736, 250.737, and 250.739;
(95) API Standard 65—Part 2, Isolating Potential Flow Zones During Well Construction; Second Edition, December 2010; incorporated by reference at §§ 250.415(f) and 250.420(a);
(96) API Standard 2552, USA Standard Method for Measurement and Calibration of Spheres and Spheroids, First Edition, 1966; reaffirmed, October 2007; incorporated by reference at § 250.1202;
(97) API Standard 2555, Method for Liquid Calibration of Tanks, First Edition, September 1966; reaffirmed March 2002; incorporated by reference at § 250.1202;
(f) American Society of Mechanical Engineers (ASME), 22 Law Drive, P.O. Box 2900, Fairfield, NJ 07007-2900; http://www.asme.org; phone: 1-800-843-2763.
(1) 2017 ASME Boiler and Pressure Vessel Code (BPVC), Section I, Rules for Construction of Power Boilers, 2017 Edition, July 1, 2017, incorporated by reference at §§ 250.851(a) and 250.1629(b).
(2) 2017 ASME Boiler and Pressure Vessel Code, Section IV, Rules for Construction of Heating Boilers, 2017 Edition, July 1, 2017, incorporated by reference at §§ 250.851(a) and 250.1629(b).
(3) 2017 ASME Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels; Division 1, 2017 Edition; July 1, 2017, incorporated by reference at §§ 250.851(a) and 250.1629(b).
(4) 2017 ASME Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels; Division 2: Alternative Rules, 2017 Edition, July 1, 2017, incorporated by reference at §§ 250.851(a) and 250.1629(b).
(5) 2017 ASME Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels; Division 3: Alternative Rules for Construction of High Pressure Vessels, 2017 Edition, July 1, 2017, incorporated by reference at §§ 250.851(a) and 250.1629(b).
(g) American Society for Testing and Materials (ASTM), ASTM Standards, 100 Bar Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; http://www.astm.org; phone: 1-877-909-2786:
(1) ASTM Standard C 33-07, approved December 15, 2007, Standard Specification for Concrete Aggregates; incorporated by reference at § 250.901;
(2) ASTM Standard C 94/C 94M-07, approved January 1, 2007, Standard Specification for Ready-Mixed Concrete; incorporated by reference at § 250.901;
(3) ASTM Standard C 150-07, approved May 1, 2007, Standard Specification for Portland Cement; incorporated by reference at § 250.901;
(4) ASTM Standard C 330-05, approved December 15, 2005, Standard Specification for Lightweight Aggregates for Structural Concrete; incorporated by reference at § 250.901;
(5) ASTM Standard C 595-08, approved January 1, 2008, Standard Specification for Blended Hydraulic Cements; incorporated by reference at § 250.901;
(h) American Welding Society (AWS), AWS Codes, 8669 NW 36 Street, #130, Miami, FL 33126; http://www.aws.org;phone: 800-443-9353:
(1) AWS D1.1:2000, Structural Welding Code—Steel, 17th Edition, October 18, 1999; incorporated by reference at § 250.901;
(2) AWS D1.4-98, Structural Welding Code—Reinforcing Steel, 1998 Edition; incorporated by reference at § 250.901;
(3) AWS D3.6M:1999, Specification for Underwater Welding (1999); incorporated by reference at § 250.901.
(i) National Association of Corrosion Engineers (NACE) International, NACE Standards, Park Ten Place, Houston, TX 77084; http://www.nace.org; phone: 281-228-6200:
(1) NACE Standard MR0175-2003, Standard Material Requirements, Metals for Sulfide Stress Cracking and Stress Corrosion Cracking Resistance in Sour Oilfield Environments, Revised January 17, 2003; incorporated by reference at §§ 250.490; 250.518(a); 250.619(a); 250.901.
(2) NACE Standard RP0176-2003, Standard Recommended Practice, Corrosion Control of Steel Fixed Offshore Structures Associated with Petroleum Production; incorporated by reference at § 250.901.
(j) International Organization for Standardization (ISO), 1, ch. de la Voie-Creuse, CP 56, CH-1211, Geneva 20, Switzerland; www.iso.org; phone: 41-22-749-01-11:
(1) ISO/IEC (International Electrotechnical Commission) 17011, Conformity assessment—General requirements for accreditation bodies accrediting conformity assessment bodies, First edition 2004-09-01; Corrected version 2005-02-15; incorporated by reference at §§ 250.1900, 250.1903, 250.1904, and 250.1922.
(2) ISO/IEC 17021-1, Conformity assessment—Requirements for bodies providing audit and certification of management systems—Part 1: Requirements, First Edition, June 2015, incorporated by reference at § 250.730(d).
(3) [Reserved]
(k) Center for Offshore Safety (COS), 1990 Post Oak Blvd., Suite 1370, Houston, TX 77056; www.centerforoffshoresafety.org; phone: 832-495-4925.
(1) COS Safety Publication COS-2-01, Qualification and Competence Requirements for Audit Teams and Auditors Performing Third-party SEMS Audits of Deepwater Operations, First Edition, Effective Date October 2012; incorporated by reference at §§ 250.1900, 250.1903, 250.1904, and 250.1921.
(2) COS Safety Publication COS-2-03, Requirements for Third-party SEMS Auditing and Certification of Deepwater Operations, First Edition, Effective Date October 2012; incorporated by reference at §§ 250.1900, 250.1903, 250.1904, and 250.1920.
(3) COS Safety Publication COS-2-04, Requirements for Accreditation of Audit Service Providers Performing SEMS Audits and Certification of Deepwater Operations, First Edition, Effective Date October 2012; incorporated by reference at §§ 250.1900, 250.1903, 250.1904, and 250.1922.
§ 250.199 Paperwork Reduction Act statements—information collection.
(a) OMB has approved the information collection requirements in part 250 under 44 U.S.C. 3501 et seq. The table in paragraph (e) of this section lists the subpart in the rule requiring the information and its title, provides the OMB control number, and summarizes the reasons for collecting the information and how BSEE uses the information. The associated BSEE forms required by this part are listed at the end of this table with the relevant information.
(b) Respondents are OCS oil, gas, and sulphur lessees and operators. The requirement to respond to the information collections in this part is mandated under the Act (43 U.S.C. 1331 et seq.) and the Act’s Amendments of 1978 (43 U.S.C. 1801 et seq.). Some responses are also required to obtain or retain a benefit or may be voluntary. Proprietary information will be protected under § 250.197, Data and information to be made available to the public or for limited inspection; parts 30 CFR Parts 251, 252; and the Freedom of Information Act (5 U.S.C. 552) and its implementing regulations at 43 CFR part 2.
(c) The Paperwork Reduction Act of 1995 requires us to inform the public that an agency may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.
(d) Send comments regarding any aspect of the collections of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.
(e) BSEE is collecting this information for the reasons given in the following table:
30 CFR Subpart, title and/or BSEE Form (OMB Control No.) | BSEE collects this information and uses it to: |
---|---|
(1) Subpart A, General (1014-0022), including Forms BSEE-0011, iSEE; BSEE-0132, Evacuation Statistics; BSEE-0143, Facility/Equipment Damage Report; BSEE-1832, Notification of Incidents of Noncompliance | (i) Determine that activities on the OCS comply with statutory and regulatory requirements; are safe and protect the environment; and result in diligent development and production on OCS leases. |
(ii) Support the unproved and proved reserve estimation, resource assessment, and fair market value determinations. | |
(iii) Assess damage and project any disruption of oil and gas production from the OCS after a major natural occurrence. | |
(2) Subpart B, Plans and Information (1014-0024) | Evaluate Deepwater Operations Plans for compliance with statutory and regulatory requirements |
(3) Subpart C, Pollution Prevention and Control (1014-0023) | (i) Evaluate measures to prevent unauthorized discharge of pollutants into the offshore waters. |
(ii) Ensure action is taken to control pollution. | |
(4) Subpart D, Oil and Gas and Drilling Operations (1014-0018), including Forms BSEE-0125, End of Operations Report; BSEE-0133, Well Activity Report; and BSEE-0133S, Open Hole Data Report | (i) Evaluate the equipment and procedures to be used in drilling operations on the OCS. |
(ii) Ensure that drilling operations meet statutory and regulatory requirements. | |
(5) Subpart E, Oil and Gas Well-Completion Operations (1014-0004) | (i) Evaluate the equipment and procedures to be used in well-completion operations on the OCS. |
(ii) Ensure that well-completion operations meet statutory and regulatory requirements. | |
(6) Subpart F, Oil and Gas Well Workover Operations (1014-0001) | (i) Evaluate the equipment and procedures to be used during well-workover operations on the OCS. |
(ii) Ensure that well-workover operations meet statutory and regulatory requirements. | |
(7) Subpart G, Blowout Preventer Systems (1014-0028), including Form BSEE-0144, Rig Movement Notification Report | (i) Evaluate the equipment and procedures to be used during well drilling, completion, workover, and abandonment operations on the OCS. |
(ii) Ensure that well operations meet statutory and regulatory requirements. | |
(8) Subpart H, Oil and Gas Production Safety Systems (1014-0003) | (i) Evaluate the equipment and procedures that will be used during production operations on the OCS. |
(ii) Ensure that production operations meet statutory and regulatory requirements. | |
(9) Subpart I, Platforms and Structures (1014-0011) | (i) Evaluate the design, fabrication, and installation of platforms on the OCS. |
(ii) Ensure the structural integrity of platforms installed on the OCS. | |
(10) Subpart J, Pipelines and Pipeline Rights-of-Way (1014-0016), including Form BSEE-0149, Assignment of Federal OCS Pipeline Right-of-Way Grant | (i) Evaluate the design, installation, and operation of pipelines on the OCS. |
(ii) Ensure that pipeline operations meet statutory and regulatory requirements. | |
(11) Subpart K, Oil and Gas Production Rates (1014-0019), including Forms BSEE-0126, Well Potential Test Report and BSEE-0128, Semiannual Well Test Report | (i) Evaluate production rates for hydrocarbons produced on the OCS. |
(ii) Ensure economic maximization of ultimate hydrocarbon recovery. | |
(12) Subpart L, Oil and Gas Production Measurement, Surface Commingling, and Security (1014-0002) | (i) Evaluate the measurement of production, commingling of hydrocarbons, and site security plans. |
(ii) Ensure that produced hydrocarbons are measured and commingled to provide for accurate royalty payments and security. | |
(13) Subpart M, Unitization (1014-0015) | (i) Evaluate the unitization of leases. |
(ii) Ensure that unitization prevents waste, conserves natural resources, and protects correlative rights. | |
(14) Subpart N, Remedies and Penalties | (The requirements in subpart N are exempt from the Paperwork Reduction Act of 1995 according to 5 CFR 1320.4). |
(15) Subpart O, Well Control and Production Safety Training (1014-0008) | (i) Evaluate training program curricula for OCS workers, course schedules, and attendance. |
(ii) Ensure that training programs are technically accurate and sufficient to meet statutory and regulatory requirements, and that workers are properly trained. | |
(16) Subpart P, Sulfur Operations (1014-0006) | (i) Evaluate sulfur exploration and development operations on the OCS. |
(ii) Ensure that OCS sulfur operations meet statutory and regulatory requirements and will result in diligent development and production of sulfur leases. | |
(17) Subpart Q, Decommissioning Activities (1014-0010) | Ensure that decommissioning activities, site clearance, and platform or pipeline removal are properly performed to meet statutory and regulatory requirements and do not conflict with other users of the OCS. |
(18) Subpart S, Safety and Environmental Management Systems (1014-0017), including Form BSEE-0131, Performance Measures Data | (i) Evaluate operators’ policies and procedures to assure safety and environmental protection while conducting OCS operations (including those operations conducted by contractor and subcontractor personnel). |
(ii) Evaluate Performance Measures Data relating to risk and number of accidents, injuries, and oil spills during OCS activities. | |
(19) Application for Permit to Drill (APD, Revised APD), Form BSEE-0123; and Supplemental APD Information Sheet, Form BSEE-0123S, and all supporting documentation (1014-0025) | (i) Evaluate and approve the adequacy of the equipment, materials, and/or procedures that the lessee or operator plans to use during drilling. |
(ii) Ensure that applicable OCS operations meet statutory and regulatory requirements. | |
(20) Application for Permit to Modify (APM), Form BSEE-0124, and supporting documentation (1014-0026) | (i) Evaluate and approve the adequacy of the equipment, materials, and/or procedures that the lessee or operator plans to use during drilling and to evaluate well plan modifications and changes in major equipment. |
(ii) Ensure that applicable OCS operations meet statutory and regulatory requirements. |
Subpart B—Plans and Information
General Information
§ 250.200 Definitions.
Acronyms and terms used in this subpart have the following meanings:
(a) Acronyms used frequently in this subpart are listed alphabetically below:
(1) BOEM means Bureau of Ocean Energy Management of the U.S. Department of the Interior.
(2) BSEE means Bureau of Safety and Environmental Enforcement of the U.S. Department of the Interior.
(3) CID means Conservation Information Document.
(4) CZMA means Coastal Zone Management Act.
(5) DOCD means Development Operations Coordination Document.
(6) DPP means Development and Production Plan.
(7) DWOP means Deepwater Operations Plan.
(8) EIA means Environmental Impact Analysis.
(9) EP means Exploration Plan.
(10) ESA means Endangered Species Act.
(11) HPHT means High Pressure High Temperature
(12) I3P means Independent Third Party
(13) MMPA means Marine Mammal Protection Act.
(14) NPDES means National Pollutant Discharge Elimination System.
(15) NTL means Notice to Lessees and Operators.
(16) OCS means Outer Continental Shelf.
(b) Terms used in this subpart are listed alphabetically below:
Amendment means a change you make to an EP, DPP, or DOCD that is pending before BOEM for a decision (see 30 CFR 550.232(d) and 30 CFR 550.267(d)).
Barrier categorization includes identifying barriers as one of the following two types of categories:
Category 1 Barrier means any equipment, component, or assembly that functions as part of a primary barrier during any operational phase of its life cycle. The operational phases of the barrier equipment, component, or assembly are drilling, completion, workover, intervention, injection, production, or abandonment.
Category 2 Barrier means any equipment, component, or assembly that normally functions as part of a secondary barrier during any operational phase of its life cycle, except when a primary barrier fails. The operational phases of the barrier equipment, component, or assembly are drilling, completion, workover, intervention, injection, production, or abandonment. BSEE may consider non-barrier structural components of a barrier system as a Category 2 Barrier if failure of this structural component could reasonably result in a Primary Barrier failure.
Fit for Purpose means a determination made by an I3P at the conclusion of I3P review that the barrier equipment design has been verified and validated in conformance with recognized engineering standards and any additional project specification requirements; that the material selection, design verification analysis, design validation testing, and quality control are appropriate to justify the technical specifications; and that the technical specifications meet or exceed a project’s site specific functional requirements.
Fit for Service means a determination made by the operator that the material selection, design verification analysis, design validation testing, and quality control of the barrier equipment is appropriate to justify the technical specifications and that the technical specifications meet or exceed a project’s site-specific functional requirements.
New or unusual technology means equipment or procedures used for any drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations that meet any of the following criteria:
(1) Has not been approved for use or used extensively in a BSEE OCS Region;
(2) Has not been approved for use or used extensively under the anticipated operating conditions;
(3) Has operating characteristics that are outside the performance parameters established in this part;
(4) Will operate in an HPHT environment as defined in § 250.105; or
(5) Is part of a primary or secondary barrier system that uses materials, design analysis techniques, validation testing methods, or manufacturing processes not addressed in existing industry standards.
Primary Barrier means the equipment, material, component, or assembly that is designated as the principal means of isolating the hydrocarbon pressure source from people and the environment.
Secondary Barrier means the equipment, material, component, or assembly that is designated as the secondary means of isolating the hydrocarbon pressure source from people and the environment.
Subsea tieback development technology means, but is not limited to, floating production systems, tension leg platforms, spars, Floating Production Storage and Offloading (FPSO) systems, guyed towers, compliant towers, subsea manifolds, subsea wells, hybrid wells, production risers, export risers, and other subsea completion or production components that rely on a remote site or host facility for utility and well control services.
§ 250.201 What plans and information must I submit before I conduct any activities on my lease or unit?
(a) Plans and permits. Before you conduct the activities on your lease or unit listed in the following table, you must submit, and BSEE must approve, the listed plans (or relevant portions thereof), and any applicable permits. Your plans and applicable permits may cover one or more leases or units.
You must have BSEE
approval of a(n) . . . | Before you . . . | Additional information |
---|---|---|
(1) New or Unusual Technology Conceptual Plan | install the new or unusual technology | (i) Must be approved by BSEE before it will approve any associated application or permit ( (ii) May be independent of a project Conceptual Plan or DWOP. (iii) BSEE will not approve this Conceptual Plan until all associated I3P Reports (if required) are submitted and are reviewed by BSEE. (iv) May not contain equipment identified as a primary or secondary barrier. |
(2) New or Unusual Technology Barrier Equipment Conceptual Plan | install the new or unusual technology that is identified as barrier equipment | (i) Is required for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier.
(ii) Must be approved by BSEE before it will approve any associated application or permit ( (iii) BSEE will not approve this Conceptual Plan until all associated I3P Reports are submitted and reviewed by BSEE. |
(3) Project Conceptual Plan | conduct post-drilling installation or well completion activities for a deepwater development project, or for any project that will involve the use of a subsea tieback development technology in any water depth, which may include new or unusual technology | (i) Must be approved before well completion permit approval ( (ii) Any relevant new or unusual technology associated with completion operations must be approved by BSEE before project Conceptual Plan approval. |
(4) Deepwater Operations Plan (DWOP) | (i) conduct post-completion installation activities for a deepwater development project, or for any project that will involve the use of a subsea tieback development technology in any water depth, which may include new or unusual technology; and (ii) initiate production activities | Must include reference to all applicable, previously approved Conceptual Plans for the associated development project. |
(b) Submitting additional information. On a case-by-case basis, the Regional Supervisor may require you to submit additional information if the Regional Supervisor determines that it is necessary to evaluate your proposed plan or permit.
(c) Referencing. In preparing your proposed plan or permit, you may reference information and data discussed in other plans or permits you previously submitted or that are otherwise readily available to BSEE.
(d) All plans listed under paragraph (a) of this section that are initially submitted after October 29, 2024 must comply with the requirements of this subpart.
§ 250.202 How must I protect the rights of the Federal government?
(a) To protect the rights of the Federal government, you must either:
(1) Drill and produce the wells that the Regional Supervisor determines are necessary to protect the Federal government from loss due to production on other leases or units or from adjacent lands under the jurisdiction of other entities (e.g., State and foreign governments); or
(2) Pay a sum that the Regional Supervisor determines as adequate to compensate the Federal government for your failure to drill and produce any well.
(b) Payment under paragraph (a)(2) of this section may constitute production in paying quantities for the purpose of extending the lease term.
(c) You must complete and produce any penetrated hydrocarbon-bearing zone that the Regional Supervisor determines is necessary to conform to sound conservation practices.
§ 250.203 Are there special requirements if my well affects an adjacent property?
For wells that could intersect or drain an adjacent property, the Regional Supervisor may require special measures to protect the rights of the Federal government and objecting lessees or operators of adjacent leases or units.
§ 250.204 Requirements for high pressure high temperature (HPHT) barrier equipment.
If you plan to install HPHT barrier equipment, you must submit information with your applicable Project Conceptual Plan, New or Unusual Technology Barrier Equipment Conceptual Plan, DWOP, and applicable permit(s) that demonstrates the equipment is fit for service in the applicable HPHT environment. You must follow the applicable DWOP Process requirements (e.g., §§ 250.229 and 250.242).
§ 250.205 [Reserved]
Barrier Equipment and Systems
§ 250.206 What equipment does BSEE consider to be a barrier?
A barrier or barrier system is any engineered equipment, material, component, or assembly that is installed to contain a hydrocarbon pressure source(s) to prevent harm to people or the environment. BSEE only recognizes barriers that are either permanently or temporarily installed, pressure controlling, and/or pressure containing. You must be able to activate pressure controlling barriers on demand (i.e., closed by an operator or automated safety system). You must function test and pressure test any pressure controlling barriers or barrier systems to defined acceptance criteria that can be repeated. You must pressure test any pressure containing barrier or barrier system to defined acceptance criteria that can be repeated.
§ 250.207 How must barrier systems be used?
You must install and maintain a primary and a secondary barrier system (redundant barriers) to prevent a loss of containment during any operational phase of a well, flowline, pipeline, production, or riser system.
Activities and Post-Approval Requirements for the EP, DPP, DWOP, and DOCD
§ 250.208 How must I conduct activities under an approved EP, DPP, or DOCD?
(a) Compliance. You must conduct all of your lease and unit activities according to your approved EP, DPP, or DOCD and any approval conditions. If you fail to comply with your approved EP, DPP, or DOCD:
(1) You may be subject to BSEE enforcement action, including civil penalties; and
(2) The lease(s) involved in your EP, DPP, or DOCD may be forfeited or cancelled under 43 U.S.C. 1334(c) or (d). If this happens, you may not be entitled to compensation under 30 CFR 550.185(b) and 30 CFR 556.1102.
(b) Emergencies. Nothing in this subpart or in your approved EP, DPP, or DOCD relieves you of or limits your responsibility to take appropriate measures to meet emergency situations. In an emergency situation, the Regional Environmental Officer may approve or require departures from your approved EP, DPP, or DOCD.
§ 250.209 What must I do to conduct activities under the approved EP, DPP, or DOCD?
(a) Approvals and permits. Before you conduct activities under your approved EP, DPP, or DOCD you must obtain the following approvals and or permits, as applicable, from the District Manager or BSEE Regional Supervisor:
(1) Approval of Applications for Permits to Drill (APDs) (see § 250.410);
(2) Approval of production safety systems (see § 250.800);
(3) Approval of new platforms and other structures (or major modifications to platforms and other structures) (see § 250.905);
(4) Approval of applications to install lease term pipelines (see § 250.1007); and
(5) Other permits, as required by applicable law.
(b) Conformance. The activities proposed in these applications and permits must conform to the activities described in detail in your approved EP, DPP, or DOCD.
§ 250.210 Do I have to conduct post-approval monitoring?
The Regional Supervisor may direct you to conduct monitoring programs, including monitoring in accordance with the ESA and the MMPA, in association with your approved EP, DPP, DWOP, or DOCD. You must retain copies of all monitoring data obtained or derived from your monitoring programs and make them available to BSEE upon request. The Regional Supervisor may require you to:
(a) Submit monitoring plans for approval before you begin work; and
(b) Prepare and submit reports that summarize and analyze data and information obtained or derived from your monitoring programs. The Regional Supervisor will specify requirements for preparing and submitting these reports.
§ 250.211 What are my new or unusual technology failure reporting requirements?
If you have an approved new or unusual technology and it experiences a failure (i.e., any condition that prevents the equipment from meeting its functional specification) during or post-installation, you must notify the applicable Regional Supervisor within 30 days of the failure. You must also provide a failure analysis report as soon as it is available following notification. The failure analysis report must include any results of and potential root cause(s) of the failure. You must also follow all applicable failure or incident reporting requirements associated with the failure (e.g., §§ 250.188, 250.730, and 250.803).
§§ 250.212-250.219 [Reserved]
Deepwater Operations Plan (DWOP) Process
§ 250.220 What is the DWOP process?
(a) The DWOP process consists of providing sufficient information from a total system approach for BSEE to review:
(1) A deepwater development project,
(2) A subsea tieback development technology, or
(3) Any other project or system that uses new or unusual technology during any phase of the following operations: drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment.
(b) The DWOP process does not replace but complements other submittals required by the regulations, such as BOEM EPs, DPPs, and DOCDs, or BSEE applications and/or permits (e.g., APD, Application for Permit to Modify (APM), pipeline application, and platform application). BSEE will use the information in your DWOP process to determine whether the project will be developed in an acceptable manner, particularly with respect to operational safety and environmental protection involved with a deepwater development project, subsea tieback development technology, or new or unusual technology.
(c) The DWOP process consists of two phases:
(1) The Conceptual Plans. The Conceptual Plans outline certain equipment and process specifications, operational concepts, and basis of design that you plan to use for project development, and for applicable equipment design, installation, and operation. Sections 250.227 through 250.229 prescribe what each of the Conceptual Plans must contain. Each Conceptual Plan may be submitted separately or combined as applicable; and
(2) The DWOP. The DWOP identifies specific design, fabrication, installation and operational requirements for equipment, systems, and activities as applicable in §§ 250.236 through 250.242.
(d) You must submit to BSEE the applicable plan(s) covered under the DWOP process as appropriate (see § 250.225 for Conceptual Plan requirements and § 250.235 for DWOP requirements). Certain projects requiring New or Unusual Technology Conceptual Plans or New or Unusual Technology Barrier Equipment Conceptual Plans may not be required to have an associated Project Conceptual Plan or DWOP.
§ 250.221 When must I use the DWOP process?
(a) You must use the DWOP process for any project that meets any of the following criteria:
(1) Is planned in water depths greater than 1000 ft;
(2) Will use subsea tieback development technology, regardless of water depth; or
(3) Will use any new or unusual technology for any drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment project.
(b) If you are unsure if your project will use subsea tieback development technology or new or unusual technology, contact the Regional Supervisor for guidance.
§§ 250.222-250.224 [Reserved]
Conceptual Plans
§ 250.225 What are the types of Conceptual Plans that I must submit?
There are three types of Conceptual Plans:
(a) A Project Conceptual Plan is required for any project that is planned in water depths greater than 1000 feet, will use subsea tieback development technology, or will use new or unusual technology for completion, injection, production, pipeline, or platform operations;
(b) A New or Unusual Technology Conceptual Plan is required for any project or system that involves equipment or procedures that are considered new or unusual technology (see § 250.200 for the definition of new or unusual technology) for drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations; and
(c) A New or Unusual Technology Barrier Equipment Conceptual Plan is required for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier (see § 250.200 for the definition of primary and secondary barriers) for drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations.
§ 250.226 When and how must I submit each applicable Conceptual Plan?
You must submit each applicable Conceptual Plan to the Regional Supervisor after you have decided on the general concept(s) for a project or system, and before you finalize engineering design of the equipment, well, well safety control system, or subsea production systems. You must submit, for BSEE approval, each Conceptual Plan according to the following table:
Conceptual plan type | Where to find the
description (§) | Additional information |
---|---|---|
(a) Project Conceptual Plan | 250.227 | You may not complete any production or injection well or install the tree before BSEE has approved the Project Conceptual Plan. |
(b) New or Unusual Technology Conceptual Plan | 250.228 | (1) Operations and approval timing requirements are as follows:
(i) You may not install any new or unusual technology until BSEE approves your New or Unusual Technology Conceptual Plan, |
(ii) You may not complete any production or injection well or install a tree before BSEE has approved all New or Unusual Technology Conceptual Plans associated with all well completion equipment and the Project Conceptual Plan, and | ||
(iii) BSEE must first approve your New or Unusual Technology Conceptual Plan associated with subsea production systems before the DWOP may be approved. You may install this new or unusual technology following BSEE permit approval ( | ||
(2) The Regional Supervisor may require the operator to use an I3P to perform certain functions and verifications in accordance with § 250.231, as applicable. | ||
(3) BSEE will not approve a New or Unusual Technology Conceptual Plan until you submit and BSEE reviews all I3P Reports (if any required). | ||
(4) BSEE must approve your New or Unusual Technology Conceptual Plan before it will approve any associated application or permit application ( | ||
(5) You must submit separate New or Unusual Technology Conceptual Plans for each piece of equipment at an assembly level ( | ||
(c) A New or Unusual Technology Barrier Equipment Conceptual Plan | 250.229 | (1) You must submit a New or Unusual Technology Barrier Equipment Conceptual Plan for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier. |
(2) Operations and approval timing requirements are as follows: | ||
(i) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan prior to you installing new or unusual technology identified as barrier equipment, | ||
(ii) You may not complete any production or injection well or install the tree before BSEE has approved all the New or Unusual Technology Barrier Equipment Conceptual Plans associated with all well completion equipment and the Project Conceptual Plan, and | ||
(iii) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan associated with subsea production systems before the DWOP may be approved. You may install this equipment after BSEE permit approval ( | ||
(3) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan before it will approve any associated application or permit application ( | ||
(4) All new or unusual technology identified as barrier equipment requires the use of an Independent Third Party (I3P) to perform certain functions and verifications in accordance with § 250.231. BSEE will not approve New or Unusual Technology Barrier Equipment Conceptual Plans until you submit and BSEE reviews all required I3P Reports pursuant to § 250.231. | ||
(5) You must submit separate New or Unusual Technology Barrier Equipment Conceptual Plans for each piece of equipment at an assembly level ( |
§ 250.227 What must the Project Conceptual Plan contain?
In the Project Conceptual Plan, you must explain the basis of design that you will use to develop the field. You must include the following information:
(a) An overview of the development concept(s);
(b) The system control type (i.e., direct hydraulic or electro-hydraulic);
(c) The estimated distance from each of the wells to the host platform, and umbilical length(s);
(d) A statement that the subsea production safety system will be designed to comply with Subpart H of this part;
(e) For a new facility, a description of the type of facility you plan to install (e.g. spar, tension leg platform (TLP), FPSO, etc.);
(f) For a subsea tie back to an existing facility:
(1) A description of known structural modifications that you will need to make to accommodate the tieback, including a statement about whether these accommodations constitute minor or major modifications,
(2) The BSEE-approved service life of the existing facility, and
(3) A description of how you will evaluate whether the modifications may affect the BSEE-approved service life.
(g) A statement regarding whether the host facility will be manned or unmanned;
(h) A schedule of development activities, including well completion, facility installation, and date of first oil;
(i) Schematics, including:
(1) A proposed well location plat,
(2) A conceptual subsea field schematic depicting the planned development infrastructure that contains (as applicable) the wells, pipelines, manifolds, subsea booster pumps, high integrity pressure protection system, riser systems, umbilical(s), and facility footprint,
(3) The surface or subsea tree, and
(4) A proposed wellbore and completion schematic for a typical well (including Surface Controlled Subsurface Safety Valve (SCSSV) location and chemical injection points; and depiction or description of gas zones, if any, behind the production casing or production liner and how those gas zones will be isolated).
(j) A description of the drilling and completion systems;
(k) The estimated shut-in tubing pressure for the proposed well(s), including the calculation used to arrive at the estimate, specifying true vertical depth (TVD), reservoir pressure, and the fluid gradient used, or a brief discussion of the pressure volume temperature (PVT) data used for estimation;
(l) The wellbore static bottomhole temperature and the estimated flowing temperature at the tree;
(m) The pressure and temperature rating of the tree and wellhead;
(n) Whether there will be corrosive production (e.g., hydrogen sulfide (H
(o) Whether any of the proposed equipment will be re-furbished and re-certified;
(p) Whether enhanced recovery is planned for the early life of the project;
(q) Whether any new or unusual technology will be used to develop your project involving the following: drilling, completion, injection, production, risers, pipelines, or platforms;
(r) Whether the well(s) will include smart completion technology;
(s) A list of requests for any alternate procedures or equipment in accordance with § 250.141 and request for departures in accordance with § 250.142 associated with your applicable Conceptual Plans; and
(t) Documentation demonstrating payment of the service fee listed in § 250.125.
§ 250.228 What must the New or Unusual Technology Conceptual Plan contain?
(a) You must include the following information, as applicable, in your New or Unusual Technology Conceptual Plan:
(1) How the New or Unusual Technology Conceptual Plan fits within your overall site specific project, if applicable, including an overview of the project development concepts.
(2) A description of the technology and specific conditions under which it will be used;
(3) A description of shut-in capabilities and procedures;
(4) A description of redundancies of critical components or systems that will be used;
(5) A discussion of how the new or unusual technology could impact the barrier or safety system, if any, including:
(i) The detection method for new or unusual technology failure;
(ii) A description of how barriers or safety systems function to a fail-safe state when impacted by tew or unusual technology failure;
(6) Information on inspection and testing capabilities;
(7) A risk assessment and failure mode analysis;
(8) Operating procedures;
(9) A history of development and application of the technology;
(10) The basis of design, including design verification and validation testing;
(11) Detailed schematics identifying all components;
(12) A justification for new or unusual technology use, and any additional information required for a complete review;
(13) A list of requests for alternate procedures or equipment in accordance with § 250.141 and request for departures in accordance with § 250.142 needed for the new or unusual technology proposed in your New or Unusual Technology Conceptual Plan;
(14) A statement that the technology is fit for service in the applicable environment (for the specific project at location); and
(15) Documentation demonstrating payment of the service fee listed in § 250.125.
(b) The Regional Supervisor may require the use of an I3P according to § 250.231 if the system or equipment you propose to use requires a high degree of specialized or technically complex engineering knowledge, expertise, and experience to evaluate, or if existing industry standards do not address the system or equipment you propose to use.
(1) The Regional Supervisor may also require you to follow the I3P requirements according to § 250.232, as applicable, on a case-by-case basis.
(2) If you have any questions about I3P requirements for the New or Unusual Technology Conceptual Plan, contact the applicable Regional Supervisor.
§ 250.229 What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?
Your New or Unusual Technology Barrier Equipment Conceptual Plan must include the following information:
(a) A description how the New or Unusual Technology Barrier Equipment Conceptual Plan fits within your overall site-specific project, if applicable. You must include an overview of the project development concepts and a proposed schedule for submittal of associated Conceptual Plans;
(b) Detailed schematics depicting the primary and secondary barriers that include all components, assemblies, or sub-assemblies, each labeled and categorized as a Category 1 barrier or Category 2 barrier;
(c) A list of the primary and secondary barriers that includes all components, assemblies, or sub-assemblies specifying each assigned barrier as either a Category 1 barrier or Category 2 barrier;
(d) A list of the engineering standards that will be used in the equipment’s material selection and qualification, design verification analysis, and design validation testing;
(e) A list of requested alternate procedures or equipment in accordance with § 250.141 and requested departures in accordance with § 250.142 needed for the new or unusual technology barrier equipment proposed in your New or Unusual Technology Barrier Equipment Conceptual Plan;
(f) A list of the functional requirements (e.g., environmental and physical loads (magnitude and frequency)) for which the barrier equipment is being designed;
(g) A description of the equipment’s safety critical functions, (e.g., function(s) performed by or inherent to the equipment enabling it to achieve or maintain a safe state);
(h) An I3P nomination, in accordance with § 250.231(a);
(i) An I3P verification plan that includes the following:
(1) A discussion of the equipment’s material selection and qualification;
(2) A discussion of the equipment’s design verification analyses;
(3) A discussion of the equipment’s design validation testing;
(4) An explanation of why the analyses, processes, and procedures ensure that the equipment is fit for service in the applicable environment; and
(5) Details regarding how the I3P will address the additional items listed in § 250.232.
(j) Documentation demonstrating payment of the service fee listed in § 250.125.
§ 250.230 When are you required to submit an I3P Report?
You must submit to BSEE any I3P reports required in § 250.232 for any equipment identified in your New or Unusual Technology Barrier Equipment Conceptual Plan and when required by the Regional Supervisor. BSEE will not approve your associated Conceptual Plan until BSEE reviews the required I3P Reports.
§ 250.231 What are your requirements for the Independent Third Party (I3P) nomination?
In accordance with each applicable Conceptual Plan, you must:
(a) Nominate I3P(s) to review the design verification and design validation documentation of the Original Equipment Manufacturer (OEM). Your I3P must be a technical classification society, a licensed professional engineering firm, or a registered professional engineer capable of providing the required verifications and validations. You must submit your I3P nomination(s) within the applicable Conceptual Plan for separate BSEE acceptance before BSEE will approve the applicable Conceptual Plan. Your I3P nomination must include the following descriptions:
(1) Previous experience in third-party verification and validation or experience in the design, fabrication, and installation of applicable offshore oil and gas equipment;
(2) Technical capabilities of the individual or the primary staff for the specific project;
(3) Size and type of organization or corporation;
(4) In-house availability of, or access to, appropriate technology to review the specific project. This should include, but not limited to, computer programs, hardware, and equipment as applicable;
(5) Ability to perform the I3P functions for the specific project considering current commitments (e.g., project timelines, schedules, and personnel availability); and
(6) Previous experience with BSEE requirements and procedures.
(b) You must ensure that the I3P has access to all associated documentation and equipment related to items listed on the I3P verification plan defined at § 250.229(i) and necessary for performance of complete reviews in accordance with § 250.232, including relevant OEM documentation (including documentation and data labeled as confidential and proprietary) and access to the OEM fabrication and manufacturing locations if such access is necessary to review the data.
(c) If your project involves submittal of multiple Conceptual Plans, you may propose to use the services of an I3P previously accepted by BSEE for the same project, and not submit the items required under paragraph (a), if the BSEE-accepted I3P’s qualifications are still valid and applicable to provide the required verifications and validations. You must submit documentation regarding the previous I3P nomination acceptance.
§ 250.232 What are the I3P review requirements for Conceptual Plan reviews?
In accordance with each applicable Conceptual Plan, the I3P must:
(a) Review the following information regarding the applicable equipment and/or system:
(1) Basis of Design, technical specification of the equipment (if known at this point in the design process) and functional requirements of the specific project (e.g., environmental and physical loads (magnitude and frequency));
(2) Risk assessment and failure mode analysis;
(3) Material specification, selection, qualification, and testing;
(4) Design verification analysis, including:
(i) Structural/strength analysis, and
(ii) Fatigue assessment and/or analysis.
(5) If fatigue is identified as a potential failure mode, as identified in the fatigue assessment and/or analysis in paragraph (a)(4) of this section, the plan to record and gather data (load monitoring) in order to conduct a future fatigue analysis;
(6) Design validation testing; and
(7) A fabrication, quality management system, and inspection and test plan that identifies the quality control/quality assurance process, and inspection of the final products.
(b) Submit a report to BSEE documenting the review of each item covered under paragraph (a) of this section. Each report must clearly identify all OEM and operator documents used during the I3P review. The report must also include:
(1) The equipment and/or system’s technical specifications, including a statement that the equipment and/or system is fit for purpose for the technical specification by the I3P; and
(2) Verification that the equipment’s technical specifications meet or exceed the project’s functional requirements, including a statement that the equipment and/or system is fit for purpose for the proposed project by the I3P.
(c) For any new project, you may use previous I3P reviews of equipment and/or systems technical specification that was approved in a previous Conceptual Plan. The Regional Supervisor may accept a final report in accordance with paragraph (c) of this section that includes the following:
(1) A statement that the previous report submitted pursuant to of paragraph (b) of this section remains valid;
(2) Verification that the equipment’s technical specifications meet or exceed the proposed project’s functional requirements; and
(3) A statement by the I3P that the equipment and/or system is fit for purpose for the proposed project.
§ 250.233 General requirements for any I3P Report.
An I3P Report as required in § 250.232 must be a standalone document that clearly summarizes the required verification and validation work performed and must contain a sufficient level of detail (e.g., quantitative information) and clarity to establish the basis of the I3P’s findings. Each report must identify the OEM or operator documents reviewed, describe the detailed I3P review, and convey the results of the I3P’s review without requiring BSEE to review of any other referenced documents.
§ 250.234 [Reserved]
DWOP Approval
§ 250.235 When and how must I submit the DWOP?
(a) You must submit the DWOP to the Regional Supervisor after BSEE has approved your Project Conceptual Plan and you have substantially completed system design, and before you conduct installation activities post-well completion for:
(1) A deepwater development project;
(2) A project that will use subsea tieback development technology in any water depth; or
(3) An HPHT development project, any project that uses Category 1 or 2 new or unusual technology barrier equipment, or any project that uses new or unusual technology that may impact the safety critical function of Category 1 or 2 barrier equipment regardless of the water depth.
(b) You may install subsea systems and associated pipelines after you have received applicable BSEE permit(s) and Conceptual Plan approvals. However, you may not begin production from the well until BSEE approves your DWOP.
§ 250.236 What information must I submit with the DWOP?
Your DWOP must contain the following information, as applicable:
Information that you must include with your DWOP | Where to find the
description (§) |
---|---|
(a) General information | 250.237 |
(b) Well or completion information | 250.238 |
(c) Structural information | 250.239 |
(d) Production safety system information | 250.240 |
(e) Subsea system and pipeline information | 250.241 |
(f) New or unusual technology information | 250.242 |
§ 250.237 What general information must my DWOP include?
You must include the following general information in your DWOP, as applicable:
(a) A list of requests for any alternate procedures or equipment in accordance with § 250.141 and requests for departures in accordance with § 250.142 applicable to the DWOP, and a list of any identified alternate procedures or equipment or departures for which you may request approval in any future applicable permit or application. You do not need to list alternative procedures or equipment or departure requests that were previously submitted and approved for the same project’s Conceptual Plans unless the same alternate procedures or equipment or departure requests are needed for a different piece of equipment for post-completion activities.
(b) Documentation demonstrating payment of the service fee listed in § 250.125; and
(c) A list of any associated industry standards not incorporated in the regulations that you are using for your project design or operation.
§ 250.238 What well or completions information must my DWOP include?
You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
(a) A description and schematic of the typical wellbore, casing, and completion;
(b) Information concerning the drilling and completion systems; and
(c) Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.
§ 250.239 What structural information must my DWOP include?
You must include the following information in your DWOP, as applicable, to align with the activities to be addressed in the associated platform application, including any major modifications:
(a) Structural design, fabrication, and installation information;
(b) Design, fabrication, installation, and monitoring information on the tendon, or mooring systems, including the turret or buoy system, if applicable; and
(c) Information on any active station keeping system(s) involving thrusters or other means of propulsion.
§ 250.240 What production safety system information must my DWOP include?
You must include the following information in your DWOP, as applicable, to be consistent with the activities you plan to address in the associated production safety system application:
(a) A general description of the operating procedures;
(b) Information about the design, fabrication, and operation of an offtake system for transferring produced hydrocarbons to a transport vessel, including a table summarizing the curtailment of production and offloading based on operational considerations;
(c) A description of the process facility installation and commissioning procedure;
(d) A safety analysis flow diagram of the production system from the SCSSV downstream to the first item of separation equipment;
(e) A statement that the surface and/or subsea safety system and emergency support systems will comply with Subpart H of this part. This statement must include:
(1) The methods, frequency, and acceptance criteria for testing the underwater safety valves (USVs), SCSSVs, and boarding shutdown valves;
(2) A description of the function and testing of the host facility Emergency Shutdown Device (ESD) system and its interface to the subsea system; and
(3) If applicable, a description of the surface and/or subsea safety system and emergency support systems not covered in Subpart H of this part. If you propose to use systems not covered in Subpart H of this part, you must request an approval of alternate procedures or equipment according to § 250.141, and you must also include a table that depicts what valves will close, at what times, and for what events or reasons; and
(f) Information regarding the design, operation, maintenance, personnel competency, and testing of your subsea leak detection system to protect your subsea field/infrastructure (e.g., trees, manifolds, jumpers). You must include a description of the procedures regarding how you will operate the system, ensure system functionality, identify a leak, and the actions you will take if a leak is identified.
§ 250.241 What subsea systems and pipeline information must my DWOP include?
(a) You must include the following information common to the subsea system and the associated pipeline systems, which constitute all or part of a single project development covered by the DWOP and/or is consistent with activities addressed in your associated pipeline application, as applicable:
(1) The subsea field schematic depicting the planned subsea development equipment and infrastructure, including wells/trees, non-pipe subsea equipment, pipeline route(s), pipeline riser systems, umbilical(s), and platform footprint;
(2) A description of the subsea development project detailing the subsea and pipeline equipment design criteria and analysis procedures (including industry standards, pressure and temperature ratings, materials selection), testing methods, and general operational procedures;
(3) A description of the fabrication and assembly/testing location of subsea trees, pipelines, and non-pipe subsea equipment (manifold, Pipeline End Manifold (PLEM), Pipeline End Termination (PLET), Subsea Umbilical Termination Assembly (SUTA), subsea pumps, suction piles, etc.);
(4) A summary of the Integrity Management Program for subsea tieback development technologies, including a plan for inspection and monitoring to support assessment of the condition of the systems a minimum of once every 10 years. This should include, but is not limited to, the in-service inspections or surveys of hull and topsides structures, tendons, mooring, and pipeline and/or wellbore riser systems to assess component condition by inspection and analysis after each significant environmental event (e.g., hurricane, earthquake, loop and eddy currents, or mudslide) impacting the system, or once every 10 years, whichever occurs first. You must also include in your Integrity Management Plan a description of how you will determine significant environmental events; and
(5) A summary of safety and environmental controls.
(b) You must include the following information about subsea systems that constitute all or part of a single project development covered by the DWOP:
(1) The system control type (e.g., direct hydraulic or electro-hydraulic);
(2) Well tree(s), wellhead, and non-pipe equipment general arrangement drawings and schematics, with size and valve type annotations to illustrate the tree and other equipment in operation;
(3) The estimated shut-in tubing pressure for the proposed well(s), including the calculation used to arrive at the estimate, specifying TVD, reservoir pressure, and the fluid gradient used, or a brief discussion of the PVT data used for estimation;
(4) The wellbore static bottomhole temperature and the estimated flowing temperature at the tree, including a description of the method used to calculate this estimate;
(5) A description of the umbilical(s) and umbilical connection(s), including an umbilical cross-section schematic;
(6) A description of the chemical or other injection systems and/or enhanced recovery systems you plan to use;
(7) A description of the corrosion monitoring and prevention/inhibition processes;
(8) Details of any re-furbished and/or re-certified equipment you plan to use; and
(9) A schedule of development activities, including well completion, facility installation, and anticipated date of first oil.
(c) You must include the following pipeline information in your DWOP, as applicable, to be consistent with your associated pipeline application(s):
(1) General design and fabrication information for each pipeline riser system;
(2) If you propose to use a pipeline free standing hybrid riser (FSHR) on a permanent installation that uses a buoyancy air can suspended from the top of the riser, you must provide the following information in your DWOP as part of the discussions required by paragraphs (b)(1) and (2) of this section:
(i) A detailed description and drawings of the FSHR, buoy, and the associated connection system;
(ii) Detailed information regarding the system used to connect the FSHR to the buoyancy air can, and associated redundancies; and
(iii) Descriptions of your monitoring system and monitoring plan for the pipeline FSHR and the associated connection system for fatigue, stress, and any other abnormal condition (e.g., corrosion), that may negatively impact the riser system’s integrity.
(3) Pipeline and pipeline riser installation methods.
§ 250.242 What New or Unusual Technology information must my DWOP include?
You must include the following new or unusual technology information in your DWOP, as applicable:
(a) A description of any new or unusual technology being used in your development project, including a reference to previously approved New or Unusual Technology Conceptual Plans or New or Unusual Technology Barrier Equipment Conceptual Plans.
(b) A description of any new or unusual technology not covered under the New or Unusual Technology Conceptual Plan or New or Unusual Technology Barrier Equipment Conceptual Plan. You must include the same applicable information as required in §§ 250.228 or 250.229.
§§ 250.243-250.244 [Reserved]
§ 250.245 May I combine the Project Conceptual Plan and the DWOP?
If your development project meets the following criteria, you may submit a combined Project Conceptual Plan/DWOP that complies with all applicable requirements for both, on or before the deadline for submitting the Project Conceptual Plan, as described in § 250.226:
(a) The project is similar to projects involving subsea tieback development technology for which you have obtained approval previously, and
(b) The project does not involve either new or unusual technology or a new platform.
§ 250.246 When must I revise my DWOP?
You must revise your approved DWOP to reflect any material change to the plan that does not involve a physical alteration of the equipment on the platform or the seabed.
§ 250.247 When must I supplement my DWOP?
You must supplement your DWOP to reflect additions or changes in your development project that:
(a) Physically alter the equipment or systems upstream of your boarding shut down valve, approved in your DWOP. If a Supplemental DWOP includes the addition of a well or wells (e.g., a new subsea field) not approved in your original DWOP, you may not complete or produce from the new well(s) until BSEE approves the Supplemental DWOP; or
(b) Involves the addition of any new or unusual technology to your project that was not previously covered under the New or Unusual Technology Conceptual Plan, New or Unusual Technology Barrier Equipment Conceptual Plan, or DWOP. You may not install any new or unusual technology until BSEE approves the applicable Conceptual Plan and Supplemental DWOP.
§ 250.248 What information must I include in my Supplemental DWOP?
You must include the following information, as applicable, in your Supplemental DWOP:
(a) The same information for your wells or equipment as required in the applicable Conceptual Plan and DWOP requirements in this subpart;
(b) A description of each applicable Conceptual Plan or DWOP section that is being impacted by the addition or change; and
(c) Documentation demonstrating payment of the service fee listed in § 250.125.
Subpart C—Pollution Prevention and Control
§ 250.300 Pollution prevention.
(a) During the exploration, development, production, and transportation of oil and gas or sulphur, the lessee shall take measures to prevent unauthorized discharge of pollutants into the offshore waters. The lessee shall not create conditions that will pose unreasonable risk to public health, life, property, aquatic life, wildlife, recreation, navigation, commercial fishing, or other uses of the ocean.
(1) When pollution occurs as a result of operations conducted by or on behalf of the lessee and the pollution damages or threatens to damage life (including fish and other aquatic life), property, any mineral deposits (in areas leased or not leased), or the marine, coastal, or human environment, the control and removal of the pollution to the satisfaction of the District Manager shall be at the expense of the lessee. Immediate corrective action shall be taken in all cases where pollution has occurred. Corrective action shall be subject to modification when directed by the District Manager.
(2) If the lessee fails to control and remove the pollution, the Director, in cooperation with other appropriate Agencies of Federal, State, and local governments, or in cooperation with the lessee, or both, shall have the right to control and remove the pollution at the lessee’s expense. Such action shall not relieve the lessee of any responsibility provided for by law.
(b)(1) The District Manager may restrict the rate of drilling fluid discharges or prescribe alternative discharge methods. The District Manager may also restrict the use of components that could cause unreasonable degradation to the marine environment. No petroleum-based substances, including diesel fuel, may be added to the drilling mud system without prior approval of the District Manager. For Arctic OCS exploratory drilling, you must capture all petroleum-based mud to prevent its discharge into the marine environment. The Regional Supervisor may also require you to capture, during your Arctic OCS exploratory drilling operations, all water-based mud from operations after completion of the hole for the conductor casing to prevent its discharge into the marine environment, based on various factors including, but not limited to:
(i) The proximity of your exploratory drilling operation to subsistence hunting and fishing locations;
(ii) The extent to which discharged mud may cause marine mammals to alter their migratory patterns in a manner that impedes subsistence users’ access to, or use of, those resources, or increases the risk of injury to subsistence users; or
(iii) The extent to which discharged mud may adversely affect marine mammals, fish, or their habitat.
(2) You must obtain approval from the District Manager of the method you plan to use to dispose of drill cuttings, sand, and other well solids. For Arctic OCS exploratory drilling, you must capture all cuttings from operations that utilize petroleum-based mud to prevent their discharge into the marine environment. The Regional Supervisor may also require you to capture, during your Arctic OCS exploratory drilling operations, all cuttings from operations that utilize water-based mud after completion of the hole for the conductor casing to prevent their discharge into the marine environment, based on various factors including, but not limited to:
(i) The proximity of your exploratory drilling operation to subsistence hunting and fishing locations;
(ii) The extent to which discharged cuttings may cause marine mammals to alter their migratory patterns in a manner that impedes subsistence users’ access to, or use of, those resources, or increases the risk of injury to subsistence users; or
(iii) The extent to which discharged cuttings may adversely affect marine mammals, fish, or their habitat.
(3) All hydrocarbon-handling equipment for testing and production such as separators, tanks, and treaters shall be designed, installed, and operated to prevent pollution. Maintenance or repairs which are necessary to prevent pollution of offshore waters shall be undertaken immediately.
(4) Curbs, gutters, drip pans, and drains shall be installed in deck areas in a manner necessary to collect all contaminants not authorized for discharge. Oil drainage shall be piped to a properly designed, operated, and maintained sump system which will automatically maintain the oil at a level sufficient to prevent discharge of oil into offshore waters. All gravity drains shall be equipped with a water trap or other means to prevent gas in the sump system from escaping through the drains. Sump piles shall not be used as processing devices to treat or skim liquids but may be used to collect treated-produced water, treated-produced sand, or liquids from drip pans and deck drains and as a final trap for hydrocarbon liquids in the event of equipment upsets. Improperly designed, operated, or maintained sump piles which do not prevent the discharge of oil into offshore waters shall be replaced or repaired.
(5) On artificial islands, all vessels containing hydrocarbons shall be placed inside an impervious berm or otherwise protected to contain spills. Drainage shall be directed away from the drilling rig to a sump. Drains and sumps shall be constructed to prevent seepage.
(6) Disposal of equipment, cables, chains, containers, or other materials into offshore waters is prohibited.
(c) Materials, equipment, tools, containers, and other items used in the Outer Continental Shelf (OCS) which are of such shape or configuration that they are likely to snag or damage fishing devices shall be handled and marked as follows:
(1) All loose material, small tools, and other small objects shall be kept in a suitable storage area or a marked container when not in use and in a marked container before transport over offshore waters;
(2) All cable, chain, or wire segments shall be recovered after use and securely stored until suitable disposal is accomplished;
(3) Skid-mounted equipment, portable containers, spools or reels, and drums shall be marked with the owner’s name prior to use or transport over offshore waters; and
(4) All markings must clearly identify the owner and must be durable enough to resist the effects of the environmental conditions to which they may be exposed.
(d) Any of the items described in paragraph (c) of this section that are lost overboard shall be recorded on the facility’s daily operations report, as appropriate, and reported to the District Manager.
§ 250.301 Inspection of facilities.
Drilling and production facilities shall be inspected daily or at intervals approved or prescribed by the District Manager to determine if pollution is occurring. Necessary maintenance or repairs shall be made immediately. Records of such inspections and repairs shall be maintained at the facility or at a nearby manned facility for 2 years.
Subpart D—Oil and Gas Drilling Operations
General Requirements
§ 250.400 General requirements.
Drilling operations must be conducted in a safe manner to protect against harm or damage to life (including fish and other aquatic life), property, natural resources of the Outer Continental Shelf (OCS), including any mineral deposits (in areas leased and not leased), the National security or defense, or the marine, coastal, or human environment. In addition to the requirements of this subpart, you must also follow the applicable requirements of subpart G of this part.
§§ 250.401-250.403 [Reserved]
§ 250.404 What are the requirements for the crown block?
You must have a crown block safety device that prevents the traveling block from striking the crown block. You must check the device for proper operation at least once per week and after each drill-line slipping operation and record the results of this operational check in the driller’s report.
§ 250.405 What are the safety requirements for diesel engines used on a drilling rig?
You must equip each diesel engine with an air intake device to shut down the diesel engine in the event of a runaway.
(a) For a diesel engine that is not continuously manned, you must equip the engine with an automatic shutdown device;
(b) For a diesel engine that is continuously manned, you may equip the engine with either an automatic or remote manual air intake shutdown device;
(c) You do not have to equip a diesel engine with an air intake device if it meets one of the following criteria:
(1) Starts a larger engine;
(2) Powers a firewater pump;
(3) Powers an emergency generator;
(4) Powers a BOP accumulator system;
(5) Provides air supply to divers or confined entry personnel;
(6) Powers temporary equipment on a nonproducing platform;
(7) Powers an escape capsule; or
(8) Powers a portable single-cylinder rig washer.
§ 250.406 [Reserved]
§ 250.407 What tests must I conduct to determine reservoir characteristics?
You must determine the presence, quantity, quality, and reservoir characteristics of oil, gas, sulphur, and water in the formations penetrated by logging, formation sampling, or well testing.
§ 250.408 May I use alternative procedures or equipment during drilling operations?
You may use alternative procedures or equipment during drilling operations after receiving approval from the District Manager. You must identify and discuss your proposed alternative procedures or equipment in your Application for Permit to Drill (APD) (Form BSEE-0123) (see § 250.414(h)). Procedures for obtaining approval are described in § 250.141 of this part.
§ 250.409 May I obtain departures from these drilling requirements?
The District Manager may approve departures from the drilling requirements specified in this subpart. You may apply for a departure from drilling requirements by writing to the District Manager. You should identify and discuss the departure you are requesting in your APD (see § 250.414(h)).
Applying for a Permit To Drill
§ 250.410 How do I obtain approval to drill a well?
You must obtain written approval from the District Manager before you begin drilling any well or before you sidetrack, bypass, or deepen a well. To obtain approval, you must:
(a) Submit the information required by §§ 250.411 through 250.418;
(b) Include the well in your approved Exploration Plan (EP), Development and Production Plan (DPP), or Development Operations Coordination Document (DOCD);
(c) Meet the oil spill financial responsibility requirements for offshore facilities as required by 30 CFR part 553; and
(d) Submit the following to the District Manager:
(1) An original and two complete copies of Form BSEE-0123, Application for Permit to Drill (APD), and Form BSEE-0123S, Supplemental APD Information Sheet;
(2) A separate public information copy of forms BSEE-0123 and BSEE-0123S that meets the requirements of § 250.186; and
(3) Payment of the service fee listed in § 250.125.
§ 250.411 What information must I submit with my application?
In addition to forms BSEE-0123 and BSEE-0123S, you must include the information required in this subpart and subpart G of this part, including the following:
Information that you must include with an APD | Where to find a description |
---|---|
(a) Plat that shows locations of the proposed well, | § 250.412. |
(b) Design criteria used for the proposed well, | § 250.413. |
(c) Drilling prognosis, | § 250.414. |
(d) Casing and cementing programs, | § 250.415. |
(e) Diverter systems descriptions, | § 250.416. |
(f) BOP system descriptions, | § 250.731. |
(g) Requirements for using a MODU, and | § 250.713. |
(h) Additional information. | § 250.418. |
§ 250.412 What requirements must the location plat meet?
The location plat must:
(a) Have a scale of 1:24,000 (1 inch = 2,000 feet);
(b) Show the surface and subsurface locations of the proposed well and all the wells in the vicinity;
(c) Show the surface and subsurface locations of the proposed well in feet or meters from the block line;
(d) Contain the longitude and latitude coordinates, and either Universal Transverse Mercator grid-system coordinates or state plane coordinates in the Lambert or Transverse Mercator Projection system for the surface and subsurface locations of the proposed well; and
(e) State the units and geodetic datum (including whether the datum is North American Datum 27 or 83) for these coordinates. If the datum was converted, you must state the method used for this conversion, since the various methods may produce different values.
§ 250.413 What must my description of well drilling design criteria address?
Your description of well drilling design criteria must address:
(a) Pore pressures;
(b) Formation fracture gradients, adjusted for water depth;
(c) Potential lost circulation zones;
(d) Drilling fluid weights;
(e) Casing setting depths;
(f) Maximum anticipated surface pressures. For this section, maximum anticipated surface pressures are the pressures that you reasonably expect to be exerted upon a casing string and its related wellhead equipment. In calculating maximum anticipated surface pressures, you must consider: drilling, completion, and producing conditions; drilling fluid densities to be used below various casing strings; fracture gradients of the exposed formations; casing setting depths; total well depth; formation fluid types; safety margins; and other pertinent conditions. You must include the calculations used to determine the pressures for the drilling and the completion phases, including the anticipated surface pressure used for designing the production string;
(g) A single plot containing curves for estimated pore pressures, formation fracture gradients, proposed drilling fluid weights (surface and downhole), planned safe drilling margin, and casing setting depths in true vertical measurements;
(h) A summary report of the shallow hazards site survey that describes the geological and manmade conditions if not previously submitted; and
(i) Permafrost zones, if applicable.
§ 250.414 What must my drilling prognosis include?
Your drilling prognosis must include a brief description of the procedures you will follow in drilling the well. This prognosis includes but is not limited to the following:
(a) Projected plans for coring at specified depths;
(b) Projected plans for logging;
(c) Planned safe drilling margin that is between the estimated pore pressure and the lesser of estimated fracture gradients or casing shoe pressure integrity test and that is based on a risk assessment consistent with expected well conditions and operations.
(1) Your safe drilling margin must also include use of equivalent downhole mud weight that is:
(i) Greater than the estimated pore pressure; and
(ii) Except as provided in paragraph (c)(2) of this section, a minimum of 0.5 pound per gallon below the lower of the casing shoe pressure integrity test or the lowest estimated fracture gradient.
(2) In lieu of meeting the criteria in paragraph (c)(1)(ii) of this section, you may use an equivalent downhole mud weight as specified in your APD, provided that you submit adequate documentation (such as risk modeling data, off-set well data, analog data, seismic data) to justify the alternative equivalent downhole mud weight. You may submit such justification in advance of your full APD, and BSEE may consider such justification for approval when submitted. Any such approval will be contingent upon your confirmation in the APD that your plans and the information underlying your approved justification have not changed.
(3) When determining the pore pressure and lowest estimated fracture gradient for a specific interval, you must consider related off-set and analogous well behavior observations, if available.
(d) Estimated depths to the top of significant marker formations;
(e) Estimated depths to significant porous and permeable zones containing fresh water, oil, gas, or abnormally pressured formation fluids;
(f) Estimated depths to major faults;
(g) Estimated depths of permafrost, if applicable;
(h) A list and description of all requests for using alternate procedures or departures from the requirements of this subpart in one place in the APD. You must explain how the alternate procedures afford an equal or greater degree of protection, safety, or performance, or why the departures are requested;
(i) Projected plans for well testing (refer to § 250.460);
(j) The type of wellhead system and liner hanger system to be installed and a descriptive schematic, which includes but is not limited to pressure ratings, dimensions, valves, load shoulders, and locking mechanisms, if applicable; and
(k) Any additional information required by the District Manager needed to clarify or evaluate your drilling prognosis.
§ 250.415 What must my casing and cementing programs include?
Your casing and cementing programs must include:
(a) The following well design information:
(1) Hole sizes;
(2) Bit depths (including measured and true vertical depth (TVD));
(3) Casing information, including sizes, weights, grades, collapse and burst values, types of connection, and setting depths (measured and TVD) for all sections of each casing interval; and
(4) Locations of any installed rupture disks (indicate if burst or collapse and rating);
(b) Casing design safety factors for tension, collapse, and burst with the assumptions made to arrive at these values;
(c) Type and amount of cement (in cubic feet) planned for each casing string;
(d) In areas containing permafrost, setting depths for conductor and surface casing based on the anticipated depth of the permafrost. Your program must provide protection from thaw subsidence and freezeback effect, proper anchorage, and well control;
(e) A statement of how you evaluated the best practices included in API RP 65, Recommended Practice for Cementing Shallow Water Flow Zones in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths greater than 500 feet and are in either of the following two areas:
(1) An “area with an unknown shallow water flow potential” is a zone or geologic formation where neither the presence nor absence of potential for a shallow water flow has been confirmed.
(2) An “area known to contain a shallow water flow hazard” is a zone or geologic formation for which drilling has confirmed the presence of shallow water flow; and
(f) A written description of how you evaluated the best practices included in API Standard 65—Part 2, Isolating Potential Flow Zones During Well Construction, Second Edition (as incorporated by reference in § 250.198). Your written description must identify the mechanical barriers and cementing practices you will use for each casing string (reference API Standard 65—Part 2, Sections 4 and 5).
§ 250.416 What must I include in the diverter description?
You must include in the diverter description:
(a) A description of the diverter system and its operating procedures;
(b) A schematic drawing of the diverter system (plan and elevation views) that shows:
(1) The size of the element installed in the diverter housing;
(2) Spool outlet internal diameter(s);
(3) Diverter-line lengths and diameters; burst strengths and radius of curvature at each turn; and
(4) Valve type, size, working pressure rating, and location.
§ 250.417 [Reserved]
§ 250.418 What additional information must I submit with my APD?
You must include the following with the APD:
(a) Rated capacities of the drilling rig and major drilling equipment, if not already on file with the appropriate District office;
(b) A drilling fluids program that includes the minimum quantities of drilling fluids and drilling fluid materials, including weight materials, to be kept at the site;
(c) A proposed directional plot if the well is to be directionally drilled;
(d) A Hydrogen Sulfide Contingency Plan (see § 250.490), if applicable, and not previously submitted;
(e) A welding plan (see §§ 250.109 to 250.113) if not previously submitted;
(f) In areas subject to subfreezing conditions, evidence that the drilling equipment, BOP systems and components, diverter systems, and other associated equipment and materials are suitable for operating under such conditions;
(g) A request for approval, if you plan to wash out or displace cement to facilitate casing removal upon well abandonment. Your request must include a description of how far below the mudline you propose to displace cement and how you will visually monitor returns;
(h) Certification of your casing and cementing program as required in § 250.420(a)(7); and
(i) Such other information as the District Manager may require.
(j) For Arctic OCS exploratory drilling operations, you must provide the information required by § 250.470.
Casing and Cementing Requirements
§ 250.420 What well casing and cementing requirements must I meet?
You must case and cement all wells. Your casing and cementing programs must meet the applicable requirements of this subpart and of subpart G of this part.
(a) Casing and cementing program requirements. Your casing and cementing programs must:
(1) Properly control formation pressures and fluids;
(2) Prevent the direct or indirect release of fluids from any stratum through the wellbore into offshore waters;
(3) Prevent communication between separate hydrocarbon-bearing strata;
(4) Protect freshwater aquifers from contamination;
(5) Support unconsolidated sediments;
(6) Provide adequate centralization consistent with the guidelines of API Standard 65—Part 2 (as incorporated by reference in § 250.198); and
(7)(i) Include a certification signed by a registered professional engineer that the casing and cementing design is appropriate for the purpose for which it is intended under expected wellbore conditions, and is sufficient to satisfy the tests and requirements of this section and § 250.423. Submit this certification with your APD (Form BSEE-0123).
(ii) You must have the registered professional engineer involved in the casing and cementing design process.
(iii) The registered professional engineer must be registered in a state of the United States and have sufficient expertise and experience to perform the certification.
(b) Casing requirements. (1) You must design casing (including liners) to withstand the anticipated stresses imposed by tensile, compressive, and buckling loads; burst and collapse pressures; thermal effects; and combinations thereof.
(2) The casing design must include safety measures that ensure well control during drilling and safe operations during the life of the well.
(3) On all wells that use subsea BOP stacks, you must include two independent barriers, including one mechanical barrier, in each annular flow path (examples of barriers include, but are not limited to, primary cement job and seal assembly). For the final casing string (or liner if it is your final string), you must install one mechanical barrier in addition to cement to prevent flow in the event of a failure in the cement. A dual float valve, by itself, is not considered a mechanical barrier. These barriers cannot be modified prior to or during completion or abandonment operations. The BSEE District Manager may approve alternative options under § 250.141. You must submit documentation of this installation to BSEE in the End-of-Operations Report (Form BSEE-0125).
(4) If you need to substitute a different size, grade, or weight of casing than what was approved in your APD, you must contact the District Manager for approval prior to installing the casing.
(c) Cementing requirements. (1) You must design and conduct your cementing jobs so that cement composition, placement techniques, and waiting times ensure that the cement placed behind the bottom 500 feet of casing attains a minimum compressive strength of 500 psi before drilling out the casing or before commencing completion operations. (If a liner is used refer to § 250.421(f)).
(2) You must use a weighted fluid during displacement to maintain an overbalanced hydrostatic pressure during the cement setting time, except when cementing casings or liners in riserless hole sections.
§ 250.421 What are the casing and cementing requirements by type of casing string?
The table in this section identifies specific design, setting, and cementing requirements for casing strings and liners. For the purposes of subpart D, the casing strings in order of normal installation are as follows: drive or structural, conductor, surface, intermediate, and production casings (including liners). The District Manager may approve or prescribe other casing and cementing requirements where appropriate.
Casing type | Casing requirements | Cementing requirements |
---|---|---|
(a) Drive or Structural | Set by driving, jetting, or drilling to the minimum depth as approved or prescribed by the District Manager | If you drilled a portion of this hole, you must use enough cement to fill the annular space back to the mudline. |
(b) Conductor | Design casing and select setting depths based on relevant engineering and geologic factors. These factors include the presence or absence of hydrocarbons, potential hazards, and water depths Set casing immediately before drilling into formations known to contain oil or gas. If you encounter oil or gas or unexpected formation pressure before the planned casing point, you must set casing immediately and set it above the encountered zone | Use enough cement to fill the calculated annular space back to the mudline. Verify annular fill by observing cement returns. If you cannot observe cement returns, use additional cement to ensure fill-back to the mudline. For drilling on an artificial island or when using a well cellar, you must discuss the cement fill level with the District Manager. |
(c) Surface | Design casing and select setting depths based on relevant engineering and geologic factors. These factors include the presence or absence of hydrocarbons, potential hazards, and water depths | Use enough cement to fill the calculated annular space to at least 200 feet measured depth (MD) inside the conductor casing. When geologic conditions such as near-surface fractures and faulting exist, you must use enough cement to fill the calculated annular space to the mudline. |
(d) Intermediate | Design casing and select setting depth based on anticipated or encountered geologic characteristics or wellbore conditions | Use enough cement to cover and isolate all hydrocarbon-bearing zones and isolate abnormal pressure intervals from normal pressure intervals in the well. As a minimum, you must cement the annular space 500 feet MD above the casing shoe and 500 feet MD above each zone to be isolated. |
(e) Production | Design casing and select setting depth based on anticipated or encountered geologic characteristics or wellbore conditions | Use enough cement to cover or isolate all hydrocarbon-bearing zones above the shoe. As a minimum, you must cement the annular space at least 500 feet MD above the casing shoe and 500 feet MD above the uppermost hydrocarbon-bearing zone. |
(f) Liners | If you use a liner as surface casing, you must set the top of the liner at least 200 feet MD above the previous casing/liner shoe. If you use a liner as an intermediate string below a surface string or production casing below an intermediate string, you must set the top of the liner at least 100 feet MD above the previous casing shoe. You may not use a liner as conductor casing. A subsea well casing string whose top is above the mudline and that has been cemented back to the mudline will not be considered a liner. | Same as cementing requirements for specific casing types. For example, a liner used as intermediate casing must be cemented according to the cementing requirements for intermediate casing. |
§ 250.422 When may I resume drilling after cementing?
(a) After cementing surface, intermediate, or production casing (or liners), you may resume drilling after the cement has been held under pressure for 12 hours. For conductor casing, you may resume drilling after the cement has been held under pressure for 8 hours. One acceptable method of holding cement under pressure is to use float valves to hold the cement in place.
(b) If you plan to nipple down your diverter or BOP stack during the 8- or 12-hour waiting time, you must determine, before nippling down, when it will be safe to do so. You must base your determination on a knowledge of formation conditions, cement composition, effects of nippling down, presence of potential drilling hazards, well conditions during drilling, cementing, and post cementing, as well as past experience.
§ 250.423 What are the requirements for casing and liner installation?
You must ensure proper installation of casing in the subsea wellhead or liner in the liner hanger.
(a) You must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the casing string.
(b) If you run a liner that has a latching mechanism or lock down mechanism, you must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the liner.
(c) You must perform a pressure test on the casing seal assembly to ensure proper installation of casing or liner. You must perform this test for the intermediate and production casing strings or liners.
(1) You must submit for approval with your APD, test procedures and criteria for a successful test.
(2) You must document all your test results and make them available to BSEE upon request.
§§ 250.424-250.426 [Reserved]
§ 250.427 What are the requirements for pressure integrity tests?
You must conduct a pressure integrity test below the surface casing or liner and all intermediate casings or liners. The District Manager may require you to run a pressure-integrity test at the conductor casing shoe if warranted by local geologic conditions or the planned casing setting depth. You must conduct each pressure integrity test after drilling at least 10 feet but no more than 50 feet of new hole below the casing shoe. You must test to either the formation leak-off pressure or to an equivalent drilling fluid weight if identified in an approved APD.
(a) You must use the pressure integrity test and related hole-behavior observations, such as pore-pressure test results, gas-cut drilling fluid, and well kicks to adjust the drilling fluid program and the setting depth of the next casing string. You must record all test results and hole-behavior observations made during the course of drilling related to formation integrity and pore pressure in the driller’s report.
(b) While drilling, you must maintain the safe drilling margin identified in § 250.414. When you cannot maintain the safe drilling margin, you must:
(1) Suspend drilling operations and submit proposed remedial actions to the District Manager. The District Manager must review and approve your proposed remedial actions, which may include limited drilling through a lost circulation zone; or
(2) Notify the District Manager and take further action in accordance with API Bulletin 92L (as incorporated by reference in § 250.198), if appropriate. You must submit a revised permit documenting any responsive actions taken.
§ 250.428 What must I do in certain cementing and casing situations?
The table in this section describes actions that lessees must take when certain situations occur during casing and cementing activities.
If you encounter the following situation: | Then you must . . . |
---|---|
(a) Have unexpected formation pressures or conditions that warrant revising your casing design, | Submit a revised casing program to the District Manager for approval. |
(b) Need to change casing setting depths or hole interval drilling depth (for a BHA with an under-reamer, this means bit depth) more than 100 feet true vertical depth (TVD) from the approved APD due to conditions encountered during drilling operations, | Submit those changes to the District Manager for approval and include a certification by a professional engineer (PE) that he or she reviewed and approved the proposed changes. |
(c) Have indication of inadequate cement job (such as unplanned lost returns, no cement returns to mudline or expected height, cement channeling, or failure of equipment), | (1) Locate the top of cement by: (i) Running a temperature survey; (ii) Running a cement evaluation log; (iii) Using tracers in the cement and logging them prior to drill out; or (iv) Using a combination of these techniques. (2) Determine if your cement job is inadequate. If your cement job is determined to be inadequate, refer to paragraph (d) of this section. (3) If your cement job is determined to be adequate, report the results to the District Manager in your submitted WAR. |
(d) Inadequate cement job, | Comply with § 250.428(c)(1) and take remedial actions. The District Manager must review and approve all remedial actions either through a previously approved contingency plan within the permit or remedial actions included in a revised permit before you may take them, unless immediate actions must be taken to ensure the safety of the crew or to prevent a well-control event. If you complete any immediate action to ensure the safety of the crew or to prevent a well-control event, submit a description of the action to the District Manager when that action is complete. Any changes to the well program, that are not included in the approved permit, will require submittal of a certification by a professional engineer (PE) certifying that they have reviewed and approved the proposed changes. You must also meet any other requirements of the District Manager for remedial actions. |
(e) Primary cement job that did not isolate abnormal pressure intervals, | Isolate those intervals from normal pressures by squeeze cementing before you complete; suspend operations; or abandon the well, whichever occurs first. |
(f) Decide to produce a well that was not originally contemplated for production, | Have at least two cemented casing strings (does not include liners) in the well. Note: All producing wells must have at least two cemented casing strings. |
(g) Want to drill a well without setting conductor casing, | Submit geologic data and information to the District Manager that demonstrates the absence of shallow hydrocarbons or hazards. This information must include logging and drilling fluid-monitoring from wells previously drilled within 500 feet of the proposed well path down to the next casing point. |
(h) Need to use less than required cement for the surface casing during floating drilling operations to provide protection from burst and collapse pressures, | Submit information to the District Manager that demonstrates the use of less cement is necessary. |
(i) Cement across a permafrost zone, | Use cement that sets before it freezes and has a low heat of hydration. |
(j) Leave the annulus opposite a permafrost zone uncemented, | Fill the annulus with a liquid that has a freezing point below the minimum permafrost temperature and minimizes opposite a corrosion. |
(k) Plan to use a valve(s) on the drive pipe during cementing operations for the conductor casing, surface casing, or liner, | Include a description of the plan in your APD. Your description must include a schematic of the valve and height above the water line. The valve must be remotely operated and full opening with visual observation while taking returns. The person in charge of observing returns must be in communication with the drill floor. You must record in your daily report and in the WAR if cement returns were observed. If cement returns are not observed, you must contact the District Manager and obtain approval of proposed plans to locate the top of cement before continuing with operations. |
Diverter System Requirements
§ 250.430 When must I install a diverter system?
You must install a diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter sealing element, diverter lines, and control systems. You must design, install, use, maintain, and test the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials away from facilities and personnel.
§ 250.431 What are the diverter design and installation requirements?
You must design and install your diverter system to:
(a) Use diverter spool outlets and diverter lines that have a nominal diameter of at least 10 inches for surface wellhead configurations and at least 12 inches for floating drilling operations;
(b) Use dual diverter lines arranged to provide for downwind diversion capability;
(c) Use at least two diverter control stations. One station must be on the drilling floor. The other station must be in a readily accessible location away from the drilling floor;
(d) Use only remote-controlled valves in the diverter lines. All valves in the diverter system must be full-opening. You may not install manual or butterfly valves in any part of the diverter system;
(e) Minimize the number of turns (only one 90-degree turn allowed for each line for bottom-founded drilling units) in the diverter lines, maximize the radius of curvature of turns, and target all right angles and sharp turns;
(f) Anchor and support the entire diverter system to prevent whipping and vibration; and
(g) Protect all diverter-control instruments and lines from possible damage by thrown or falling objects.
§ 250.432 How do I obtain a departure to diverter design and installation requirements?
The table below describes possible departures from the diverter requirements and the conditions required for each departure. To obtain one of these departures, you must have discussed the departure in your APD and received approval from the District Manager.
If you want a departure to: | Then you must . . . |
---|---|
(a) Use flexible hose for diverter lines instead of rigid pipe, | Use flexible hose that has integral end couplings. |
(b) Use only one spool outlet for your diverter system, | (1) Have branch lines that meet the minimum internal diameter requirements; and (2) Provide downwind diversion capability. |
(c) Use a spool with an outlet with an internal diameter of less than 10 inches on a surface wellhead, | Use a spool that has dual outlets with an internal diameter of at least 8 inches. |
(d) Use a single diverter line for floating drilling operations on a dynamically positioned drillship, | Maintain an appropriate vessel heading to provide for downwind diversion. |
§ 250.433 What are the diverter actuation and testing requirements?
When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines.
(a) For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test.
(b) For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation. For subsequent testing, you may partially actuate the diverter element and a flow test is not required.
(c) You must alternate actuations and tests between control stations.
§ 250.434 What are the recordkeeping requirements for diverter actuations and tests?
You must record the time, date, and results of all diverter actuations and tests in the driller’s report. In addition, you must:
(a) Record the diverter pressure test on a pressure chart;
(b) Require your onsite representative to sign and date the pressure test chart;
(c) Identify the control station used during the test or actuation;
(d) Identify problems or irregularities observed during the testing or actuations and record actions taken to remedy the problems or irregularities; and
(e) Retain all pressure charts and reports pertaining to the diverter tests and actuations at the facility for the duration of drilling the well.
§§ 250.440-250.451 [Reserved]
§ 250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?
(a) When conducting exploratory drilling operations on the Arctic OCS, you must gather and monitor real-time data using an independent, automatic, and continuous monitoring system capable of recording, storing, and transmitting data regarding the following:
(1) The BOP control system;
(2) The well’s fluid handling systems on the rig; and
(3) The well’s downhole conditions as monitored by a downhole sensing system, when such a system is installed.
(b) During well operations, you must transmit the data identified in paragraph (a) of this section as they are gathered, barring unforeseeable or unpreventable interruptions in transmission, and have the capability to monitor the data onshore, using qualified personnel. Onshore personnel who monitor real-time data must have the capability to contact rig personnel during operations. After well operations, you must store the data at a designated location for recordkeeping purposes as required in §§ 250.740 and 250.741. You must provide BSEE with access to your real-time monitoring data onshore upon request.
Drilling Fluid Requirements
§ 250.455 What are the general requirements for a drilling fluid program?
You must design and implement your drilling fluid program to prevent the loss of well control. This program must address drilling fluid safe practices, testing and monitoring equipment, drilling fluid quantities, and drilling fluid-handling areas.
§ 250.456 What safe practices must the drilling fluid program follow?
Your drilling fluid program must include the following safe practices:
(a) Before starting out of the hole with drill pipe, you must properly condition the drilling fluid. You must circulate a volume of drilling fluid equal to the annular volume with the drill pipe just off-bottom. You may omit this practice if documentation in the driller’s report shows:
(1) No indication of formation fluid influx before starting to pull the drill pipe from the hole;
(2) The weight of returning drilling fluid is within 0.2 pounds per gallon (1.5 pounds per cubic foot) of the drilling fluid entering the hole; and
(3) Other drilling fluid properties are within the limits established by the program approved in the APD.
(b) Record each time you circulate drilling fluid in the hole in the driller’s report;
(c) When coming out of the hole with drill pipe, you must fill the annulus with drilling fluid before the hydrostatic pressure decreases by 75 psi, or every five stands of drill pipe, whichever gives a lower decrease in hydrostatic pressure. You must calculate the number of stands of drill pipe and drill collars that you may pull before you must fill the hole. You must also calculate the equivalent drilling fluid volume needed to fill the hole. Both sets of numbers must be posted near the driller’s station. You must use a mechanical, volumetric, or electronic device to measure the drilling fluid required to fill the hole;
(d) You must run and pull drill pipe and downhole tools at controlled rates so you do not swab or surge the well;
(e) When there is an indication of swabbing or influx of formation fluids, you must take appropriate measures to control the well. You must circulate and condition the well, on or near-bottom, unless well or drilling-fluid conditions prevent running the drill pipe back to the bottom;
(f) You must calculate and post near the driller’s console the maximum pressures that you may safely contain under a shut-in BOP for each casing string. The pressures posted must consider the surface pressure at which the formation at the shoe would break down, the rated working pressure of the BOP stack, and 70 percent of casing burst (or casing test as approved by the District Manager). As a minimum, you must post the following two pressures:
(1) The surface pressure at which the shoe would break down. This calculation must consider the current drilling fluid weight in the hole; and
(2) The lesser of the BOP’s rated working pressure or 70 percent of casing-burst pressure (or casing test otherwise approved by the District Manager);
(g) You must install an operable drilling fluid-gas separator and degasser before you begin drilling operations. You must maintain this equipment throughout the drilling of the well;
(h) Before pulling drill-stem test tools from the hole, you must circulate or reverse-circulate the test fluids in the hole. If circulating out test fluids is not feasible, you may bullhead test fluids out of the drill-stem test string and tools with an appropriate kill weight fluid;
(i) When circulating, you must test the drilling fluid at least once each tour, or more frequently if conditions warrant. Your tests must conform to industry-accepted practices and include density, viscosity, and gel strength; hydrogenion concentration; filtration; and any other tests the District Manager requires for monitoring and maintaining drilling fluid quality, prevention of downhole equipment problems and for kick detection. You must record the results of these tests in the drilling fluid report; and
(j) In areas where permafrost and/or hydrate zones are present or may be present, you must control drilling fluid temperatures to drill safely through those zones.
§ 250.457 What equipment is required to monitor drilling fluids?
Once you establish drilling fluid returns, you must install and maintain the following drilling fluid-system monitoring equipment throughout subsequent drilling operations. This equipment must have the following indicators on the rig floor:
(a) Pit level indicator to determine drilling fluid-pit volume gains and losses. This indicator must include both a visual and an audible warning device;
(b) Volume measuring device to accurately determine drilling fluid volumes required to fill the hole on trips;
(c) Return indicator devices that indicate the relationship between drilling fluid-return flow rate and pump discharge rate. This indicator must include both a visual and an audible warning device; and
(d) Gas-detecting equipment to monitor the drilling fluid returns. The indicator may be located in the drilling fluid-logging compartment or on the rig floor. If the indicators are only in the logging compartment, you must continually man the equipment and have a means of immediate communication with the rig floor. If the indicators are on the rig floor only, you must install an audible alarm.
§ 250.458 What quantities of drilling fluids are required?
(a) You must use, maintain, and replenish quantities of drilling fluid and drilling fluid materials at the drill site as necessary to ensure well control. You must determine those quantities based on known or anticipated drilling conditions, rig storage capacity, weather conditions, and estimated time for delivery.
(b) You must record the daily inventories of drilling fluid and drilling fluid materials, including weight materials and additives in the drilling fluid report.
(c) If you do not have sufficient quantities of drilling fluid and drilling fluid material to maintain well control, you must suspend drilling operations.
§ 250.459 What are the safety requirements for drilling fluid-handling areas?
You must classify drilling fluid-handling areas according to API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities, Classified as Class I, Division 1 and Division 2 (as incorporated by reference in § 250.198); or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities, Classified as Class 1, Zone 0, Zone 1, and Zone 2 (as incorporated by reference in § 250.198). In areas where dangerous concentrations of combustible gas may accumulate, you must install and maintain a ventilation system and gas monitors. Drilling fluid-handling areas must have the following safety equipment:
(a) A ventilation system capable of replacing the air once every 5 minutes or 1.0 cubic feet of air-volume flow per minute, per square foot of area, whichever is greater. In addition:
(1) If natural means provide adequate ventilation, then a mechanical ventilation system is not necessary;
(2) If a mechanical system does not run continuously, then it must activate when gas detectors indicate the presence of 1 percent or more of combustible gas by volume; and
(3) If discharges from a mechanical ventilation system may be hazardous, then you must maintain the drilling fluid-handling area at a negative pressure. You must protect the negative pressure area by using at least one of the following: a pressure-sensitive alarm, open-door alarms on each access to the area, automatic door-closing devices, air locks, or other devices approved by the District Manager;
(b) Gas detectors and alarms except in open areas where adequate ventilation is provided by natural means. You must test and recalibrate gas detectors quarterly. No more than 90 days may elapse between tests;
(c) Explosion-proof or pressurized electrical equipment to prevent the ignition of explosive gases. Where you use air for pressuring equipment, you must locate the air intake outside of and as far as practicable from hazardous areas; and
(d) Alarms that activate when the mechanical ventilation system fails.
Other Drilling Requirements
§ 250.460 What are the requirements for conducting a well test?
(a) If you intend to conduct a well test, you must include your projected plans for the test with your APD (form BSEE-0123) or in an Application for Permit to Modify (APM) (form BSEE-0124). Your plans must include at least the following information:
(1) Estimated flowing and shut-in tubing pressures;
(2) Estimated flow rates and cumulative volumes;
(3) Time duration of flow, buildup, and drawdown periods;
(4) Description and rating of surface and subsurface test equipment;
(5) Schematic drawing, showing the layout of test equipment;
(6) Description of safety equipment, including gas detectors and fire-fighting equipment;
(7) Proposed methods to handle or transport produced fluids; and
(8) Description of the test procedures.
(b) You must give the District Manager at least 24-hours notice before starting a well test.
§ 250.461 What are the requirements for directional and inclination surveys?
For this subpart, BSEE classifies a well as vertical if the calculated average of inclination readings does not exceed 3 degrees from the vertical.
(a) Survey requirements for a vertical well. (1) You must conduct inclination surveys on each vertical well and record the results. Survey intervals may not exceed 1,000 feet during the normal course of drilling;
(2) You must also conduct a directional survey that provides both inclination and azimuth, and digitally record the results in electronic format:
(i) Within 500 feet of setting surface or intermediate casing;
(ii) Within 500 feet of setting any liner; and
(iii) When you reach total depth.
(b) Survey requirements for a directional well. You must conduct directional surveys on each directional well and digitally record the results. Surveys must give both inclination and azimuth at intervals not to exceed 500 feet during the normal course of drilling. Intervals during angle-changing portions of the hole may not exceed 180 feet.
(c) Measurement while drilling. You may use measurement-while-drilling technology if it meets the requirements of this section.
(d) Composite survey requirements. (1) Your composite directional survey must show the interval from the bottom of the conductor casing to total depth. In the absence of conductor casing, the survey must show the interval from the bottom of the drive or structural casing to total depth; and
(2) You must correct all surveys to Universal-Transverse-Mercator-Grid-north or Lambert-Grid-north after making the magnetic-to-true-north correction. Surveys must show the magnetic and grid corrections used and include a listing of the directionally computed inclinations and azimuths.
(e) If you drill within 500 feet of an adjacent lease, the Regional Supervisor may require you to furnish a copy of the well’s directional survey to the affected leaseholder. This could occur when the adjoining leaseholder requests a copy of the survey for the protection of correlative rights.
§ 250.462 What are the source control, containment, and collocated equipment requirements?
For drilling operations using a subsea BOP or surface BOP on a floating facility, you must have the ability to control or contain a blowout event at the sea floor.
(a) To determine your required source control and containment capabilities you must do the following:
(1) Consider a scenario of the wellbore fully evacuated to reservoir fluids, with no restrictions in the well.
(2) Evaluate the performance of the well as designed to determine if a full shut-in can be achieved without having reservoir fluids broach to the sea floor. If your evaluation indicates that the well can only be partially shut-in, then you must determine your ability to flow and capture the residual fluids to a surface production and storage system.
(b) You must have access to and the ability to deploy Source Control and Containment Equipment (SCCE) and all other necessary supporting and collocated equipment to regain control of the well. SCCE means the capping stack, cap-and-flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels, which have the collective purpose to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment based on the determinations outlined in paragraph (a) of this section. This SCCE, supporting equipment, and collocated equipment may include, but is not limited to, the following:
(1) Subsea containment and capture equipment, including containment domes and capping stacks;
(2) Subsea utility equipment including hydraulic power sources and hydrate control equipment;
(3) Collocated equipment including dispersant injection equipment;
(4) Riser systems;
(5) Remotely operated vehicles (ROVs);
(6) Capture vessels;
(7) Support vessels; and
(8) Storage facilities.
(c) You must submit a description of your source control and containment capabilities to the Regional Supervisor and receive approval before BSEE will approve your APD, Form BSEE-0123. The description of your containment capabilities must contain the following:
(1) Your source control and containment capabilities for controlling and containing a blowout event at the seafloor;
(2) A discussion of the determination required in paragraph (a) of this section; and
(3) Information showing that you have access to and the ability to deploy all equipment required by paragraph (b) of this section.
(d) You must contact the District Manager and Regional Supervisor for reevaluation of your source control and containment capabilities if your:
(1) Well design changes; or
(2) Approved source control and containment equipment is out of service.
(e) You must maintain, test, and inspect the source control, containment, and collocated equipment identified in the following table according to these requirements:
Equipment | Requirements, you must: | Additional information |
---|---|---|
(1) Capping stacks, | (i) Function test all pressure containing critical components on a quarterly frequency (not to exceed 104 days between tests), | Pressure containing critical components are those components that will experience wellbore pressure during a shut-in after being functioned. |
(ii) Pressure test pressure containing critical components on a bi-annual basis, but not later than 210 days from the last pressure test. All pressure testing must be witnessed by BSEE (if available) and an independent third party. | Pressure containing critical components are those components that will experience wellbore pressure during a shut-in. These components include, but are not limited to: All blind rams, wellhead connectors, and outlet valves. | |
(iii) Notify BSEE at least 21 days prior to commencing any pressure testing | ||
(2) Production safety systems used for flow and capture operations, | (i) Meet or exceed the requirements set forth in Subpart H, excluding required equipment that would be installed below the wellhead or that is not applicable to the cap and flow system. | |
(ii) Have all equipment unique to containment operations available for inspection at all times | ||
(3) Subsea utility equipment, | Have all equipment utilized solely for containment operations available for inspection at all times | Subsea utility equipment includes, but is not limited to: Hydraulic power sources, debris removal, and hydrate control equipment. |
(4) Collocated equipment designated by the operator in the Regional Containment Demonstration (RCD) or Well Containment Plan (WCP), | Have equipment available for inspection at all times | Collocated equipment includes, but is not limited to, dispersant injection equipment and other subsea control equipment. |
§ 250.463 Who establishes field drilling rules?
(a) The District Manager may establish field drilling rules different from the requirements of this subpart when geological and engineering information shows that specific operating requirements are appropriate. You must comply with field drilling rules and nonconflicting requirements of this subpart. The District Manager may amend or cancel field drilling rules at any time.
(b) You may request the District Manager to establish, amend, or cancel field drilling rules.
Applying for a Permit To Modify and Well Records
§ 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
(a) You must submit an APM (form BSEE-0124) or an End of Operations Report (form BSEE-0125) and other materials to the Regional Supervisor as shown in the following table. You must also submit a public information copy of each form.
When you . . . | Then you must . . . | And . . . |
---|---|---|
(1) Intend to revise your drilling plan, change major drilling equipment, or plugback, | Submit form BSEE-0124 or request oral approval, | Receive written or oral approval from the District Manager before you begin the intended operation. If you get an approval, you must submit form BSEE-0124 no later than the end of the 3rd business day following the oral approval. In all cases, or you must meet the additional requirements in paragraph (b) of this section. |
(2) Determine a well’s final surface location, water depth, and the rotary kelly bushing elevation, | Immediately Submit a form BSEE-0124, | Submit a plat certified by a registered land surveyor that meets the requirements of § 250.412. |
(3) Move a drilling unit from a wellbore before completing a well, | Submit forms BSEE-0124 and BSEE-0125 within 30 days after the suspension of wellbore operations, | Submit appropriate copies of the well records. |
(b) If you intend to perform any of the actions specified in paragraph (a)(1) of this section, you must meet the following additional requirements:
(1) Your APM (Form BSEE-0124) must contain a detailed statement of the proposed work that would materially change from the approved APD. The submission of your APM must be accompanied by payment of the service fee listed in § 250.125;
(2) Your form BSEE-0124 must include the present status of the well, depth of all casing strings set to date, well depth, present production zones and productive capability, and all other information specified; and
(3) Within 30 days after completing this work, you must submit an End of Operations Report (EOR), Form BSEE-0125, as required under § 250.744.
§§ 250.466-250.469 [Reserved]
Additional Arctic OCS Requirements
§ 250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations?
In addition to complying with all other applicable requirements included in this part, you must provide with your APD all of the following information pertaining to your proposed Arctic OCS exploratory drilling:
(a) A detailed description of:
(1) The environmental, meteorological, and oceanic conditions you expect to encounter at the well site(s);
(2) How you will prepare your equipment, materials, and drilling unit for service in the conditions identified in paragraph (a)(1) of this section, and how your drilling unit will be in compliance with the requirements of § 250.713.
(b) A detailed description of all operations necessary in Arctic OCS conditions to transition the rig from being under way to conducting drilling operations and from ending drilling operations to being under way, as well as any anticipated repair and maintenance plans for the drilling unit and equipment. You should include, among other things, a description of how you plan to:
(1) Recover the subsea equipment, including the marine riser and the lower marine riser package;
(2) Recover the BOP;
(3) Recover the auxiliary sub-sea controls and template;
(4) Lay down the drill pipe and secure the drill pipe and marine riser;
(5) Secure the drilling equipment;
(6) Transfer the fluids for transport or disposal;
(7) Secure ancillary equipment like the draw works and lines;
(8) Refuel or transfer fuel;
(9) Offload waste;
(10) Recover the Remotely Operated Vehicles;
(11) Pick up the oil spill prevention booms and equipment; and
(12) Offload the drilling crew.
(c) A description of well-specific drilling objectives, timelines, and updated contingency plans for temporary abandonment of the well, including but not limited to the following:
(1) When you will spud the particular well (i.e., begin drilling operations at the well site) identified in the APD;
(2) How long you will take to drill the well;
(3) Anticipated depths and geologic targets, with timelines;
(4) When you expect to set and cement each string of casing;
(5) When and how you would log the well;
(6) Your plans to test the well;
(7) When and how you intend to abandon the well, including specifically addressing your plans for how to move the rig off location and how you will meet the requirements of § 250.720(c);
(8) A description of what equipment and vessels will be involved in the process of temporarily abandoning the well due to ice; and
(9) An explanation of how you will integrate these elements into your overall program.
(d) A detailed description of your weather and ice forecasting capability for all phases of the drilling operation, including:
(1) How you will ensure your continuous awareness of potential weather and ice hazards at, and during transition between, wells;
(2) Your plans for managing ice hazards and responding to weather events; and
(3) Verification that you have the capabilities described in your BOEM-approved EP.
(e) A detailed description of how you will comply with the requirements of § 250.472.
(f) A statement that you own, or have a contract with a provider for, source control and containment equipment (SCCE), which is capable of controlling and/or containing a worst case discharge, as described in your BOEM-approved EP, when proposing to use a MODU to conduct exploratory drilling operations on the Arctic OCS. The following information must be included in your SCCE submittal:
(1) A detailed description of your or your contractor’s SCCE capability to stop or contain flow from an out-of-control well, including your operating assumptions and limitations; your access to and ability to deploy, in accordance with § 250.471, all necessary SCCE; and your ability to evaluate the performance of the well design to determine how you can achieve a full shut-in without having reservoir fluids discharged into the environment;
(2) An inventory of the local and regional SCCE, supplies, and services that you own or for which you have a contract with a provider. You must identify each supplier of such equipment and services and provide their locations and telephone numbers;
(3) Where applicable, proof of contracts or membership agreements with cooperatives, service providers, or other contractors who will provide you with the necessary SCCE or related supplies and services if you do not possess them. The contract or membership agreement must include provisions for ensuring the availability of the personnel and/or equipment on a 24-hour per day basis while you are drilling below or working below the surface casing;
(4) A detailed description of the procedures you plan to use to inspect, test, and maintain your SCCE; and
(5) A detailed description of your plan to ensure that all members of your operating team, who are responsible for operating the SCCE, have received the necessary training to deploy and operate such equipment in Arctic OCS conditions and demonstrate ongoing proficiency in source control operations. You must also identify and include the dates of prior and planned training.
(g) Where it does not conflict with other requirements of this subpart, and except as provided in paragraphs (g)(1) through (11) of this section, you must comply with the requirements of API RP 2N, Third Edition “Planning, Designing, and Constructing Structures and Pipelines for Arctic Conditions” (incorporated by reference as specified in § 250.198), and provide a detailed description of how you will utilize the best practices included in API RP 2N during your exploratory drilling operations. You are not required to incorporate the following sections of API RP 2N into your drilling operations:
(1) Sections 6.6.3 through 6.6.4;
(2) The foundation recommendations in Section 8.4;
(3) Section 9.6;
(4) The recommendations for permanently moored systems in Section 9.7;
(5) The recommendations for pile foundations in Section 9.10;
(6) Section 12;
(7) Section 13.2.1;
(8) Sections 13.8.1.1, 13.8.2.1, 13.8.2.2, 13.8.2.4 through 13.8.2.7;
(9) Sections 13.9.1, 13.9.2, 13.9.4 through 13.9.8;
(10) Sections 14 through 16; and
(11) Section 18.
§ 250.471 What are the requirements for Arctic OCS source control and containment?
You must meet the following requirements for all exploration wells drilled on the Arctic OCS:
(a) If you use a MODU when drilling below or working below the surface casing, you must have access to the following SCCE capable of stopping or capturing the flow of an out-of-control well:
(1) A capping stack, positioned to ensure that it will arrive at the well location within 24 hours after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section;
(2) A cap and flow system, positioned to ensure that it will arrive at the well location within 7 days after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section. The cap and flow system must be designed to capture at least the amount of hydrocarbons equivalent to the calculated worst case discharge rate referenced in your BOEM-approved EP; and
(3) A containment dome, positioned to ensure that it will arrive at the well location within 7 days after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section. The containment dome must have the capacity to pump fluids without relying on buoyancy.
(b) You must conduct a monthly stump test of dry-stored capping stacks. If you use a pre-positioned capping stack, you must conduct a stump test prior to each installation on each well.
(c) As required by § 250.465(a), if you propose to change your well design, you must submit an APM. For Arctic OCS operations, your APM must include a reevaluation of your SCCE capabilities for any new Worst Case Discharge (WCD) rate, and a demonstration that your SCCE capabilities will meet the criteria in § 250.470(f) under the changed well design.
(d) You must conduct tests or exercises of your SCCE, including deployment of your SCCE, when directed by the Regional Supervisor.
(e) You must maintain records pertaining to testing, inspection, and maintenance of your SCCE for at least 10 years and make the records available to any authorized BSEE representative upon request.
(f) You must maintain records pertaining to the use of your SCCE during testing, training, and deployment activities for at least 3 years and make the records available to any authorized BSEE representative upon request.
(g) Upon a loss of well control, you must initiate transit of all SCCE identified in paragraph (a) of this section to the well.
(h) You must deploy and use SCCE when directed by the Regional Supervisor.
(i) Operators may request approval of alternate procedures or equipment to the SCCE requirements of subparagraph (a) of this section in accordance with § 250.141. The operator must show and document that the alternate procedures or equipment will provide a level of safety and environmental protection that will meet or exceed the level of safety and environmental protection required by BSEE regulations, including demonstrating that the alternate procedures or equipment will be capable of stopping or capturing the flow of an out-of-control well.
§ 250.472 What are the relief rig requirements for the Arctic OCS?
(a) In the event of a loss of well control, the Regional Supervisor may direct you to drill a relief well using the relief rig able to kill and permanently plug an out-of-control well as described in your APD. Your relief rig must comply with all other requirements of this part pertaining to drill rig characteristics and capabilities, and it must be able to drill a relief well under anticipated Arctic OCS conditions.
(b) When you are drilling below or working below the surface casing during Arctic OCS exploratory drilling operations, you must have access to a relief rig, different from your primary drilling rig, staged in a location such that it can arrive on site, drill a relief well, kill and abandon the original well, and abandon the relief well prior to expected seasonal ice encroachment at the drill site, but no later than 45 days after the loss of well control.
(c) Operators may request approval of alternative compliance measures to the relief rig requirement in accordance with § 250.141. The operator must show and document that the alternate compliance measure will meet or exceed the level of safety and environmental protection required by BSEE regulations, including demonstrating that the alternate compliance measure will be able to kill and permanently plug an out-of-control well.
§ 250.473 What must I do to protect health, safety, property, and the
environment while operating on the Arctic OCS?
In addition to the requirements set forth in § 250.107, when conducting exploratory drilling operations on the Arctic OCS, you must protect health, safety, property, and the environment by using the following:
(a) Equipment and materials that are rated or de-rated for service under conditions that can be reasonably expected during your operations; and
(b) Measures to address human factors associated with weather conditions that can be reasonably expected during your operations including, but not limited to, provision of proper attire and equipment, construction of protected work spaces, and management of shifts.
Hydrogen Sulfide
§ 250.490 Hydrogen sulfide.
(a) What precautions must I take when operating in an H
(1) Take all necessary and feasible precautions and measures to protect personnel from the toxic effects of H
(2) Follow your approved contingency plan.
(b) Definitions. Terms used in this section have the following meanings:
Facility means a vessel, a structure, or an artificial island used for drilling, well-completion, well-workover, and/or production operations.
H
(1) Drilling, logging, coring, testing, or producing operations have confirmed the absence of H
(2) Drilling in the surrounding areas and correlation of geological and seismic data with equivalent stratigraphic units have confirmed an absence of H
H
H
Well-control fluid means drilling mud and completion or workover fluid as appropriate to the particular operation being conducted.
(c) Classifying an area for the presence of H
(1) Request and obtain an approved classification for the area from the Regional Supervisor before you begin operations. Classifications are “H
(2) Submit your request with your application for permit to drill;
(3) Support your request with available information such as geologic and geophysical data and correlations, well logs, formation tests, cores and analysis of formation fluids; and
(4) Submit a request for reclassification of a zone when additional data indicate a different classification is needed.
(d) What do I do if conditions change? If you encounter H
(e) What are the requirements for conducting simultaneous operations? When conducting any combination of drilling, well-completion, well-workover, and production operations simultaneously, you must follow the requirements in the section applicable to each individual operation.
(f) Requirements for submitting an H
(1) Safety procedures and rules that you will follow concerning equipment, drills, and smoking;
(2) Training you provide for employees, contractors, and visitors;
(3) Job position and title of the person responsible for the overall safety of personnel;
(4) Other key positions, how these positions fit into your organization, and what the functions, duties, and responsibilities of those job positions are;
(5) Actions that you will take when the concentration of H
(6) Briefing areas where personnel will assemble during an H
(7) Criteria you will use to decide when to evacuate the facility and procedures you will use to safely evacuate all personnel from the facility by vessel, capsule, or lifeboat. If you use helicopters during H
(8) Procedures you will use to safely position all vessels attendant to the facility. Indicate where you will locate the vessels with respect to wind direction. Include the distance from the facility and what procedures you will use to safely relocate the vessels in an emergency;
(9) How you will provide protective-breathing equipment for all personnel, including contractors and visitors;
(10) The agencies and facilities you will notify in case of a release of H
(11) The medical personnel and facilities you will use if needed, their addresses, and telephone numbers;
(12) H
(i) All vessels, flare outlets, wellheads, and other equipment handling production containing H
(ii) Approximate maximum concentration of H
(iii) Location of all H
(13) Operational conditions when you expect to flare gas containing H
(14) Your assessment of the risks to personnel during flaring and what precautionary measures you will take;
(15) Primary and alternate methods to ignite the flare and procedures for sustaining ignition and monitoring the status of the flare (i.e., ignited or extinguished);
(16) Procedures to shut off the gas to the flare in the event the flare is extinguished;
(17) Portable or fixed sulphur dioxide (SO
(18) Increased monitoring and warning procedures you will take when the SO
(19) Personnel protection measures or evacuation procedures you will initiate when the SO
(20) Engineering controls to protect personnel from SO
(21) Any special equipment, procedures, or precautions you will use if you conduct any combination of drilling, well-completion, well-workover, and production operations simultaneously.
(g) Training program: (1) When and how often do employees need to be trained? All operators and contract personnel must complete an H
(i) Before beginning work at the facility; and
(ii) Each year, within 1 year after completion of the previous class.
(2) What training documentation do I need? For each individual working on the platform, either:
(i) You must have documentation of this training at the facility where the individual is employed; or
(ii) The employee must carry a training completion card.
(3) What training do I need to give to visitors and employees previously trained on another facility?
(i) Trained employees or contractors transferred from another facility must attend a supplemental briefing on your H
(ii) Visitors who will remain on your facility more than 24 hours must receive the training required for employees by paragraph (g)(4) of this section; and
(iii) Visitors who will depart before spending 24 hours on the facility are exempt from the training required for employees, but they must, upon arrival, complete a briefing that includes:
(A) Information on the location and use of an assigned respirator; practice in donning and adjusting the assigned respirator; information on the safe briefing areas, alarm system, and hazards of H
(B) Instructions on their responsibilities in the event of an H
(4) What training must I provide to all other employees? You must train all individuals on your facility on the:
(i) Hazards of H
(ii) Proper use of safety equipment which the employee may be required to use;
(iii) Location of protective breathing equipment, H
(iv) Restrictions and corrective measures concerning beards, spectacles, and contact lenses in conformance with ANSI Z88.2, American National Standard for Respiratory Protection (as specified in § 250.198);
(v) Basic first-aid procedures applicable to victims of H
(vi) Location of:
(A) The first-aid kit on the facility;
(B) Resuscitators; and
(C) Litter or other device on the facility.
(vii) Meaning of all warning signals.
(5) Do I need to post safety information? You must prominently post safety information on the facility and on vessels serving the facility (i.e., basic first-aid, escape routes, instructions for use of life boats, etc.).
(h) Drills. (1) When and how often do I need to conduct drills on H
(i) Conduct a drill for each person at the facility during normal duty hours at least once every 7-day period. The drills must consist of a dry-run performance of personnel activities related to assigned jobs.
(ii) At a safety meeting or other meetings of all personnel, discuss drill performance, new H
(2) What documentation do I need? You must keep records of attendance for:
(i) Drilling, well-completion, and well-workover operations at the facility until operations are completed; and
(ii) Production operations at the facility or at the nearest field office for 1 year.
(i) Visual and audible warning systems: (1) How must I install wind direction equipment? You must install wind-direction equipment in a location visible at all times to individuals on or in the immediate vicinity of the facility.
(2) When do I need to display operational danger signs, display flags, or activate visual or audible alarms?
(i) You must display warning signs at all times on facilities with wells capable of producing H
(ii) In addition to the signs, you must activate audible alarms and display flags or activate flashing red lights when atmospheric concentration of H
(3) What are the requirements for signs? Each sign must be a high-visibility yellow color with black lettering as follows:
Letter height | Wording |
---|---|
12 inches | Danger. |
Poisonous Gas. | |
Hydrogen Sulfide. | |
7 inches | Do not approach if red flag is flying. |
(Use appropriate wording at right) | Do not approach if red lights are flashing. |
(4) May I use existing signs? You may use existing signs containing the words “Danger-Hydrogen Sulfide-H
(5) What are the requirements for flashing lights or flags? You must activate a sufficient number of lights or hoist a sufficient number of flags to be visible to vessels and aircraft. Each light must be of sufficient intensity to be seen by approaching vessels or aircraft any time it is activated (day or night). Each flag must be red, rectangular, a minimum width of 3 feet, and a minimum height of 2 feet.
(6) What is an audible warning system? An audible warning system is a public address system or siren, horn, or other similar warning device with a unique sound used only for H
(7) Are there any other requirements for visual or audible warning devices? Yes, you must:
(i) Illuminate all signs and flags at night and under conditions of poor visibility; and
(ii) Use warning devices that are suitable for the electrical classification of the area.
(8) What actions must I take when the alarms are activated? When the warning devices are activated, the designated responsible persons must inform personnel of the level of danger and issue instructions on the initiation of appropriate protective measures.
(j) H
(i) Be capable of sensing a minimum of 10 ppm of H
(ii) Activate audible and visual alarms when the concentration of H
(2) Where must I have sensors for drilling, well-completion, and well-workover operations? You must locate sensors at the:
(i) Bell nipple;
(ii) Mud-return line receiver tank (possum belly);
(iii) Pipe-trip tank;
(iv) Shale shaker;
(v) Well-control fluid pit area;
(vi) Driller’s station;
(vii) Living quarters; and
(viii) All other areas where H
(3) Do I need mud sensors? The District Manager may require mud sensors in the possum belly in cases where the ambient air sensors in the mud-return system do not consistently detect the presence of H
(4) How often must I observe the sensors? During drilling, well-completion and well-workover operations, you must continuously observe the H
(i) When you pull a wet string of drill pipe or workover string;
(ii) When circulating bottoms-up after a drilling break;
(iii) During cementing operations;
(iv) During logging operations; and
(v) When circulating to condition mud or other well-control fluid.
(5) Where must I have sensors for production operations? On a platform where gas containing H
(i) You must have a sensor in rooms, buildings, deck areas, or low-laying deck areas not otherwise covered by paragraph (j)(2) of this section, where atmospheric concentrations of H
(ii) You must have a sensor in buildings where personnel have their living quarters;
(iii) You must have a sensor within 10 feet of each vessel, compressor, wellhead, manifold, or pump, which could release enough H
(iv) You may use one sensor to detect H
(v) You do not need to have sensors near wells that are shut in at the master valve and sealed closed;
(vi) When you determine where to place sensors, you must consider:
(A) The location of system fittings, flanges, valves, and other devices subject to leaks to the atmosphere; and
(B) Design factors, such as the type of decking and the location of fire walls; and
(vii) The District Manager may require additional sensors or other monitoring capabilities, if warranted by site specific conditions.
(6) How must I functionally test the H
(ii) If the results of any functional test are not within 2 ppm or 10 percent, whichever is greater, of the applied concentration, recalibrate the instrument.
(7) How often must I test my detectors? (i) When conducting drilling, drill stem testing, well-completion, or well-workover operations in areas classified as H
(ii) When conducting production operations, test all detectors at least every 14 days between tests.
(iii) If equipment requires calibration as a result of two consecutive functional tests, the District Manager may require that H
(8) What documentation must I keep? (i) You must maintain records of testing and calibrations (in the drilling or production operations report, as applicable) at the facility to show the present status and history of each device, including dates and details concerning:
(A) Installation;
(B) Removal;
(C) Inspection;
(D) Repairs;
(E) Adjustments; and
(F) Reinstallation.
(ii) Records must be available for inspection by BSEE personnel.
(9) What are the requirements for nearby vessels? If vessels are stationed overnight alongside facilities in areas of H
(10) What are the requirements for nearby facilities? The District Manager may require you to equip nearby facilities with portable or fixed H
(11) What must I do to protect against SO
(i) Monitor the SO
(ii) Take readings at least hourly and at any time personnel detect SO
(iii) Implement the personnel protective measures specified in the H
(iv) Calibrate devices every 3 months if you use fixed or portable electronic sensing devices to detect SO
(12) May I use alternative measures? You may follow alternative measures instead of those in paragraph (j)(11) of this section if you propose and the Regional Supervisor approves the alternative measures.
(13) What are the requirements for protective-breathing equipment? In an area classified as H
(i) Provide all personnel, including contractors and visitors on a facility, with immediate access to self-contained pressure-demand-type respirators with hoseline capability and breathing time of at least 15 minutes.
(ii) Design, select, use, and maintain respirators in conformance with ANSI Z88.2 (as specified in § 250.198).
(iii) Make available at least two voice-transmission devices, which can be used while wearing a respirator, for use by designated personnel.
(iv) Make spectacle kits available as needed.
(v) Store protective-breathing equipment in a location that is quickly and easily accessible to all personnel.
(vi) Label all breathing-air bottles as containing breathing-quality air for human use.
(vii) Ensure that vessels attendant to facilities carry appropriate protective-breathing equipment for each crew member. The District Manager may require additional protective-breathing equipment on certain vessels attendant to the facility.
(viii) During H
(ix) As appropriate to the particular operation(s), (production, drilling, well-completion or well-workover operations, or any combination of them), provide a system of breathing-air manifolds, hoses, and masks at the facility and the briefing areas. You must provide a cascade air-bottle system for the breathing-air manifolds to refill individual protective-breathing apparatus bottles. The cascade air-bottle system may be recharged by a high-pressure compressor suitable for providing breathing-quality air, provided the compressor suction is located in an uncontaminated atmosphere.
(k) Personnel safety equipment: (1) What additional personnel-safety equipment do I need? You must ensure that your facility has:
(i) Portable H
(ii) Retrieval ropes with safety harnesses to retrieve incapacitated personnel from contaminated areas;
(iii) Chalkboards and/or note pads for communication purposes located on the rig floor, shale-shaker area, the cement-pump rooms, well-bay areas, production processing equipment area, gas compressor area, and pipeline-pump area;
(iv) Bull horns and flashing lights; and
(v) At least three resuscitators on manned facilities, and a number equal to the personnel on board, not to exceed three, on normally unmanned facilities, complete with face masks, oxygen bottles, and spare oxygen bottles.
(2) What are the requirements for ventilation equipment? You must:
(i) Use only explosion-proof ventilation devices;
(ii) Install ventilation devices in areas where H
(iii) Provide movable ventilation devices in work areas. The movable ventilation devices must be multidirectional and capable of dispersing H
(3) What other personnel safety equipment do I need? You must have the following equipment readily available on each facility:
(i) A first-aid kit of appropriate size and content for the number of personnel on the facility; and
(ii) At least one litter or an equivalent device.
(l) Do I need to notify BSEE in the event of an H
(m) Do I need to use special drilling, completion and workover fluids or procedures? When working in an area classified as H
(1) You may use either water- or oil-base muds in accordance with § 250.300(b)(1).
(2) If you use water-base well-control fluids, and if ambient air sensors detect H
(3) If the concentration detected by air sensors in over 20 ppm, personnel conducting the tests must don protective-breathing equipment conforming to paragraph (j)(13) of this section.
(4) You must maintain on the facility sufficient quantities of additives for the control of H
(i) Scavengers. You must have scavengers for control of H
(ii) Control pH. You must add additives for the control of pH to water-base well-control fluids in sufficient quantities to maintain pH of at least 10.0.
(iii) Corrosion inhibitors. You must add additives to the well-control fluid system as needed for the control of corrosion.
(5) You must degas well-control fluids containing H
(n) What must I do in the event of a kick? In the event of a kick, you must use one of the following alternatives to dispose of the well-influx fluids giving consideration to personnel safety, possible environmental damage, and possible facility well-equipment damage:
(1) Contain the well-fluid influx by shutting in the well and pumping the fluids back into the formation.
(2) Control the kick by using appropriate well-control techniques to prevent formation fracturing in an open hole within the pressure limits of the well equipment (drill pipe, work string, casing, wellhead, BOP system, and related equipment). The disposal of H
(o) Well testing in a zone known to contain H
(1) Before starting a well test, conduct safety meetings for all personnel who will be on the facility during the test. At the meetings, emphasize the use of protective-breathing equipment, first-aid procedures, and the Contingency Plan. Only competent personnel who are trained and are knowledgeable of the hazardous effects of H
(2) Perform well testing with the minimum number of personnel in the immediate vicinity of the rig floor and with the appropriate test equipment to safely and adequately perform the test. During the test, you must continuously monitor H
(3) Not burn produced gases except through a flare which meets the requirements of paragraph (q)(6) of this section. Before flaring gas containing H
(4) Use downhole test tools and wellhead equipment suitable for H
(5) Use tubulars suitable for H
(6) Use surface test units and related equipment that is designed for H
(p) Metallurgical properties of equipment. When operating in a zone with H
(1) Use tubulars and other equipment, casing, tubing, drill pipe, couplings, flanges, and related equipment that is designed for H
(2) Use BOP system components, wellhead, pressure-control equipment, and related equipment exposed to H
(3) Use temporary downhole well-security devices such as retrievable packers and bridge plugs that are designed for H
(4) When producing in zones bearing H
(5) Keep the use of welding to a minimum during the installation or modification of a production facility. Welding must be done in a manner that ensures resistance to sulfide stress cracking.
(q) General requirements when operating in an H
(2) Logging operations. You must treat and condition well-control fluid in use for logging operations to minimize the effects of H
(3) Stripping operations. Personnel must monitor displaced well-control fluid returns and wear protective-breathing equipment in the working area when the atmospheric concentration of H
(4) Gas-cut well-control fluid or well kick from H
(5) Drill- and workover-string design and precautions. Drill- and workover-strings must be designed consistent with the anticipated depth, conditions of the hole, and reservoir environment to be encountered. You must minimize exposure of the drill- or workover-string to high stresses as much as practical and consistent with well conditions. Proper handling techniques must be taken to minimize notching and stress concentrations. Precautions must be taken to minimize stresses caused by doglegs, improper stiffness ratios, improper torque, whip, abrasive wear on tool joints, and joint imbalance.
(6) Flare system. The flare outlet must be of a diameter that allows easy nonrestricted flow of gas. You must locate flare line outlets on the downside of the facility and as far from the facility as is feasible, taking into account the prevailing wind directions, the wake effects caused by the facility and adjacent structure(s), and the height of all such facilities and structures. You must equip the flare outlet with an automatic ignition system including a pilot-light gas source or an equivalent system. You must have alternate methods for igniting the flare. You must pipe to the flare system used for H
(7) Corrosion mitigation. You must use effective means of monitoring and controlling corrosion caused by acid gases (H
(8) Wireline lubricators. Lubricators which may be exposed to fluids containing H
(9) Fuel and/or instrument gas. You must not use gas containing H
(10) Sensing lines and devices. Metals used for sensing line and safety-control devices which are necessarily exposed to H
(11) Elastomer seals. You must use H
(12) Water disposal. If you dispose of produced water by means other than subsurface injection, you must submit to the District Manager an analysis of the anticipated H
(13) Deck drains. You must equip open deck drains with traps or similar devices to prevent the escape of H
(14) Sealed voids. You must take precautions to eliminate sealed spaces in piping designs (e.g., slip-on flanges, reinforcing pads) which can be invaded by atomic hydrogen when H
Subpart E—Oil and Gas Well-Completion Operations
§ 250.500 General requirements.
Well-completion operations must be conducted in a manner to protect against harm or damage to life (including fish and other aquatic life), property, natural resources of the OCS, including any mineral deposits (in areas leased and not leased), the National security or defense, or the marine, coastal, or human environment. In addition to the requirements of this subpart, you must also follow the applicable requirements of subpart G of this part.
§ 250.501 Definition.
When used in this subpart, the following term shall have the meaning given below:
Well-completion operations means the work conducted to establish the production of a well after the production-casing string has been set, cemented, and pressure-tested.
§ 250.502 [Reserved]
§ 250.503 Emergency shutdown system.
When well-completion operations are conducted on a platform where there are other hydrocarbon-producing wells or other hydrocarbon flow, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller’s console or well-servicing unit operator’s work station.
§ 250.504 Hydrogen sulfide.
When a well-completion operation is conducted in zones known to contain hydrogen sulfide (H
§ 250.505 Subsea completions.
No subsea well completion shall be commenced until the lessee obtains written approval from the District Manager in accordance with § 250.513 of this part. That approval shall be based upon a case-by-case determination that the proposed equipment and procedures will adequately control the well and permit safe production operations.
§§ 250.506-250.508 [Reserved]
§ 250.509 Well-completion structures on fixed platforms.
Derricks, masts, substructures, and related equipment shall be selected, designed, installed, used, and maintained so as to be adequate for the potential loads and conditions of loading that may be encountered during the proposed operations. Prior to moving a well-completion rig or equipment onto a platform, the lessee shall determine the structural capability of the platform to safely support the equipment and proposed operations, taking into consideration the corrosion protection, age of platform, and previous stresses to the platform.
§ 250.510 Diesel engine air intakes.
Diesel engine air intakes must be equipped with a device to shut down the diesel engine in the event of runaway. Diesel engines that are continuously attended must be equipped with either remote operated manual or automatic-shutdown devices. Diesel engines that are not continuously attended must be equipped with automatic-shutdown devices.
§ 250.511 Traveling-block safety device.
All units being used for well-completion operations that have both a traveling block and a crown block must be equipped with a safety device that is designed to prevent the traveling block from striking the crown block. The device must be checked for proper operation weekly and after each drill-line slipping operation. The results of the operational check must be entered in the operations log.
§ 250.512 Field well-completion rules.
When geological and engineering information available in a field enables the District Manager to determine specific operating requirements, field well-completion rules may be established on the District Manager’s initiative or in response to a request from a lessee. Such rules may modify the specific requirements of this subpart. After field well-completion rules have been established, well-completion operations in the field shall be conducted in accordance with such rules and other requirements of this subpart. Field well-completion rules may be amended or canceled for cause at any time upon the initiative of the District Manager or upon the request of a lessee.